(navigation image)
Home American Libraries | Canadian Libraries | Universal Library | Community Texts | Project Gutenberg | Children's Library | Biodiversity Heritage Library | Additional Collections
Search: Advanced Search
Anonymous User (login or join us)
Upload
See other formats

Full text of "Annual report 1945"

of tl|0 

The Estate of the Late 
Wills Maclachlan, f 06 



NOTE 



The names recorded on the Frontispiece to this Annual 
Report as those of the staff of The Hydro- Electric Power 
Commission of Ontario who died on Active Service in the war 
of 1939 to 1945 have been compiled with painstaking care by 
the Commission. 

The names recorded as of the Municipal Hydro Utilities 
were secured by enquiry from the managers and superintendents 
of the Municipal Hydro or Public Utility Commissions served 
by The Hydro- Electric Power Commission. 

In neither group is it possible at the present time to be 
sure that every name has been recorded. The Commission would 
be grateful, therefore, to have any errors or omissions drawn 
to its attention. 



1— H.E. 



In memory of too 

EMPLOYEES .WHO 



ffi hydro 

DIED ON 



ACTIVE SERVICE'-- -1939-1945 

THE HYDRO-ELECTRIC POWER COMMISSION M THE HYDRO-ELECTRIC POWER COMMISSION 

OF ONTARIO WA OF ONTARIO 



Name 


Department 1$ 


Name 






Department 


ANDERSON, BRUCE B. . . 


Hydraulic f\ 


MOREAU, BRUCE Accounting 


BATE, JOHN R. . . . . . 


Operating 


NAISMITH, DOUGLAS 




Construction 


BISHEFF, GEORGE E. . . . 




NOBLE, NELSON A. . 
OAKLEY, W. HERBERT 




. Electrical 


BROWN, JOHN W. . . . 






Operating 
Municipal 


BROWN, LEONARD G. . . 




POOLE, ROBERT N. . 
POUND, J. RUSSELL . 






BUCKMASTER, JOHN ... 




. Electrical 


BUDNICK, NICHOLAS. . . 


Operating 


REYNOLDS, GEORGE G, 






. Electrical 


CARTER, RONALD R. . . . 




RIDDELL, CHARLES J. 






Operating 
. Electrical 


CHARBONNEAU, MILTON . 


Construction 


ROBERTSON, JOHN M. 






CLEMENTS, HERBERT C. . 


Municipal 


ROGERS, THOMAS A. 






Operating 


COGGER, WALTER L. . . . 


. Electrical 


SMITH, THOMAS T . 






Operating 


DWYER, WILLIAM S. . . . 


Operating 


WALKER, LeCLARE A. 






Operating 


EDWARDS, ALFRED R. . . 


Municipal 


WALL, FREDERICK V. 






Filing 


ELLIS, WILLIAM J 


. Research 


WATSON, WILLIAM J. C 






Municipal 


GREAR, HENRY W, . . . 


Production 


WILSON, JOHN W. . 




Construction 


HALL, REGINALD J. W. . . 


. Electrical 


WILSON, WILLIAM B. 




. Electrical 


HARDING, ANDREW C. . . 


Operating 


WOLCH, EDWARD B. . 




Construction 


HOLLINSWORTH, WILLIAM \S 


J . . Electrical 




HOSTETLER, CHARLES W. . 


Operating 


MUNICIPAL HYDRO UTILITIES 


JANNEY, WILLIAM H. . , 


Accounting 




KILSBY, ALBERT C . 


Operating 1 


Name Municipality 


KINGSHOTT, GERALD . . 


Construction 


LEE, EDGAR J Almonte 


KINNEAR, CALVIN . . . 


Construction 


SMITH, BASIL , . Delhi 


LaROSE, JOSEPH A. P. . . 


Operating 


PIRIE, JOHN Hamilton 


LENNOX, ALLEN J. ... 


Operating 


SHANTZ, DANIEL Kitchener 


LOVERING, MERVYN . . , 


Construction 


SMILLIE, WILLIAM E London 


MARTIN, T. RUSSELL . . 


Operating 


WILLIAMS, HIRAM Oakville 


McCAUSLAND, WILLIAM . 


Construction 


RAMSAY, BALFOUR Oakville 


McCONVEY, CARL J. . . . 




PAUL, A. B. GORDON . , . Port Arthur 


Mclaughlin, andrew 


Municipal 


WATKINSON, JAMES L Sudbury 


McMULLEN, DOUGLAS J. . 


Operating 


BALLANTYNE, ROSWELL A. . . Toronto 


McROBERTS, CLARE . . . 




McCURRY, ALEXANDER .... Toronto 


MESSING, EARL E. ... 


Operating 


STEANE, MAUD Toronto 


MILLER, JOHN A 


. Electrical 


SPARKS, G' N. BRYEN 






. Windsor 



.Q 













$ /THIRTY-EIGHTH ANNUAL REPORT 



OF 



THE HYDRO-ELECTRIC 
POWER COMMISSION 

OF ONTARIO 



FOR THE YEAR ENDED OCTOBER 31st 



1945 




ONTARIO 

PRINTED BY ORDER OF 
THE LEGISLATIVE ASSEMBLY OF ONTARIO 



TORONTO 

Printed and Published by T. E. Bowman, Printer to the King's Most Excellent Majesty 

1946 



THE HYDRO-ELECTRIC POWER COMMISSION 
OF ONTARIO 




T. H. Hogg, B.A.Sc, C.E., D.Eng Chairman 

Hon. George H. Challies, Phm.B., M.L.A. . .Commissioner 

W. Ross Strike, K.C Commissioner 

Osborne Mitchell Secretary 



LIBRARY 

727506 

UNIVERSITY OF TORONTO 



HEAD OFFICE 
620 UNIVERSITY AVENUE - TORONTO 2, ONTARIO 



CHAIRMAN'S LETTER OF TRANSMITTAL 



To His Honour 

The Honourable Albert Matthews, LL.D., 

Lieutenant-Governor of Ontario 

May It Please Your Honour: 

The undersigned respectfully presents the Thirty-eighth Annual Report 
of The Hydro-Electric Power Commission of Ontario for the fiscal year 
which ended October 31, 1945. 

The record of the Commission's work presented in this Annual Report 
relates to three principal fields — the co-operative municipal field, the field 
of rural supply, and the northern Ontario field. The first two cover the 
Commission's activities on behalf of the co-operative systems, and the last 
relates to its trusteeship of the Northern Ontario Properties on behalf of the 
Province. Throughout the various sections of the Report dealing broadly 
with physical operation of the plants, constructional activities and financial 
statements, these fields of activity are clearly differentiated. 

The Report also presents for the calendar year 1945 financial statements 
and statistical data relating to the municipal electric utilities operating in 
conjunction with the co-operative systems for the supply of electrical service 
throughout the Province. 

HYDRO IN 1945 

For the second time in its history Hydro has withstood -the test of war. 
Having successfully met the many and varied demands of Ontario's vast 
war production programme through nearly six years, Hydro turns to its 
peacetime tasks with assurance and vigour. 

LOAD CONDITIONS SINCE VE-DAY 

A remarkable feature of the Commission's operations during 1945 was 
that the demand for power following VE-Day, as measured in primary peak 
load of the Southern Ontario system, continued month by month to exceed 
the demand for the corresponding month of the previous year. 

[v] 



vi THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

The Southern Ontario system served most of the war loads. In certain 
large industries served by the Commission there has, of course, been some 
recession of load but this was more than made up by the general increase in 
demand of the municipalities. This, itself, is the result of many factors. 
The lifting of war restrictions, the return to standard time for the winter 
months, the ending of the need for rigid economy in the use of electricity in 
the home have, at least for the time being, more than offset the reduction 
in the demand for war industry. 

The main decreases in power use since the war have been in the large 
industries producing basic materials such as aluminum, magnesium, nickel 
products and abrasives. For much of this type of production little or no 
conversion problem is involved, but for a time at least the peacetime produc- 
tion will be much less than production for war, and may be temporarily affected 
also' by the existence of stocks accumulated during the closing period of the 
war. In the general industrial factories which were converted to war produc- 
tion excellent progress is being made in reconversion, mostly to their former 
line of activity. 

Nevertheless, it remains a fact that the total energy output handled 
by the Commission in 1945 was about 65 per cent greater than in the year 
1938, the last complete year before the war started. It will be recalled that 
the industrial output even early in 1939 was in part utilized for what was 
then called a defence programme but which in fact was preparation for war. 

OPERATING CONDITIONS 1944-45 

The 1944-45 winter season was entered with water storages in many 
areas below satisfactory levels. Consequently, a careful regulation in the 
use of storage water was maintained through to the spring run-off. The 
spring freshet, which began early due to an unusually warm period in March, 
1945, approximated normal expectancy and practically all storages were 
filled by the end of June. There was greater than average precipitation 
during the summer over most areas and storage water conditions at the 
beginning of the winter of 1945-46 were very satisfactory. 

Operating conditions on the whole were quite favourable throughout 
the year. Nearly 80,000 horsepower of generating capacity was added, 
about 60,000 in Northern Ontario and 19,000 in the Thunder Bay district, 
bringing the aggregate normal capacity of the Commission's generating 
stations up to 1,720,000 horsepower. All generating plants were operated 
to the maximum extent, units being removed from service only to perform 
absolutely essential maintenance work. Except at a few of the smaller 
generating stations where adverse ice conditions are a normal experience 
each winter, no special trouble from ice-runs was experienced. No major 
failure of equipment occurred until December 21, 1945 when the Commission 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



vn 



DISTRIBUTION OF POWER TO SYSTEMS 

PRIMARY POWER 

20-Minute Peak Horsepower— System Coincident Primary Peaks 



System 



1944 



1945 



October 



Southern Ontario system ... 

Thunder Bay system 

Northern Ontario Properties 

Total 

' outhern Ontario system 

fhunder Bay system 

Northern Ontario Properties 

Total 



1,981,428 
122,252 
192,075 



2,295,755 2,364,431 



2,027,361 
124,397 
212,673 



December 



2,044,416 
119,303 
220,936 



2,079,382 
127,078 



2,384,655 



2,410,805 



PRIMARY AND SECONDARY POWER 

20-Minute Peak Horsepower — System Coincident Peaks 



System 


1944 


1945 




October 


Southern Ontario system 


2,043,646 
127,212 
245,299 


2,177,763 


Thunder Bay system 


136,863 


Northern Ontario Properties 


285,247 






Total 


2,416,157 


2,599,873 








December 


Southern Ontario system 


2,084,275 
135,523 
273,611 


2,185,012 


Thunder Bav system 


140,483 


Northern Ontario Properties 


291,517 






Total . 


2,493,409 


2,617,012 



lost the output of the 70,000 horsepower, 25-cycle unit at the DeCew Falls 
extension generating station. Damage to this unit necessitated the rewinding 
of the generator which was returned to service early in February, 1946. 

Record Peak Loads 

The total peak output of power from all sources, throughout the fiscal 
year ended October 31, 1945, was higher than in any former year. The 
maximum output was 2,608,000 horsepower and exceeded the maximum 
output of the previous year by 6.7 per cent, or about 163,000 horsepower. 



viii THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

The output for primary power purposes also reached levels never before 
attained. The maximum primary peak demands, which usually occur during 
the fall and winter months, occurred in the spring of 1945, reaching 2,470,000 
horsepower. Compared with the maximum demand of the previous year this 
was an increase of 5.2 per cent or 122,000 horsepower. In all areas municipal 
and rural demands held well above the levels of the previous year but industrial 
demands receded somewhat following the ending of the war in Europe and in 
the Pacific. 

Energy Production Again Reaches Ail-Time High 

Total energy production from all sources was nearly 12,500,000,000 
kilowatt-hours. This was 3.7 per cent or approximately 450,000,000 kilowatt- 
hours greater than the production during the previous year. Energy output 
for primary power purposes rose 3 per cent from 10,787,000,000 kilowatt- 
hours in 1944 to 11,110,000,000 kilowatt-hours in 1945. 

Primary energy demands on all of the Commission's operating systems, 
Southern Ontario, Thunder Bay and the Northern Ontario Properties, were 
higher than the corresponding demands in the previous year. On the Southern 
Ontario system primary energy demands exceeded those of the previous 
year by 2 per cent, on the Thunder Bay system by 4.8 per cent and on the 
Northern Ontario Properties by 11.7 per cent. The increase on the Northern 
Ontario Properties however, was influenced by the taking over of the Northern 
Ontario Power Company's system in March, 1945; otherwise the primary 
demands of Northern Ontario would have shown a decrease of 3.0 per cent. 

FINANCIAL OPERATING RESULTS 

Revenues for the year ended October 31, 1945, were influenced by 
important changes in conditions. Relaxation of wartime power conservation 
restrictions which had been permitted at the close of the previous year 
stimulated total deliveries of power, especially in the earlier months of the 
year. With cessation of hostilities first in Europe and later in the Pacific 
area, utilization of power in special war industries was rather sharply curtailed, 
particularly in later months. The aggregate demands of consumers served 
through the co-operating municipalities, however, continued to advance 
throughout the year. Substantial reductions in interim rates were granted 
to a large number of municipalities as of January 1, 1945, affecting the 
Commission's revenues from this source to the extent in ten months of some 
$1,300,000. Increase in load from supply of power to rural power districts 
was large, and despite a further reduction in rates to consumers, there was a 
moderate increase in revenues from that source. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION ix 

The composite result of all factors was to produce revenues for the 
Southern Ontario system substantially unchanged in the aggregate from those 
of 1944. Costs for power, operation, maintenance and interest, were also very 
close to those of 1944. Even though the year's expenditures for maintenance 
cover a programme less extensive than is normally desirable, nevertheless the 
financial outcome of operations, with virtually stationary costs in conjunction 
with increased deliveries of power other than for war purposes, is to be 
regarded with satisfaction. 

On the Thunder Bay system, rates for power customers, mines and 
interim rates to municipalities were all reduced. Revenues on the whole, 
however, due to moderately increased aggregate load, held up well. With 
the new generating unit coming into operation only towards the end of the 
year, costs of operation and interest in the aggregate were not greatly changed 
from those of 1944. 

The Northern Ontario Properties' revenues reflect the sharp reduction 
in rates to mining customers that was put into effect January 1, 1945, together 
with a reduction in rates to municipalities. Curtailment of operations at 
many gold mines below the peace-time scale continued, and a substantial 
reduction in power demands for nickel production occurred towards the 
end of the year. Nevertheless, the exceptionally rapid rate of progress towards 
liquidation of capital liabilities that has characterized the Northern Ontario 
Properties in previous years was maintained, with only a small charge to 
surplus account. The acquisition of the undertaking of the Northern Ontario 
Power Company as at December 1, 1944, was a factor in making possible 
these favourable results. 

Assistance to Small Municipalities With Higher Wholesale Unit Costs 

During 1945, in accordance with the resolution adopted by the Ontario 
Municipal Electric Association in March, 1944, the Commission continued 
to limit to $39 per horsepower the wholesale cost of power to small cost con- 
tract municipalities whose cost in accordance with their contracts made prior 
to 1945 would have exceeded this maximum. It is now possible to assess the 
results of this municipal co-operative action. ,, 

With the guaranteed lowering of wholesale cost, the Commission was 
enabled immediately to authorize the municipal Hydro utilities to put into 
effect a downward price adjustment in *he rates to consumers which in 1944 
and again in 1945, led to increased use, larger revenues, and lower unit costs. 
Until the wholesale cost per horsepower was reduced it was not possible to 
establish a rate or price structure for retail service low enough 'to encourage 
increased use. ...no- 



x THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

When the scheme of reducing the wholesale cost to certain municipalities 
by means of a small levy per horsepower was put into effect in 1944, there 
were about 63 small municipalities whose wholesale cost of service in 1943 
had been more than $39 per horsepower. At the end of 1944 only 30 required 
assistance and at the end of 1945 for only 21 municipalities had the actual 
cost per horsepower to the Commission exceeded the $39 maximum. Due 
to the decreasing assistance required each year the original levy of 2 cents per 
horsepower made in 1944 was sufficient to take care of the requirements for 
1944 and 1945. 

The prevailing conditions of heavy loads and low unit costs to all munici- 
palities contributed to the results achieved and to the fact that they were 
obtained at so small a cost as to be scarcely noticeable in the general cost 
of power. 

Financial Progress of Municipal Electric Utilities 

The record of financial progress of the municipal electric utilities has 
some outstanding and indeed impressive features. The results as at December 
31, 1945 are especially informative. Under ordinary conditions substantial 
new capital expenditures for extensions of utilities would be made each year. 
This tends to obscure in financial statements the progress with respect to 
liquidation of liabilities incurred for earlier additions to plant. For several 
years up to and including 1945, however, wartime restrictions limited capital 
expenditures to a minimum, and the rapidity with which the Hydro utilities 
are achieving debt- free status is evident. 

The investment in plant by the 304 urban Hydro utilities exceeds one 
hundred million dollars. Because much of the plant has been financed by 
use of surplus and reserve funds, debenture issues to finance this capital 
investment have been made to the extent of only 55 per cent of the plant 
cost. Principal repayments on these debentures have equalled about 45 
per cent of plant cost and further specific provision of sinking funds for this 
purpose equals nearly 5 per cent of plant cost, so that the net amount of 
debenture debt still outstanding equals less than 6 per cent of plant cost. 

But the relation of plant investment to debentures is only part of the 
financial picture. As long as a utility is a going concern it is likely to have at 
the end of any year current assets and current liabilities. The liabilities of 
the 304 municipal utilities other than debentures are recorded as less than 
3 per cent of the plant cost, and their current assets of a quickly realizable 
nature are equal to 26 per cent of plant cost. Thus the excess of current assets 
over current liabilities is more than four times as great as the remaining 
balance of debenture debt over accumulated sinking funds. 

The figures cited are of course, simply a summation of 304 separate 
utilities. Considering them individually, 190 have actually paid off their 



1946 THE HYDRO-ELECTRIC POWER COMMISSION xi 

debenture liabilities completely, and 81 others have liquid assets sufficient 
to discharge their total liabilities. Even in the case of the remaining 33 
utilities, the excess of total liabilities over quickly realizable assets amounts 
to only 12 per cent of their investment in plant. 

CONSTRUCTION AND PLANNING 

The year 1945 was characterized by intern! ve planning rather than by 
active construction. However, as a result ol extensive studies certain major 
projects were authorized and in some cases work was started. 

In the Niagara division of the Southern Ontario system the construction 
of a second unit at DeCew Falls was commenced during the « .jmmer of 1945. 
Certain provisions were made for this work at the time of construction of 
Unit No. 1. The new unit with a capacity of 70,000 horsepower, under 280 
ft. head, will deliver its output to the Southern Ontario system. It is estimated 
that its construction will extend over a period of two years and that its cost 
will be about $7,700,000. 

To meet the immediate growth requirements in eastern Ontario, a 
54,000 horsepower development at Stewartville on the Madawaska river 
has been authorized and its construction commenced. The head to be 
developed at this site, which is about eight miles southwest of Arnprior, is 
150 feet. It is estimated to cost almost $9,000,000 and that it will become 
available for use during the fall of 1947. The new development, in head and 
in capacity, is similar to that completed during the war, at Barrett Chute 
higher up the same river, where 56,000 horsepower in two units is developed 
under a head of 154 feet. 

The third and most important hydro-electric development authorized 
by the Commission during 1945 and destined to increase the power resources 
of the Southern Ontario system, is that at the des Joachims site On the 
Ottawa river situated forty miles upstream from the town of Pembroke. 
The initial programme will comprise the installation of six units with a 
total capacity of 360,000 horsepower under a gross head of 135 feet, to be 
created by a dam across the river. Work will commence during 1946 and 
present plans call for its completion in 1949. Present estimate of cost for 
initial installation is $51,000,000. 

Associated with these new generating plants at Stewartville and des 
Joachims are important new transmission lines. From Stewartville to Oshawa 
a new 60-cycle transmission line will be constructed and will tie into Barrett 
Chute. This may cost in the neighbourhood of $3,000,000. To carry the 
power generated at des Joachims, transmission lines about 235 miles long 
will be required to deliver the power to distribution centres at Burlington and 
Islington. These transmission lines are estimated to cost $24,000,000. 



xii THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

The third transmission line of importance, authorized during 1945, is a 
60-cycle line from Oshawa west to Scarborough and thence northerly to 
Barrie. This line will provide an important 60-cycle tie between the Eastern 
Ontario and Georgian Bay divisions. 

At Scarborough a frequency-changer station with an initial unit of 
25,000 kva will connect up with the above 60-cycle tie line and be con- 
nected by a 25-cycle tie to Leaside transformer station. The 60-cycle tie 
line is scheduled for completion during the summer of 1946 and the frequency- 
changer station, with the line to Leaside, in the summer of 1947. 

Throughout southern Ontario the process of amalgamating and strength- 
ening the great transmission networks goes steadily on. The great metro- 
politan district of Toronto with its suburbs and satellite towns demands 
constant revision and additions to its transformer and transmission facilities. 
In the St. Thomas district, around Sarnia and Essex county, in the Cornwall 
area on the St. Lawrence river, in the Eugenia district, in connection with the 
recently acquired Caledon Electric Company, and elsewhere in the area 
served by the Southern Ontario system, changes and additions are in progress. 

Increased Power for Thunder Bay System 

To increase power supplies for the Thunder Bay system a fourth unit 
was placed in service at Alexander generating station on October 1, 1945. 
This installation produces an additional 19,000 horsepower. The site and 
transformers have been purchased for a 15,000 kva, step-down transformer 
station in Port Arthur. 

Careful consideration was given during the year to the sequence in which 
additional hydro-electric resources in the Thunder Bay district should be 
developed, having regard to the geographical distribution of the immediate 
known demands for additional supplies of Hydro power. 

It was finally decided to develop a site on the Aguasabon river about 
seventy miles east of the Alexander generating station on the Nipigon river, 
and in close proximity to a pulp and paper mill to be constructed near the 
mouth of the Aguasabon river. 

The hydro-electric development will have a capacity of 53,000 horsepower 
under a head of 300 feet and will cost about $8,500,000. A transmission line 
from Aguasabon to Alexander to tie in with the Thunder Bay system network 
is estimated to cost $1,500,000, and an additional circuit from Alexander to 
Fort William will be required costing approximately $2,000,000. 

Northern Ontario Activities 

In northern Ontario, the Commission commenced, in March 1945, 
operation of the generating stations and other properties acquired under a 



1946 THE HYDRO-ELECTRIC POWER COMMISSION xiii 

purchase agreement from the Northern Ontario Power Company, Ltd. These 
properties comprise eight hydro-electric plants with a total capacity of 60,000 
electrical horsepower, complete with transmission lines and distribution 
facilities. Included also in the purchase was a hydro-pneumatic station 
utilized for production of compressed air for distribution to mining customers 
in the neighbourhood of Cobalt. Five of the hydro-electric plants, with a 
capacity of 35,000 horsepower, are situated on the Matabitchuan and Montreal 
rivers in the Cobalt area. The remaining three are on the Mattagami river 
in the Timmins area. It is anticipated that the acquisition of these sources 
of energy will enable the Commission to extend rural service in the area and 
also reduce the cost of power to the mines. 

REDUCTIONS IN RATES AND REFUNDS TO CONSUMERS 

During 1945 the Commission recommended and approved an adjustment 
in rates for domestic, commercial and power consumers in urban municipalities 
receiving power from the Commission. These reductions involved 255 
municipal utilities, the consumers of which will benefit by an aggregate 
amount exceeding $3,300,000 per annum. 

The Commission also recommended and approved refunds to consumers 
in urban municipalities where the municipal Hydro surplus in the form of 
cash or bonds had accumulated during recent years in excess of the amounts 
estimated as required for plant construction, maintenance, etc., in the next 
few years. The total refunds to consumers amounted to more than $485,000. 

In addition the Commission adopted a uniform rate for most mining 
townsites served by the Northern Ontario Properties, the local distribution 
systems of which are owned and operated by the Commission. This will 
benefit the consumers by more than $19,000 per annum. 

The mines of northern Ontario continued to benefit by rate reductions 
announced last year, which came into operation on January 1, 1945. It is 
estimated that the total annual saving in power costs to the mines as a result 
of these rate reductions will exceed $500,000. 

Average Annual Consumption for Domestic Service 

The average use of electricity by domestic consumers has become a 
recognized criterion of the standard of living. A recent statement made 
by the Edison Electric Institute announces that a new milestone of 100 
kilowatt-hours per month average residential use of electricity has been 
reached in the United States. 

The attainment of this level of consumption, however, is an old story 
in Ontario. This average level was attained in the 250 urban utilities then 
supplied under cost contracts by The Hydro-Electric Power Commission, 



xiv THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

in the year 1926; in cities the 100 kilowatt-hour record was reached in 1925; 
in towns in 1929, and even in villages in 1937. But in Ontario, in the cities, 
average monthly consumption by domestic consumers has now passed the 
200 kilowatt-hour mark. It was reached in 1941. In 1944 the average 
monthly consumption per domestic consumer in the 300 urban communities 
now supplied was more than 190 kilowatt-hours. In 1944 two cities and 
one town had an average consumption per domestic consumer exceeding 
400 kilowatt-hours per month and no less than ten had an average consump- 
tion exceeding 250 kilowatt-hours per month. 

The average cost per kilowatt-hour is very largely a function of use. It 
is nevertheless noteworthy that the average cost per kilowatt-hour to domestic 
consumers in the 300 urban municipalities operating their own Hydro utilities 
is only 1.15 cents. 

RURAL ELECTRICAL SERVICE DURING WAR YEARS 

The extension of rural electrical service in Ontario was a casualty of the 
war. However, the effect of war restrictions on progress was greatly ameliorated 
by the fact that in the five years previous to the end of 1940 there had been 
unusual activity in this branch of Hydro service. In the five years, 1936 to 
1940, the Commission actually constructed 9,373 miles of rural primary line 
to supply a total of 55,000 consumers. This was an increase of 94 per cent 
in miles of line and 81 per cent in consumers. The relative increase in farm 
consumers was even greater; they more than doubled in this five year period. 
There can be little doubt that the progress made in rural electrification 
of farms, just prior to the war, had a beneficial effect upon food production 
in Ontario during the critical war years. 

In 1941 the Dominion Metals Controller placed restrictions on the use 
of non-ferrous metals, and from September 1941 to April 1944, no rural 
primary lines were constructed except a few short connections for war purposes, 
less than 100 miles in all. In March 1944, the Metals Controller eased the 
restrictions by permitting short extensions in urgent cases for war production, 
but shortage of materials, equipment and labour prevented full advantage 
being taken of this improvement. On June 1, 1945, restrictions governing 
use of non-ferrous metals were cancelled and the Commission was able to 
proceed with construction to the extent that both labour and materials 
were available. 

In 1944, therefore, 350 miles of primary line were completed and service 
was given to 8,050 new consumers. In 1945, 1,073 miles were constructed and 
there was a net increase in the consumers served of 11,442; of these however, 
9,600 were served by short extensions from existing lines. These figures 
are for the fiscal years ending October 31, 1944 and 1945. In addition, the 
Commission purchased the Caledon Electric Company properties which 
included 59 miles of rural primary line serving more than 900 consumers. 



1946 THE HYDRO ELECTRIC POWER COMMISSION xv 

The total mileage of lines constructed, or under construction, at the end 
of 1945 was 22,309 and after allowance for the usual adjustments, including 
transfer of some rural consumers to service from municipal utilities, the 
total rural consumers served or to be served number 159,608. 

Increased Rural Consumption 

Removal of power restrictions by the Dominion Power Controller on 
October 1, 1944, is reflected in the consumption of electricity by rural con- 
sumers. Notwithstanding a general decrease in power taken by certain war 
industries served by rural lines, the use of power in rural areas, stimulated 
by rate reductions, increased during the year by nearly 13 per cent. In 
August the power sold was approximately 132,600 horsepower, the highest 
load ever recorded in rural areas. 

Rural Rate Reductions 

The effect of the general rate reduction incorporated in the new uniform 
rural rate structure was so satisfactory that the Commission, after detailed 
study, considered it would be advantageous to make further reductions. 
The two reductions made are as follows: 

(a) The first block rate of 4 cents per kilowatt-hour was reduced to 3.5 
cents per kilowatt-hour for all rural consumers. This reduction 
came into effect on May 1, 1945. It reduced the amount that 
consumers would pay by approximately $300,000 per annum; 

(b) Power rates to industrial power consumers in rural districts have 
been reduced in all areas where it was practicable to do so. This 
reduction came into effect on January 1, 1946 and will benefit power 
consumers by approximately $47,000 per annum. 

Extensions and Increased Capacity 

On October 31, 1945, there were on hand enough applications for rural 
service to warrant the construction of 5,630 miles of new primary line. Con- 
struction plans call for the erection in 1946 of about 2,000 miles, providing 
materials and equipment can be obtained. 

There is, however, another limiting feature to the programme of exten- 
sions. During the war, even after certain restrictions had been eased, material 
was so short that in the interest of food production it was used for extensions 
rather than for improvements to service. Meantime, the load on all rural 
lines steadily increased and on many existing lines capacity became insufficient 
to supply satisfactory service. It is now imperative in many districts to 
increase the capacity of certain lines before satisfactory service can be given 
by means of further extensions. 



xvi THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

RESEARCH AND TESTING 

When victory was achieved in 1945 approximately one-third of the 
Commission's Laboratories' staff was engaged on work for the Dominion 
government having to do directly or indirectly with the war. This work 
covered a wide field, including besides research work, testing of electrical 
coils, testing of waxes, adhesives, packings, insulants and many other items. 

With the ending of hostilities these activities ceased and the staff thus 
made available was transferred to the many pressing research problems of 
the Commission, deferred during the war years. Work was expanded in the 
fields of grounding, insulation, electronics, stress analysis and the treatment 
of wood poles, to mention some of the more important. 

The Commission's post-war programme has also been responsible for 
much new work. Field surveys for the purpose of locating suitable sources 
of concrete aggregate have been carried out in several places where major 
construction projects are planned. Existing structures have been inspected 
and tested to obtain data on service behaviour as a guide to future design and 
construction. New materials and methods developed during the war are 
being studied to determine whether they can be usefully applied in the 
Commission's work. 

The Hydro undertaking of Ontario is greatly benefited by the efforts 
of engineers and scientists everywhere who contribute to the world's scientific 
knowledge. The scientific staff of the Commission recognizes its obligation 
to add something to this knowledge and the Commission encourages its staff 
to participate actively in the work of scientific societies, standardizing 
organizations and other bodies by the presentation of papers, the contribution 
of scientific data and the preparation of standard specifications. 

EFFICIENT USE-ADEQUATE WIRING— BETTER LIGHTING 

The staff of the Commission formerly engaged in promotional activities 
continued to encourage the most efficient use of electricity by all classes 
of consumers. Guidance was given to many industrial consumers in efficient 
power application, and lighting plans were supplied for schools, factories, 
public buildings, stores, offices and streets. Information was made available 
calling attention to the varied operations and war work of the Commission 
and urging consumers to plan their power needs well in advance. 

In the rural field, activities generally were of an educational nature. 
Farmers were asked to plan for adequate wiring of their farm premises. 
Booklets were distributed to aid farmers to operate more efficiently their 
existing electrical equipment. Efficient methods of homemaking with Hydro 
were explained to domestic consumers. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION xvii 

Hydro motion pictures were shown to more than 500 audiences through- 
out the Province, comprising service clubs, schools and other organizations, 
with an aggregate attendance of approximately 100,000. A new educational 
motion picture was produced, entitled "More Power to the Farmer." This 
film stresses the need for safe, adequate wiring. 

THE COMMISSION AND ITS EMPLOYEES 

Some 1,200 employees of the Commission joined the services. Of these 
350 have already returned to Hydro work and about 75 others are taking 
educational courses or have taken other positions. All former employees who 
enlisted from the Commission's service are being reinstated if they so desire. 
In many cases it has been found possible to re-employ them in better positions. 
Former employees who might benefit by taking courses sponsored by the 
Training Division of the Department of Veterans' Affairs are encouraged to 
do so and positions are held for them for a period of one year after discharge. 

In the expanding construction programme of the Commission preference 
is given to veterans and during the past year the Commission has employed 
some 400 ex-servicemen who were not in the Commission's employ prior to 
enlistment. / 

Linemen's Training School 

The Commission, in cooperation with the Ontario Municipal Electric 
Association, is operating a school to train linemen. It is estimated that the 
Commission and the municipalities will need in the next two years some 
300 linemen for post-war construction work. The men selected are veterans 
and after two or three months' introductory practical work are given three 
months' training — two months' theoretical work in the school and one month's 
practical work in the field. The school is situated on the outskirts of Toronto 
and the men live in camp and are paid while taking training. The results to 
date are very promising. 

Resuscitation Training 

For almost thirty years training in artificial respiration has been carried 
on among the employees of the Commission and field employees are required 
to practice by approved methods at least once a month. During the past 
year three Canadian Electrical Association resuscitation medals and one 
President's medal of the National Safety Council have been awarded to 
groups of employees for the successful resuscitation from electrical shock of 
three fellow employees. In one case a member of the public was saved from 
drowning by artifcial respiration. 

The hazard of electric shock is ever present in an electric public utility 
and for this reason training and practice in manual artificial respiration have 
been closely followed with excellent results. 



xviii THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



CAPITAL INVESTMENT AND RESERVES 
Capital Investment 

The total capital investment of The Hydro-Electric Power Commission 
of Ontario in power undertakings is $375,361,480.44 exclusive of government 
grants in respect of construction of rural power districts' lines ($22,022,423.79) 
and the investment of the municipalities in distributing systems and other 
assets is $146,282,082.81, making in power undertakings a total investment 
of $521,643,563.25. 

The following statement shows the capital invested in the respective 
systems, properties and municipal undertakings, etc: 

Southern Ontario system (including Hamilton street railway) $292,256,223.30 

Thunder Bay system 21,329,829. 55 

Office and service buildings 3,749,526. 15 

Construction plant and inventories 3,976,820. 69 

Total capital investments in co-operative systems $321,312,399.69 

Northern Ontario Properties — Operated by H-E.P.C. on behalf of the Province 

of Ontario 53,653,771.79 

Northern Ontario Properties — Construction plant and inventories 395,308.96 

Total Commission capital investments 375,361,480. 44 

Municipalities' distribution systems 106,346,101 . 06 

Other assets of municipal Hydro utilities 39,935,981 . 75 

Total $521,643,563.25 



Reserves of Commission and Municipal Electrical Utilities 

The total reserves of the Commission and the municipal electrical util- 
ities for depreciation, contingencies, stabilization of rates, sinking fund and 
insurance purposes, amount to $382,287,778.39, made up as follows: 

Southern Ontario system (including Hamilton street railway) $202,650,549.68 

Thunder Bay system 13,774,141 . 71 

Office and service buildings and equipment 1,675,607. 48 

Total reserves in respect of co-operative systems' properties $218,100,298.87 

Northern Ontario Properties 21,704,191.77 

Fire insurance reserve 153,819. 50 

Miscellaneous reserves 562,685. 75 

Employers' liability insurance, and staff pension reserves 11,762,476.98 

Total reserves of the Commission $252,283,472.87 

1 otal reserves and surplus of municipal electric utilities 130,004,305.52 

Total Commission and municipal reserves $382,287,778.39 



1946 THE HYDRO-ELECTRIC POWER COMMISSION x;x 



REVENUE OF COMMISSION 

The revenue of the Commission at interim rates from the municipal 
utilities operating under cost contracts, from customers in rural power 
districts and from other customers with whom — on behalf of the municipalities 
—the Commission has special contracts, all within the Southern Ontario 
and Thunder Bay systems, aggregated $51,385,412.45. The revenue of the 
Commission from customers served by the Northern Ontario Properties, 
which are held and operated in trust for the Province, was $6,154,893.74, 
making a total (excluding $233,941.70 of Northern Ontario Properties 
revenue transferred to Thunder Bay system in respect of power supplied) 
of $57,306,364.49. 

Summarized operating results of these co-operative systems and rural 
power districts and of the Northern Ontario Properties, follow: 



Summarized Operating Results 

SOUTHERN ONTARIO SYSTEM— THUNDER BAY SYSTEM 
RURAL POWER DISTRICTS 

Revenue: amount received from or billed against municipalities 

and other customers $45,452,959. 77 

Revenue from customers in rural power districts (retail) 5,932,452 . 68 



Total revenue, systems and rural $51,385,412. 45 

Operation, maintenance, administration, interest and other 

current expenses $32,101,138. 25 

Provision for reserves — 

Renewals $2,757,325. 25 

Contingencies and obsolescence 11,207,302. 28 

Stabilization of rates (48,619. 76) 

Sinking fund 3,193,387.70 

17,109,395.47 

49,210,533.72 



Balance : $2,174,878. 73 



NORTHERN ONTARIO PROPERTIES 

Held and operated by The Hydro-Electric Power Commission of Ontario 
In trust for the Province of Ontario 

Revenue: amount received from or billed against municipalities 

and other customers $6,154,893. 74 

Operation, maintenance, administration, interest and other 

current expenses $3,942,037. 26 

Provision for reserves — 

Renewals $ 455,409. 98 

Contingencies and obsolescence 480,161 . 45 

Sinking fund 1,496,103. 48 

2,431,674.91 

6,373,712 . 17 

Balance $218,818. 43 



XX 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



COMPARATIVE FINANCIAL STATEMENTS 1944-1945 
Cooperative Systems of the Commission 

SOUTHERN ONTARIO SYSTEM 
Embracing Niagara, Georgian Bay and Eastern Ontario divisions 



1944 



1945 



Operating Expenses and Fixed Charges 

Power purchased 

Operation, maintenance and administration 

Interest 

Provision for renewals 

Provision for contingencies and obsolescence 

Sinking fund 

TOTAL COST OF POWER 

REVENUE from municipalities at interim rates, from rural 
consumers and from private customers under contract rates 



$ c. 

10,807,512.45 
7,954,180.27 

11,654,752.45 
2,573,497.34 
9,430,542.93 
2,991,625.22 



$ 



c. 



10,832,402.63 
8,212,118.86 

11,696,222.61 
2,590,685.26 

10,640,505.26 
2.993,496.03 



45,412,110.66 



48,892,351.62 



46,965,430.65 
49,083,310.70 



Net balance credited to municipalities under cost contracts 



3,480,240.96 



2,117,880.05 



THUNDER BAY SYSTEM 





1944 


1945 


Operating Expenses and Fixed Charges 

Operation, maintenance and administration 


$ c. 

405,465.42 
926,937.27 
165,103.09 
548,381.71 
33,793.90 
198,242.32 


$ c. 
493,229.05 


Interest 


867,165.10 


Provision for renewals 


166,639.99 


Provision for contingencies and obsolescence 


566,797.02 


Provision for stabilization of rates 


(48,619.76) 


Sinking fund 


199,891.67 






TOTAL COST OF POWER. . . 


2,277,923.71 
2,364,893.89 


2,245,103.07 


REVENUE from municipalities at interim rates, from rural 
consumers and from private customers under contract rates 


2,302,101.75 


Net balance credited to municipalities under cost contracts .... 


86,970. 18 


56,998.68 



1946 THE HYDRO-ELECTRIC POWER COMMISSION xxi 

MUNICIPAL ELECTRIC UTILITIES 

The following is a summary of the year's operation of the local electric 
utilities conducted by municipalities receiving power under cost contracts 
with the Commission: 

Total revenue collected by the municipal electric utilities $43,702,261 . 90 

Cost of power $26,149,578.07 

Operation, maintenance and administration 7,309,690.52 

Interest 703,359.39 

Sinking fund and principal payments on debentures 1,226,578.43 

Depreciation and other reserves . . 3,886,947.26 

Total 39,276,153.67 

Surplus $ 4,426,108.23 



With regard to the local Hydro utilities operating under cost contracts, 
the following statements summarize for each of the co-operative systems 
administered by the Commission, the financial status and the year's oper- 
ations as detailed in Section X of the Report. 

Southern Ontario System 

The total plant assets of the Southern Ontario system utilities amount 
to $101,855,073.37. The total assets, including an equity in the H-E.P.C. 
of $71,015,455.54 aggregate $211,029,500.92. The reserves and surplus 
accumulated in connection with the local utilities, exclusive of the equity in 
the H-E.P.C, amount to $124,368,748.80, an increase of $9,157,642.70 
during the year 1945. The percentage of net debt to total assets is 6.9, a 
reduction of 0.4 per cent. 

The total revenue of the municipal electric utilities served by this 
system was $42,518,703.28, an increase of $865,285.97 as compared with 
the previous year. After meeting all expenses in respect of operation, 
including interest, setting up depreciation and other reserves amounting 
to $3,826,193.11 and providing $1,221,323.59 for the retirement of instal- 
ment and sinking fund debentures, the total net surplus for the year for the 
municipal electric utilities served by the Southern Ontario system amounted 
to $4,262,101.59, as compared with $3,729,360.56 the previous year. 

Thunder Bay System 

The total plant assets of the Thunder Bay system utilities amount to 
$2,832,850.28. The total assets, including an equity in the H-E.P.C. of 
$3,986,895.84, aggregate $8,180,939.77. The reserves and surplus accumu- 
lated in connection with the local utilities, exclusive of the equity in 
H-E.P.C, amount to $3,818,209.26 an increase of $104,455.75 during the 
year 1945. The percentage of net debt to total assets is 6.1, a reduction of 
0.1 per cent. 

The total revenue of the municipal electric utilities served by this 
system was $1,183,558.62, an increase of $1,741.61 as compared with the 
previous year. After meeting all expenses in respect of operation, including 
interest, setting up depreciation and other reserves amounting to $60,754.15 
and providing $5,254.84 for the retirement of instalment and sinking fund 
debentures, the total net surplus for the year for the municipal electric 
utilities served by the Thunder Bay system amounted to $164,006.64, as 
compared with a net surplus of $172,198.32 for the previous year. 



xxii THIRTY-EIGHTH ANNUAL REPORT OF No. 26 







HYDRO POWER LOADS 
THROUGH THE WAR YEARS 






PRIMARY PEAK LOADS ALL SYSTEMS 


HORSEPOWER 


KILOWATTS 

-2.000.000 
-1.500.000 
-1.000.000 
- 500.000 


O.UUU.UUU 

2,500.000 
2,000.000 
1.500.000 
1.000.000 
500.000 








































1945 










1944 








7942 














1940 






















J938 


































































JAN. FEB. MAR. APR. MAY JUNE JULY AUG SEPT. OCT NOV. DEC. 



1946 THE 'HYDRO-ELECTRIC POWER COMMISSION xxiii 



HYDRO MOVES FORWARD 

In closing this review of the year which brought final victory, it is 
satisfactory to recall that during the whole period of the war no war industry 
in Ontario lacked sufficient power for its needs and no major breakdown 
curtailed essential production. 

The Commission entered the war with adequate reserves of power and 
with future deliveries planned for normal growth several years ahead. The 
tremendous expansion in munitions of war which accompanied the adverse 
war trend of the early years quickly absorbed all Hydro power reserves. As 
the war progressed the Commission, by construction and purchase, augmented 
its power supplies to keep pace with demand, trying always to limit new 
construction to a minimum in conformity with the national policy of husband- 
ing the limited supplies of men and materials. 

With victory achieved the Commission turns with confidence from the 
problems of war to the problems of peace. 

Within the orbit of the municipal environment, where Hydro service is 
chiefly utilized, much may be done to steady and guide the movements that 
are at present causing difficulties as the people of all nations restlessly strive 
for security and stability. Those associated with Hydro utility administration 
can accomplish much by grasping the opportunities for service, by making 
improvements in urban and farm homes, by friendly helpfulness in business 
and industry, and particularly by active participation in all worthwhile plans 
for the betterment of Ontario communities. 

In all these things Hydro stands ready to lend a helping hand by providing 
at very low cost the electrical service which is a basic essential of all modern 
wealth producing activity, and the ingredient which by well directed work 
in factory and mine, forest and farm will help bring to Canada an era of 
peace and prosperity. Let us then move forward with Hydro. 



Respectfully submitted, 

T. H. Hogg, 

Chairman 



xxiv THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



Toronto, Ontario, March 31, 1946. 

T. H. Hogg, Esq., B.A.Sc, C.E., D.Eng., 

Chairman, The Hydro-Electric Power Commission of Ontario, 

Toronto, Ontario. 
Sir: 

I have the honour to submit, herewith, the Thirty-eighth Annual Re- 
port of The Hydro-Electric Power Commission of Ontario for the fiscal year 
which ended October 31, 1945. This report covers the operations of the 
Commission with regard to the supply of power to, or on behalf of, the part- 
ner Municipalities of the Co-operative Systems, as well as the administration 
of the Northern Ontario Properties, which are held and operated by the 
Commission in trust for the Province of Ontario. 

I have the honour to be, Sir, 

Your obedient servant, 

Osborne Mitchell, 

Secretary. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION xxv 




HYDRO ON THE FARM — Above: A farm workshop. 
Below: Safety and security around the farm buildings 



XXVI 



THIRTY-EIGHTH ANNUAL REPORT T OF 



No. 26 




Alexander Power Develop- 
ment — Nipigon river 

Left: 

Logchute discharging 
pulpwood 

Below: 
Flash boards on dam 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



XXVll 



At Right: Suspended 
220,000 -volt lightning 
arresters. Toronto - Lea- 
side transformer station. 



Below: Essex condenser 
station showing two 
transformers and bus 
structure; starting auto- 
transformer; switching 
building and at right 
background, 40,000 kva 
synchronous condenser 
building 




gK» 



Mm 
5€M 



. . 






A 




XXV111 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 




s 

A 
L 
V 
A 
G 
E 



*•»" 



When, in 1944, shortage of lumber became acute, discarded poles were converted 
into usable lumber. During 1945 nearly eight hundred old poles were collected from 
districts near Hamilton and sawn into lumber and square timber, chiefly used for 
crating and for permanent cribs and booms in DeCew Falls forebay. Other saw 
logs of pine and oak were obtained from transmission line operations 




1946 THE HYDRO ELECTRIC POWER COMMISSION xxix 



MORE POWER FOR THE THUNDER BAY DISTRICT — The fourth unit adds 
19,000 horsepower to the Alexander generating station making total capacity 73,000 

horsepower 



XXX 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



i 

1 



* 


\ '""JMtt 






i 




■01::.?. "''flypMBJMPi 


■Al 






i r: 


" _J— 


mfft 


:.■.■■• . 


'" "' ' .... v 


5^5^iia 


"""" /" 1| 


._- 


^^^^^g^ 












% 








9HBR9H 



NEW INDUSTRIES FOR ONTARIO — Above: Nylon plant of 

Canadian Industries Limited. Below: Tube drawing plant of 

Aluminum Company of Canada — both at Kingston, Ontario 




1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



XXXI 




MORE POWER FOR THE FARMERS OF ONTARIO — Training 

at the school for linemen. Above: Instruction in pole climbing 

technique. Below: Knots and splices explained 




XXX11 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 






■i?\ 




A Hydro substation in keeping with its residential environment. 
Strouds Lane, Hamilton 




GOOD HOUSEKEEPING — Clean floors and well kept powerhouses 
contribute to efficient operation and safety. Big Eddy generating 

station 



1946 THE HYDRO-ELECTRIC POWER COMMISSION xxxiii 



CONTENTS 

Section page 

Foreword and Guide to the Report _______--- i 

I. Legal ________________ n 

Right-of-way and Property ----------- 13 

II. Operation of the Systems: 

General ----------------15 

Total Power Generated and Purchased (Table) ------ 16 

Southern Ontario system ------------18 

Thunder Bay System ------------- 28 

Northern Ontario Properties -----------30 

III. Municipal Work: 

General _________-__--- 36 

Southern Ontario system ------------42 

Thunder Bay system ____________ 49 

Northern Ontario Properties -----------50 

IV. Rural Electrical Service ----------- 51 

New Uniform Rural Rate Structure ---------55 

V. Promotional and Publicity Services --------- 73 

VI Hydraulic Engineering and Construction: 

General ----------------76 

Southern Ontario system ----------- 76 

Thunder Bay system -------------79 

Northern Ontario Properties __-_-_---- 82 

VII. Electrical Engineering and Construction: 

General ----------------84 

Southern Ontario system ___■____-____ 88 

Thunder Bay system -------------92 

Northern Ontario Properties ---------- 92 

Tabulation of Transformer Changes ---------93 

Total Mileage Transmission Lines (Table) ------- 95 

Transmission Line Changes and Additions --------96 

Communications— All Systems _____-_-_- 97 

Distribution Lines and Systems in Rural Power Districts - 98 

2— H.E. 



xxxiv THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

SECTION PAGE 

VIII. Research, Testing, Inspection, Production and Service - 99 

Electrical Inspection ------------ 109 

IX. Financial Statements Relating to Properties Operated by the Commission: 
Explanatory Statement - - - - - - - - - - - -111 

Co-operative Systems and Properties: 
Balance sheet --------- - - - - - 118 

Statement of operations ------ ------120 

Schedules supporting the balance sheet --------122 

Statements for Municipalities Receiving Power under Cost Contracts: 
Southern Ontario system, embracing the Niagara, Georgian Bay and 
Eastern Ontario divisions ----------- 138 

Thunder Bay system ___-__--___- 176 

Northern Ontario Properties: 
Balance Sheet --______-___-- 18O 

Operating account ------------- 182 

Schedules supporting the balance sheet -------- ij$4 

The Hamilton Street Railway Company --------189 

X. Municipal Accounts and Statistical Data: 

Explanatory statement ------------193 

Consolidated balance sheet ----------- 196 

Consolidated operating report ---------- 198 

Statement A— Balance sheets ---------- 200 

Statement B — Detailed operating reports --------254 

Statement C — Respecting street lights -------- 308 

Statement D — Comparative revenue, consumption, number of con- 
sumers, AVERAGE MONTHLY BILL, NET COST PER KILOWATT-HOUR, ETC. - - 310 

Statement E — Cost of power to municipalities and rates to consumers 

FOR DOMESTIC, COMMERCIAL LIGHTING AND POWER SERVICE - 328 

Appendix I — Generating Stations — Northern Ontario Properties - - - - - 347 
Index- --------------- ---355 



1946 THE HYDRO-ELECTRIC POWER COMMISSION xxxv 



ILLUSTRATIONS 

PAGE 

In Memory of Those Who Died on Active Service, 1939-1945 - - Frontispiece 

Hydro on the Farm: 

Farm workshop --------------- xxv 

Outside lighting of farm buildings ----------- xxv 

Alexander Power Development — Nipigon River: 

logchute discharging pulpwqod __-_--_---_ xxvi 
Flash boards on dam ________-_---- X xyi 

Equipment at Transformer Stations: 

Lightning arresters, Toronto-Leaside transformer station - xxvii 

Essex condenser station, two transformers and bus structure, etc. - - xxvii 

Salvage of Discarded Poles: 

Old poles collected near Hamilton ____-_-_-- xxviii 
Saw logs of pine and oak ___--_--__-- xxviii 

Alexander Generating Station— Interior with Fourth Unit - xxix 

New Industries for Ontario: 

Nylon plant of Canadian Industries Limited --------- x xx 

Tube drawing plant of Aluminum Company of Canada - - - - - - xxx 

Training School for Linemen: 

Instruction in pole climbing technique ---------- xxxi 

Knots and splices explained ------------ xxxi 

Hydro Substation in Residential District -__---_-_ X xxii 

Big Eddy Generating Station — Interior ---------- xxxii 

Rural Electrical Service: 

Modern chopper installed in barn on Ontario farm -------62 

Milk cooling by refrigeration ___________ 63 

Electric clippers contribute to comfort and appearance of animals - 64 

Electric pig brooder protects young pigs and keeps them warm - 65 

Electric brooders remove uncertainties from turkey raising ----- 67 

Typical Hydro Advertising _____________ 74 

Hydraulic Engineering: 

Niagara river remedial weir ____________ 77 

stewartville power development — site of dam -------- 79 

Falls at the mouth of the aguasabon river ---------80 

Sandy Falls generating station — interior - - - - . - - - - - 83 

Electrical Engineering: 

Wood-pole transmission line, 110,000- volt, supplying war plant - - - - 85 

War-time line construction in the winter --------- 87 

An enemy of wood poles — pine borer ---------- 97 

The Laboratories: 

High- voltage testing of insulated wire and cable -------101 

Developments in domestic water-heating equipment ------- 102 

New water-heater element ------------ 103 

Locating cracks in concrete ------------- 105 

Universal testing machine --___-______ 107 

Recently Acquired Hydro Plants in Northern Ontario: 

Views of eight generating stations ----------- 346 



xxxvi THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



DIAGRAMS 

PAGE 

Hydro Power Loads through the War Years --------- xxiii 

Thirty Years Record — Capital investment and reserves, all systems - 3 

Thirty Years Record — Provincial advances and funded debt ------ 5 

Thirty Years Record — Power resources and loads, Southern Ontario system - 7 
Thirty Years Record — Assets and liabilities of "Hydro" utilities - - - - 8 

Thirty Years Record — Revenues of "Hydro" utilities ____--_9 

All Systems Combineef-Peak loads, 1930 to 1945 --------- 18 

Southern Ontario System — Peak loads, 1910 to 1945 _______ 19 

Thunder Bay System— Peak loads, 1920 to 1945 --------- 29 

Northern Ontario Properties: 

Abitibi District— Peak loads, 1931 to 1945 --------- 30 

Sudbury District— Peak loads, 1930 to 1945 ---------32 

Nipissing District— Peak Loads, 1920 to 1945 -------- 33 

Patricia District— Peak loads, 1930 to 1945 ---------34 

Domestic Service— Increased Use Brings Lower Unit Cost ------ 38 

Commercial Light Service— Low Unit Cost Promoted by Increased Use - 39 

Rural Power Districts: 

Mileage of primary lines approved, 1921 to 1945 ___-_-- 52 
Aggregate peak loads, 1921 to 1945 -----------53 

Taylor Hydraulic Air Compressor ------------ 81 

Cost of Electrical Service in Municipalities served by The Hydro-Electric 

Power Commission ---------------311 



MAPS 

Transmission Lines and Stations of the Southern Ontario System At end of volume 

Transmission Lines and Stations of the Northern Ontario Properties At end of volume 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 1 

THIRTY-EIGHTH ANNUAL REPORT 
* OF 

The Hydro-Electric Power Commission 

of Ontario 



FOREWORD 

and 

Guide to the Report 

'T^HE Hydro-Electric Power Commission of Ontario administers a co- 
-■- operative municipal-ownership enterprise, supplying power throughout 
the Province of Ontario. The Commission was created in 1906 by special 
act of the Legislature and followed investigations by advisory commissions 
appointed as a result of public agitation to conserve the water powers of 
Ontario as a valuable asset of the people and to provide a more satisfactory 
supply of low-cost power in southern Ontario. In 1907 the Power Com- 
mission Act (7-Edward VII Ch. 19) was passed amplifying and extending 
the Act of 1906, and this Act — modified by numerous amending acts which 
now form part of the Revised Statutes of Ontario, 1937, Chap. 62, and 
subsequent amending Acts — constitutes the authority under which the Com- 
mission operates. 

The Hydro-Electric Power Commission of Ontario consists of a Chairman 
and two Commissioners, all of whom are appointed by the Lieutenant- 
Governor-in-Council to hold office during pleasure. One of the Commissioners 
must be a member of the Executive Council and two may be members. 

In 1909, work was commenced on a comprehensive transmission system 
and by the end of 1910 power was being supplied to several municipalities. 

The Commission has now been supplying electrical energy for more than 
thirty-five years and the Report contains diagrams depicting the growth of 
the enterprise. During this period the costs of electricity to the consumer 
have been substantially reduced and the finances of the enterprise have been 
established on a secure foundation. 

At the end of 1945 the Commission was serving 922 municipalities in 
Ontario. This number included 26 cities, 124 towns and mining townsites, 
300 villages and police villages and 472 townships. With the exception of 
14 suburban sections of townships known as 'Voted areas," the townships 
and 120 of the smaller villages are now served as an amalgamated rural 
division of Hydro service with a uniform rate structure. Thus, no matter 
where rural service is given in Ontario by the Hydro, the rural consumer for 
the same class of service with the same consumption of electricity, pays the 
same amount on his quarterly bill. 

Financial Features of Co-operative Systems 

The basic principle governing the financial operations of the undertaking 
is, that electrical service be given by the Commission to the municipalities 



2 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

and by the municipalities to the ultimate consumers at cost. Cost includes 
not only all operating and maintenance charges, interest on capital investment 
and reserves for renewals or depreciation, for obsolescence and contingencies, 
and for stabilization of rates, but also a reserve for sinking fund or capital 
payments on debentures. 

The undertaking from its inception has been entirely self-supporting and 
no contributions have been made from general taxes except in connection with 
service in rural power districts. In this case, the Province, in pursuance of 
its long established policy of assisting agriculture and with the approval of the 
urban citizens, assists extension of rural electrical service by a grant-in-aid of 
the capital cost and in other ways as specified and detailed in the Report. 

As the principle of ''service at cost" is radically different from that ob- 
taining in private organizations, where profit is the governing feature, it 
naturally results in different and in some ways unique administrative features. 

The undertaking as a whole involves two distinct phases of operations as 
follows: 

The* First phase of operations is the provision of the electrical power — 
either by generation or purchase — and its transformation, transmission and 
delivery in wholesale quantities to individual municipal utilities, to large in- 
dustrial consumers, and to rural power districts. This phase of the operations 
is performed by The Hydro-Electric Power Commission of Ontario as trustee 
for the municipalities acting collectively in groups or "systems", and the 
financial statements relating to these collective activities of the municipalities 
are presented in Section IX of the Report. Each system of municipalities, as 
provided in The Power Commission Act, forms an independent financial unit 
and the accounts are therefore segregated and separately presented for each 
system. In order, however, that there may be a comprehensive presentation 
of the co-operative activities of the undertaking as a whole, there are pre- 
sented, in addition, for the two main systems and miscellaneous co-operative 
activities, a balance sheet of assets and liabilities, a statement of operations, 
a tabulation of fixed assets, and summary combined statements respecting 
the various reserves. 

The Second phase of operations is the retail distribution of electrical 
energy to consumers, within the limits of the areas served by the various 
municipal utilities and throughout the rural areas of the Province. In the 
case of the consolidated rural power districts The Hydro-Electric Power 
Commission not only provides the power at wholsesale, but also — on behalf of 
the respective individual townships — attends to all physical and financial 
operations connected with the distribution of energy at retail to the consumers 
within the rural power districts. Summary financial statements relating 
to rural service are presented in Section IX of the Report, and a general 
report on their operation is given in Section IV. 

In the case of cities, towns, many villages and certain thickly populated 
areas of townships, retail distribution of electrical energy provided by the 
Commission is in general conducted by individual local municipal utility 
commissions under the general supervision of The Hydro-Electric Power 
Commission of Ontario. The balance sheets, operating reports and statistical 
data relating to the individual urban electrical utilities are presented in Section 
X of the Report. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 





THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 












THIRTY YEARS RECORD ALL SYSTEMS 


DoLLARS CAPITAL INVESTMENT 


Dollars 

- 500.000,000 

- 450,000.000 

- 400,000,000 

- 350.000,000 

- 300,000,000 




MUNICIPAL PLANT AND OTHER LOCAL ASSETS r 












1 H-E.P.C. PLANT 


















- 


- 


- 


- 


350,000,000 












300,000,000 


- 












- 


- 








































150,000,000 




















































Zlf? 






















































alll 






















































O^ CT> CT"> CT> o*> o"> o^ ct*> o*> 0*> Ol 0"> 0"> CT> O"* O^ O") O^ O^ 0"> O^ O O"* O^ 0"> CT> ot oS o^ o> 


D0LLJR5 RESERVES 


Dollars 

- 350,000,000 

- 300,000.000 

- 250,000,000 

- 200.000.000 

- 150.000,000 

- 100.000.000 

- 50,000,000 




MUNICIPAL RESERVES AND SURPLUS 






— 


300,000,000 - 


H-E.P.C. RESERVES 


— 


— 




- 




200,000,000 — 




- 








" 




- 


- 








100,000,000 


rti 


- 
























^oodqqqBUi 


Illlllll 




















(CNeocio-(M(»i'<fifiioivoooio-(MroTrinicNcoaio>-NmTtin 

O CT> CT> O"* CT> O^ 0"> 0*> CT1 CT> CT"> CT> 0"> <T> 0"> 0"> s * Ol 0*> <T> CT» O") O^ <?> 0"> 0"> Ol <T> CT> CT> 



4 • THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

For the Northern Ontario Properties held and operated by the Commis- 
sion in trust for the Province there are also presented in Section IX financial 
statements including a balance sheet, an operating account, and statements 
respecting reserves and capital expenditures. 

Further details respecting administration and explanations of the finan- 
cial tables presented in the Report are given in the introductions to sections 
IX and X on pages 111 and 193. 

Co-operative Systems Operating 

From time to time in accordance with provisions of The Power Commission 
Act various groups of municipalities have been co-ordinated to form systems 
for the purpose of obtaining power supplies from convenient sources. In some 
cases these small systems grew until their transmission lines interlocked with 
those of adjacent systems and it proved beneficial to consolidate the trans- 
mission networks and the financial and administrative features. Early in 
1944 the three systems serving southern Ontario, the Niagara, Georgian Bay 
and Eastern Ontario systems, were amalgamated to form the Southern 
Ontario System and financially the amalgamation was made retroactive to 
apply to the fiscal year 1942-43. The three former systems are now known 
as divisions of the Southern Ontario system. 

The Niagara division embraces municipalities in all the territory between 
Niagara Falls, Hamilton and Toronto on the east and Windsor, Sarnia and 
Goderich on the west. It is served with 25-cycle power supplied from plants 
on the Niagara river, supplemented with power transmitted from generating 
plants on the Ottawa river and with power purchased from Quebec companies. 

The Georgian Bay division comprises municipalities in that part of the 
Province which surrounds the southern end of Georgian Bay and lies to the 
north of the territory served by the Niagara division. It includes the districts 
surrounding lake Simcoe and extends as far north as Huntsville in the Lake 
of Bays district and south to Port Perry. Its power supplies, 60 cycles, are 
derived chiefly from local water power developments. 

The Eastern Ontario division serves all of Ontario east of the areas com- 
prising the Georgian Bay and the Niagara divisions. It includes the districts 
of Central Ontario, St. Lawrence, Rideau, Ottawa and Madawaska; formerly 
separate systems. Its power supplies, 60 cycles, are from local developments 
supplemented by purchases from other sources. 

The Thunder Bay System comprises the cities of Port Arthur and Fort 
William, adjacent rural sections, the village of Nipigon, and the mining 
district of Longlac. Two developments on the Nipigon river supply 60-cycle 
power. 

Northern Ontario Properties 

In addition to its operations on behalf of the partner municipalities, the 
Commission, under an agreement with the Province, holds and operates the 
Northern Ontario Properties in trust for the Province. For the purposes of 
financial administration these properties are treated as one unit. The prin- 
cipal areas in the vast territory of northern Ontario at present receiving 
service are the Abitibi District comprising the territory served by 25-cycle 
power from the Abitibi Canyon development, together with a small area in 
the southern portion of the district of Sudbury in which mining properties 
are served with 60-cycle power; the Timiskaming District comprising the 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 


PROVINCIAL ADVANCES AND FUNDED DEBT 


Dollars PROVINCIAL ADVANCES DoLLARS 




• 












100,000,000 - - ■ ■ ■ - 








nlll 




to r«s co en o •— NMtmteiNOOOO'- NfO'jmixirvooaiO'-Nm^'in 
en en en en en en en en en en en en en en en en en en en en en en en en en en en en en en 




Dolurs FUNDED DEBT IN HANDS OF PUBLIC DouARS 












llllllllll 




■lllllllllllllllll 


LL 


i_ r^ co en o «— Nm^miorxoowO'- n ro t 
Cn en Cn Cn Cn en cn cn cn cn cn cn cn cn Cn Cn Cn en c 


r_r>vor~»cocn_«— N co t in 

■> co co fo oo co ^3" -^ -3* -3" ^" *-r 
i cn cn cn cn cn cn cn cn cn cn cn 


DoLLARS TOTAL OUTSTANDING CAPITAL LIABILITIES DoLLARS 












200,000.000' 1- - - - - 

150,000,000 


- _ _ _ __ 200,000,000 

_ _ _ _ _ 150,000,000 


1 00,000,000 

50,000.000 ill 




_____ -100.000,000 

- nr ______ 50,000,000 


■III 






tDNOOfflO-NnflftieNCOOlO-NM'S 
Cn Cn Cn Cn ©> Cn , Cn Cn Cn Cn Cn Cn Cn en en Cn cn cn 9 


m <o n oo o> o -■ n ro^ m 
co co co co ci -a- ^- -«a- ■<* -» -» 
en cn en en en en en en en < en en 



6 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

drainage basins of the Matabitchuan river, the Montreal river and a portion 
of the Mattagami river with eight generating plants, four 25 cycle and four 
60 cycle; the Sudbury District comprising the city of Sudbury and the adjoin- 
ing mining area known as Sudbury Basin; the Nipissing District centering 
around the city of North Bay on the shore of lake Nipissing; the Patricia 
District comprising the territory within transmission distance from the 
Ear Falls development at the outlet of lac Seul on the English river including 
the Red Lake mining area, and the territory immediately north of lake 
St. Joseph in the territorial district of Patricia served with power from a 
development at Rat Rapids on the Albany river; and the Rainy River district 
which derives its power from the Thunder Bay system. Included in the 
Northern Ontario Properties are rural districts on Manitoulin island, and 
others adjacent to the communities served in the various districts of northern 
Ontario. Power supplies are 60 cycle except from Abitibi canyon develop- 
ment, and four plants in Timiskaming district. 

The geographic boundaries of the various systems and districts are shown 
on the maps of transmission lines and stations at the back of the Report. 

The power supplies for the systems and Northern Ontario districts are 
listed in the first table of Section II of the Report on pages 16 and 17. 

The Annual Report 

The table of contents, pages xxxiii and xxxiv lists the matters dealt with in 
the Report. At the end of the Report there is a comprehensive index. To 
those not conversant with the Commission's Reports, the following notes 
will be useful. 

In Section II, pages 15 to 35, dealing with the operations of the systems, 
are a number of diagrams showing graphically the monthly loads on the 
several systems and districts. Tables are also presented showing the amounts 
of power taken by the various municipalities during the past two years. 

The rural distribution work of the Commission has proved of widespread 
interest and special reference to this is made in Section IV on pages 51 to 72. 

In Sections VI and VII will be found information respecting progress of 
work on new power developments and on transmission system extensions, 
together with photographic illustrations. 

About one-half of the Report is devoted to financial and other statistical 
data which are presented in two sections IX and X already referred to above. 

Frequent enquiries for the rates for service to consumers are received 
by the Commission. For the urban municipalities served by the Commission 
these are given in Statement "E" starting on page 330. For the rural power 
districts they are given in Section IV on page 55. Certain statistical data 
resulting from the application of the rates in urban utilities are given in 
Statement "D". This statement is prefaced by a special introduction starting 
on page 310. 

In its Annual Reports the Commission aims to present a comprehensive 
statement respecting the activities of the whole undertaking under its ad- 
ministration. Explanatory statements are suitably placed throughout the 
Report. The Commission receives many letters asking for general information 
respecting its activities, as well as requests for specific information concerning 
certain phases of its operations. In most cases the enquiries can satisfactorily 
be answered by simply directing attention to information presented in the 
Annual Report. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 





THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 












THIRTY YEARS RECORD — SOUTHERN ONTARIO 


SYSTEM 




Horsepower DEVELOPED AND PURCHASED POWER RESOURCES 


Horsepower 




M PURCHASED POWER 


- 






-2.000,000 

- 1 .800,000 
-1.600.000 
-1.400.000 
-1.200.000 
-1,000,000 

- 800,000 

- 600,000 

- 400,000 

- 200,000 




2,000,000 M 

1 DEVELOPED POWER 






















1,600.000 ■— — ——— 


" 












n 














n 




' 





























200.000 -p—UH 


ii 


























to n n dt'o •■ n n ■« in u 

^•>-^»-(Njfvj<M(\j(M(\Jrg 


i-soocio — NMTrinicr^oooiOi-NMtin 
cgrMfMroporompororo on, copn^-^-^*^-"*^- 
O^ 0"> CT> o*> o^ o^ o^ o^ o*> o*> o*> o^ oi o^ oS oS o^ o*> oS 




Horsepower PRIMARY AND SECONDARY LOADS 


Horsepower 






SECONDARY LOAD . [1 


- 2,000,000 
-1,800,000 
-1,600.000 
-1.400,000 
-1,200,000 
- 1 ,000,000 

- 800,000 

- 600,000 

- 400,000 

- 200,000 






PRIMARY LOAD 














- 
















1 


















1 


- 


1 










































• 
































































































































-,11111 












^©r^cooio*— r\ic->^-Lr>t©r^coCTio»— csiroxrmioi — oos\o<-Nro^m 

O^ 0"» 0"> 0"> C> Ci CT) Ol O^ O^ 0"> 0"> ^> 0"> CTJ Ol 0"> Ol C» CT O"* CT> CT> CT> o"> o^ o*> o"> o^ c^ 





THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



The Hydro-Electric Power Commission Of Ontario 

HYDRO UTILITIES OF CO-OPERATING URBAN MUNICIPALITIES 

THIRTY YEARS RECORD 



Dollars 
225,000,000- 



200,000,000 



175,000,000 



150,000,000 



125,000,000 



100,000,000 



75,000,000 



50.000,000 



25,000,000 



TOTAL ASSETS 



Dollars 
225,000.000 



200,000.000 



175,000,000 



150,000,000 



125,000,000 



100,000.000 



75,000,000 



50,000,000 



25.000,000 



Lr>vor^cooo»— rMm^rm 



(ONOOfflO'-NMTtiniONWWO'-N 

c> CI O O O Ol Ol CI CI o*> C> CI Ol C> C> c> c> o c> C> c» o c> c> ci cS oS cr> cS c> 



Dollars 
50,000,000 ■ 



LIABILITIES 



25.000,000 




Dollars 
50.000,000 



25,000.000 




ior^oociO'-Mf'O^uiiorvwoio — rgoi^iniorvoooo^iNm^irt 

c> c» o c> CI C> C> Cv C> C> CY Ct c> CV O^O^O^C»C>O^O^C>0*l O C> CI Ct (Jl CI CI 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



The Hydro-Electric Power Commission Of Ontario 

HYDRO UTILITIES OF CO-OPERATING URBAN MUNICIPALITIES 

THIRTY YEARS REVENUES 


Dollars DOMESTIC SERVICE Dollars 


















12,000,000 - ■ 
































4,000,000 








-■■III 




llllll 




1 | 1 


Dollars COMMERCIAL LIGHT SERVICE Dollars 


























■ 1 1 1 1 




■ ■llllll 


III 1 


Dollars POWER SERVICE Dollars 
















































- - 4,000,000 


2,000,000 '■ III 















. 


Dollars, STREET LIGHTING SERVICE Dollars 


innnnnn' .■■■■■llllll § ? * 


llllllllll 


,moo ° 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 




o> cr> o*> ot o> o* o o^ o> o> o*> o^ o^ o> o> o*> o> o> o> ct» o^ ct* ^ o^ o> o> o^ oS <r* o> 



10 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 11 



SECTION I 



LEGAL 



THERE were no amendments to The Power Commission Act and no 
special Acts relating to the Commission passed by the Legislative As- 
sembly of the Province of Ontario during 1945. 

The Agreements between The Hydro-Electric Power Commission of 
Ontario and municipalities, persons and corporations mentioned in the list 
hereunder given were approved by Orders-in-Council. 

CO-OPERATIVE SYSTEMS 

Towns 

Burlington June 5, 1945 

Newmarket ; Feb. 19, 1945 

Thornbury Mar. 16, 1945 

Villages 

Braeside Feb. 20, 1945 

Vienna Aug. 1, 1945 

Townships 

Freeman Oct. 17, 1945 

Middleton Nov. 27, 1945 

Pembroke April 7, 1945 

Corporations 

Bonter, W. F t . Sept. 19, 1945 

Brompton Pulp and Paper Company Limited. July 6, 1945 

Burlington Steel Company Limited Aug. 20, 1945 

Canada Cement Company Limited Dec. 5, 1945 

Canadian Industries Limited Feb. 5, 1945 

Cedars Rapids Transmission Company Limited Feb. 19, 1945 

Cedars Rapids Transmission Company Limited April 30, 1945 

Defence Industries Limited May 1, 1945 

Defence Industries Limited June 14, 1945 

Deloro Smelting and Refining Company Limited May 9, 1945 

Gair Company Limited (Campbellford Plant) July 9, 1945 

Gair Company Limited (Frankford Plant July 9, 1945 

Gypsum Lime and Alabastine, Canada, Limited Nov. 13, 1945 



12 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

His Majesty the King, represented by the Minister of National Defence Oct. 11, 1945 

His Majesty the King, represented by the Minister of Transport (Iroquois Section, 

Galops Canal) , May 15, 1945 

His Majesty the King, represented by the Minister of Transport (Upper Entrance 

Section, Galops Canal) May 15, 1945 

Imperial Oil Limited (Yards) May 1, 1945 

Imperial Oil Limited (Pump House) May 1, 1945 

Maclaren Quebec Power Company April 12, 1945 

Nichols Chemical Company Limited Sept.26, 1945 

Strathcona Paper Company Limited Oct. 25, 1945 

Undersill Gold Mining Company Limited Aug. 29, 1945 

NORTHERN ONTARIO PROPERTIES 

City 
Sudbury Dec. 17, 1945 

Township 
Calvert Oct. 26, 1944 

Corporations 

Aquarius Porcupine Gold Mines Limited Nov. 2, 1945 

Armistice Gold Mines Limited Oct. 16, 1945 

Ausic Mining and Reduction Company Limited (Genessee Mining Property) Nov. 24, 1945 

Ausic Mining and Reduction Company Limited (Silver Cliff Property) Nov. 24, 1945 

Canadian Northern Railway Company Feb. 26, 1945 

Canadian Splint & Lumber Corporation Ltd July 9, 1945 

Cathroy Larder Mines Limited June 25, 1945 

Coniaurum Mines Limited July 9, 1945 

Cross Lake Lease July 30, 1945 

Crowshore Patricia Gold Mines Limited Sept. 11, 1945 

Dome Mines Limited (Power for mining operations) Aug. 7, 1945 

Dome Mines Limited (Power for pumping tailings) Aug. 7, 1945 

Dome Mines Limited (Power for pumphouse) Aug. 7, 1945 

Gold Hawk Porcupine Mines Limited July 6, 1945 

Hasaga Gold Mines Limited June 5, 1945 

Hayes Steel Products Limited Sept. 5, 1945 

Kirkland Lake Gold Mining Company Ltd July 9, 1945 

Mclntyre Porcupine Mines Limited Jan. 1, 1945 

Macassa Mines Limited _. June 11, 1945 

Miles (Red Lake) Mines Limited •. * Dec. 21, 1945 

Orlac Red Lake Mines Limited Sept. 7, 1945 

O'Shaughnessy, C.V.J Nov.21, 1945 

Porcupine Peninsular Gold Mines Ltd July 12, 1945 

Poupore Lumber Company Aug. 22, 1945 

Queenston Gold Mines Limited July 9, 1945 

Silanco Mining and Refining Company Ltd Dec. 31, 1945 

Silanco Mining and Smelting Corporation Limited (Aquamico Mining Property) .... July 9, 1945 

Silanco Mining and Smelting Corporation Limited (Beaver Mining Property) July 9, 1945 

Silanco Mining and Smelting Corporation Limited (Colonial Mining Property). . . .July 9, 1945 
Silanco Mining and Smelting Corporation Limited (Coleman Mining Property).. . .Oct. 3, 1945 

Sylvanite Gold Mines Limited May 25, 1945 

Teck Hughes Gold Mines Limited June 22, 1945 

Toburn Gold Mines Limited June 4, 1945 

Upper Canada Mines Limited July 9, 1945 

Wright Hargreaves Mines Limited May 25, 1945 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 13 



RIGHT-OF-WAY AND PROPERTY 



THE gradual relaxation of wartime restrictions has increased substantially 
the volume of construction, particularly of rural service extensions and 
this increased construction has resulted in a greater number of poles, anchors, 
etc. being placed on private property. 



SOUTHERN ONTARIO SYSTEM 

As in the past few years term easement and tree trimming rights have 
been renewed in addition to the rights obtained for both rural and high- 
tension lines. 

The policy of providing improved and better centralized rural offices was 
continued and several leases and purchases for this purpose were completed. 

Niagara Division 

Progress has continued in obtaining lands required in the enlargement 
of the DeCew Falls development and several properties required in con- 
nection with water storage for this generating station were obtained. 

Lands were obtained for a new transformer station at Islington and a 
proposed transmission line from this station to a junction with the present 
220-kv line to Burlington transformer station. 

In connection with the transmission line from the proposed frequency 
changer station in Scarborough township, the acquisition of right-of-way 
extending northwesterly to the town of Barrie was commenced. 

Negotiations were commenced for the purchase of a right-of-way owned 
by the Canadian National Railways, extending from Bronte to a point 
near Whitby. 

Some land was purchased and easements obtained for the 110-kv line 
from Kent transformer station to St. Clair transformer station. 

A site was purchased for the Caledonia transformer station. 

Outstanding purchases were made to complete all necessary ownership of 
lands required on various rights-of-way in the Niagara division. 

Georgian Bay Division 

The purchase of additional land required for the South Falls generating 
station was completed. 

Expired rights for lines constructed approximately thirty years ago have 
been renewed and many rights for new lines constructed were obtained. 

Transmission line rights were obtained for the line from Eugenia to 
Price ville. 



14 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

Eastern Ontario Division 

Sale of lands acquired in the purchase of the Canadian National Rail- 
ways right-of-way between Colborne and Port Hope was continued and this 
right-of-way is now practically all disposed of to abutting owners subject 
to perpetual transmission line rights. 

Lands were obtained in Oshawa for the Oshawa transformer station. 
Lands have been obtained for the new hydro-electric development at Stewart- 
ville and purchasing is continuing. Lands and rights were also acquired for 
the development on the Madawaska river at Bark lake. 

Easements and tree cutting rights were obtained for the 110-kv line 
from Haleys switching station to Chalk River which practically completes 
the right-of-way required for this line. 

Rights were obtained for the new 110-kv line from Merrivale Road 
junction to Cornwall transformer station, a distance of approximately 
fifty miles. 

Sites were obtained for the Merrivale switching station and for the 
Riverdale transformer station. 

Rights were obtained for the transmission line between Maxville and 
South Plantagenet. 

THUNDER BAY SYSTEM 

Rights were obtained for several lines in this system, including dis- 
tribution lines serving Atikoken. 



NORTHERN ONTARIO PROPERTIES 



A study of properties acquired in the purchase of the Northern Ontario 
Power Company was made and rights for several lines acquired with that 
Company were secured. 

SURVEYS 

Surveys were made for all properties acquired and sold during the year 
and for easement and other rights both new and in renewal. Contour and 
levelling surveys were carried out in connection with some properties. 

GENERAL 

Assessment notice and tax bills from 361 municipalities were certified 
and where necessary appeals were entered against assessments not in accord- 
ance with The Power Commission Act. During the year 237.75 acres of land 
were acquired and 223.68 acres of surplus land were sold. Efforts were 
continued to lease all available lands for agricultural or other purposes and all 
associated buildings have been well maintained. Several leases associated 
with the war have been terminated or revised. The revenue from leased 
property continues to increase materially. 

A total of 2,548 documents were recorded during the year. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 15 



SECTION II 



OPERATION OF THE SYSTEMS 



THE Commission's fiscal year ending October 31, 1945, was particularly 
favourable, both in respect to operation of the properties and service 
rendered. During the year total power resources rose from 2,545,000 horse- 
power as of October 31, 1944, to 2,672,000 horsepower on October 31, 1945, 
details ot which are given in the following table of 'Total Power Generated 
and Purchased." 

Water conditions on the whole were favourable. Although the year was 
entered with water storages below satisfactory levels, the 1945 spring run-off, 
followed by greater than average precipitation during the summer and fall 
months, restored storages available for the 1945-46 winter season to above 
normal levels in most areas. 

Load Conditions, November 1, 1944, to October 31, 1945. 

The total output on the Commission's combined systems reached a 
maximum of 2,608,000 horsepower in the spring of 1945. This was the 
highest load ever carried by the Commission. It exceeded the maximum 
output in the previous year by 163,000 horsepower, or 6.7 per cent. The 
total energy output from all generated and purchased sources amounted to 
12,488,227,179 kilowatt-hours, exceeding all previous records, and that of 
the previous year by 3.7 per cent. 

The output for primary power purposes also reached levels never before 
attained. The maximum primary peak demands, which usually occur during 
the fall and winter months, occurred in the spring of 1945, reaching 2,470,000 
horsepower. Compared with the maximum demand of the previous year, 
this was an increase of 5.2 per cent, or 122,000 horsepower. The monthly 
primary peak loads, without exception, exceeded those of the corresponding 
months of the previous year and contrary to expectations, no appreciable 
recession took place following the ending of the wars in Europe and the 
Pacific. Energy output for primary power purposes rose three per cent from 
10,787,348,600 kilowatt-hours in the previous year to 11,110,548,529 kilowatt- 
hours. 

Details regarding the peak loads of the Southern Ontario and Thunder 
Bay systems and of the several districts of the Northern Ontario Properties, 
are given in the load curves in this section of the Report. 



16 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



TOTAL POWER GENERATED 
HYDRO-ELECTRIC GENERATING PLANTS 



Generating plants 


Maximum 
normal plant 

capacity 
Oct. 31, 1945 

horsepower 


Peak Load 
during fiscal year 


Total output 
during fiscal year 


1943-44 
horse- 
power 


1944-45 
horse- 
power 


1943-44 
kilowatt- 
hours 


1944-45 

kilowatt- 
hours 


Southern Ontario System 

Niagara division 

Queens ton-Chippawa— Niagara river 


500,000 
180,000 
150,000 
108,000 
72,000 
50,000 

9,500 

10,000 

600 

5,600 

1,600 

2,300 

5,800 

1,200 

7,500 

400 

500 

800 

4,500 
3,500 
2,100 
7,000 
4,500 

11,500 
4,200 

15,300 

2,400 

2,300 



1,000 

1,100 

200 

3,400 

6,000 

.54,000 

72,000 
70,000 

240,000 

12,000 
11,300 
■ 3,000 
4,800 
3,900 
8,000 
4,300 
12,600 

5,900 

3,100 

7,500 

10,000 

2,100 
1,200 
1,700 

1,800 
15,000 


506,702 
182,306 
139,142 
115,952 
69,973 
51,609 

10,556 

11,059 

536 

5,630 

1,743 

2,279 

5,871 

1,106 

7,507 

422 

489 

5,161 

4,182 

2.252 

7,755 

5,060 

12,024 

4,491 

16,186 

2,547 

2,473 

536 

938 

1,227 

402 

3,686 

6,475 

53,619 

75,737 
52,279 

217 158 


495,979 
184,987 
146,113 
117,292 
71,582 
49,598 

10,556 

10,858 

509 

5,764 

1,743 

2,279 

5,871 

1,086 

7,882 

402 

483 

637 

5,395 
3,887 
2,252 
7,942 
5,060 

12,252 
4,692 

16,287 

2,869 

2,373 



891 

1,206 



3,485 

6,434 

53,619 

74,397 
71,716 

227,346 

11,796 
10,724 
2,681 
4,859 
3,887 
8,043 
4,290 
12,064 

5,831 

3,150 

7,802 

10,925 

2,151 
1,287 
1,890 

2,064 
13,941 


2,832,963,000 
1,082,090,300 
723,260,300 
345,895,600 
411,368,000 
197,867,000 

31,718,080 
34,692,730 

1,705,200 
29,098,725 

7,786,700 
10,008,000 
26,130,000 

3,579,504 

13,139,200 

859,248 

2,098,600 

19,683,300 

16,455,250 

11,720,040 

36,700,700 

22,646,200 

53,527,320 

19,678,560 

67,665,820 

10,825,230 

10,259,230 

397,600 

4,115,250 

2,987,400 

141,725 

11,328,480 

24,231,370 

161,483,800 

,415,204,800 
279,243,800 

933,214,500 

26,157,600 
18,087,800 
24,102,200 
32,369,200 

6,803,380 
3,988,520 
3,400,600 

6,592,580 
48,460,320 


2,849,865,000 
1,123,406,300 
844,141,900 
324,656,150 
411,503,000 
196,880,900 

38,117,600 
41,514,510 

1,377,840 
30,719,820 

9,227,500 
11,476,800 
26,507,120 

4,019,964 

23,050,400 

552,528 

2,159,100 

1,412,660 

23,288,100 
17,519,650 
10,231,040 
38,684,020 
23,808,220 
59,409,280 
21,505,440 
75,443,900 
12,304,920 
7,464,580 

o 




Chats Falls (Ontario half)— Ottawa river. . 
DeCew Falls (25 cycle)— Wei land canal . . . 
DeCew Falls (66% cycle)— Welland canal . 

Georgian Bay division 




Bala No. 1 and No. 2— Muskoka river 

South Falls— South Muskoka river 

Hanna Chute— South Muskoka river 

Trethewey Falls— South Muskoka river. . . 










Caledon Electric— Credit river (Hydraulic. 


Eastern Ontario division 


Frankford— Dam No. 5— Trent river 

Sills Island— Dam No. 6— Trent River 

Meyersburg— Dam No. 8— Trent river 

Hague's Reach— Dam No. 9— Trent river. . 
Ranney Falls— Dam No. 10— Trent river.. 

Seymour— Dam No. 11 — Trent river 

Heely Falls— Dam No. 14— Trent river 

Auburn — Dam No. 18 — Trent river 




Fenelon Falls — Dam No. 30 — Sturgeon river 
Galetta — Mississippi river . . 


3,300,575 
2,902,200 





9,421,920 




26,942,330 




171,236,600 


Thunder Bay System 


416 601 900 




299,628,800 

999,847,500 

17,632,000 
26,716,430 


Northern Ontario Properties 
Abitibi district 


Timiskaming district 

Matabitchuan — Matabitchuan river • 








7,196,308 




14,703,381 
1 0,829,020 




Lower Sturgeon — Mattagami river 


24,196,664 
11,821,774 




20,545,075 


Sudbury district 


5,898 
3,083 
7,802 
10,925 

2,192 
1,300 
1,917 

2,011 
11,260 


24,334,400 




17,858,400 




22,496,500 




36,810,500 


Nipissing district 


6,963,520 




4,233,040 


Elliott Chute — South river 


4,118,000 


Patricia district 

Rat Rapids — Albany river 


9,973,760 


Ear Falls — -English river 

* 


58,021,120 






| 1,719,000 


* 


* 


8,025,732,762 


8,478,579,959 



*Because the peak loads on the various generating plants and purchased power sources usually occur at different 
times, the sum of the individual peak loads would not represent the sum of the peak loads on the systems. These, in 
the case of each system, must relate to the maximum load occurring at any one time. Consequently, the column 
headed "Peak load" is not totalled. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



17 



AND PURCHASED— ALL SYSTEMS 

POWER PURCHASED 



Power sources 



Southern Ontario System 

Canadian Niagara Power Co 

Department of Transport (Welland Ship Canal).. 

Gatineau Power Co. — 25 cycle contract 

Gatineau Power Co. — 60 cycle contract at 110 kv 
Gatineau Power Co.— 60 cycle contract at 11 kv.. 
Gatineau Power Co. — 60 cycle contract at 

Treadwell (cancelled Sept. 30, 1945) 

Ottawa Valley Power Co 

Beauharnois Light, Heat and Power Co. "Main 

contract" 

Beauharnois Light, Heat and Power Co. "Short 

term agreement". . 

MacLaren-Quebec Power Co. — "Main contract". 
MacLaren-Quebec Power Co. — "War power". . . . 

M. F. Beach Estate 

Rideau Power Co 

Campbellford Water and Light Commission 

Miscellaneous 



Thunder Bay System 

Kaministiquia Power Co 

Miscellaneous 



Northern Ontario Properties 

Manitoulin Pulp Co 

Abitibi Power and Paper Co 

Miscellaneous 



Total purchased. 



Contract 

amount 

horsepower 

Oct. 31, 1945 



20,000 

260,000 
60,000 
20,000 



108,000 
250,000 

50,000 
125.000 

57,500 
500 
400 
800 



800 



Total purchased 



1943-44 
kilowatt-hours 



98,094,400 

2,439,900 

1,135,317,600 

275,634,700 

72,594,000 

1,791.900 
348,364,200 



1,215,950,000 

821,145,000 

3,000,400 
1,891,400 
7,082,900 
2,460,500 

22,629,760 




1,486,400 

5,016,768 

546,400 



953,000 4,015,446,228 4,009,647,220 



1944-45 
kilowatt-hours 



91,597,300 

5,261,600 

1,135,753,300 

259,763,000 

75,090,600 

1,758,560 
327,486,250 



1,300,670,000 



756,025 : 000 

2,979,600 
1,891,500 
4,478,900 
3,388,658 



31,788,480 
237,900 



1,876,800 

8,606,272 

993,500 



Power purchased, contract amount, 1945 . 
Maximum normal plant capacity, 1945. . 



953,000 horsepower 
1,719,000 



Total available capacity generated and purchased, 1945 
Total available capacity generated and purchased, 1944 

Difference (increase) 



2,672,000 
2.545.018 



126,982 



Total energy purchased, 1945 4,009,647,220 kilowatt-hours 

Total energy generated, 1945 8,478,579,959 



Total energy generated and purchased, 1945 12,488,227,179 

Total energy generated and purchased, 1944 12,041,178,990 



Difference (increase) 



447,048,189 



CAUTION: The figures for "Maximum normal plant capacity" reflect the capacity of the 
various plants under the most favourable operating conditions which can reasonably be considered 
as normal, taking into consideration turbine capacity as well as generator capacity, and also 
the net operating head and available water supply. 

Owing, among other things, to changes in generating equipment due to wear and tear or the 
replacement of parts, also to changes in limitations governing water levels and effective net heads, 
the maximum normal plant capacity is not a fixed quantity but is one which must be revised from 
time to time. 

It is particularly important to bear in mind that the column headed "Maximum normal 
plant capacity" cannot be taken as an indication of the dependable capacity of the various plants, 
in some cases it is, but in many cases it is not. Chief among the factors which govern the maximum 
dependable capacity of an hydraulic power plant and which are not reflected in column headed 
"Maximum normal plant capacity" are abnormal variations in water supply and operating 
limitations encountered when plants are so situated on a given stream as to be affected by one 
another. 



18 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



innnnnn '"*«*" 3s °° s * s *«*"« s °"'"*«"«So§B32«^ 










r\ 7 


r-'-v & ,\ ^ 


___±___±_w_^:::x-^--i'V-AZ 


i, ^^4-<--^i-1s: - 


_.. -. a ^ v ?-__JiL_ 


» f, r--> // 1942 1943 1944 


' ' k\ > J Tv ^ l 




w / Vr Total Primary and Secondary Load i\ ! / 




y /\ f V* • '/\^ / ,/' ' <\ / 


1 i r " l/ L 1 1 \ / V -^J 


' i /!■ ' ^ /\ / \ ' ™ 


f j » Total Primary LOADi^y 1 r V 






mo \V L 3^ ^/ Mi 






_L_ 


500 ooo A L L S Y S T E M S 


COMBINED 


PFAK 1 OADS 


PRIMARY AND TOTAL 




THE HYDRO-ELECTRIC POWER COMMISSION 


OF ONTARIO 

Q 1 1 i i | i "i 1 1 1 | 1 1 i J .J I 1 1 1 1 





HORSEPOWER 
3,000,000 



SOUTHERN ONTARIO SYSTEM 



The power load in the Southern Ontario system reached heights during 
the past year never before attained. The maximum primary load occurred 
in the spring and from that point to the end of the year, receded in comparison 
with the load of the previous year. However, at the end of the year following 
V-E and V-J Days, it was still greater than the load for the same period last 
year. Compared with the previous year, the maximum total load rose from 
2,114,953 to 2,177,763 horsepower, an increase of three per cent, and the 
maximum primary load rose from 2,033,103 to 2,104,580 horsepower, an 
increase of 3.5 per cent. 

The total energy output of the Southern Ontario system for primary 
and secondary power was 1.9 per cent greater than the output of the previous 
year. The output of energy classed as primary power and representing about 
90 per cent of the total, rose from 9,211,310,482 kilowatt-hours in the previous 
year to 9,391,920,645 kilowatt-hours, an increase of two per cent. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



19 




500.000 



20 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

On December 1, 1944, the Commission took over the operation of the 
properties purchased from the Caledon Electric Company. These properties 
have been included in the Georgian Bay division of the Southern Ontario 
system. The generating plant, consisting of two small hydraulic units and 
two small Diesel driven units, has a total maximum normal output of 800 
horsepower. 

During certain periods of the year special power purchases were arranged 
with the. Quebec power companies for such power as the companies had 
available in excess of their standing agreements with the Commission. 
Under a flexible arrangement with the Department of Transport, a block of 
5,000 horsepower was purchased during the non-navigation period on the 
Welland Ship canal in the winter of 1944-45. As the 60-cycle resources 
available to the Georgian Bay division were inadequate to carry the high 
summer loads on this division, arrangements were made in July with Defence 
Industries Limited at Nobel to obtain the use of their steam-turbo unit, 
which was then in the process of being closed down. This unit was used regu- 
larly over the summer peak period on the Georgian Bay division and has 
since been retained as standby for emergency use. 

Except for shut-downs to perform essential maintenance work, all of 
the Commission's plants on the Niagara river were operated at practically 
full output during the year. Early in the spring of 1945, automatic devices 
for regulating Queenston forebaj r levels by the regulation of generating output 
were placed in service. These devices have been a worthwhile addition in 
raising the efficiency of the Queenston generating station and at the same 
time relieving operators of the onerous duty of manual operation. 

All of the generators at Chats Falls were available for service as required 
during the whole of the year, routine maintenance being carried out during the 
lighter load periods. This station was used as frequency control point for 
the whole of the Southern Ontario system during most of the year, the 
controlling equipment giving satisfactory service. The early break-up on 
the Ottawa river in April, one full month ahead of normal, eliminated possible 
water deficiency due to low storages caused by the dry summer of 1944. 
Average flow was maintained during the summer of 1945 and storage at the 
end of the year was above normal. 

Water storage and stream flow on the rivers supplying the generating 
stations on the Georgian Bay and Eastern Ontario divisions, although sub- 
normal in the fall of 1944, showed decided improvement in 1945, with the 
result that on the whole the water supply for the year under review was well 
above normal. 

Except at a few of the smaller generating stations, where adverse ice 
conditions are a normal experience each winter, no special trouble from ice 
runs was encountered. Notwithstanding the unprecedented demand for 
power and the necessity of accepting a somewhat lower standard of main- 
tenance owing to the shortages in skilled labor and supplies, generating 
equipment gave remarkably good service throughout the year. 

Outside of an occasional transformer failure, no trouble was experienced 
in the operation of the Commission's transformer and distributing stations. 
To provide for rising loads, the capacity of several distributing stations was 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



21 



increased and a few new stations were erected to relieve loads on near-by 
existing stations. 

Transmission lines, subject to the hazards of wind, sleet and lightning 
storms, functioned reliably throughout the year. Even the record blizzard 
of December 12, 1944, caused only minor line outrages and Hydro was 
available for all essential uses. Disrupted transportation facilities throughout 
the storm area, however, resulted in the direct loss in load of some 175,000 
horsepower, which took about four days to recover. 

In last year's Report, mention was made of steps taken to improve the 
economy of operation in the parallel operation of the Niagara, Georgian Bay 
and Eastern Ontario divisions of the Southern Ontario system. As a further 
study in this direction, a test was arranged by the Commission and the 
Central New York Power Coporation to interconnect their respective systems 
by means of an existing 60-cycle 110,000-volt tie line sixty miles long, extend- 
ing between Ottawa, Ontario, and Massena, New York. This test was 
carried out on March 11 and 12, 1945. 

The test was successful and yielded results of great operational and 
research value to the Commission. It is also interesting to note that the 
geographical areas supplied by the interconnection of these great systems 
comprised all southern Ontario below Algonquin Park, from Windsor to the 
Ottawa river, together with a portion of the Province of Quebec, while in 

SUMMATION OF PEAK LOADS IN HORSEPOWER AS SUPPLIED TO URBAN 
MUNICIPAL UTILITIES AND FOR RURAL HYDRO SERVICE, SHOWING 
TREND OF POWER DEMANDS 1944-1945 



System 



Total of peak loads 
in horsepower 



July to 
Dec. 1944 



July to 
Dec. 1945 



Net 

increase 

in 

horsepower 


Number of utilities with 


De- 
creases 


Increases 


No 
change 



Total 



URBAN MUNICIPAL UTILITIES 



Southern Ontario. 

Thunder Bay .... 

Northern Ontario 

Properties 



1,266,644 
45,325 

18,293 



1,378,360 
47,251 

20,868 



111,716 
1,926 

2,575 



22 




283 
6 

14 



307 
6 

16 



RURAL HYDRO SERVICE 



Southern Ontario. . . . 

Thunder Bay 

Northern Ontario 
Properties 


121,399 
862 

3,001 


145,992 
1,048 

3,405 


24,593 
186 

404 


8 


1 


105 
2 

4 


1 





114 
2 

5 


Total, Rural Service 


125,262 


150,445 


25,183 


9 


111 


1 


121 



Note : The yearly peak demands of the individual municipal Hudro utilities do not all occur 
during the same month of the year nor, for any given municipality, do they always occur in the 
same month in successive years; in nearly all cases however the yearly peak occurs during the 
second half of the calendar year. For this reason a comparison of the peaks occurring during the 
second half of the year as shown in the tables of this Section shows most satisfactorily the general 
trend of the local loads. The loads given above for Rural Hydro Service are a summation of the 
loads in the various operational districts and are similarly obtained. 



22 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



the United States it included the States of New York, Maryland, New 
Jersey, Connecticut, Vermont, New Hampshire, Massachusetts, Rhode 
Island and a portion of Pennsylvania. 

The generation connected totalled 11,000,000 kilowatts, about 3 V- million 
being hydraulic generation and the remainder steam. On the Canadian 
system, approximately 837,000 cutomers were being supplied while in the 
United States the customer total reached about 4,000,000. 

An interesting feature of this experiment was that over the whole of 
this interconnected network automatic frequency control was maintained, 
so that electric clocks at points as far separated as Baltimore, Maryland, and 
Parry Sound, Ontario, indicated the seconds at precisely the same rate. 
This synchronous operation applied, of course, to all connected generators 
and to synchronous motors throughout the entire interconnected area. 

SOUTHERN ONTARIO SYSTEM— LOADS OF MUNICIPALITIES 1944-1945 



Municipality 


Frequ- 
ency 
cycles 


Peak load in 
horsepower 


Change in load 




July to Dec, 

1944 


July to Dec, 
1945 


Decrease 


Increase 


Acton 


25 
25 
25 

60 
60 

25 
25 
25 
60 
25 

60 
60 
60 
25 
25 

25 
25 
60 
60 
60 

25 
25 
60 
60 
25 

60 
25 
60 
25 
25 

25 
60 
60 
60 
25 


1,730.6 
244.8 
159.0 
311.1 

474.9 

137.4 
1,088.3 

493.8 
55.0 
72.1 

1,322.2 
185.0 
129.3 

1,443.2 
987.8 

299.2 

673.5 

358.0 

4,422.3 

58.0 

791.7 
508.8 
340.5 
157.2 
210.8 

8,236.6 
714.2 
171.8 
169.2 
264.6 

147.3 

3,189.1 

251.3 

300.2 

2,995.6 


1,918.5 
308.4 
179.1 
485.5 
581.4 

177.9 

1,330.6 

618.6 

66.6 

84.2 

1,546.0 

231.9 

155.1 

1,674.0 

1,249.7 

315.5 

678.1 

516.1 

5,333.8 

59.9 

811.7 
685.8 
398.0 
129.1 
255.9 

9,120.0 
851.5 
183.9 
196.4 
279.6 

200.5 

3,579.7 

335.5 

331.1 

3,799.6 




187.9 


Agincourt 




63.6 


Ailsa Craig 




20.1 


Alexandria 




174.4 


Alliston 




106.5 


Alvinston : 




40.5 


Amherstburg 




242.3 


Ancaster Twp. — Voted Area 




124.8 


Apple Hill 


11.6 


Arkona 




12.1 


Arnprior 




223.8 


Arthur 




46 9 


Athens 




25.8 


Aurora 




230.8 


Aylmer 


261 9 


Ayr 




16 3 


Baden 




4 6 


Bala 




158.1 


Barrie 




911 5 


Bath 




1 9 


Beachville 




20 


Beamsville 


177 


Beaverton 




57 5 


Beeton 


28.1 




Belle River 


45 1 


Belleville 




883 4 


Blenheim 




137 3 


Bloomfield 




12 1 


Blyth 




27 2 


Bolton 




15 


Bothwell 




53 2 


Bowmanville 




390 6 






84.2 


Braeside 




30 9 






804.0 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



23 



SOUTHERN ONTARIO SYSTEM— LOADS OF MUNICIPALITIES 1944-1945— Continued 



Municipality 


Frequ- 
ency 
cycles 


Peak load in 
horsepower 


Change in load 




July to Dec, 
1944 


JulvtoDec, 

* 1945 


Decrease 


Increase 


Brantford 


25 
25 
60 
25 
25 

60 
60 
66 H 
25 
25 

25 

66% 

25 & 

66% 

25 

25 

60 
60 
60 
25 

25 

60 
60 
60 

25 
25 

25 
60 
60 
60 

60 

60 
25 
60 
25 
25 

60 
25 
25 
25 

60 

25 
25 
25 
25 
25 

60 
25 
25 
60 
25 


23,802.9 

1,535.0 

64.3 

168.6 

93.8 

536.1 

5,277.5 
193.0 
166.8 
293.4 

57.9 
1,836.5 

500.7 

432.1 

53.7 

271.1' 

422.4 

2,002.5 

168.2 

7,768.4 

106.6 
650.4 
338.2 
390.6 
118.0 

810.4 

135.7 

2,387.9 

272.5 

224.0 

3,056.1 

173.3 

111.4 

92.6 

57.0 

163.5 
139.0 
79.2 
728.1 
277.2 

145.7 
160.1 
521.0 
126.8 
62.5 

269.1 

3,357.6 

1,583.7 

580.6 

279.9 


23,912.4 

2,059.2 

67.8 

300.6 

116.2 

651.7 
6,021.4 
249.3 
248.5 
321.6 

61.8 

2,281.6 

665.9 

534.8 

59.6 

298.4 
517.9 

2,236.8 
201.7 

9,317.9 

158.3 
682.2 
385.7 

472.1 
142,6 

856.2 
165.7 
2,618.4 
346.2 
225.1 

2,965.8 

208.6 

124.1 

134.0 

69.8 

216.5 
152.4 
101.7 
988.2 
332.4 

166.9 
186.2 
648.5 
133.2 
66.5 

304.1* 

3,579.7 

1,889.1 

511.9 

327.2 




109.5 


Brantford Twp. — Voted Area 




524.2 


Brechin 




3.5 


Bridgeport 




132.0 


Brigden 




22.4 


Brighton 




115.6 


Brock ville 




743.9 


Bronte 




56.3 


Brussels . 




81.7 


Burford 




28.2 


Burgessville 




3.9 


Burlington 




445.1 


Burlington Beach 




165 2 


Caledonia 




102.7 


Campbellville 


5 9 


Cannington 




27 3 


Cardinal 




95.5 


Carleton Place 




234.3 


Cayuga 




33.5 


Chatham 




1,549.5 


Chatsworth 




51.7 


Chesley 




31 8 


Chesterville 




47 5 


Chippawa 




81 5 


Clifford 




24 6 


Clinton 




45 8 


Cobden 




30 


Cobourg 




230.5 


Colborne 




73 7 


Coldwater 




1 1 


Collingwood 


90.3 




Comber 


35 3 


Cookstown 




12 7 


Cottam 




41 4 


Courtright 




12 8 


Creemore 




53 


Dashwood 




13 4 


Delaware 




22 5 


Delhi 




260 1 


Deseronto 




55 2 


Dorchester 




21 2 


Drayton 




26 1 


Dresden 




127 5 


Drumbo 




6.4 


Dublin 




4 


Dundalk 




35.0 


Dundas 




222 1 


Dunnville 




305 4 


Durham 


68.7 




Dutton 


47.3 



24 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO SYSTEM— LOADS OF MUNICIPALITIES 1944-1945— Continued 



Municipality 



Frequ- 
ency 
cycles 



Peak load in 
horsepower 



July to Dec. 
1944 



July to Dec. 
1945 



Change in load 



Decrease 



Increase 



East York Twp.- Voted Area 

Elmira 

Elmvale 

Elmwood 

Elora 

Embro 

Erieau 

Erie Beach 

Erin 

Essex 

Etobicoke Twp. -Voted Area. 

Exeter 

Fergus 

Finch '. 

Flesherton 

Fonthill 

Forest 

Forest Hill 

Frankford 

Gait 

Georgetown 

Glehcoe 

Goderich 

Grand Valley 

Granton 

Gravenhurst 

Grimsby 

Guelph 

Hagersviile 

Hamilton 

Hanover 

Harriston 

Harrow 

Hastings 

Havelock 

Hensall 

Hepworth 

Hespeler 

Highgate 

Holstein 

Humberstone 

Huntsville 

Ingersoll 

Iroquois 

Jarvis 

Kemptville 

Kincardine 

Kingston 

Kingsville 

Kirkfield 



25 
25 
60 
60 
25 

25 
25 
25 
60 
25 

25 
25 
25 
60 
60 

25 
25 
25 

60 
25 

25 
25 
25 
60 
25 

60 

25 

25 

25 

25 & 

66% 

60 
25 
25 
60 
60 

25 
60 
25 
25 
60 

25 
60 
25 
60 
25 

60 
60 
60 
25 
60 



11,001.6 

1,467.8 

173.0 

76.4 

501.5 

176.3 
262.7 
40.2 
104.0 
650.7 

9,120.2 
854.8 

1,414.9 

113.5 

85.5 

222.5 

612.2 

8.344.5 

180.4 

12,436.2 

1,944.8 
222.9 

1,828.0 

182.8 

79.7 



1.310. 

1.014. 

13,131. 

1,198. 



169,113.6 

1444.3 
535.1 
722.8 
157.3 
200.0 

'224.3 

25.7 

3,050.2 

100.0 

29.0 

691.0 

1,311.1 

3,634.6 

278.1 

196.8 

380.8 

866.9 

16,525.7 

729.7 

27.0 



13,261.5 

1,598.2 

234.6 

93.3 

554.7 

185.5 

288.7 

51.5 

153.4 
711.8 

12,333.9 

987.7 

1,609.2 

139.7 

103.8 



277. 

746. 
10,161. 

210. 
12,998. 



2.426.3 
260.3 

1.983.9 
218.0 

74.7 

1.626.6 

1.218.5 

13.834.1 

1,326.3 

173,975.5 

1,625.0 
563.5 
829.7 
186.5 
251.1 

303.7 

50.7 

3 233.6 

139.9 
23.3 

754.7 

1,428.1 

3.605.8 

368.8 

225.7 



466. 

932. 

18,523. 

952. 



5.0 



5.7 



28.8 



2,259.9 

130.4 

61.6 

16.9 

53.2 

9.2 
26.0 
11.3 

49.4 
61.1 

3,213.7 

132.9 

194.3 

26.2 

18.3 

54.7 

134.4 

1,817.0 

29.8 
562.2 

481.5 
37.4 

155.9 
35.2 



315.7 
204.4 
702.4 
128.1 

4,861.9 



180 
28. 

106. 
29. 
51. 

79. 

25. 

183. 

39 



63.7 
117.0 



90.7 
28.9 

85.2 

65.7 

1,997.6 

222.6 



27.0 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



25 



SOUTHERN ONTARIO SYSTEM— LOADS OF MUNICIPALITIES 1944-1945— Continued 



Municipality 


Frequ- 
ency 
cycles 


Peak load in ~, • , , 
horsepower Change in load 




July to Dec, 
1944 


July to Dec, 
1945 


Decrease 


Increase 


Kitchener 


25 
60 
25 
60 
60 

25 
25 
60 
25 
25 

25 
25 
25 
60 
25 

60 
60 
60 
25 
60 

60 
60 
60 
25 
25 

60 
60 
60 
25 
25 

25 
25 
25 
60 
25 

60 
60 
60 
60 
25 

60 
25 
25 
25 
25 

25 
25 
25 
60 
25 & 
66 M 


30,141.4 

519.7 

169.6 

101.6 

66.8 

300.8 
2,386.4 
3,983.8 
1,656.8 

44,916.1 

672.9 
1,656.8 
215.7 
452.7 
121.2 

136.9 
236.0 
207.5 
397.7 
158.8 

46.0 

120.2 

790.0 

135.9 

12,465.5 

5,007.1 
163.3 
126.3 

1,613.5 
507.5 

3,209.1 

787.8 

56.4 

336.1 

103.5 

584.3 

1,566.3 

48.8 

57.9 

39.1 

176.0 

726.0 

2,080.0 

12,556.8 

11,003.1 

1,179.6 

12,271.7 

498.0 

186.9 

1,680.9 


31,292.6 

600.5 

206.2 

136.7 

66.4 

386.6 

2,664.6 

4,044.1 

1,685.0 

49,128.5 

823.7 
2,024.8 
266.5 
450.7 
145.8 

140.7 
264.4 
241.4 
483.6 
189.1 

53.7 

155.4 

949.4 

171.4 

11,266.6 

5,179.5 
209.6 
152.3 

1,669.6 
557.9 

3,968.5 
904.5 
121.1 
419.6 
149.7 

794.3 

1,730.0 

48.1 

63.9 

47.8 

291.8 

775.6 

2,363.4 

12,130.6 

13,589.3 

1,182.3 

13,272.4 

565.7 

223.0 

1,938.3 




1,151.2 


Lakefield . 




80.8 


Lambeth 




36.6 


Lanark 




35.1 


Lancaster 


0.4 




LaSalle 


85.8 


Leamington 




278.2 


Lindsay 




60.3 


Listowel 




28.2 


London < .!;... . 




4,212.4 


London Twp. — Voted Area 




150.8 


Long Branch 




368.0 


Lucan 




50.8 


Lucknow 


2.0 






24.6 






3.8 


Madoc 




28.4 






33.9 


Markham 




85.9 






30.3 






7.7 


Maxville 




35.2 


Meaford 




159.4 


Merlin 




35.5 




1,198.9 






172.4 


Mildmay 




46.3 






26.0 


Milton 




56.1 






50.4 






759.4 


Mitchell 




116.7 


Moorefield 




64.7 


Morrisburg 




83.5 


Mount Brydges 




46.2 






210.0 


Napanee 




163.7 




0.7 




Newburgh 


6.0 






8.7 






115.8 


New Hamburg 




49.6 


Newmarket 




283.4 


New Toronto 


426.2 






2,586.2 






2.7 


North York Twp. — Voted Area 




1,000.7 






67.7 


Norwood 




36.1 


Oakville 




257.4 



26 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO SYSTEM— LOADS OF MUNICIPALITIES 1944-1945— Continued 



Municipality 


Frequ- 
ency 
cycles 


Peak load in 
horsepower 


Change in load 




July to Dec, 
1944 


July to Dec, 
1945 


Decrease 


Increase 


Oil Springs 


25 
60 
60 
60 
60 

60 
25 
60 
60 
25 

25 
25 
60 
60 
60 

25 
60 
25 
25 
60 

25 
25 
25 
25 

60 

60 
60 
60 
25 
25 

60 
25 
60 
25 
25 

60 
60 
25 
25 
60 

25 

25 

25 

60 

60 

25 & 

66M 

25 

25 

25 

25 


196.2 
222.9 
766.2 
103.6 
18,368.6 

39,929.3 

139.0 

6,579.8 

133.9 

647.8 

2,060.6 

241.9 

1,126.7 

1.922.0 

14,573.2 

1,063.5 
1,427.6 

154.0 
1,845.6 

332.4 

1,925.4 

1,118.0 

1,203.2 

638.6 

667.4 

2,910.7 
115.5 
364.7 
127.7 

1,267.6 

1,585.8 

4,514.7 

10.0 

156.2 

169.4 

238.6 
75.5 
588.6 
711.8 
111.3 

1,417.1 

159.1 

165.5 

40.4 

93.3 

31,514.4 

126.2 

218.5 

369.3 

1,791.2 


215.8 

257.5 

1,025.1 

150.0 

19,805.6 

42,978.2 

149.7 

7,625.3 

194.2 

729.3 

2,133.7 

334.8 

1,266.1 

2,075.1 

18,091.1 

1,299.0 
1,734.7 

168.2 
1,725.2 

385.1 

2,698.3 

1,369.7 

1,267.8 

709.8 

794.8 

3,167.8 
135.6 
403.2 
152.5 

1,406.8 

1,744.1 

4,646.1 

10.0 

165.5 

169.0 

309.1 
88.5 
726.5 
815.8 
174.1 

1,922.9 

193.3 

209.8 

52.8 

112.1 

28,329.4 
145.5 

244.2 

408.2 

1,880.3 




19 6 


Omemee 




34.6 


Orangeville 




258.9 


Orono 




46 4 


Oshawa 




1,437.0 


Ottawa 




3,048.9 


Otterville . 




10 7 


Owen Sound 




1,045 5 


Paisley 




60 3 


Palmerston 




81 5 


Paris 




73.1 


Parkhill 




92.9 


Penetanguishene 




139.4 


Perth '. 




153.1 






3,517 9 




235.5 


Picton 




307.1 


Plattsville 


14.2 


Point Edward 


120.4 






52.7 


Port Colborne 




772.9 


Port Credit 




251.7 


Port Dalhousie .... 




64.6 


Port Dover 




71.2 


Port Elgin 




127.4 






257.1 


Port McNicol 




20.1 


Port Perry 




38.5 


Port Rowan 




24.8 


Port Stanley 




139.2 






158.3 


Preston 




131.4 


Priceville 






Princeton 




9.3 




0.4 






70.5 


Richmond 




13.0 


Richmond Hill 


137.9 


Ridgetown 




104.0 






62.8 


Riverside 




505.8 


Rockwood 




34.2 


Rodney 




44.3 


Rosseau 




12.4 






18.8 




3,185.0 




St. Clair Beach 


19.3 






25.7 


St. Jacobs. . 




38.9 


St. Marys 




89.1 









1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



27 



SOUTHERN ONTARIO SYSTEM- LOADS OF MUNICIPALITIES 1944-1945— Continued 





Frequ- 
ency 
cycles 


Peak load in 
horsepower 


Change in load 


Municipality 


July to Dec, 
1944 


July to Dec, 
1945 


Decrease 


Increase 


St Thomas 


25 
25 
25 
25 
60 

25 
60 
25 
60 
25 

25 
60 
60 
25 
25 

25 
25 
25 
60 
25 

25 
60 
25 
25 
60 

25 
25 
25 
60 
25 

60 
25 
25 
25 
25 

25 
60 
25 & 
66 % 
25 & 
66 % 
60 

60 
60 
60 
60 
25 

25 
60 
25 
25 
25 


8,761.4 

12,334.4 

5,632.9 

1,060.6 

277.0 

3,106.3 

3,191.2 

221.1 

784.0 

79.7 

3,347.4 
314.7 
365.4 
273.7 
401.5 

8,216.8 
1,694.8 

268.5 
93.8 

560.0 

3,433.0 
144.3 
750.3 
537.5 
175.9 

248.9 
251.7 
184.0 
82.2 
101.6 

41.1 

3,429.0 

1,626.0 

1,640.0 

393,919.6 

3,764.8 
119.9 

484.9 

186.2 
5,652.7 

308.0 

370.8 

112.2 

1,144.6 

4,694.3 

43.0 

88.7 

285.6 

506.7 

6,698.4 


9,454.4 
8,809.2 
7,081.9 
1,268.1 
345.2 

3.327.1 

3,491.8 

231.0 

779.9 

107.5 

4,138.7 
379.8 
450.3 
372.2 
464.1 

8,703.0 

1,810.7 

284.8 

117.1 

628.7 

4,193.7 
183.9 
788.7 
561.9 
237.9 

333.5 
315.9 
160.9 
115.3 
117.6 

53.4 

3,858.2 

1,483.8 

2,058.9 

442,134.0 

4,626.5 
174.1 

639.9 

227.8 
6,104.6 

418.5 

491.7 

128.4 

1,246.9 

5,501.3 

68.9 

120.5 

394.5 

600.3 

6,724.5 




693.0 


Saroia 


3,525.2 




Scarborough Twp 


1,449.0 


Seaforth 




207.5 


Shelburne 




68.2 


Simcoe 




220.8 


Smiths Falls 




300.6 


Smithville 




9.9 


Southampton 


4.1 




Springfield .• 


27.8 


Stamford Twp. — Voted Area 




791.3 


Stayner 




65.1 


Stirling 




84.9 


Stoney Creek 




98.5 


Stouffville 




62.6 




486.2 


Strathroy 




115.9 


Streetsville 




16.3 


Sunderland 




23.3 






68.7 






760.7 


Tara 




39.6 


Tavistock 




38.4 


Tecumseh 




24.4 






62.0 






84.6 


Thamesville 




64.2 




23.1 




Thornbury 


33.1 


Thorndale 




16.0 






12.3 


Thorold 




429.2 


Tilbury 


142.2 




Tillsonburg 


418.9 


Toronto 




48,214.4 






861.7 


Tottenham 




54.2 


Trafalgar Twp. V.A.— No. 1 




155.0 


Trafalgar Twp. V.A.— No. 2 




41.6 






451.9 


Tweed 




110.5 


Uxbridge 




120.9 


Victoria Harbour 




16.2 


Walkerton 




102.3 


Wallaceburg 




807.0 


Wardsville 




25.9 


Warkworth 




31.8 






108.9 


Waterford 




93.6 


Waterloo 




26.1 



28 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO SYSTEM— LOADS OF MUNICIPALITIES 1944-1945— Concluded 


Municipality 


Frequ- 
ency 
cycles 


Peak load in 
horsepower 


Change 


in load 




July to Dec, 
1944 


July to Dec, 
1945 


Decrease 


Increase 


Watford 


25 
60 
25 
25 
60 

25 
25 
60 
25 
60 

60 
60 
60 
60 
25 

60 
25 
25 
60 

25 

25 
25 


425.9 

195.3 

13,226.5 

148.2 

464.1 

262.6 

5,539.5 

123.9 

226.8 

1,614.3 

376.4 

98.7 

430.0 

110.3 

56,445.0 

866.6 

676.1 

9,829.4 

83.2 

92.3 

23,257.4 
153.2 


459.5 

188.1 

12,393.3 

162.2 

442.7 

322.6 

5,782.8 

147.0 

251.3 

1,922.8 

508.4 
133.4 
485.2 
121.8 
55,807.5 

910.3 
843.2 
9,964.8 
116.0 
141.4 

27,703.7 
165.7 




33.6 


Waubaushene 


7.2 
833.2 




Welland 




Wellesley 


14 


Wellington 


21.4 




West Lome 


60 


Weston 




243 3 


Westport 




23.1 


Wheatley 




24 5 


Whitby 




308 5 


Wiarton 




132.0 


Williamsburg 


34.7 


Winchester. . . .* 




55.2 


Windermere 




11.5 


Windsor 


637.5 




Wingham 


43.7 


Woodbridge 




167.1 


Woodstock 




135.4 






32.8 


Wyoming 




49.1 


York Township 




4,446.3 






12.5 









SOUTHERN ONTARIO SYSTEM— LOADS OF NEW MUNICIPALITIES 



Municipality 


Frequ 
ency 
cycles 


Date 
connected 


Peak load in 
horsepower 


Change in load 




Initial 


July to Dec, 
1945 


Decrease 


Increase 


Almonte 


60 


Jan. 21, 1945 


457.1 


435.7 


21.4 









THUNDER BAY SYSTEM 



The plants on the Nipigon river, comprising Alexander and Cameron 
Falls generating stations, which supply the bulk of the power distributed in 
the Thunder Bay system and Rainy River district, operated at practically 
full output during the whole year. On September 30, 1945, the newly installed 
unit at Alexander generating station was placed in service, thereby raising 
the normal maximum capacity of this station from 50,000 to 70,000 horse- 
power. The Ogoki diversion, which commenced in 1943, has increased the 
water available for generation of power on the Nipigon river sufficiently to 
operate the Nipigon plants, including the Alexander extension, at load factors 
above those expected to exist for primary loads on the Thunder Bay system. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



29 



HORSEPOWER 



HORSEPOWER 



;SliiN; 




«i"«Sozo 3£i4 


"ZjOtl- 


9u 


*£i 


I??2"oi 


Ml 


i??<5 


3Zo|*uiS.I??3li!oZQ ?£lil3?«!i!o§0*£lSi"3!!o2o'i!l<l"35!oio 






— r 


II 1 1 1 1 1 1 .1 1 1 i M 

rHUNDER BAY J 
PEAK LOAD 


1 1 I I I.I 








>ystem - 








s 






. 1 


rm 

'HE HYD 


mnni nixu iumL 




RO-ELECTRIC POWER COMMISSION' 








OF ONTARIO 

II III III 




Se 


tal Primary and 
condary load— l 


1942 








1944 




1945 


ik 




1941 ^La 


,1 


943' 




' 


N 


'V 


\ 


1 




I 


\ f* 


*/ 




V J 


i 


i 




^V N 


\ 194( 


7 


1 ^ 


\ 


















S~iZ£-ii 








-Total Primary Load 


'1938 1939 


' -i r -- 


p vr± 


















193 i K n 


--193C 
1 


L:_::_::: 


















--S*x/^--JA^ ^ 


&«.__ _ . 


1 


933 






1934 




1935 


^^_-'A_^lJ7>\ 


\l 


\ 193t 


1932 


/: 


\ 




nl 


1 


\, 


V 


'V ' 1928 r / \ 


XT 


:>:s:x:: 


S\, 


'" 


\ 


-J 


i 


r 


V 




1927 ^ ^'1929 




V - 


, c=r 








M, 




1925 


,/\ 1926 y~^ x - N ^ 














1924,/ 






Xv / 






1 


923 




* — 


V 










192( 


L 4+1" 


-- — y " — 


-_/ 








































*"z<i"« 


Islfaolils&ls^ 


<s"<"ozo *tl< 


"<»!c 


oii 


zml il 


i"< 


M 


i!j2i; 


<| 33! 


OZo'»I<Ii,<»0ZO-,»J<5=;-,<llOZO-,i5<I^<«0Zo'iZ<!^<»O2Q 



150,000 



100,000 



50,000 



The maximum primary peak demand of the Thunder Bay system was 
126,206 horsepower, slightly above the corresponding demand of the previous 
year. The year's primary energy demands totalled 636,058,180 kilowatt- 
hours, exceeding that of the previous year by 4.8 per cent. The primary 
load, as in the previous year, includes power delivered to the Rainy River 
district of the Northern Ontario Properties. 

During most of the year, as in past years, the generating station of the 
Kaministiquia Power Company, a subsidiary of the Abitibi Power and Paper 
Company, has been operated in parallel with the Commission's generating 
stations on the Nipigon river. This has enabled the Abitibi Power and 
Paper Company, under a standing arrangement, to transfer power for 
electric steam boiler operation at the paper companies under its control. 
During the year, 31,788,480 kilowatt-hours were thus transferred which with 
the surplus energy available from the Commission's plants, produced a total 
of 112,198,900 kilowatt-hours for electric boiler operation. 



THUNDER BAY SYSTEM-LOADS OF MUNICIPALITIES- -1944-1945 



Municipality 


Frequ- 
ency 
cycles 


Peak load in 
horsepower 


1 

Change in load 




July to Dec, 

1944 


JulvtoDec, 

'1945 


Decrease 


Increase 


Atikokan Townsite 


60 
60 
60 
60 
60 

60 


19.3 

92.6 

18,876.2 

582.2 

273.1 

25,482.1 


133.2 
143.2 
19,623.3 
676.8 
330.9 

26,343.9 




113 9 


Beardmore Townsite 




50 6 


Fort William 




747 1 


Geraldton Townsite .... 




94.6 


Nipigon Twp.— Voted Area 




57 8 


Port Arthur 




861.8 


3— H.E. 













30 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



1 HORSEPOWER 



iSlilliis 


jIS<slilIi!l8l 


s Iris 






lis 


s§ 


u 


ss 


it 


5? 


'auuou 


*"l<5?? 


« S i'. - r 


JS 






it 


-" 


'."' 


sa 


5! 




\ 




- " 


sa 


|S 






:" 


|S 








^-M 




















































































_£ 




a 




,.-• Total Primary an 


3 Secondary 


LOAD 














































i! v. 




^ 


-^ 
















( 






















































i 






i 


1 




\ 


1 












\ 


















































A \ 


,\ 




J 1 


V 


< 


\, 




1. 




, 




f -J 


A l 




















































1 \ 










V 


1 


1 

1 




/ 








n ' 


















































L i/. 


-l-A 




■J 








1 


! 




! 


l' 




J 1 


A 


















































ii 






.J 


^ 






i 










J 


^. 


















































^n 


rW \ 


^ 


/ 




c 


> 


































































r 17 


1941 


1942 






\ 


N 


s 










/ 


k - 


















































1940 










1943 




f 


H 


l/ 
















































1939 ^ 






Total 


= RIMA 


RY 


-OAD- 


' 




1944 


H ? 














































































V 


^ 






























1938 








































194 


»\ 


































/ 












































\ 


















193; 












/ 


/ 
































































fv\^ 


f 






















































1936 










/ 






































































f 


•s. 


/ 


v> 


/ 


























































193 


5 








J 






































































/ 


-=" 


5 


/ 






























































19 


34 




/ 


























































1 


333 






















NUKIHtKN UINIAKIU KKUKtKlltb 

ABITIBI DISTRICT 
PEAK LOADS 




1931 




932 












y 


r- 


■W 






























/ 


























THE HYDRO-ELECTRIC POWER COMMISSION 




































'OF ONTARIO 

II 1 1 1 1 1 II 1 1 1 1 1 1 1 


5"ki"<! 




i!"i< 


s"<S 


izo'S 


J«I 


!H 


Ss 


Ou 
ZO 




3« 


H 


s= 


Sozo 


*"i<x" 


jssfs 


52 




i? 




So 


11 


ia 


5? 




iS 


1r 




is 


II 


H 




l^ 




znOjir 
*iHza 


2^ 


it 


iuoii 
• OZO 



HORSEPOWER 



250,000 



200.000 



50.000 



100,000 



50,000 



NORTHERN ONTARIO PROPERTIES 

The area served by the Commission on behalt of the Province in northern 
Ontario was enlarged during the year by the acquisition of the properties 
of the Northern Ontario Power Company. The new properties are adminis- 
tered by the Commission in trust for the Province under a separate district 
set up in the Northern Ontario Properties known as the Timiskaming district. 

A comparison of the year's end primary loads gives a fair indication of 
the load trends in these areas. Accordingly, the total primary load (summation 
of the district primary peaks) of the Northern Ontario Properties rose about 
20,000 horsepower from October 1944 to October 1945, an increase of 11 
per cent. This increase was the net result of a new load of about 40,000 
horsepower resulting from the purchase of the Northern Ontario Power 
Company's properties and a recession, chiefly at smelting plants, of approxi- 
mately 20,000 horsepower. The average output for primary power purposes 
was 11.7 per cent greater. Gold mining activities during 1945 held at about 
the 1944 level to which it had fallen during the war due to the shortage of 
labor and supplies. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 31 

Abitibi District 

The primary peak load of the Abitibi district dropped from 154,557 
horsepower in October 1944 to 122,761 horsepower in October 1945, a decrease 
of 20.6 per cent. About 20,000 horsepower of this decrease resulted from 
reduced demands of base metal smelting loads, and most of the balance 
represented the power sold to the Canada Northern Power Corporation 
for transfer to Quebec, a load transfer which was discontinued shortly after 
the Commission took over the properties of the Northern Ontario Power 
Company. 

Water storage at the commencement of the year was normal. The spring 
break-up, coming about one month ahead of time, resulted in a substantial 
carry-over of the previous winter storage. On the whole, water conditions for 
the year exceeded normal. Production at the Abitibi canyon plant totalled 
999,847,500 kilowatt-hours for the year. This includes 225,780,340 kilowatt- 
hours of surplus energy generated for delivery to the electric boilers at the 
paper mills of the Abititi Power and Paper Company. 

The Abitibi district has been operated in parallel with the Timiskaming 
district under conditions similar to those existing prior to the acquisition of 
the Northern Ontario Power Company's properties. During the year, inter- 
connections between the districts have been improved, providing a greater 
flexibility in the transfer of power. Up to October 31, 1945, a net interchange 
of 8,500,000 kilowatt-hours passed from the Abitibi district to the Timiskam- 
ing district. 

Timiskaming District 

The Timiskaming district is a new district of the Northern Ontario 
Properties, formed to administer the properties purchased from the Northern 
Ontario Power Company. The properties were purchased as of December 
1, 1944, but the Commission did not take over operation until March 26, 
1945, from which date the load of the Timiskaming district is included in the 
Commission's statistics of operation. The district comprises, besides facilities 
for the transmission and distribution of power, eight hydro-electric generating 
stations, four of which operate at 25 cycles with a total normal maximum 
rating of 36,200 horsepower, and four at 60 cycles with a corresponding 
rating of 23,700 horsepower. 

The maximum peak demand of the Timiskaming district, exclusive of 
emergency power supplied to Quebec, was 49,129 horsepower. The corres- 
ponding energy demand from March 26,1945, to October 31, 1945, was 139,- 
014,871 kilowatt-hours. All of the above power was for primary distribution. 

Sudbury District 

The total load of the Sudbury district, all of which was for primary 
distribution, rose from 21,945 horsepower in October 1944 to 24,598 horse- 
power in October 1945, an increase of 12.1 per 'cent. The total energy con- 
sumption for the year was 4.1 per cent greater. 

Water conditions in the Sudbury district during the fall and winter of 
1944-45 were subnormal and it was necessary to purchase, during the above 
period, a quantity of power and energy from the Sturgeon Falls plant of 



32 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



HORSEPOWER 



HORSEPOWER 



30 000 =t J " ?s ° gs tf3S*^2S8iS ?CSftS|=3S§gg «5sll«ls§l§ I=lill=ls§ls 


'"l<I??<Sozo'"l<I??<!iioZO*"l<In?<SoZQ""3<I?T<Sozo""l<I??<il!oZQ 






















h 




1944 J 


\\ 


K 1941 1942 1943 i 


\t- 


1940 p r r\ A / 


-Sl 




1939 )_ 


20m :::::v±TXit:iY/:' ~J~ 


r r 


/7^ V *' v 


1938 U / 


\i : 


~i 77" 


rO 


-,^-^a 1 




iL-:- ic: , 




4^ Jh /^ g 


1930 1934 


-j--\ Z v 'i 


- l ,m i931 m y A \ / 


\__X_V 


_: l^_ , 4^: / :*?_: 


^/ 


V / 7 


r 


,000 ° V __ $ 7\J 




[ r J 




Sr 




1r 








NORTHERN ONT/ 


RIO PROPERTIES - 


SUDBURY 


DISTRICT 


PEAK 


LOADS 


THE HYDRO-ELECTRK 


. POWER COMMISSION 


OF Of 


TARIO 


z o«il>-2jOi>->u z oirir>-zjOiH>u za) o:ir>-i;uai->uziiiJl>- Z jOji->oziDjitJz-/aQ.^gi- 


ISililiiisi^iliiiiisis <rililiii§is ^iiiiiiisis ISiilliiigis 



25.000 



20,000 



5,000 



the Abitibi Power and Paper Company to meet the district load demands. 
An early spring break-up on the Sturgeon and Wanapitei rivers, followed 
by more than normal precipitation in the early summer, replenished storages 
and stream flow which enabled the Commission's own plants to produce 
full district demands from March to September 1945. On September 1, 
purchase from the Sturgeon Falls plant was resumed, a measure taken to 
conserve water for the winter season. During the year, 8,500,000 kilowatt- 
hours were purchased. 

Nipissing District 

The Nipissing district peak load was 7,205 horsepower in October 1945. 
Compared with the peak load of the previous October it shows an increase 
of 7.9 per cent. Energy consumption for the year was 6 per cent greater. 

Water conditions in this district have been about normal, but, in recent 
years insufficient to generate the district load requirements. During 1945, 
the shortage was approximately 9,420,000 kilowatt-hours, which was supplied 
from the Sudbury district's resources. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



33 



HORSEPOWER 



;kHi;;«io2o -,u.i 



11,000 
10,000 
9,000 
8,000 



6,000 



5,000 



4,000 



2.000 



1940 



1920 



A 



1921 



ttf 3 



1942 
■1941-- m- 



1922 



1934 1935 

-- 1930 1931 -*r-- 1932 1933--: rrr^r^m 

I I 1925 

"TO 1923 " 924 /\-sl I L 






I III I I I I I I II I I I I I M I I.I I 
NORTHERN ONTARIO PROPERTIES 

NIPISSING DISTRICT 
PEAK LOADS 

THE HYDRO-ELECTRIC POWER COMMISSION 
OF ONTARIO 



— 1943— i— - 



*-\^> 



1944 



4=* D J 



1945 



Kt 



---l936-n--- 7 



1926 



1937 




fV 






1938 
ft 



1928 / ^ \ 



& 



1939 



if. 



1929 



*/j 



^ 



12.000 



11.000 



10,000 



9.000 



8,000 



7,000 



6.000 



,000 



3,000 



2,000 



1,000 



1,000 



; k i<i^<<on 



I<Iii«10ZO -,»KJ^<«OZO 'll 



Ii^<ulOZO ^U.KI 



Manitoulin District 

The load of the Manitoulin district, which is supplied by purchase from 
the Manitoulin Pulp Company, rose from a peak load in October 1944 of 
540 horsepower, to 723 horsepower in October 1945, an increase of 33.7 
per cent. The year's energy requirements increased 26.3 per cent. 

Patricia District 

In the Patricia district, the primary peak loads in October 1944 and 
1945 were 8,358 horsepower and 9,866 horsepower, respectively, showing 
an increase of 18 per cent. Most of this increase resulted from power supplied 
to the Dryden Paper Company, this power being supplied on an at-will 
basis. Demands of the gold mines in this district have changed little from the 
previous year. Exclusive of primary power, 21,424,000 kilowatt-hours 
were supplied to four mining companies for the operation of electric boilers 
during the year. 

Rainy River District 

Power for the Rainy River district is .purchased from the Thunder Bay 
system at cost. The district supplies power to the Steep Rock Iron Mines 
Limited and the Ontario-Minnesota Pulp and Paper Company, to replace 
the output from the company's Moose Lake generating station, made in- 
operative by the development of Steep Rock mine. On December 14, 1944, 
a small distributing station was placed in service to supply power to Atikokan 
townsite. During the year the average of the monthly peak loads supplied 
to the district was 18,644 horsepower. 



34 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



HORSEPOWER 



HORSEPOWER 



25 000 



"000 *" S ^"* S8 "* 1! '«-- 3S 




Oi 




_;• 


< ' 


:' 


<■ 




5: 


; 




^ 


ll 


6. t 




i 


: - 


^ 


So 


-: - 


ss 


;, 


s| 


\i 




5: 


J: 


5S 


Jl 


^ 




:■- 


- 


5; 


it 


il|5|t 


• 


NORTI 


HERN ONTARIO PROPERTIES 
ATRICIA DISTRICT 




































_T _ p 




































PEAK LOADS 










































































OF ONTARIO 






















































































































































































::::::::;:' 


L 








































































11 























19 


4< 




; 














































r 


Total Primary and Secondary Load- 


i 


^ 




/ 














































i 


\ 1942 


















V 






















































_-j - - 


V~::::::: 








9 


44 




1 










i 
















































r 1 


\ 






■v 
























































1939 t 


Total Primaf 


YL o.o>\ 1943 


; 




> 


' 




i 














/ 












































/' 




~\ - 








(« 










f 








/ 






























9 


38 










r 


/ 




p 


<r 


^ 


V 


f 






r 


/ 


r 


\ 


K: 


/ 




































^ 








U 


i 






L 


V 


V 






























1937 








,/ s 




















































































































1936 
























































1935 


























































9 


34 
































































1933 














































































































































1930 1931 














4~~ : 






















































































































































:o^<'iil'ilui^iZ<l<ii'ii,u 


■:.' 


52 


5< 








?ii 


1° 


JJ 


!i 


\i 


sS 




5S 


i< 


E = 


35 


< 


o" 


IS 


5J 


■:? 


ii 


''■ : 


zo 


JS 


<! 


:• 2 


-; 


'r 






w 


J2 


Hals 



20.000 



15,000 



5,000' 



NORTHERN ONTARIO PROPERTIES- 


LOADS OF MUNICIPALITIES— 1944-1945 


Municipality 


Frequ- 
ency 
cycles 


Peak load in 
horsepower 


Change in load 


July to Dec, 

1944 


July to Dec, 
1945 


Decrease 


Increase 


Abixibi district 
Hislop Townsite 


25 
25 
25 
25 

25 

25 

60 
60 

60 
60 
60 
60 

60 
60 
60 
60 


33.1 

117.8 
32.4 

162.7 
40.2 

128.4 

282.6 
11,327.0 

96.9 

3.0 

5,305.6 

128.4 

55.9 

72.8 

160.3 

345.8 


48.5 
112.3 

40.6 
235.0 

49.1 

182.6 

365.3 
12,683.1 

119.6 

3.0 

6,031.5 

148.9 

71.8 
105.2 
229.3 

442.2 




15 4 


Kearns Townsite 


5.5 




King Kirk land Townsite 


8 2 


Matachewan Townsite. 




72 3 


Mooretown 




8 9 


Ramore & Matheson . . - 




54 2 


Sudbury district 
Capreol 




82 7 


Sudbury 




1,356 1 


NlPISSING DISTRICT 

Callander 




22 7 


Nipissing 






North Bay 




725 9 


Powassan 




20 5 


Patricia district 
Cottage Cove 




15 9 


Hudson 




32 4 


Red Lake Townsite 




69 


Sioux Lookout 




96.4 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 35 

MAINTENANCE OF THE SYSTEMS 

Power demands were greater during the past year than during any year 
since the outbreak of war and have placed a continued strain upon the 
physical structures of the Commission, which owing to the restrictions on 
labor, equipment and supplies, had to carry on during the long war years 
on the basis of bare maintenance. Nevertheless, all equipment essential 
to maximum service has been maintained in efficient operating condition. 
No better evidence of this can be found than the absence of any serious failures 
during the year. 

At the power houses, inspection and routine maintenance was carried 
out on all turbines, generators and auxiliary equipment. During the year 
six turbines of 10,000 horsepower or greater and eight turbines under 10,000 
horsepower capacity were completely dismantled and thoroughly over- 
hauled. New armature windings were installed in No. 14 generator at the 
Ontario Power plant and No. 8 generator at the Toronto Power plant and 
also in three small generators at the Big Chute and Kanover generating 
stations. 

Several transformers of varying sizes were rebuilt and restored to service 
during the year. Transformers at a number of distributing stations were 
replaced by ones of larger capacity to meet local load conditions. A certain 
amount of work was carried out modernizing equipment and layout at a 
number of stations. • 

Transmission lines were regularly patrolled. During the year about 
3,000 defective wooden poles were replaced. Nearly 25,000 poles were given 
butt treatment to retard rot. Insulators were systematically checked, in- 
volving several thousand units, and defective units were replaced to forestall 
failure and the resultant interruptions to service. Underbrushing of right- 
of-ways, which had been deferred during the war years, was extended in 
1945 owing to the easing of the labor situation in the latter part of the year. 

FORESTRY DIVISION 

Forestry division activities continued to suffer early in the year because 
of loss of personnel to military service. The co-operation of Operating and 
Rural department linemen has made possible the amount of work performed 
which was facilitated by the Department of Highways. 

Transmission and rural maintenance line clearing operations during 
the fiscal year involved treatment of 63,139 trees and the removal of 302 
spans of brush, spread over 2,746 miles of line. 

Municipal line clearing operations have been curtailed until the Forestry 
field staff is restored to its customary strength. 

Reforested areas in the vicinity of Eugenia and Trenton were heavily 
infested by the pine saw fly. To control the insects approximately 175 
acres were sprayed with D.D.T. applied by an autogyro. Definite results 
cannot be determined until the summer of 1946. 

Spraying of trees and shrubs was continued on Commission-owned 
properties in the Eastern and Niagara divisions for the control of various 
insects and fungus diseases. 



36 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



SECTION III 



MUNICIPAL WORK 



AT the end of 1945 the Commission was serving 922 municipalities in 
Ontario. Of this number about two-thirds or 577, including 120 villages 
and 457 townships are served as an amalgamated rural division of Hydro 
service (dealt with in Section IV of this Report), and about one- third or 300 
are supplied with power by the Commission under cost contracts and operate 
their own Hydro utilities either as a separate service or as part of a public 
utilities organization. In addition 45 municipalities are operated direct by 
the Commission or are served under other forms of contract. This section 
of the Annual Report deals with the Commission's work in connection with 
these urban municipalities which operate their own Hydro utilities. 

The Commission acts in an advisory capacity to the municipalities with 
which it has contracts, and assists municipal officials to purchase, construct 
or extend distribution systems. As provided under The Power Commission 
Act, all rate adjustments are approved by the Commission, therefore, a study 
of the operating conditions of all utilities is made annually and adjustments 
recommended. 

Municipalities Served 

During the year the Commission provided power to a number of munici- 
palities under the following conditions — 

New Municipalities 

Cost contract agreements were entered into and service supplied 
to the Towns of Almonte, Renfrew and Thornbury. 

Municipality formerly billed at a fixed rate 

During the year the Commission entered into a new contract with 
the town of Newmarket, by which the cost of power was changed from 
a fixed rate per horsepower to a regular cost contract. 

Hydro owned Systems sold to Municipalities 

The Hydro owned systems in the town of Burlington and the 
village of Braeside were sold to these municipalities and regular con- 
tracts entered into for their supply of power on a cost basis. 

New Townsites Served 

The Commission constructed new distribution facilities in Atikokan 
townsite to provide service to consumers directly by the Commission. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 37 

Northern Ontario Power Company 

The Northern Ontario Power Company properties were purchased 
during the year. In all 12 municipal systems came under Hydro operation 
in the following places: 

Towns of Cobalt, Englehart, Haileybury, New Liskeard and Timmins; 
townsites of Earlton, Elk Lake, Kirkland Lake, Schumacher, South 
Porcupine and Swastika; organized township of Bucke. 

Increased Municipal Loads 

The transition from war to post-war conditions affected the municipal 
Hydro utilities in different ways but on the whole the additional use of 
electricity following the lifting of restrictions, the return to standard time 
for the winter months, and the ending of the need for rigid economy in the use 
of electricity in the home, more than offset the reductions in demand for 
war industry. 

Comparing the period July to December, 1945, the transition stage 
following victory, with the corresponding period of the previous year when 
war production was maintained at about its peak output, there were increases 
in peak load demands by 303 Hydro utilities, no change in 3, and decreases 
in only 23. The change from Day-light Saving time in October 1945 to 
Standard time produced in most municipalities an indeterminate increase, 
which accounts in part for the demands established after October 1945. 
This record emphasizes the steady character of the municipal load and augurs 
well for Hydro stability and progress in the future. 

Statistical Summary of Growth by Utilities 

The annual growths in revenue and kilowatt-hour consumption, also 
the reduction in the average cost per kilowatt-hour from 1914 to 1944 for 
all domestic and commercial consumers are shown in the accompanying 
tables and graphs. The figures include all the municipal utilities listed in 
Statement "D" of Section X of this Report and also those municipal utilities 
owned and operated by The Hydro-Electric Power Commission of Ontario. 

The tables give complete information for "all municipal utilities com- 
bined" for both domestic and commercial services; the graphs show only 
increased use and decreased cost for domestic and commercial services but 
give these data for cities, towns and villages as well as for "all municipalities 
combined." 

It should be noted that the reduction in average cost per kilowatt-hour 
shown in accompanying tables is only in part due to reductions in rates or 
prices to consumers. Credit for the reduction in average cost belongs chiefly 
to the promotional form of modern rate schedules which are designed to 
give consumers the benefit of the low overall costs of providing additional 
energy by means of distribution facilities already established. 

Under such promotional rate schedules, providing the initial rates are 
not too high, there is established a beneficial cycle of increased use, leading to 
lower average costs, which if passed on to consumers in the form of lower 
rates or prices starts a repetition of the cycle. Under the Hydro practice of 
giving service at cost the promotional feature is inherent in the rate schedules, 
and the annual review of operations made by the Commission leads to appro- 



38 



THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



PER 
MONTH 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 

INCREASED USE BRINGS LOWER UNIT COST 

DOMESTIC SERVICE 



AVERAGE CONSUMPTION — KILOWATT-HOURS 



PER 

YEAR 




ajc^o^aioiaio^aic^ai^o^aic^a^aif^o^o^c^^t^a^oi^c^aiait^o^aicriaio^c^oi^ 




O"* o*» o*» o"» o*> o^ ct> o"» o** ot o"> o"* a*> c» 01 o~> o*» 01 o*» o*> <y> o*> o*» o"» o*> o*> o^ ^ ot a*» o~» o-> o** ot o - * <t> o*> 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



39 



















THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 


















LOW UNIT COST PROMOTED BY INCREASED USE 


COMMERCIAL LIGHT SERVICE 


PER PER 


MONTH AVERAGE CONSUMPTION — KILOWATT-HOURS YEAR 
















































































800 












































































9.600 












































































600 




















































/ 


/ 


r 


\ 


V 


/ 














7.200 
















































/ 


/ 


/ 




















































C 


TIE 


S 1 


1.00 


A 


JD 


3VE 


'> 


y 


y 
































400 








































<^" 


y 


































4.800 


































•» t> 


LL 


MU 


NIC 


PAL 


ITIE 


s 


































200 
































































2.400 






























*-T 


OWNS 2.000 AND OVER 






































































■VILLAGES AND SMALL TOWNS 










































■srlft^^coa)0»-f^J^OTTlnl£>fsooalo•-^^Jfo■«tlf)lD^.oo^o»-N( ¥ ^^ln^o^eoa>o 


'--'-»-'-'-N(MNf\jojNNf\jfM<NroforocoMforofnnpn^^t^^Tr^^*tnin 


<J> O"' 0> 0> Oi <Ji <J> \J> Oi CT> Oi 0"> 0"> Ol Ol O"* Ol CT> O") o*> 0"> 0"> 0"> 0"> 0"> O Ol 0"> CT> oS oS oS oS 0"> CT* o» o> 


CENTS AVERAGE COST PER KILOWATT-HOUR CENTS 


7 




7 














































































\ 


\ 










































































6 












































































6 






V. 


-\ 






r 


s 








































































J 






\ 




























































5 


_^ 
















\ 


























































5 




\ 












































































V 


^ 


— 


















<T 


AGE 


S A 


ND 


SM 


ALL 


TC 


WN 


; 


































4 










\ 
















\ 
















































4 


T 
























k 


















































■ 


















-TOWNS 2.000 | 


\ 






































































AND OVER 


s 
















































3 




i 




























\ 












































3 




V 






























\- 














































s 


V 






-AL 


M 


UNI 


CIP/ 


LIT 


IES 
























































2 

1 












































































2 

1 






















CITIE 


5 1 


.000 AND 


OVER-^ 








































































































































«TLn^c^coa)0^f^Jm^ln^£^oofl>o^Nfo^m^c^ooC10^No^^ln^D^oocno 




o - * <r> 0"> o"> o"> o"> .oi o^o~>cno^a^o^a^cr>o^«T>o^CT^o^o^o^a*><ncT , >o ,, »<T»o*»o^o , »o^o^CTvo^o^o^CT> 



40 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



GROWTH IN HYDRO DOMESTIC SERVICE 1914 TO 1944 
ALL URBAN MUNICIPALITIES COMBINED 





CO 

CD 




Kilowatt- 




CO 




2 


| 




fca 


Annual 


hours 


Number of 


CD* 1 ? 

si* 






u 




revenue 


consumed 


consumers 


2S 


s5§ 

& G 2 


<o 


J3 3 








{> *-« 


> O 


> O g 


>H 


ZB 








< a 


<£ 


<S8 






$ 






cents 


$ c. 


kw-hrs 


1913.... 








49,200 








1914.... 


49 


730,168 


14,359,100 


64,866 


5.08 


1.06 


21 


1915.... 




854,748 
992,628 


20,935,000 
29,359,900 


85,865 
108,364 


4.08 
3.42 


0.92 
0.82 


22 


1916. . . 




24 


1917.... 


"123" 


1,340,855 


41,930,200 


131,313 


3.20 


0.91 


29 


1918. . . . 




1,583,677 
1,933,577 


52,731,700 
68,409,100 ' 


146,885 
169,455 


3.00 
2.82 


0.92 
1.01 


31 


1919.... 




35 


1920. . . 


"*i66" 


2,514,658 


98,211,000 


193,892 


2.56 


1.15 


45 


1921 . . . 




3,086,051 
3,761,172 
4,955,420 


124,619,800 
166,182,000 
242,926.600 


219,465 

245,577 
286,852 


2.48 
2.26 
2.04 


1.24 
1.34 
1.54 


50 


1922... 




59 


1923... 


"206" 


76 


1924... 




5,548,835 


292,608,400 


303,787 


1.89 


1.56 


80 


1925. .. 




6,414,134 
7,353,394 


342,356,700 
404,722,959 


326,307 
349,882 


1.85 
1.81 


1.67 
1.79 


90 


1926... 


'"242" 


98 


1927... 


267 


8,497,190 


469,851,690 


387,573 


1.80 


1.87 


103 


1928... 


268 


9,411,812 


551,010,035 


408,071 


1.71 


1.97 


115 


1929... 


273 


10,256,860 


612,141,722 


424,419 


1.67 


2.05 


122 


1930. . . 


273 


10,752,720 


671,028,310 


433,260 


1.61 


2.09 


130 


1931... 


289 


11,226,091 


704,784,457 


447,466 


1.59 


2.12 


133 


1932... 


298 


11,676,222 


740,900,418 


452,615 


1.57 


2.15 


136 


1933... 


300 


11,639,178 


742,195,402 


460,878 


1.57 


2.10 


134 


1934... 


300 


12,078,069 


797,532,709 


463,913 


1.51 


2.17 


143 


1935... 


302 


12,393,536 


826,972,873 


471,265 


1.50 


2.19 


146 


1936... 


302 


12,922,466 


881,972,324 


482,557 


1.47 


2.23 


152 


1937. . . 


305 


12,680,921 


926,350,703 


490,140 


1.37 


2.16 


157 


1938... 


312 


12,880,180 


1,003,489,453 


507,132 


1.28 


2.12 


165 


1939. . . 


317 


13,300,898 


1,056,310,109 


518,123 


1.26 


2.14 


170 


1940. . . 


317 


13,905,290 


1,115,888,837 


531,514 


1.25 


2.18 


175 


1941... 


320 


14,452,796 


1,169,273,964 


546,613 


1.24 


2.20 


178 


1942... 


323 


15,022,931 


1,224,195,712 


559,605 


1.23 


2.24 


182 


1943... 


323 


15,069,547 


1,266,930,625 


570,470 


1.19 


2.20 


185 


1944... 


323 


15,528,445 


1,348,099,019 


579.890 


1.15 


2.23 


194 



priate rate reductions from time to time, although reduced average cost 
is chiefly a function and evidence of increased average use. 



Reductions in Rates and Refunds to Consumers 

During 1945 the Commission recommended and approved an adjustment 
in rates for domestic, commercial and power consumers in urban munici- 
palities receiving power from the Commission. These reductions involved 
255 municipal utilities, the consumers of which will benefit by an aggregate 
amount exceeding $3,300,000 per annum. 

The Commission also recommended and approved refunds to consumers 
in urban municipalities where the municipal Hydro surplus in the form of 
cash or bonds had accumulated during recent years in excess of the amounts 
estimated as required for plant construction, maintenance, etc., in the 
next few years. The total refunds to consumers amounted to more than 
$485,000. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



41 



GROWTH IN HYDRO COMMERCIAL LIGHT SERVICE 
1914 TO 1944— ALL URBAN MUNICIPALITIES COMBINED 





.<y 




Kilowatt- 




CO 



u, 


IS 


e 
.2 




<d.2* 


Annual 


hours 


Number of 




CD >> 

bCTJ 




J-4 


era 


revenue 


consumed 


consumers 


CD C 


era 
nth 

ISUI 


s 


^ ^ 








> 


> 2 


>o«. 


>< 


ZB 








<J a 


<B 


<as 






$ 






cents 


$ c. 


kwhrs 


1913.... 








13,113 








1914.... 


43 


624,781 


15,669,700 


15,657 


4.00 


3.63 


91 


1915.... 




649,585 


21,444,900 


19,324 


3.03 


2.95 


97 


1916.... 




753,784 


26,866,000 


22,216 


2.82 


2.87 


102 


1917. . . . 


"i23" 


860,475 


31,983,500 


27,453 


2.69 


2.77 


103 


1918. . . . 




947,769 


35,053,500 


29,570 


2.70 


2.70 


99 


1919.... 




1,158,406 


47,087,000 


33,307 


2.46 


3.03 


123 


1920.... 


"i66" 


1,477,963 


59,336,900 


36,496 


2.50 


3.51 


140 


1921.... 




1,818,211 


68,863,500 


39,333 


2.64 


3.98 


151 


1922.... 




2,143,981 


81,216,000 


43,098 


2.64 


4.26 


162 


1923.... 


"206" 


2,613,257 


105,482,600 


46,383 


2.46 


4.80 


196 


1924.... 




2,907,427 


120,474,800 


50,137 


2.41 


4.99 


207 


1925 




3,836,946 


151,555,200 


56,018 


2.54 


5.98 


235 


1926.... 


"242" 


4,176,595 


171,797,014 


58,444 


2.43 


6.08 


250 


1927.... 


267 


4,823,781 


200,606,137 


64,039 


2.40 


6.39 


267 


1928.... 


268 


5,436,795 


234,526,831 


68,013 


2.32 


6.66 


287 


1929.... 


273 


5,893,217 


272,343,330 


70,106 


2.16 


7.11 


329 


1930. . . . 


273 


6,094,871 


287,838,022 


71,873 


2.11 


7.15 


338 


1931.... 


289 


6,377,520 


305,121,640 


75,286 


2.09 


7.20 


344 


1932.... 


298 


6,402,882 


306,596,543 


75,705 


2.09 


7.05 


338 


1933.... 


300 


6,149,792 


292,335,489 


75,443 


2.10 


6.79 


323 


1934.... 


300 


6,344,921 


306,632,722 


75,016 


2.07 


7.05 


341 


1935.... 


302 


6,601,461 


327,413,421 


74,884 


2.02 


7.35 


364 


1936.... 


302 


7,001,893 


355,235,553 


75,878 


1.97 


7.69 


390 


1937. . . . 


305 


6,676,968 


393,067,119 


76,620 


1.70 


7.26 


428 


1938. . . . 


312 


6,909,454 


427,020,841 


78,021 


1.62 


7.38 


456 


1939.... 


317 


7,256,262 


459,635,100 


78,949 


1.58 


7.66 


485 


1940.... 


317 


7,785,024 


508,986,422 


79,512 


1.53 


8.16 


533 


1941.... 


320 


7,991,091 


540,995,581 


79,824 


1.48 


8.34 


565 


1942.... 


323 


7,695,928 


531,680,336 


77,326 


1.45 


8.29 


573 


1943.... 


323 


6,787,241 


472,129,977 


76,194 


1.44 


7.42 


516 


1944.... 


323 


7,298,848 


524,905,356 


78,256 


1.39 


7.77 


559 



In addition the Commission adopted a uniform rate for most mining 
townsites served by the Northern Ontario Properties, the local distribution 
systems of which are owned and operated by the Commission. This will 
benefit the consumers by more than $19,000 per annum. 

The mines of Northern Ontario continued to benefit by rate reductions 
announced last year, which came into operation on January 1, 1945. It is 
estimated that the total annual saving in power costs to the mines as a result 
of these rate reductions will exceed $500,000. 



Financial Progress of Municipal Electric Utilities 

The consolidated balance sheet, published on page 197 of this Report, 
shows a total plant value in Hydro utilities of $106,346,101 against which is a 
debenture balance debt of $10,612,595. However, some municipalities are 
accumulating a sinking fund to pay for debentures at maturity and up to 
1945 this fund amounted to $4,952,718. If this sinking fund is deducted from 



42 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

the debenture balance debt the actual unpaid debenture debt would be 
$5,659,876 or about 5 per cent of the original value of the distribution 
systems. 

Automatic reduction in the debenture debt, due to the annual principal 
or sinking fund payment being provided for out of revenue, and the remark- 
able accumulation of assets reflect a satisfactory financial condition of the 
Hydro utilities generally. Statement "A" of this Report shows the relation 
of assets to liabilities in 304 municipalities. In 92 per cent of these munici- 
palities the quick assets such as cash, bonds, accounts receivable and inven- 
tories exceed in value the total liabilities, including the debenture balance and 
their Hydro utilities may fairly be considered as being out of debt. 

Engineering Assistance to Municipalities 

In its advisory capacity the Commission gave general engineering assist- 
ance to municipalities especially in preparing estimates for expenditures to 
be made in the post-war period. The assistance given relates to deferred 
maintenance and rehabilitation of the local systems, to the design of more 
modern street lighting facilities, the preparation of estimates for increased 
substation facilities, the taking on of new industries and the general utilization 
of Hydro service. The more important matters concerning which advice 
was given are briefly tabulated below. 

SOUTHERN ONTARIO SYSTEM 

Niagara Division 

Agincourt — The capacity of the distribution system was increased to 
supply power for a manufacturer of wax products. 

Amherstburg — The 4,000 volt lines on Sandwich street were relocated 
to permit landscaping of the north entrance to the town. 

Ancaster Township Voted Area — New housing facilities, provided 
in this area made it necessary to change the power supply from a point near 
Dundas to the village. A new station was constructed by the Commission 
and many main feeder lines were re-routed within the municipality. 

Aylmer — Changes were made in the distribution system to provide 
service to a new industry which will take approximately 500 horsepower. 

Aurora — The capacity of the distribution system was increased to 
supply power to a manufacturer of aluminum products. 

Ayr — Service to new power customers involved changes. A bank of 
transformers was centrally placed and power at motor voltage was supplied 
to feed mills and a saw mill. 

Baden — Increased power facilities were provided to serve additions 
to a large linseed oil plant. Power is now supplied at 13,200 volts instead of 
4,000 volts as formerly. 

Blenheim — Distribution transformer capacity was increased to supply 
new and increased power loads. 

Brantford Township Voted Area — Sites were obtained and equip- 
ment ordered for two new substations of the unit type each having a capacity 
of 1,000 kva with two 4,000- volt feeders. They will be supplied at 26,400 
volts and serve the northern and eastern sections. The boundaries of the 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 43 

voted area have, been extended to include a portion of the district previously 
served by the Brant rural operating area. 

Brigd en— Distribution transformer capacity was increased to supply 
two new consumers operating chopping mills and feed supplies. 

Burford — Work on remodelling the distribution system was carried 
out in accordance with plans submitted including a new bank of transformers 
for supplying power customers. 

Burlington — The Burlington distribution system was acquired in the 
purchase of assets of the Dominion Power and Transmission Company by 
this Commission in 1930. The municipality has now decided to purchase 
its local distribution system from the Commission and passed the necessary 
by-laws. Ownership passed to the Corporation on January 1, 1945. 

Cayuga — New power customers, including a saw mill and feed grinding 
mills, were supplied with power. 

Chatham — Work was started on the new municipal station on Grand 
avenue, and plans were completed to lay a 26,000-volt submarine cable to 
supply this station. 

Plans were also initiated to construct a new municipal station in the 
west section of the city. The 4,000-volt circuit capacity in this section was 
increased to supply new industrial loads. 

East York Township — Plans and specifications were prepared for a 
new 1,875-kva substation which will go into service early in 1946. 

Essex — Suitable property was purchased and plans were made for a 
new building to accommodate utility office quarters, line supplies and trucks. 

Etobicoke Township — Improved street lighting utilizing modern 
fixtures and equipment throughout was installed on the main thoroughfares 
within the Township. In addition, facilities were provided to supply six 
new large power customers who are constructing plants within the area. 

Forest — Distribution transformer capacity was increased to supply 
new power consumers. 

Glencoe — Distribution transformer capacity was increased to supply 
new power consumers. 

Guelph — An additional 13,200-volt feeder from the Commission's 
transformer station to the main substation in the city, has been provided. 
A new substation will be built to house the 1,500-kva transformer purchased 
last year. 

Hespeler — New street-lighting units of modern design were installed 
on a portion of the main business intersection. 

Kitchener — Adequate storage facilities for transportation equipment 
and the handling of materials are being provided. A plan to modernize the 
street lighting system in certain sections of the city was also undertaken. 

London — Plans were made for the installation of an additional 13,200- 
volt feeder from London high-tension station to Ridout street station. 
It is to be partly overhead and partly underground. 

New Hamburg — A suitable property was purchased by the local 
Commission for the installation of a 1,000 kva, outdoor type station. 



44 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

Newmarket — In 1915 the corporation of the town of Newmarket 
entered into a contract for a supply of power, with the Toronto and York 
Radial Railway Company. In 1920 this Company was acquired by the 
Commission, which since then has supplied the town with power under the 
terms of the agreement signed with the Company. This agreement expired 
during the year, and the matter of entering into a new contract with the 
Commission on the co-operative plan was submitted to the electorate and 
voted upon favourably, with the result that the Corporation is now operat- 
ing its own system as a Hydro cost-contract municipality. 

New Toronto — Owing to a very large development in a number of 
industries in New Toronto, together with an increase in load, it was necessary 
during the year to make provision whereby five large power consumers would 
receive their power at 26,400 volts. 

North York Township— The substations required for the transforma- 
tion of power from 26,400 volts to 4,000 volts were installed and have been 
owned by this Commission since the inception of the North York Hydro- 
Electric Commission. Rapid development and growth in this area made it 
possible for the local Commission to own its own four substations, and 
arrangements were made for their purchase. 

Parkhill — Preliminary investigations were undertaken regarding the 
removal of poles from the business section of the main street and also the 
installation of a modern street lighting system. 

Petrolia — Plans were completed and construction commenced on a 
new building on Petrolia street to accommodate office quarters, trucks, 
materials and equipment of the utility. 

Port Stanley— Arrangements were made for additional property in 
connection with the enlarging of this Commission's distributing station. 
Investigations were also carried out in regard to the incoming and outgoing 
feeders at this station. 

St. Marys — To provide for increased power loads, the 13,200-volt line 
from the local substation was extended approximately one-half mile and a 
600 kva, three-phase, 13,200/550-volt transformer was installed at Water 
and Jones streets. 

St. Thomas — Plans were made for the installation of a second 13,200- 
volt feeder to take care of a large increase in power load in the north-east of 
the city. This feeder will be underground for 3,500 feet and overhead for 
3,750 ft. 

Plans also were made for the installation of two step-down stations with 
new connecting underground primary 13,200-volt cable for a distance of 
2,500 feet. 

Sarnia — Plans were completed to place the 4,000-volt primaries under- 
ground in the business section. Work was commenced on the installation 
of ducts and transformer vaults. The 4,000-volt distribution system was 
extended to supply a large block of new homes. 

Smithville — An important development took place in this area, brought 
about by the construction of a large alfalfa dehydrating plant. Since this 
customer will require approximately 600 horsepower, arrangements were 
made with the Company to take this power at 13,200 volts. Improved facili- 
ties to smaller power users in the area were also made. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 45 

Stamford Township Voted Area — Increased demands for service have 
necessitated additional station capacity. Investigation of the requirements 
indicated that a new station to serve the northern portion of the area was 
necessary. Plans and estimates were submitted and orders placed for a unit- 
type station of 1,500-kva capacity. New 4,000-volt feeders and tie lines are 
also planned. It is expected most of this work will be completed in 1946. 

Stratford — In order to supply two new power consumers, one of which 
requires both 550 volts, three-phase and 220 volts, three-phase, two power 
banks were erected each with a capacity of 150 kva. The second consumer 
owns the transformers, with a total capacity of 225 kva. 

Strathroy — A spare 500 kva transformer was added to the station 
with pad and structure accommodation for two additional 500 kva trans- 
formers to make up a future three-phase bank. 

Thorold — Plans for a new 1,875-kva station have been prepared and 
the material ordered. This station will provide additional capacity for the 
increased demands and relieve the overload on the present station. When 
materials are available, a second station will be constructed. 

Tillsonburg — Plans have been made for extensive changes to improve 
the street lighting on Broadway and Simcoe streets. 

Wallaceburg— The 4,000-volt distribution system was extended and 
the capacity increased to supply new industrial loads. Plans for the con- 
struction of a new municipal station on the west side of the town to meet 
increasing load growth were proceeded with. 

Welland — A large rubber products plant enlarged its facilities, making 
it desirable that its present power, as well as that required for the additions, 
be taken at 26,400 volts, replacing former services at a lower voltage. 

West Lome — Approval has been obtained and the property purchased 
for the erection of a building for office, material stores and trucks. The 
building will not be erected until materials become more plentiful. 

Wheatley — Plans were completed and work started on the installation 
of an ornamental street lighting system in the business section. 

Woodstock — Approval was obtained and a suitable site purchased for 
the erection of an office building with accommodation for truck, tools and 
material stores of the utility. This building will not be constructed until 
materials and labour become more plentiful. 

Plans were prepared to supply 600 horsepower to a wood-working plant 
in the southeast part of the city. 

York Township — Modern street lighting facilities were installed on the 
main thoroughfares throughout this area. It is expected that traffic con- 
ditions will be improved and the liability to accidents greatly reduced. 

Georgian Bay. Division 
Arthur — Plans are being prepared for improving the service to this 
municipality. These involve rebuilding the feeder line supplying the town, 
raising the feeder voltage to 12,000 and providing a new transformer station 
of 300 kva capacity to step down from 12,000 to 4,000 volts at Arthur. 

Alliston — Extensive changes were carried out on the distribution system 
and transformer banks were erected for three new power consumers. 



46 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

Barrie — The erection of a large industrial plant with other substantial 
growth in load necessitated the installation of another 3,000-kva substation 
in the Allandale section of the town. A large portion of the series street 
lighting was converted to multiple. Service was provided for the artificial 
ice plant in the Arena. 

Collingwood — Arrangements were made by the local Commission to 
supply 400 to 600 horsepower to a large furniture manufacturing plant 
being installed in the former Clyde Aircraft building. 

Another new industry, manufacturing leather hassocks, is equipping a 
plant which will utilize approximately 75 horsepower. 

Durham — The distribution system was extended and a bank of trans- 
formers erected to supply 40 horsepower to a new furniture company. 

Work was partially completed in connection with changing the trans- 
mission voltage to Durham from 22,000 to 38,000 volts, with a corresponding 
change in voltage and an increase in the capacity of the transformers in the 
substation from 450 to 600 kva. 

Dundalk — Work was partially completed in connection with changing 
the transmission voltage from 22,000 to 38,000 volts with an increase in the 
capacity of the station transformers from 225 kva at 22,000 volts to 600 
kva at 38,000 volts. 

Elmwood — The distribution system was extended and a bank of three 
15 kva transformers erected to supply a new chopping mill. 

Negotiations were also carried out in connection with a prospective load 
of approximately 60 horsepower for a woodworking plant. 

Flesherton — In connection with the change of the transmission lines 
south of Flesherton, from 22,000 to 38,000 volts, the transmission lines 
through the village were removed from the main thoroughfares by diversions, 
joining up again with the lines at a point south and west of the village. 

Grand Valley — Work was partially completed in connection with chang- 
ing the transmission voltage from 22,000 to 38,000 volts with a corresponding 
voltage change in the station transformers. 

An investigation was also made re providing additional station capacity 
by removing from the Grand Valley station the load of the village of Arthur 
and the rural load and providing a new station for these loads. 

Gravenhurst — A new pumping installation was completed, consisting 
of two 40 horsepower motors with automatic pressure and time control. 

Hanover — Studies were made and plans completed to improve the 
distribution system by constructing two new feeders from the substation to 
take care of present loads and future growth. 

Arrangements were made to provide a bank of three 125 kva trans- 
formers at a large flour mill, replacing a bank of 75 kva units. The new 
bank will provide capacity for load increase at this mill of approximately 
150 horsepower plus an increase of load at a nearby furniture company of 
approximately 50 horsepower. 

Negotiations were also conducted re supply of load to a new furniture 
company expected to have a small initial load of approximately 10 horsepower. 

Huntsville — A new 1,000-kva rural substation was erected to relieve 
the serious overloaded condition on the municipal station. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 47 

Kincardine — A new power feeder was constructed from the substation 
to a knitting company to take care of load increase of approximately 200 
horsepower expected in this plant. 

Additional substation capacity is also being arranged by the removal 
of the rural load from the municipal station, leaving the total capacity of the 
present station available for the municipal load. A new substation is being 
provided for the rural load. 

Lucknow — Arrangements were made during the year to supply ap- 
proximately 80 horsepower to a new industry, which took over the plant 
of the Maple Leaf Aircraft. 

Meaford — Service was extended to a new furniture company whose 
load will be approximately 75 horsepower and negotiations have been under 
way for supplying a former sawmill consumer with a load of approximately 
70 horsepower. 

Plans were made for the construction of a new station to supply the 
rural area, thereby releasing additional station capacity for the town of 
Meaford. 

Mount Forest — Work was partially completed in connection with 
changing the transmission voltage from 22,000 to 38,000 volts, involving a 
corresponding change in the connection of the station transformers. 

Neustadt — Plans and estimates for improvements to the distribution 
system were made and for the supply of 10 horsepower to a new food proces- 
sing industry. 

Orangeville — Estimates were prepared on the cost of improved street 
lighting for the main thoroughfares of the municipality. 

Work was partially completed in connection with changing the trans- 
mission voltage from 22,000 to 38,000 volts, involving a corresponding change 
in voltage and an increase in the capacity of the station transformers from 
750 to 2,000 kva. 

Owen Sound — Studies were made -to determine the best methods of 
providing additional substation capacity to take care of rapidly increasing 
loads. 

As a result of these studies, it was recommended that a new substation 
be constructed on the west side of the town, in the vicinity of Twelfth street 
and Second avenue west. This station will have an initial capacity of 3,000 
kva, with an ultimate capacity of 6,000 kva. 

Arrangements are also being made to install, temporarily, 3,000 kva 
at the main station, making the total installation, at that point, 9,000 kva. 

The local Commission is planning to rehabilitate the local distribution 
system and increase the distribution voltage from 2,300 to 4,000 volts. The 
temporary installation of 3,000 kva at the main substation will provide 4,000 
volts in order that power feeders of the local distribution system may be 
changed over to 4,000 volts as soon as the temporary installation has been 
completed. 

The new station on the west side, when placed in service, will provide 
4,000 volts for the portion of the distribution system to be supplied from this 
station, and the change to 4,000 volts for the balance of the system will be 
completed as soon as the work can be carried out, after which the temporary 
installation of 3,000 kva at the main station will be removed from service. 



48 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

Paisley — Arrangements were made with the municipality to utilize 
the services of the Commission's rural staff at Walkerton for maintenance 
and construction work in Paisley as required from time to time. 

Ripley — An extension was made to the distribution system to provide 
three-phase power to a planing mill, a new consumer using approximately 
45 horsepower. 

Shelburne — Work was partially completed in connection with changing 
the transmission voltage from 22,000 to 38,000 volts with a corresponding 
change in voltage and an increase in the capacity of the station transformers 
from 300 to 600 kva. 

Southampton — Arrangements were made to supply additional power 
to a plywood manufacturing company for high frequency drying of laminated 
plywoods. 

Stayner — Estimates were in course of preparation for the municipality 
in connection with changing the street lighting from series to multiple. 

Walkerton — Arrangements were made with the municipality whereby 
the services of the rural staff of the Walkerton rural operating area would 
be made available for maintenance and construction work on the local dis- 
tribution system as required from time to time. 

Wiarton — Plans were made for the construction of a new station to 
supply the rural area, thereby releasing additional station capacity for the 
town of Wiarton. 

Eastern Ontario Division 

Almonte — A 1,000-kva transformer station was installed in Almonte 
to augment the supply of power from the local generating plant and at the 
request of the municipality the Commission designed and installed a sub- 
station to provide additional distribution feeders. 

Bobcaygeon — At the request of the municipality estimates were pre- 
pared for a supply of 100 horsepower to supplement the power from the 
local generating plant. 

Braeside — The distribution system in this village was acquired by the 
Commission in the purchase of the assets of the M. J. O'Brien Company in 
1930, since which date the Commission has owned the utility serving the 
citizens within the municipality. On January 1, 1945, the corporation 
purchased the distribution system from the Commission and entered into a 
cost contract, on which basis they have since been a Hydro municipality of 
the Southern Ontario system. The Commission at the request of the munici- 
pality is continuing the operation of the utility on its behalf. 

Havelock — At the request of the municipality the Commission's rural 
staff, which operates the system on behalf of the municipality, rebuilt and 
improved a considerable portion of the distribution system. 

Lindsay — Plans were prepared for improving and extending the under- 
ground street lighting system. Consideration was also given to improving the 
present overhead distribution system. 

Oshawa — Estimates are in preparation for the construction of a new 
substation of 6,000 kva capacity in the north end of the city to increase the 
substation capacity and replace the old No. 2 station. 

Negotiations are proceeding regarding the' sale to Oshawa of No. 1 
substation at present owned by the Commission. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 49 

Pembroke— The municipality of Pembroke requested advice from this 
Commission in connection with the renewal of the franchise of the Pembroke 
Electric Light Company, Limited. Engineers made a study of the generating 
station and distribution system and submitted a report to the town. 

Picton — Estimates have been prepared on behalf of the Picton Public 
Utilities Commission covering the installation of a new 2,000 kva municipal 
station in the central part of the town. 

THUNDER BAY SYSTEM 

The Thunder Bay system is operated on a cost-contract basis similar to 
the Southern Ontario system and the area served by this system is the only 
area in Northern Ontario receiving power supply under such conditions. 

The co-operative municipalities include the cities of Port Arthur and 
Fort William, a voted area in Nipigon township and the various townships 
included in the Thunder Bay rural operating area. 

Power is also supplied to seven gold mines and two mining townsites 
in the Longlac and Beardmore mining districts east of lake Nipigon, utilizing 
approximately 6,070 horsepower; to four pulp and paper companies, utilizing 
approximately 53,000 horsepower; and to the Rainy River district of the 
Northern Ontario Properties, utilizing approximately 18,300 horsepower, 
all of which are served at fixed rates as system customers. 

In addition to meeting the requirements of the municipal utilities, the 
pulp and paper industry and the mines, power supply is also utilized for 
handling the greater portion of Canada's western grain crop through terminal 
elevators at Port Arthur and Fort William, at which the various grains are 
cleaned, graded, stored and transhipped from rail to water transportation 
systems for delivery to eastern and European markets. 

The average load sold by the Thunder Bay system in 1945 was 120,010 
horsepower representing an increase of three per cent over the previous year. 

The city of Port Arthur utilized during the year an average load of 
24,311 horsepower, an increase of seven per cent over the previous year and 
the city of Fort William established an average load of 16,684 horsepower, 
also an increase over the previous year of seven per cent. The load increase 
in Nipigon village was nine per cent and in the rural operating area 
eighteen per cent over the previous year. 

Gold mining operations in the Beardmore and Longlac areas, which 
were curtailed during the war by lack of labour, and which utilized some 
5,600 horsepower less during 1945 than in 1940 are expected to expand and 
regain prewar demands. A great expansion has already taken place in the 
pulp and paper industry and negotiations have been carried on with several 
new companies which intend to establish mills at points within the Thunder 
Bay system area. 

Engineering Assistance to Municipalities 

Engineering advice and assistance was given during the year to the 
local Commissions of Port Arthur and Fort William, also to Nipigon village, 
covering the operation and maintenance of the local distribution systems. 



50 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

NORTHERN ONTARIO PROPERTIES 

Northern Ontario is sparsely settled and the individual centres of 
population are scattered and largely dependent upon mining activities. For 
this reason and partly because of the hazards of mining operations the 
publicly-owned Hydro properties of northern Ontario are held by the Com- 
mission in trust for the Province and operated upon the financial responsibility 
of the Ontario government. 

Hydro's purpose in northern Ontario is to encourage the mining industry 
and facilitate the development of new properties by the establishment of 
ample supplies of electric power at a stabilized low cost. 

The Northern Ontario Properties comprise eighteen generating stations 
with extensive transmission and distribution systems, and serve seven 
districts as follows: The Abitibi district with an average load sold in 1945 
of 135,858 horsepower; the Timiskaming district with an average load of 

44,174 Horsepower; the Sudbury district with an average load of 23,393 
horsepower; the Nipissing district with an average load of 6,078 horsepower; 
the Patricia district with an average load of 9,084 horsepower and the Rainy 
River district with an average load sold in 1945 of 18,812 horsepower. 

In addition there is associated with the Northern Ontario Properties 
the rural operating area of Manitoulin Island. To service this area the 
Commission purchases power from 'a privately-owned local development. 
The average load sold in 1945 was 604 horsepower. 

Service in northern Ontario involves delivery of power to thirty munici- 
palities and townsites, four rural operating areas, forty-two gold mines, 
three nickel mines, one iron mine and seven silver and cobalt mines. The 
total average load sold in the seven districts served by the Northern Ontario 
Properties in 1945 was 238,000 horsepower, an increase of approximately 
20 per cent. This increase was due to the inclusion of the new Timiskaming 
district served by eight generating plants recently purchased by the Com- 
mission from the Northern Ontario Power Company. 

Rate Reductions 

On January 1, 1945, the Commission placed in force rate reductions to 
all gold mines served by the Northern Ontario Properties reducing the rate 
for the first 5,000 horsepower from $32.50 per horsepower per annum to 
$27.50 per horsepower per annum. These reductions in power cost greatly 
benefited properties mining low grade ore and made it possible for the older 
operating mines to clear up their low grade ore bodies. 

About the end of 1945 following the cessation of hostilities, labour 
began to be available for mining operations and the expansion in gold mining 
operations made it necessary for the Commission to plan for increased power 
development. 

There has also been a substantial demand for increased service in the 
rural operating areas of northern Ontario. Shortage of materials has, how- 
ever, handicapped the work of rural extensions in northern Ontario as 
elsewhere. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 51 



SECTION IV 

RURAL ELECTRICAL SERVICE 
IN ONTARIO 

IN ONTARIO a large part of the population is engaged in mixed farming 
or lives in villages or hamlets closely associated with rural activities. 
Intensive efforts have been made by the Commission to spread the benefits 
of electrical service throughout rural Ontario and to encourage and assist 
rural dwellers to make the maximum use of electricity. Low-cost Hydro 
service fully utilized can bring to farm and village homes the conveniences 
for modern living enjoyed in urban centres. 

As announced in the Annual Report for 1944, the Commission on January 
1, 1944 put into operation a comprehensive revision of its rural service which 
is, without doubt, the greatest step forward since the formation of rural 
power districts (now called rural operating areas) in 1920, and the subsequent 
grants-in-aid inaugurated by the Province in 1921, and extended in 1924, 
in connection with its well established policy of assistance to agriculture. 

The chief feature of the new set-up for rural service is the establishment 
for rural operating areas of a uniform rate structure with a common rate 
applicable to each class of service. Thus, no matter where rural service is 
given in Ontario by the Hydro the rural consumer* for the same class of 
service with the same consumption of electricity will pay the same amount 
on his quarterly bill. 

Although, for convenience of administration, the local rural operating 
areas will be retained as administrative units, the whole rural service is 
amalgamated into one rural power division of Hydro service, with a pooling 
of all revenues and expenses. This rural amalgamation and unification of 
rates is made possible by the financial assistance given by the Province as 
part of its aid to agriculture. The extent and effect of the Province's financial 
assistance with respect to the distribution of power in rural operating areas 
should, therefore, be clearly understood. 

Provincial Assistance 

The government grant-in-aid of 50 per cent of the capital cost of lines 
and equipment for the supply of power, relates solely to the initial capital 
investment for distribution facilities in rural operating areas. 

* Rural consumer does not include industrial power consumers served by the facilities of 
rural operating areas. 



52 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



MILES OF LINE 



MILES OF LINE 



30,000 





|! 


I; 


J: 


^ 


So 1 


-; u 






\l 


33 


Sc 


Si; 


«s 


;s 


1= 


h 


"o 


J . 


ZO 


s- 


1- 


5o£j 


oi 


zo 


IS 






Sozc 




«| 


- 


\ 


ioOw 


i: 


i< 


1 = 


33a§ 


g 


z« 


Is 


j: 


5: 


So 


B 


|! 


s2 


: 


i= 


El 


oi 




x< 


5 = 


I- 


io 


It 








































M I I M II I I I 1 I 1 1 II 1 I I I I I 
























































































































































RURAL PRIMARY LINES APPROVED 












































































ALL SYSTEMS 












































































THE HYDRO-ELECTRIC POWER COMMISSION 






























































































o 


F 


uf* 


T/ 


RIO 

1 1 1 




















































































































1 1 1 












































































































4^ 




















































































19 


41 










19 


42 






















































































20.000 




1940 
























































































































































































































939 


- 


** 


















































































































































































































































































































































1938 


























































































































/ 










































































































9 


37 


































































































































































































































9 


3f 










r 


/ 
































































































19 


35 














/ 


/ 


































10.000 






























19 


32 










19 


33 








1934 












































































9 


31 


































































































- 


9 


3C 


















































































































































































































































































































































19 


2? 


- 










































































































19 


2E 




































































































19 


27 








































































































9 


26 






































































































1925 
































































1921 






1922 




































<- 

























































































































































































zo 


3< 


5? 


33 


So 1 


3 2 


IS 


;. , 




33 


io 


: -S 


|S 


; ; 






So 


-: 


IS 


<l 


\\ 




,' 


ZO 




II 


^ 


u 


So 




5: 


; ' 


]\ 


- 


tV 


?j? 


is 


!< 








'-•.■ 


i:; 


u 


i- 


^ 


" : 


•u 


IS 


i" 




;j 


^ r 


':• 


it 


- 


s3 


- 


" ' 


\i 



10.000 



Having made this grant-in-aid the government further participates in 
the operation of the province-wide Hydro rural service in that it guarantees 
the Commission against loss due to the fixing of a maximum service charge 
or its reduction or removal.* 

The new set-up is a means of apportioning the benefits from provincial 
assistance where they will do most good: namely, to the farmer in sparsely 
settled and less fertile farming areas where, because of these conditions, 
electrical service is necessarily more costly to provide. 

Status of Rural Service in 1945 

In 1945 rural service in Ontario was given through 121 operating admin- 
istrative units which, for convenience, will continue to be referred to as rural 
operating areas. Power was delivered to approximately 159,608 rural con- 
sumers, comprising farms and dwellings in various groups. The consumers 
are situated in 435 organized townships; 27 unorganized townships and 121 



* The Rural Power District Service Charge Amendment Act, 1944. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



53 



HORSEPOWER 



52<J«lD=iuo"<2<?<lD^uuoli|2<i<33 3iuou32<a<l33iuou5S<i<l^ J 2 < a » 1 i Si uo_ 52< f < _ _-2uo_l 

■nr nnn "'KJ^^HOIO ^»2<J-.-.««02O ikKI^CBOJO ;kI<j"<eOZo|;iiS<i;,<»OZI)|*kS<I^<«02o|*uS<I,,4»OZO ?il!<J,-,<»OZO -,lLl<S,,<«020-,kI<I,-,<llO«0 


RURAL POWER DISTRICTS 


AGGREGATE PEAK LOADS 


ALL SYSTEMS 




THE HYDRO-ELECTRIC POWER COMMISSION 


OF ONTARIO 






1945 


T /, . . 


L -1 


1944 


/_■ 


_________ . • __r _j 


19 , 43 j 


1*42 ^ | l'\ 1 


i9« r / *J 


-1940 -£w -H-- H lA-L 


_u!l ±71 7 .i_ 1 :. 


:_t.L,_J W _._± VI- 


\?\ j J v 


75,000 -^ f \l h 

_J " _J IftOO t_\- 


v 7 t il n_ i v 


U .-IS- -A— 4 


__■_: : Jul .__. i __v / _ 


"36 ^L 1 V 


1935 / v; 


1934 •> i \- 7 


-S 444 444 -A--/-H L N 


-^ / V v A, As / -M J 


A- v / V V V 1929 


™\ / """' 1928 A \ 


10^6 192? ^--/ 


1 1925 r^ V^' ' 


1923 1 ._^ 


III J-4-4- -^'l 





HORSEPOWER 



175.000 



150.000 



100.000 



75.000 



50.000 



police villages, villages and small towns and are served over a network 
of rural primary lines which aggregate 22,309 miles. In addition to the 462 
townships served by rural operating areas, 10 townships are served jointly 
by rural operating areas and voted areas. 

The restrictions in the use of materials which enter into rural line con- 
struction existing during 1944, were cancelled on June 1, 1945. This enabled 
the Commission to proceed with many extensions to the extent that both 
material and labour became available. 

During the past year the mileage of rural-line extensions, approved for 
construction in rural operating areas in Ontario, was 1,279. The net increase 
in the number of consumers after allowance for cancellation was 13,924. 



54 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



Rural lines serving rural consumers were purchased from the Caledon Electric 
Co. during the year and are included in the above figures. See tables and 
footnote on this page. 

The average aggregate peak load* supplied to all rural Hydro consumers, 
including war industries in rural areas in the Province, amounted to 111,255 
horsepower, an increase of 12.9 per cent over 1944. 

* Average aggregate peak load is the summation of the twelve monthly peak loads for each 
and all rural operating areas divided by twelve. 

RURAL LINE EXTENSIONS APPROVED BY THE COMMISSION DURING 

THE YEAR 1945 



System 


Miles of 

primary 

line 


Net increase in number 
of consumers 


Power 
supplied 

in 
October 

1945 


Capital approved for 
extensions 




Farm 


Non- 
farm 


Total 


Total 


Provincial 
grant-in-aid 


Southern Ontario 

Niagara division 

Georgian Bay div. . . 
Eastern Ontario div. 


488.55 
382.55 
384.61 


3,584 
1,303 
1,788 


3,347 
1,948 
1,570 


6,931 
3,251 
3,358 


h.p. 

89,695 
12,072 
22,821 


$ 

1,915,514 

962,004 

1,325,892 


$ 

957,757 
478,457 
662,946 


Southern Ont. totals. . 

Thunder Bay 

Northern Ontario 
Properties. . 


1,255.71 
6.55 

17.10 


6,675 
20 

67 


6,865 
61 

236 


13,540 
81 

303 


124,588 
916 

2,841 


4,203,410 
29,614 

74,788 


2,099,160 
14,807 

37,394 






Totals 


1,279.36 


6,762 


7,162 


13,924 


128,345 


4,307,812 


2,151,361 







SUMMARY OF RURAL LINE EXTENSIONS 

Approved by the Commission from June 1, 1921 to October 31, 1945 

Constructed or Under Construction 



System 


Miles of 

primary 

line 


Number of consumers 


Capital approved for 
extensions 




Farm 


Non- 
farm 


Total 


Total 


Provincial 
grant-in-aid 


Southern Ontario 
Niagara division.. . . 
Georgian Bay div. . . 
Eastern Ontario div. 


12,725.40 
3,586.67 
5,327.87 


45,431 

7,607 

14,103 


51,531 
15,773 
19,467 


96,962 
23,380 
33,570 


$ c. 

32,761,428.89 

8,096,261.95 

13,330,029.31 


$ c. 

16,357,434.44 
3,955,467.49 
6,665,014.65 


Southern Ont. totals . . 

Thunder Bay 

Northern Ontario 
Properties 


21,639.94 
301.53 

368.02 


67,141 
635 

573 


86,771 
968 

3,520 


153,912 
1,603 

4,093 


54,187,720.15 
680,485.00 

1,190,278.00 


26,977,916.58 
340,242.50 

595,139.00 






Totals 


22,309.49* 


68,349 


91,259 


159,608* 


56,058,483.15 


27,913,298.08 



* These totals include 740.01 miles of primary line under construction on October 31, 1945 
and service to 3,048 new consumers, not completed until after the end of the fiscal year. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 55 

Rural Loans 

Under The Rural Power District Loans Act, 1930, authority was given 
to The Hydro-Electric Power Commission of Ontario to finance the installation 
of wiring and the purchase of specified electrical equipment by rural farm 
consumers. 

Owing to the necessity to conserve funds for war purposes this financing 
was discontinued on October 31, 1940. Up to that time 1,776 loans had been 
granted, amounting to $360,852. Details are as given in previous Annual 
Reports. 

To October 31, 1945, 1,766 loans had been repaid in full, either through 
the maturing of the loan or by being paid in advance by the borrower. 



NEW UNIFORM RURAL RATE STRUCTURE 

A new uniform rural rate structure, for the sale of energy, was placed 
in effect on January 1, 1944, for all rural Hydro service throughout the 
Province, and replaces the numerous rural rate schedules previously in effect. 

The effect of the rural-rate decrease made in 1944 was so satisfactory 
that the Commission considered it advisable to reduce the first block rate 
of 4 cents per kilowatt-hour to 3.5 cents per kilowatt-hour to all rural con- 
sumers. This reduction came into effect on May 1, 1945. 

The new energy rates consist, essentially, of a three-step energy charge, 
as follows: 

1. A first block or number of kilowatt-hours of energy consumption 
in the billing period, charged for at 3.5 cents gross per kilowatt-hour;* 

2. A second block or number of kilowatt-hours of energy consump- 
tion in the billing period, charged for at 1.6 cents gross per kilowatt- 
hour; and 

3. All remaining kilowatt-hours of energy consumption in the 
billing period, charged for at 0.75 cents gross per kilowatt-hour. 

In addition, the service charge in use prior to January 1, 1944, has been 
eliminated in the case of Farm and Commercial service, reduced by 50 per 
cent of Hamlet service and changed to an annual fixed charge in the case of 
Summer service. 

Under the new rate schedules, rural service is now available in four main 
classes. All rural contracts for service carry a symbol consisting of a letter 
indicating the classification of the contract, followed by a number which 
indicates the demand rating or permissible demand in kilowatts contracted 
for. These classes and symbols are: Farm service, F; Hamlet service, H; 
Commercial service, C, and Summer service, S. 

* Reduced from 4 to 3^ cents gross on May 1, 1945 



56 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



The following is the rate schedule for each main class of service with 
minimum demand rating: 

RATE SCHEDULES FOR RURAL SERVICE— MINIMUM DEMAND 



Class 
and 


Demand 


Service 
charge 

per 
month 


Energy consumption per month 


Minimum 


minimum 
rating 


at 3.5 cents* 
per kw-hr 


at 1.6 cents 
per kw-hr 


at 0.75 cents 
per kw-hr 


bill (gross) 
per month 


F3 

H2 (2 wire) 
H3 (3 wire) 
C2 


kw 
3 
2 
3 
2 

2 


cents 

Nil 
56 
56 

Nil. 


kw-hrs 
60 
40 
40 
60 


kw-hrs 

180 

80 

180 

120 


kw-hrs 
Balance 
Balance 
Balance 
Balance 


$ c. 
2.25 
1.67 
2.25 
1.50 




Annual 

fixed 

charge 


Energy consumption per year 


Minimum 




at 3.5 cents* 
per kw-hr 


at 1.6 cents 
per kw-hr 


at 0.75 cents 
per kw-hr 


bill per 
year 


S2 


$ c. 
11.11 


kw-hrs 
150 


kw-hrs 
450 


kw-hrs 
Balance 


$ c. 
Annual fixed 
charge 




Prompt payment discount — 10 per cent 



* Reduced from 4 to 3^ cents gross on May 1, 1945. 

For higher demands, above the minimum rating, add to the minimum 
rating set out above, for each additional kilowatt, the following: 



RATE SCHEDULES FOR RURAL SERVICE 
ADDITIONAL CHARGES AND CONSUMPTIONS FOR EXTRA DEMAND 





Additional 
service 
charge 

per month 
per kw 


Energy consumption per month per kw. 


Addition to 


Class 


at 3.5 cents 
per kw-hr 


at 1.6 cents 
per kw-hr 


at 0.75 cents 
per kw-hr 


minimum bill 

(gross) per month 

per kw 


F4, F5, etc. 
H4, H5, etc. 
C3, C4, etc. 


Nil 
No increase 

Nil 


kw-hrs 
20 
20 
30 


kw-hrs 
60 
60 
60 


kw-hrs 
Balance 
Balance 
Balance 


$ c. 
0.75 
0.75 
0.75 




Additional 

annual 

fixed 

charge 


Energy consumption per year per kw. 


Minimum 




at 3.5 cents 
per kw-hr 


at 1.6 cents 
per kw-hr 


at 0.75 cents 
per kw-hr 


bill 
per year 


S3, S4, etc. 


$ c. 
3.33* 


kw-hrs 
75 


kw-hrs 
225 


kw-hrs 
Balance 


$ c. 
Annual fixed 
charge 




Prompt payment discount — 10 per cent 



* Yearly minimum fixed charge for all summer classes above S2 — $15.56 (gross), or $3.33 
(gross), per kw of demand, whichever is the greater. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 57 

DESCRIPTION OF MAIN CLASSES OF HYDRO RURAL SERVICE 

Beginning January 1, 1944 electrical service is supplied in rural operating 
areas under four main classes described below. When the class of service 
which will meet the requirements of the individual consumer has been 
chosen, contracts are executed between the consumer and the corporation 
of the township concerned. 

Farm Service 

Farm service shall be considered to be service to property having lands 
used for the production of food stuff or industrial crops for sale and from 
which a substantial livelihood is obtained. It shall include electrical service 
to all farm buildings and equipment situated on the farm and used for farm 
purposes, including buildings and equipment required for processing the 
products of the customer's farm. 

Service under a single farm contract may be supplied to all dwellings or 
separate domestic establishments situated on the farm property and occupied 
by persons who are regularly engaged in the operation of the farm. 

Additional dwellings or domestic establishments situated on a farm 
property and occupied by persons not regularly engaged in the operation of 
the farm, if served, shall be classed as hamlet contracts and rated accordingly. 
Small properties of five acres and less will be classed as hamlet services except 
under special circumstances which would justify a farm classification. 

The minimum demand of a farm service for billing purposes shall be 
taken as three kilowatts. 

Hamlet Service 

Hamlet service shall be considered to be service to a domestic establish- 
ment or residence -in a rural or in a small suburban community served as 
part of a rural operating area. This class shall include isolated rural residences. 

The demand rating of a two-wire hamlet service will be taken as two 
kilowatts and will be limited by a 20-ampere breaker or a 30-ampere fuse. 
Where the hamlet service exceeds two kilowatts, three-wire service shall be 
supplied and the minimum demand for a three-wire service shall be three 
kilowatts. 
Commercial Service 

Commercial service shall be considered to be service to community or 
business premises including schools, churches, public halls, hospitals, hotels, 
public boarding houses, tourist camps, business and professional offices, 
stores, repair shops, garages, gasoline stations, blacksmith and woodworking 
shops, small manufacturing and processing plants, chick hatcheries, sign 
and display lighting and all other premises used for commercial or community 
purposes. 

Single-phase power only will be supplied under a commercial contract. 
Where three-phase power is required, the service will be classed as an "Indus- 
trial power service/' 

The minmum demand rating of a commercial contract shall be two 
kilowatts for a two-wire service and three kilowatts for a three-wire service. 

Summer Service 

Summer service is applicable to properties where service is used normally 
only during the summer months and which are not established as the con- 
sumer's permanent residence. This service is not limited to cottages, but may 



58 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



include summer hotels, tourist camps, refreshment booths and other com- 
mercial premises. 

The demand rating of a two-wire summer service will be taken as two 
ki'owatts and will be limited to a maximum of a 20-ampere breaker or a 
30-ampere fuse. Where the summer service exceeds two kilowatts, three- 
wire service shall be supplied and the minimum demand for a three-wire 
service shall be three kilowatts. 

STANDARD NUMBER OF CONSUMERS PER MILE 

The number of consumers required per mile of line extension varies 
according to classification and rating of all applicants. For this purpose 
a unit rating is allocated to each consumer, according to the classification 
and rating. 

The following table shows the number of units and contracts per mile 
for each class of service : — 



Classification of consumer 


Rating in 
kilowatts 


Units per 
contract 


Contracts 
per mile 


Single Services 

Farm 


3 and over 

2 

3 

4 

5 and over 

2 

3 

4 

5 and over 

2 

3 

4 

5 and over 

3 and over 
4 

5 and over 

4 

5 and over 

4 

5 and over 

4 and over 
up to 4 

5 and over 


5 
3 
3 
3 
4 
3 
3 
3 
4 
2 
2 
2 
3 

5 
3 

4 
3 
4 
2 
3 

5 
3 

4 


2 


Hamlet 


3.33 


Hamlet 


3.33 


Hamlet. . 


3.33 


Hamlet. . 


2.5 


Commercial 


3.33 


Commercial 


3.33 


Commercial 


3.33 


Commercial 


2.5 


Summer 


5 


Summer. 


5 


Summer 


5 


Summer 


3.33 


Multiple Services 

Farm 


2 


Hamlet 


3.33 


Hamlet 


2.5 


Commercial 


3.33 


Commercial 


2.5 


Summer 


5 


Summer. 


3.33 


Combination Services 

Total kilowatts of: 

Combined Farm with Hamlet or 

Commercial 

Combined Hamlet with Commercial . 
Combined Hamlet with Commercial . 


2 
3.33 

2.5 ' 



RATE SCHEDULES FOR INDUSTRIAL POWER SERVICE 
SERVED THROUGH FACILITIES OF RURAL OPERATING AREAS 

A study was made during the year relating to rates charged consumers 
for industrial power service. Rates will be reduced on January 1, 1946, in 
all areas where it is possible to do so. The schedule of rates to be placed in 
effect on January 1, 1946, is given below. 

Industrial Power Service 

Power service shall cover three-phase service to power users such as 
creameries, cheese factories, chopping mills, industries and special loads 
which cannot be supplied as Commercial single-phase service. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



59 



INDUSTRIAL POWER SERVICE— RATES TO CONSUMERS 
SERVED THROUGH FACILITIES OF RURAL OPERATING AREAS 







Basis 


















of 


Ser- 


First 


Second 












rate, 


vice 


50 


50 hrs 


All 








Rural 


130 


charge 


hrs 


per 


addi- 


Local 


Prompt 


Control office 


operating 


hours' 


per 


per 


month 


tional 


dis- 


payment 


location 


areas 


monthly 


h.p. 


month 


per 


per 


count 


discount 






use of 


per 


per 


kw-hr 


kw-hr 










demand 


month 


kw-hr 











Southern Ontario System 
Niagara Division 







$ c. 


$ c. 


cents 


cents 


cents 


1 % 


% 


Aylmer 


Aylmer 


27.00 


1.00 


2.3 


1.5 


0.33 




10 


Beamsville. . . . 


Beamsville. . . 


24.00 


1.00 


2.3 


1.5 


0.33 


10 


10 


Blenheim 


Blenheim. . . . 


28.00 


1.00 


2.5 


1.6 


0.33 




10 


Bond Lake . . . 


Bond Lake.. . 


26.00 


1.00 


2.2 


1.4 


0.33 




10 


Bothwell 


Bothwell 


30.00 


1.00 


2.8 


1.8 


0.33 




10 


Brampton .... 


Brampton . . . 


26.00 


1.00 


2.2 


1.4 


0,33 




10 




Streetsville.. . 


26.00 


1.00 


.2.2 


1.4 


0.33 




10 


Brant 


Brant 


26.00 


1.00 


2.2 


1.4 


0.33 




10 




Burford 


26.00 


1.00 


2.2 


1.4 


0.33 




10 


Chatham 


Chatham. . . . 


25.00 


1.00 


2.0 


1.3 


0.33 




10 


Delaware 


Delaware. . . . 


26.00 


1.00 


2.2 


1.4 


0.33 




10 




Strathroy. . . . 


26.00 


1.00 


2.2 


1.4 


0.33 




10 


Dorchester.. . . 


Dorchester.. . 


26.00 


1.00 


2.2 


1.4 


0.33 




10 


Dundas 


Dundas 


25.00 


1.00 


2.0 


1.3 


0.33 




10 




Lynden 


25.00 


1.00 


2.0 


1.3 


0.33 




10 


Dutton 


Dutton 


30.00 


1.00 


2.8 


1.8 


0.33 




10 


Elmira 


Elmira 


26.00 


1.00 


2.2 


1.4 


0.33 




10 




St. Jacobs . . . 


26.00 


1.00 


2.2 


1.4 


0.33 




10 


Essex 


Essex 


27.00 


1.00 


2.3 


1.5 


0.33 




10 


Exeter 


Exeter 


30.00 


1.00 


2.8 


1.8 


0.33 




10 


Forest 


Forest 


31.00 


1.00 


2.9 


1.9 


0.33 




10 


Goderich ..... 


Goderich .... 


31.00 


1.00 


2.9 


1.9 


0.33 




10 




Walton 


31.00 


1.00 


2.9 


1.9 


0.33 




10 


Guelph 


Guelph 


24.00 


1.00 


2.3 


1.5 


0.33 


10 


10 




Milton 


24.00 


1.00 


2.3 


1.5 


0.33 


10 


10 


Haldimand . . . 


Haldimand. . 


33.00 


1.00 


3.2 


2.1 


0.33 




10 




Dunnville. . . 


33.00 


1.00 


3.2 


2.1 


0.33 




10 


Harrow 


Harrow 


28.00 


1.00 


2.5 


1.6 


0.33 




10 


Ingersoll 


Ingersoll .... 


25.00 


1.00 


2.0 


1.3 


0.33 




10 


Keswick 


Keswick 


28.00 


1.00 


2.5 


1.6 


0.33 




10 


Kingsville .... 


Kingsville . . . 


28.00 


1.00 


2.5 


1.6 


0.33 




10 


Listowel 


Listowel 


26.00 


1.00 


2.2 


1.4 


0.33 




10 


London 


London 


25.00 


1.00 


2.0 


1.3 


0.33 




10 


Lucan 


Lucan 


30.00 


1.00 


2.8 


1.8 


0.33 




10 


Markham .... 


Markham. . . 


26.00 


1.00. 


2.2 


1.4 


0.33 




10 


Merlin 


Merlin : 


28.00 


1.00 


2.5 


1.6 


0.33 




10 


Mitchell 


Mitchell 


28.00 


1.00 


2.5 


1.6 


0.33 




10 




St. Marys . . . 


28.00 


1.00 


*2.5 


1.6 


0.33 




10 




Seaforth 


28.00 


1.00 


2.5 


1.6 


0.33 




10 


Niagara 


Niagara 


23.00 


1.00 


2.1 


1.4 


0.33 


10 


10 


Norwich 


Norwich 


26.00 


1.00 


2.2 


1.4 


0.33 




10 


Oil Springs . . . 


Oil Springs.. . 


31.00 


1.00 


2.9 


1.9 


0.33 




10 


Preston 


Preston 


26.00 


1.00 


2.2 


1.4 


0.33 




10 




Baden 


26.00 


1.00 


2.2 


1.4 


0.33 




10 




Gait. 


26.00 


1.00 


2.2 


1.4 


0.33 




10 



60 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



INDUSTRIAL POWER SERVICE— RATES TO CONSUMERS 
SERVED THROUGH FACILITIES OF RURAL OPERATING AREAS 







Basis 


















of 


Ser- 


First 


Second 












rate, 


vice 


50 


50 hrs 


All 








Rural 


130 


charge 


hrs 


per 


addi- 


Local 


Prompt 


Control office 


operating 


hours' 


per 


per 


month 


tional 


dis- 


payment 


location 


areas 


monthly 


h.p. 


month 


per 


per 


count 


discount 






use of 


per 


per 


kw-hr 


kw-hr 










demand 


month 


kw-hr 











Niagara Division — Continued 







$ c. 


$ c. 


cents 


cents 


cents 


% 


% 


Ridgetown.. . . 


Ridgetown. . . 


32.00 


1.00 


3.1 


2.0 


0.33 




10 


St. Thomas. , . 


St. Thomas. . 


27.00 


1.00 


2.3 


1.5 


0.33 




10 


Saltfleet 


Saltfleet 


22.00 


1.00 


1.9 


1.3 


0.33 


10 


10 




Caledonia . . . 


25.00 


1.00 


2.0 


1.3 


0.33 




10 


Sandwich 


Sandwich. . . . 


25.00 


1.00 


2.0 


1.3 


0.33 




10 


Sarnia 


Sarnia 


29.00 


1.00 


2.6 


1.7 


0.33 




10 




Brigden 


29.00 


1.00 


2.6 


1.7 


0.33 




10 


Simcoe 


Simcoe 


28.00 


1.00 


2.5 


1.6 


0.33 




10 




Walsingham . 


28.00 


1.00 


2.5 


1.6 


0.33 




10 


Stratford 


Stratford 


26.00 


1.00 


2.2 


1.4 


0.33 




10 




Tavistock. . . 


26.00 


1.00 


2.2 


1.4 


0.33 




10 


Tillsonburg. . . 


Tillsonburg. . 


26.00 


1.00 


2.2 


1.4 


0.33 




10 


Wallaceburg . . 


Wallaceburg . 


27.00 


1.00 


2.3 


1.5 


0.33 




10 




Dresden 


27.00 


1.00 


2.3 


1.5 


0.33 




10 


Waterdown. . . 


Waterdown. . 


25.00 


1.00 


2.0 


1.3 


0.33 




10 


Welland 


Welland 


20.00 


1.00 


1.6 


1.0 


0.33 


10 


10 




Chippawa . . . 


20.00 


1.00 


1.6 


1.0 


0.33 


10 


10 


Woodbridge.. . 


Woodbridge.. 


27.00 


1.00 


2.3 


1.5 


0.33 




10 


Woodstock. . . 


Woodstock.. . 


25.00 


1.00 


2.0 


1.3 


0.33 




10 



Southern Ontario System- 
Georgian Bay Division 







$ c. 


$ c. 


cents 


cents 


cents 


% 


% 


Bala 


Bala 


25.00 


1.00 


2.0 


1.3 


0.33 




10 


Barrie 


Barrie 


30.00 


1.00 


2.8 


1.8 


0.33 




10 




Alliston 


30.00 


1.00 


2.8 


1.8 


0.33 




10 


Beaumaris. . . . 


Beaumaris. . . 


29.00 


1.00 


2.6 


1.7 


0.33 




10 




Utterson .... 


29.00 


1.00 


2.6 


1.7 


0.33 




10 




Baysville .... 


29.00 


1.00 


2.6 


1.7 


0.33 




10 


Bruce 


Bruce 


30.00 


1.00 


2.8 


1.8 


0.33 




10 




Holstein 


30.00 


1.00 


2.8 


1.8 


0.33 




10 


Caledon 


Caledon. 


36.00 


1.00 


3.7 


2.4 


0.33 




10 


Cannington. . . 


Cannington. . 


31.00 


1.00 


2.9 


1.9 


0.33 




10 




Beaverton. . . 


31.00 


1.00 


2.9 


1.9 


0.33 




10 


Hawkestone. . . 


Hawkestone . 


24.00 


1.00 


2.3 


1.5 


0.33 


10 


10 




Sparrow Lake 


24.00 


1.00 


2.3 


1.5 


0.33 


10 


10 




Gravenhurst . 


24.00 


1.00 


2.3 


1.5 


0.33 


10 


10 


Hunts ville. . . . 


Huntsville. . . 


28.00 


1.00 


2.5 


1.6 


0.33 




10 


Midland 


Midland 


27.00 


1.00 


2.3 


1.5 


0.33 




10 


Owen Sound . . 


Owen Sound . 


32.00 


1.00 


3.1 


2.0 


0.33 




10 




Tara 


32.00 


1.00 


3.1 


2.0 


0.33 




10 


Shelburne. . . . 


Shelburne. . . 
Uxbridge 


31.00 
32.00 


1.00 
1.00 


2.9 
3.1 


1.9 
2.0 


0.33 
0.33 




10 


Uxbridge 




10 


Wasaga Beach 


WasagaBeach 


26.00 


1.00 


2.2 


1.4 


0.33 




10 




Creemore. . . . 


26.00 


1.00 


2.2 


1.4 


0.33 




10 


Wroxeter 


Wroxeter. . . . 


31.00 


1.00 


2.9 


1.9 


0.33 




10 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



61 



INDUSTRIAL POWER SERVICE— RATES TO CONSUMERS 
SERVED THROUGH FACILITIES OF RURAL OPERATING AREAS 







Basis 


















of 


Ser- 


First 


Second 












rate, 


vice 


50 


50 hrs 


All 








Rural 


130 


charge 


hrs 


per 


addi- 


Local 


Prompt 


Control office 


operating 


hours' 


per 


per 


month 


tional 


dis- 


payment 


location 


areas 


monthly 


h.p. 


month 


per 


per 


count 


discount 






use of 


per 


per 


kw-hr 


kw-hr 










demand 


month 


kw-hr 











Southern Ontario System 
Eastern Ontario Division 



Arnprior . 



Belleville 

Bowmanville.. 
Brockville .... 

Carleton Place 

Cobourg 

Fenelon Falls 



Frank ford . . 

Kingston. . . 
Martintown 
Millbrook. . 

Napanee. . . 
Nepean .... 
Norwood. . . 
Oshawa 
Peterboro. . 



Smiths Falls 
Sulphide. . . 



Wellington.. 
Winchester . 



Arnprior. . . . 

Renfrew 

Belleville. . . . 
Bowmanville . 
Brockville. . . 

CarletonPlace 

Cobourg 

Fenelon Falls 
Minden. . 
Omemee. . 



Fankford . . . 
Brighton . . . 
Kingston. . . 
Martintown. 
Millbrook. . 

Napanee. . . 
Nepean .... 
Norwood. . . 
Oshawa .... 
Peterboro.. . 

Lakefield. . . 
Smiths Falls 
Sulphide. . . 

Madoc 

Marmora. . . 

Wellington.. 
Winchester . 



.$ c. 
25.00 
25.00 
24.00 
26.00 
25.00 

24.00 
25.00 
28.00 
28.00 
28.00 

23.00 
23.00 
25.00 
33.00 
28.00 

24.00 
22.00 
31.00 
25.00 
20.00 

25.00 
26.00 
34.00 
34.00 
34.00 

29.00 
26.00 



$ c. 
1.00 
1.00 
1.00 
1.00 
1.00 

1.00 
1.00 
1.00 
1.00 
1.00 

1.00 
1.00 
1.00 
1.00 
1.00 

1.00 
1.00 
1.00 
1.00 
1.00 

1.00 
1.00 
1.00 
1.00 
1.00 

1.00 
1.00 



cents 
2.0 
2.0 
2.3 
2.2 
2.0 

2.3 
2.0 
2.5 
2.5 
2.5 

2.1 
2.1 
2.0 
3.2 
2.5 

2.3 
1.9 
2.9 
2.0 
1.6 

2.0 
2.2 
3.4 
3.4 
3.4 

2.6 
2.2 



cents 
1.3 
1.3 
1.5 

1.4 
1.3 

1.5 
1.3 
1.6 

1.6 
1.6 

1.4 

1.4 
1.3 
2.1 
1.6 

1.5 

1.3 

. 1.9 

1.3 

1.0 

1.3 
1.4 
2.2 
2.2 
2.2 

1.7 
1.4 



cents 
0.33 
0.33 
0.33 
0.33 
0.33 

0.33 
0.33 
0.33 
0.33 
0.33 

0.33 
0.33 
0.33 
0.33 
0.33 

0.33 
0.33 
0.33 
0.33 
0.33 

0.33 
0.33 
0.33 
0.33 
0.33 

0.33 
0.33 



% 



10 



10 



10 
10 



10 
10 



in 



% 
10 
10 
10 
10 
10 

10 
10 
10 
10 
10 

10 
10 
10 
10 
10 

10 
10 
10 
10 
10 

10 
10 
10 
10 
10 

10 
10 



Thunder Bay System 



Thunder Bay. 



Thunder Bay 
Nipigon 



$ c. 
24.00 

24.00 


$ c. 
1.00 
1.00 


cents 
2.3 
2.3 


cents 
1.5 
1.5 


cents 
0.33 
0.33 


% 
10 
10 



% 

10 
10 



Northern Ontario Properties 



Connaught 
Manitoulin 
North Bay. 
Sudbury. . . 



Connaught. 
Manitoulin 
North Bay. 
Sudbury. . . 



$ c. 
40.00 
35.00 
36.00 
35.00 



$ c. 
1.00 
1.00 
1.00 
1.00 



cents 
4.3 
3.5 
3.7 
3.5 



cents 
2.8 
2.3 
2.4 
2.3 



cents 
0.33 
0.33 
0.33 
0.33 



% 
10 
10 
10 
10 



4— H.E. 



62 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 




Modern chopper installed in barn on Ontario farm 



FARM USES FOR ELECTRICITY 

The use rrade of electrical service by farmers divides itself broadly into 
applications which provide a higher standard of living in the farm heme, 
and applications which add to the productive capacity of a farm. Some 
applications, for example, lighting and water pumping, do both. 

Farming is a productive industry and the ability of electrical service 
to provide light, heat and power in a wide range of intensities free from the 
hazards associated with oil or other fuel and the ease with which electricity 
may be controlled, permit applications to farm prcducticn problems not 
feasible with any other source of power. 

These applications result in savings in labour, increased production, 
improved quality, prevention of waste, reduced costs and substantial increases 
in earnings. 

To the farm home electricity can bring the same conveniences as are 
enjoyed by urban residents. It eliminates the drudgery of many household 
tasks, improves health and comfort and, through the radio, furnishes enter- 
tainment, news, discussions of current topics and market reports, all of which 
bring greater contentment in the rural way of life. 

In building up his electrical equipment to receive the maximum benefit 
from Hydro rural service, the farmer should keep a nice balance between 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



63 



appliances for use in the home and appliances which will add to the productive 
capacity of his farm. It is especially desirable that following the installation 
of lighting service in the home and outbuildings his early concern should be 
to purchase equipment which will result in cash returns. 

Lighting Service 

Electric lighting is safe, convenient and reduces the fire hazard to a 
minimum. It adds comfort and attractiveness to the farm home. In the 
barn and other buildings it saves time and prevents accidents while doing 
chores. 

In productive operations it is used in the poultry laying house to supple- 
ment daylight during the winter months, thus increasing egg production 
during a period when prices are highest. 

In floriculture lighting may be used to promote or retard the flowering 
of certain flowering plants in order to meet the demand of special occasions. 

Special applications of lighting include insect traps, infra-red lamps for 
brooders and ultra-violet lamps to improve the health of poultry and other 
stock. 




Milk cooling by electric refrigeration now being used by progressive Ontario farmers 

to their economic advantage 



64 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 




Electric clippers contribute to the comfort and appearance 

of animals and in the dairy they are one of the many 

sanitary devices which make easier the production of high 

quality milk 



Heating Service 

The safety and ease of control of electricity as a source of heating has 
found many applications. In the home it makes possible many of the familiar 
appliances, such as irons, toasters, hot plates, electric ranges and water 
heaters, all of which add to the comfort and convenience of the home. The 
ease of automatic control of electric heat has found application in incubators 
and poultry brooders, where accurate control of temperature is necessary. 

Water heaters and dairy sterilizing equipment assist in maintaining a 
high quality of milk production. Small capacity heaters are used to maintain 
drinking water at suitable temperature for poultry, with resultant increases 
in egg production during the winter months. It also finds application in 
brooders for pigs and lambs, preventing loss of these animals during cold 
weather and affecting very substantial savings and increased earnings. 



In horticulture electric soil heating is used for the early germination and 
propagation of seeds and plants and their protection against frost. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



65 



Power for Electric Motors 

Electric motors find many uses in replacing manual effort. A quarter- 
horsepower motor can operate any machine that can be operated by hand, 
thus effecting savings in time and effort. 

In the home motors make possible washing machines, ironing machines, 
vacuum cleaners, fans, furnace blowers, water pumps and refrigerators and 
the new cold storage home locker for the preservation and storage of perish- 
able foods in quantity. Thus, motors contribute towards making the farm 
home equal in comfort and convenience to the urban home. 

In farming operations electric motors are used for grinding grain and the 
operation of feed mixers, effecting substantial cash savings. They are also 
used for pumping water for stock and the operation of milking machines, 
cream separators and milk coolers. These result in very substantial savings 
in labor, and increases in production, and permit the handling of larger herds, 
effecting increases in farm earnings. 

Portable utility motors of various sizes find many applications, such as 
wood cutting, hoisting hay, elevating grain, seed cleaning and, in the workshop, 
motor-driven grinders and other equipment provide facilities for maintaining 
farm equipment in repair and facilitate the construction of various pieces of 
useful equipment in connection with farming operations. 




An electric pig brooder keeps young pigs warm and protects them from a rolling sow. 



66 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



Estimates of the major electrical appliances used in rural operating 
areas are set out in the following table: 

ELECTRICAL APPLIANCES IN USE AMONG FARM CONSUMERS IN 

RURAL OPERATING AREAS 

Data for all systems for the year 1942 



On the farm 


In the farm home 


Item 


Number 

of 

appliances 


Percentage 

of 
saturation 


Item 


Number 

of 
appliances 


Percentage 

of 
saturation 


Motor 


11,240 

10,186 

4,293 

3,920 

1,517 

5,302 

656 

828 

1,550 

56 

181 

113 

861 


18.0 
16.3 
6.9 
6.3 
2.4 
8.5 
1.1 
1.3 
2.5 
0.1 
0.3 
0.2 
1.4 


Range 

Hot Plates 


11,688 
14,921 
40,014 
10,651 

2,739 

1,481 
539 

4,970 
938 
50,314 
10,913 
35,465 
49,747 

1,393 
10,480 

2,276 


18.7 


Pump 


23.9 


Grain grinders 

Milking Machine 

Milk cooler. 


Washers 

Vacuum cleaners 

Water heaters, flat rate 
Water heaters, metered 
Grates 


64.2 

17.1 

4.4 


Cream separator 

Churn 


2.4 
0.9 


Incubator 


Portable air heaters. . . . 

Ironers 

Hand Irons 


7.9 


Brooder 

Hot Bed 


1.5 
80.7 


Water heater, flat rate . 
Water heater metered, . 


Refrigerators 

Toasters 


17.5 
56.9 


Miscellaneous 


Radios 

Furnace blowers 

Pumps 

Miscellaneous 


79.8 
2.2 

16.8 
3.6 



The following table makes comparison between rural and urban use:- 

ELECTRICAL APPLIANCES IN USE IN HOMES OF URBAN AND RURAL 
CONSUMERS— 1942 





Rural operating area 


Urt 






Hamlet 


Farm 


>an 


Electrical 
appliances 


Number 

of 
appliances 


Percentage 

of 
saturation 


Number 

of 
appliances 


Percentage 

of 
saturation 


Number 

of 
appliances 


Percentage 

of 
saturation 


Ranges 

Hot Plate 


7,243 

13,524 

28,270 

9,730 

2,408 

1,303 

420 

3,992 

914 

41,751 

10,184 

29,240 

42,033 

1,629 


13.4 

25.0 

52.2 

18.0 

4.4 

2.4 

0.8 

7.4 

1.7 

77.0 

18.8 

53.9 

77.5 

2.3 


11,688 
14,921 
40,014 
10,651 

2,739 

1,481 
539 

4,970 
938 
50,314 
10,913 
35,465 
49,747 

1,393 


18.7 

23.9 

64.2 

17.1 

4.4 

2.4 

0.9 

7.9 

1.5 

80.7 

17.5 

56.9 

79.8 

2.2 


166,498 

91,260 

359,428 

270,067 

75,241 

75,321 

50,619 

62,383 

19,685 

561,912 

218,922 

439,971 

577,309 

62,338 

126,650 


29.7 
16.3 


Washer 


64.0 


Vacuum cleaner 

Water* heater, flat rate. . 
Water^heater, metered. . 
Grate 


48.1 

13.4 

13.4 

9.0 


Air heater 


11.1 


Ironers 


3.5 


Irons 


100.1 


Refrigerators 


39.0 


Toasters 

Radio 

Furnace blower 

Grills . . 


78.4 

102.8 

11.1 

22.6 


Pump 

Air-conditioner 


7,112 


13.1 


10,480 


16.8 




10,202 


1.8 


Miscellaneous . 


2,532 


4.7 


2,276 


3.6 











1946 THE HYDRO-ELECTRIC POWER COMMISSION 



67 




Electric brooders have removed many uncertainties from turkey raising, reducing 

the average mortality 

Average Cost to Rural Consumers Decreasing 

The remarkable benefits obtained by rural communities in regard to the 
amount charged to them during the period 1928 to 1944 are indicated in 
the following tables. The classification of rural consumers, and the rates 
charged were changed for the year 1944. The result of the application of 
rates in force, from time to time during the period 1928 to 1943, are not 
comparable to the application of 1944 classification and rates. The 1944 
results are therefore given separately followed by the results in earlier years. 



RURAL SERVICE STATISTICS— 1944 



Service 



Annual 
revenue 



Kilowatt- 
hours 
consumed 



Number of 


Average 


Average 


consumers 


revenue 


monthly 


billed* 


per 

kw-hr. 


billf 




cents 


$ c. 


59,639 


2.11 


3.53 


56,130 


2.36 


2.95 


8,262 


2.28 


3.51 


19,291 


3.67 


1.93 



Average 
monthly 
consump- 
tion — 
kw-hr. f 



Farm service 

Hamlet service. . . . 
Commercial service 
Summer service . . . 



$ c. 

2,396,508.94 

1,937,102.28 

341,646.50 

435,622.43 



113,708,660 
82,106,734 
15,010,213 
11,859,662 



167 

125 

154 

53 



*It may be observed that the number of consumers reported here does not agree with those 
shown in other sections of the Annual Report of the Commission. This is due to the fact that the 
figures given here represent consumers actually billed, but do not include power or special contracts, 
whereas elsewhere in the Report the tables show the number of contracts executed to the end of 
the fiscal year. In many cases service is not given until the following year. 

f Estimated — due to reclassification during the year. 



68 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



HAMLET AND HOUSE LIGHTING SERVICE 
Classified as IB, 1C and 2A from 1928 to 1943 















Average 






Kilowatt- 


Number of 


Average 


Average 


monthly 




Annual 


hours 


consumers 


revenue 


monthly 


consump- 




revenue 


consumed 


billed* 


per kw-hr. 


bill 


tion — 
kw-hr. 




$ c. 






cents 


$ c. 




1928 


530,407.00 


10,702,031 


17,585 


4.95 


2.51 


50.7 


1929 


663,311.00 


14,424,770 


21,219 


4.60 


2.85 


62.0 


1930 


757,558.00 


17,815,987 


25,013 


4.25 


2.73 


64.2 


1931 


974,224.17 


22,127,474 


31,176 


4.40 


2.88 


65.6 


1932 


1,075,081.03 


24,654,386 


33,368 


4.36 


2.76 


63.3 


1933 


1,133,368.70 


25,410,470 


35,941 


4.46 


2.70 


60.1 


1934 


1,149,876.67 


27,768,460 


37,466 


4.14 


2.61 


63.0 


1935 


1,171,873.28 


30,802,290 


39,751 


3.80 


2.53 


66.5 


1936 


1,239,010.83 


35,666,241 


43,014 


3.47 


2.49 


71.8 


1937 


1,331,919.46 


40,935,040 


46,785 


3.25 


2.47 


76.0 


1938 


1,439,681.39 


47,612,820 


52,514 


3.02 


2.42 


79.9 


1939 


1,649,496.29 


54,787,544 


58,328 


3.01 


2.36 ' 


78.3 


1940 


1,812,550.53 


60,839,240 


62,973 


2.98 


2.40 


80.5 


1941 


" 1,995,468.46 


67,587,082 


67,939 


2.95 


2.45 


82.9 


1942 


2,118,911.57 


72,613,472 


69,766 


2.92 


2.56 


87.9 


1943 


2,170,221.41 


73,980,871 


70,919 


2.93 


2.57 


87.6 



FARM SERVICE 

Classified as 2B, 3, 4, 5, 6A, 6B, 7A and 7B 

from 1928 to 1943 















Average 






Kilowatt- 


Number of 


Average 


Average 


monthly 


Year 


Annual 


hours 


consumers 


revenue 


monthly 


consump- 




revenue 


consumed 


• billed* 


per kw-hr. 


bill 


tion — 

kw-hr. 




$ c. 






cents 


$ c. 




1928 


569,007.00 


10,969,828 


9,309 


5.18 


4.97 


96 


1929 


777,736.00 


16,022,842 


12,605 


4.85 


5.85 


121 


1930 


863,805.00 


20,507,063 


16,011 


4.21 


5.03 


119 


1931 


1,128,554.28 


25,716,141 


20,796 


4.39 


5.11 


116 


1932 


1,255,482.13 


28,675,400 


22,432 


4.38 


4.84 


110 


1933 


1,309,122.96 


30,062,194 


23,283 


4.35 


4.75 


109 


1934 


1,319,922.69 


33,312,314 


23,882 


3.96 


4.66 


118 


1935 


1,343,222.39 


37,667,453 


25,357 


3.57 


4.55 


128 


1936 


1,385,784.39 


45,447,669 


28,198 


3.05 


4.31 


141 


1937 


1,366,484.50 


54,858,240 


35,508 


2.49f 


3.57 


144f 


1938 


1,711,788.81 


67,886,882 


44,565 


2.52f 


3.56 


141 f 


1939 


2,090,259.14 


81,613,087 


53,240 


2.56f 


3.56 


139f 


1940 • 


2,405,092.40 


93,859,719 


58,728 


2.56f 


3.41 


133f 


1941 


2,690,250.37 


107,061,610 


63,304 


2.51 


3.54 


141 


1942 


2,870,300.31 


116,448,363 


63,748 


2.46 


3.75 


152 


1943 


2,934,011.31 


121,428,714 


64,292 


2.42 


3.81 


158 



* See footnote to table on previous page. 

t In the period 1937 to 1940, there was an increase in the statistical average revenue per 
kilowatt-hour and a decrease in the statistical average monthly consumption per consumer. 
Actually there was a great increase in the use of electricity by nearly all individual Hydro con- 
sumers and a corresponding decrease to each consumer in the average cost per kilowatt-hour. 
But due to the tremendous growth at this time in new consumers, who for the first few years are 
not equipped to use large quantities of electricity each month, the smaller monthly consumption, 
of the new consumers when averaged with the increased use of the older consumers produced per 
consumer averages which obscured the true trends of individual growth in use, and, individual 
reductions in costs. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



69 



RURAL OPERATING AREAS 
MILES OF LINE, NUMBER OF CONSUMERS— OCTOBER 31, 1945 



Control office 
location 



Rural operating 
area 



Miles 

of 

line 



Number of consumers 



Farm 



Ham- 
let 



Com- 
mercial 



Sum- 
mer 



Power 



Total 



Southern Ontario System- 
Niagara Division 



Aylmer. . . 
Beamsville . 
Blenheim. . 
Bond Lake 
Bothwell . . 

Brampton . 

Brant 

Chatham. . 

Delaware. . 

Dorchester 
Dundas . . . 

Dutton . . . 
Elmira. . . . 

Essex 

Exeter .... 

Forest. . . . 
Goderich . . 

Guelph. . . . 

Haldimand 

Harrow. . . 
Ingersoll. . 
Keswick. . . 

Kingsville . 
Listowel. . . 
London. . . 
Lucan. . . . 

Markham . 

Merlin 
Mitchell. . . 

Niagara . . . 



Aylmer . . . 
Beamsville 
Blenheim. . 
Bond Lake 
Bothwell. . 

Brampton . 
Streetsville 

Brant 

Burford . . . 
Chatham. . 

Delaware. . 
Strathroy. . 
Dorchester 
Dundas . . . 
Lynden. . . 

Dutton. . . 
Elmira. . . . 
St. Jacobs . 

Essex 

Exeter .... 

Forest. . . . 
Goderich . . 
Walton . . . 
Guelph. . . 
Milton. . . . 

Haldimand 
Dunnville . 
Harrow. . . 
Ingersoll. . 
Keswick. . . 

Kingsville . 
L,istowel. . . 
London. . . 
Lucan. . . . 
Markham . 

Merlin 
Mitchell . . . 
St. Marys . 
Seaforth. . . 
Niagara . . . 



302.41 


1,240 


577 


141 


104 


3 


271.72 


1,470 


696 


134 


147 


15 


112.44 


482 


180 


36 


68 


3 


227.68 


755 


1,696 


127 


217 


22 


289.54 


864 


188 


97 




14 


206.25 


593 


276 


51 


14 


4 


140.69 


494 


266 


32 


60 


9 


208.76 


927 


397 


54 


6 


8 


273.74 


1,042 


392 


94 


5 


1 


255.16 


1,044 


690 


96 




12 


217.81 


769 


298 


94 




3 


181.88 


558 


72 


45 




1 


170.66 


703 


252 


73 


3 


11 


109.40 


761 


561 


75 




7 


93.56 


120 


338 


32 




1 


148.64 


389 


116 


37 


11 


3 


182.01 


434 


284 


46 


1 


7 


112.67 


277 


312 


51 


14 


7 


249.34 


1,156 


472 


68 


264 


5 


171.91 


560 


304 


82 


441 


7 


251.04 


814 


83 


50 


247 


5 


225.94 


617 


304 


69 


238 


5 


137.78 
199.61 


409 
597 


203 
512 


63 
56 






9 


7 


139.66 


382 


172 


50 


80 


4 


237.16 


734 


334 


108 


117 


8 


97.58 


296 


189 


45 


137 


3 


206.72 


947 


369 


58 


846 


3 


266.81 


836 


225 


51 




3 


206.89 


493 


679 


80 


1,307 


10 


211.06 


1,267 


446 


84 


750 


8 


357.56 


1,093 


390 


100 


1 


5 


254.92 


923 


2,446 


149 


6 


11 


199.40 
308.80 


541 
1,181 


75 
1,701 


56 

140 






729 


14 


300.75 


' 1,089 


234 


99 


112 


7 


168.59 


188 


538 


60 




4 


233.60 


812 


187 


66 




3 


47.03 


124 


113 


14 




1 


221.35 


1,262 


1,645 


123 


141 


22 



2,065 
2,462 
769 
2,817 
1,163 

938 

861 

1,392 

1,534 

1,842 

1.164 

676 

1,042 

1,404 

491 

556 

772 

661 

1,965 

1,394 

1,199 
1,233 

675 
1,181 

688 

1,301 
670 
2,223 
1,115 
2,569 

2,555 
1,589 
3,535 
672 
3,765 

1,541 
790 

1,068 
252 

3,193 



70 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



RURAL OPERATING AREAS 
MILES OF LINE, NUMBER OF CONSUMERS— OCTOBER 31, 1945 



Control office 
location 



Rural operating 
area 



Miles 
of 
line 



Number of consumers 



Farm 



Ham- 
let 



Com- 
mercial 



Sum- 
mer 



Power 



Total 



Niagara Division — Continued 



Norwich. . . 
Oil Springs . 
Preston. . . . 

Ridgetown . 
St. Thomas. 
Saltfleet. . . . 

Sandwich. . . 

Sarnia 

Simcoe 

Stratford. . . 

Stratford. . . 
Tillsonburg . 
Wallaceburg 

Waterdown. 

Welland. . . . 

Woodbridge . 
Woodstock . 



Norwich. . . 
Oil Springs . 
Preston .... 

Baden 

Gait 

Ridgetown . 
St. Thomas. 
Saltfleet. . . . 
Caledonia. . 
Sandwich. . . 

Sarnia 

Brigden .... 

Simcoe 

Walsingham 
Stratford. . . 

Tavistock. . 
Tillsonburg . 
Wallaceburg 
Dresden. . . . 
Waterdown. 

Welland. . . . 
Chippawa. . 
Woodbridge 
Woodstock . 

division 



185.09 
216.70 
211.96 
162.43 
58.06 

144.76 
257.05 
113.39 
231.29 
176.99 

139.72 
103.36 
152.70 
476.48 
64.47 

157.32 

220.77 
202.46 
116.25 
102.91 

381.07 

44.35 

321.89 

204.41 



806 
643 
643 
255 

171 

475 
930 
414 
804 
647 

491 
307 
589 
1,734 
216 

549 
893 
721 
388 
483 

1,322 
129 
934 

757 



172 
129 
1,078 
574 
412 

162 
864 

2,149 
597 

3,646 

1,460 

30 

407 

620 

133 

139 

439 

499 

37 

1,014 

2,926 
173 
971 
375 



46 
76 
97 
70 
16 

46 

111 

95 

89 

141 

94 
23 
67 
130 
26 

43 
87 
82 
28 
69 

194 
33 

129 
79 



1 
119 

17 
4 

343 
5 

241 



557 
15 

100 
423 



78 

1 

33 

741 



104 
2 



1,031 
852 

1,957 
924 
607 

1,029 
1,915 
2,920 
1,499 
4,452 

2,605 

376 

1,167 

2,910 

377 

733 
1,430 
1,386 

455 
1,619 

5,219 

337 

2,161 

1,219 



Total Niagara 



12,725.40 



45,431 



37,331 



4,857 



8,859 



484 



96,962 



Southern Ontario System — 
Georgian Bay Division 



Bala 


Bala 


111.86 


35 


189 


41 


496 


1 


762 


Barrie 


Barrie 


• 199.57 


549 


481 


93 


474 


2 


1,599 




Alliston. 


279.80 


753 


462 


76 


1,248 


3 


2,542 


Beaumaris 


Beaumaris 


108.32 


154 


146 


22 


428 


2 


752 




Utterson 


66.60 


HI 


81 


22 


184 




398 


Beaumaris 


Baysville 


78.52 


90 


111 


26 


261 




488 


Bruce 


Bruce 

Holstein 


291.24 
53.37 
84.36 

108.42 


781 
130 
231 
235 


376 
28 

451 
95 


126 

8 

86 

30 


135 

4 

57 

106 


3 

6 

2 


1,421 




170 


Caledon* 


Caledon 

Cannington 


831 


Cannington 


468 


Cannington 


Beaverton 


71.64 


108 


130 


29 


451 




718 


Hawkestone 


Hawkestone. ..... 


104.32 


212 


133 


34 


242 




621 




Sparrow Lake 


87.59 


91 


192 


30 


506 


6 


825 




Gravenhurst 


28.32 


14 


41 


5 


59 


2 


121 


Hunts ville 


Huntsville 


135.94 


122 


437 


82 


238 


4 


883 



*Served by Caledon Electric Co. (now owned by H-E.P.C.) 
Not in rural financial statement for 1945. . 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



71 



RURAL OPERATING AREAS 
MILES OF LINE, NUMBER OF CONSUMERS— OCTOBER 31, 1945 



Control office 
location 



Rural operating 
area 



Miles 

of 

line 



Number of consumers 



Farm 



Ham- 
let 



Com- 
mercial 



Sum- 
mer 



Power 



Total 



Georgian Bay Division— Continued 



Midland 

Owen Sound 

Shelburne 

Uxbridge 

Wasaga Beach .... 


Midland . 

Owen Sound 

Tara 

Shelburne 

Uxbridge. 

Wasaga Beach .... 
Creemore 


231.59 
66.02 
364.53 
321.51 
298.81 

27.42 
177.69 
289.23 


463 
168 
740 
703 
702 

1 
508 
706 


233 
76 
683 
307 
587 

66 
217 
391 


82 

19 

155 

72 
104 

"63 

118 


1,105 

83 

302 

39 

398 

1,532 

10 

136 


3 

2 

2 

1 
4 


1,883 
346 
1,883 
1,121 
1,793 

1,601 
799 


Wroxeter 


Wroxeter 


1,355 






Total Georgian 


Bay division 


3,586.67 


7,607 


5,913 


1,323 


8,494 


43 


23,380 



Southern Ontario System — 
Eastern Ontario Division 



Arnprior 

Belleville 

Bowmanville. . 
Brockville .... 

Carleton Place 

Cobourg 

Fenelon Falls . 

Frankford 

Kingston 

Martintown. . 
Millbrook .... 

Napanee 

Nepean 

Norwood 

Oshawa 

Peterboro. . . . 

Peterboro. . . . 
Smiths Falls . . 
Sulphide 

Wellington. . . 
Winchester . . . 



Arnprior 

Renfrew 

Belleville 

Bowmanville. . 
Brockville .... 

Carleton Place 

Cobourg 

Fenelon Falls . 

Minden 

Omemee 

Frankford 

Brighton 

Kingston 

Martintown. . 
Millbrook 

Napanee 

Nepean 

Norwood 

Oshawa 

Peterboro. . . . 

Lakefield 

Smiths Falls . . 

Sulphide 

Madoc 

Marmora 

Wellington . . . 
Winchester . . . 



90.89 

91.10 

169.35 

160.22 

332.13 

67.91 

324.76 

183.34 

81.10 

63.98 

270.91 

53.25 

341.52 

475.86 

71,56 

314.13 
371.15 
67.36 
239.86 
163.51 

123.26 

288.24 

110.15 

67.94 

11.44 

322.19 
470.76 



178 
197 
537 
387 
943 

135 
792 
274 
106 
129 

776 
167 
906 
1,234 
184 

919 
1,196 
173 
703 
359 

137 

665 

191 

. 140 

17 

1,039 
1,619 



499 
363 
774 
310 
800 

47 
591 
206 
239 

14 

493 
64 
907 
923 
138 

548 

997 

85 

2,616 

527 

185 

496 

203 

65 

5 

463 
675 



107 



42 
200 

20 
128 
62 
51 
15 



15 
206 
202 

25 

137 
225 

14 
146 

59 

47 

151 

41 

26 

1 

103 
218 



65 
45 
12 
26 
258 

26 
274 
763 
202 

25 

65 

1 

237 

69 

2 

70 

89 

101 

249 

242 

258 

240 

44 

26 

48 

178 
16 



860 
688 

1,407 
768 

2,211 

229 

1,787 

1,307 

598 

18S 

1,426 

248 

2,265 

2,428 

349 

1,679 
2,529 
373 
3,724 
1,192 

629 

1,556 

479 

257 

71 

1,787 
2,540 



Total Eastern Ontario division. 



5,327.87 



14,103 



13,233 



2,489 



3,631 



114 



33,570; 



72 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



RURAL OPERATING AREAS 
MILES OF LINE, NUMBER OF CONSUMERS— OCTOBER 31, 1945 



Control office 
location 



Rural operating 
area 



Miles 

of 

line 



Number of consumers 



Farm 



Ham- 
let 



Com- 
mercial 



Sum- 
mer 



Power 



Total 



Thunder Bay System 



Thunder Bay 


Thunder Bay 

Nipigon . . .• 


296.28 
5.25 


623 
12 


684 

1 


77 


196 


10 


1,590 
13 












Total Thunder Bay System 


301.53 


635 


685 


77 


196 


10 


1,603 



Northern Ontario Properties 
















Connaught 

Manitoulin ....... 

North Bay ....... 

Sudbury 


Connaught 

Manitoulin 

North Bay 

Powassan 

Sudbury 


73.63 
166.86 
33.72 
57.30 
36.51 


133 
236 

36 
131 

37 


"153 

596 

426 

71 

1,429 


29 
199 

21 
14 
48 


3 

71 

313 

2 
126 


3 
6 
5 

"5 


321 

1,108 
801 
218 

1,645 


Total Northern Ontario Properties . 


368.02 


573 


2,675 


311 


515 


19 


4,093 



SUMMARY 



System 



Miles 

of 

line 



Number of consumers 



Farm 



Ham- 
let 



Com- 
mercial 



Sum- 
mer 



Power 



Total 



Southern Ontario 

Niagara division 

Georgian Bay division . . 

Eastern Ontario division 

Thunder Bay 

Northern Ontario Properties . 



Total all systems. 



12,725.40 


45,431 


37,331 


4,857 


8,859 


484 


3,586.67 


7,607 


5,913 


1,323 


8,494 


43 


5,327.87 


14,103 


13,233 


2,489 


3,631 


114 


301.53 


635 


685 


77 


196 


10 


368.02 


573 


2,675 


311 


515 


19 


22,309.49 


68,349 


59,837 


9,057 


21,695 


670 



96,962 

23,380 

33,570 

1,603 

4,093 



=159,608 



*These totals include 740.01 miles of primary line under construction on October 31, 1945, 
and service to 3,048 new consumers which was not completed at the end of the fiscal year. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 73 



SECTION V 



PROMOTIONAL AND PUBLICITY SERVICES 



WITH the conclusion of the war many of the war services of the Com- 
mission ceased entirely and others were curtailed. The problems of 
reconstruction and reconversion of industry became important and this 
change in viewpoint was reflected in the publicity services and promotional 
activities of the Commission. 

Advertising and Publicity 

An active programme of advertising and publicity of the informative 
and educational type was produced. Different types of advertisements were 
designed and published in 232 papers giving a total of about 5,000 messages 
to the public. Many Hydro utilities were assisted in the preparation of 
advertising material for use in their local press. A number of pamphlets, 
school book covers and other folders were provided and given wide distribu- 
tion by the municipal Hydro Commissions. The publication of "Hydro 
News" was continued during the year and distributed to all Hydro 
municipalities. 

Motion Pictures 

The Commission's motion pictures were widely used and were shown by 
the Commission's staff to 500 audiences totalling approximately 100,000 
people. A new 16 mm sound picture in colour, entitled "More Power to the 
Farmer" was produced. This picture tells the story of farm electrification 
and emphasizes the importance of adequate wiring. Arrangements were 
made with the National Film Board to show Hydro motion pictures on their 
regular circuits. In this manner approximately 100 additional audiences 
were reached. 

Rural Activities 

In the summer of 1945 exhibition material dealing with the use of electric- 
ity on the farm was prepared and used later in the year at farm fairs and other 
rural gatherings with a total audience of approximately 45,000. In preparation 
for more active work on the Commission's five-year rural plan when labour 
and materials are sufficiently available, discussions were held with the 



74 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 




TYPICAL HYDRO ADVERTISING 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 75 

agricultural colleges, the Department of Agriculture and manufacturers of 
farm equipment. Contact was maintained with the Farm Forums throughout 
Ontario and information on Hydro services supplied. 

Industrial Services 

In the early part of the year services to war plants were continued by the 
provision of technical assistance in the effective use of power. In the latter 
part of the year similar technical advice was given in connection with recon- 
struction problems. Complete power surveys were made in 22 industrial 
plants and engineering assistance was given to 100 other plants. 

Co-operating with municipal Hydro utilities, infotmation regarding 
technical problems was supplied to several firms seeking sites for new industry 
in the Province. 

Lighting Services 

During the war the opportunity to make lighting improvements was 
largely confined to industrial establishments. With the end of the war a shift 
of interest to commercial and other forms of lighting took place. It was 
gratifying to note the increased interest in the school lighting field and in 
improved street lighting. For commercial establishments there is a decided 
preference being shown to fluorescent lighting. 

During the year recommended lighting plans were supplied to 448 schools, 
34 public buildings and churches, 17 industries and 8 street lighting instal- 
lations. It is evident from, the work carried out in 1945 that there is a greatly 
increased interest in better lighting and as material becomes readily available 
installations will increase rapidly, particularly those involving fluorescent 
lighting. 

Northern Ontario Properties 

With the inclusion of the Northern Ontario Power Company's system 
in the Northern Ontario Properties, the Commission became responsible for 
merchandising operations in various communities formerly served by the 
Company. These duties have been carried on as well as possible under a 
limited supply of appliances and equipment. There is evidence that these 
activities render a valuable service to citizens in a somewhat isolated section 
of the Province. 

Priority and War Equipment Problems 

With the cessation of war many of the priority problems rapidly dis- 
appeared. Some war restrictions, however, had to be continued and these 
presented certain difficulties. There were also problems to be solved in 
obtaining deliveries of unrestricted material in short supply. 

During the war the Commission's machine shops under the National 
Bits and Pieces programme were active in producing war equipment. It is 
is of interest to note that the actual value of the contribution to the war effort 
bv the Commission's service shops exceeded one million dollars. 



76 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



SECTION VI 



HYDRAULIC ENGINEERING AND CONSTRUCTION 



ALTHOUGH the year 1945 brought World War II to a close and with it 
a curtailment of the power demands of war industries, it soon became 
apparent that the demands for power during the reconstruction period would 
exceed the supply. Consequently the expansion of the Commission's power 
and water storage developments must be continued. 

On October 1, 1945, the extension of the Alexander power development, 
consisting of an additional 19,000 horsepower unit was put in service. Two 
major projects were approved by the Commission in the late summer; the 
first, at DeCew Falls near St. Catharines, consisting of the installation of a 
second unit of 70,000 horsepower; and the second, at Stewartville, on the 
Madawaska river, consisting of the development of 54,000 horsepower. 
Construction and maintenance work of lesser magnitude were also carried 
out at several sites for regulating and augmenting water storage and rehabilit- 
ating existing structures and equipment. 

The properties of the Northern Ontario Power Company, acquired under 
a purchase agreement as of December 1, 1944, were placed under the operating 
control of the Commission on March 27, 1945, the capacity of these plants 
totals about 60,000 electrical horsepower. 

Preparations have also proceeded for a development at the Des Joachims 
power site, on the Ottawa river about 40 miles upstream from Pembroke. 

Surveys and studies for an early development of the Aguasabon river 
proceeded during the year; the potential resources of the Mississagi river 
were closely investigated, and a proposed overall scheme of development was 
prepared. Reconnaissance surveys of several other rivers in Northern 
Ontario were made for the purpose of determining their power resources and 
storage possibilities. 



SOUTHERN ONTARIO SYSTEM 
DeCew Falls Development 

The installation of a second unit was authorized by the Commission in 
August, and by the end of the fiscal year, the construction of camp buildings 
and the installation of power supply for construction purposes were under 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 77 

way. Provision for a second unit was made at the time of the construction 
of unit No. 1, and a large portion of the work will be concerned with enlarging 
the present facilities. As part of the work, the headwaters known as lake 
Gibson will be raised four feet to elevation 560.0. Flooding caused by the 
raised water level will necessitate relocating and raising sections of county 
and township roads, revising Niagara, St. Catharines and Toronto Railway 
trackage, raising and rebuilding several bridges, and raising and strengthening 
dykes and embankments. The reservoir canal will be widened and a new 
sixteen foot penstock will connect the existing head works with an extension 
to the sub-structure of the present power house. By deepening the tailrace 
and raising the headwaters, the operating head for both units of this plant 
will be increased from 265 to 280 feet. 

The Commission's construction staff will be engaged in the major 
portion of the work except in the tailrace, where contracts will be let to 
private contractors for the enlargement of the Twelve Mile creek channel 
and the Second Welland canal. 

The new construction supplements the general scheme of development 
of unit No. 1, and the many problems of construction, which were fully 
described in the thirty-fifth and thirty-sixth annual reports of the Com- 
mission, will have their counterpart in the installation of unit No. 2. It is 
estimated that construction will extend over a two-year period. 

Niagara River Power Plants 

At the Ontario Power plant, a second exploration shaft was sunk to 
examine No. 1 conduit, and it was found that no appreciable deterioration 
had taken place since the previous year. 

At the Toronto Power plant, new runners and gates for the four 13,000 
horsepower turbines were installed, and it is interesting to note that these 
changes were made on units which went into service when the plant com- 
menced operation in 1906. 




NIAGARA RIVER REMEDIAL WEIR 
Broken water at the crest of the completed weir 



78 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

Niagara River Remedial Weir 

At the Niagara river remedial weir observations indicated that the 
behaviour of the weir was satisfactory when ice was running in the river. 
The weir is considered to be completed but the cableway was not removed 
in case observations indicated that some additional work is required. To 
facilitate free and safe movement of traffic on the boulevard, a well-surfaced 
by-pass road was built around the head tower on the Canadian shore. The 
road was equipped with a substantial guard rail and well-marked guide 
and warning signs. 

Ogoki Diversion 

Improved radio communication facilities were provided between Waboose 
dam and Summit Control dam. Studies of run-off, stream flow and discharge 
proceeded, and ratings were made to determine stage-discharge relationship. 

Georgian Bay Division 

The -economics of alternative sources of additional power for the Georgian 
Bay division were studied, and estimates of costs of several potential sites 
on the Muskoka river were prepared and analyzed, the site at Mathiasville 
receiving particular attention. 

Eastern Ontario Division 

Studies, layouts and comparative estimates were made for hydro-electric 
developments on the Madawaska river at Claybank, Mountain chute, 
Hyland chute, Racket rapids and Stewartville. Field survey work was 
performed at several of the sites and sub-surface explorations and investiga- 
tions were conducted at Stewartville,- Claybank and Colton chute. Form line 
drawings of that section of the river from Hyland chute to Palmer rapids 
were made in co-operation with the aerial division of the Department of 
Lands and Forests. 

At Lakefield generating station on the Otonabee river, rehabilitation of 
the concrete structures and the consolidation of rock foundations were 
completed by means of the intrusion method of grouting. 

Stewartville Development 

The second phase of the comprehensive scheme of power development 
of the Madawaska river was authorized by the Commission in September, 
1945, in order to meet the immediate growing demands for power in eastern 
Ontario. After careful study, the Stewartville site was found to be the most 
economical in meeting present requirements, and surveys for construction 
roads and camps were progressing at the end of the fiscal year. 

The Stewartville site is approximately eight miles south-west of Arnprior, 
and derives its name from a once-flourishing hamlet which is now deserted. 
The new development will produce 54,000 horsepower under a head of 150 
feet, and it is expected will be available for use during the fall of 1947. 

The general scheme of development provides for a concrete dam with a 
maximum height of some 200 feet and a length of 850 feet. A concrete side 
dam about 500 feet long angles off from the south end of the main dam. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 79 




STEWARTVILLE POWER DEVELOPMENT— MADAWASKA RIVER 
A view of river looking upstream from the Stewartville bridge toward the power site 

The headworks will be incorporated towards the north end of the dam and 
will be connected by two 14-foot diameter penstocks approximately 190 
feet long, to the power house at the base of the dam. A sluiceway provided 
with two steel sluice gates, each forty feet wide, and two sixteen foot stop 
log sluices will be placed at the south end of the dam, and a concrete training 
wall will protect the power house from damage by flood waters. A 30-foot 
diameter tunnel through rock underneath the sluiceway will divert the 
flow of the river and allow construction of the dam in the dry. This tunnel 
will later be closed off by steel gates and a concrete plug poured behind them. 

Des Joachim's Power Site 

Preparatory work was continued looking forward to the construction 
of a hydro-electric development on the Ottawa river at Des Joachims. The 
fall in the river between Des Joachims and Mattawa can be concentrated by 
the construction of a concrete dam to give a head of 135 feet at the power 
site. The power house as designed will accommodate six generating units 
of 60,000 horsepower each with provision for the later installation of two 
additional units. 

THUNDER BAY SYSTEM 

The power supplies of the Thunder Bay system were increased by the 
installation of a 19,000 horsepower unit under a head of 58 feet at Alexander 
development. This plant was originally designed for four units under a head 
of 60 teet; three 18,000 horsepower units were installed in 1930 and 1931 when 
the plant was constructed, but provision was made for a fourth. Construc- 
tion of this unit was commenced in March, 1944, and the unit went on load 
on October 1, 1945. A log slide was also completed, a scale model being first 
tested at the hydraulic laboratory of the University of Toronto. The slide 
has proved very satisfactory in operation. 



80 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



The additional water supply made available by the Ogoki diversion has 
materially increased the potentialities of the Nipigon river, and close attention 
was paid to the possibilities of further extensions at Cameron Falls and 
Alexander, as well as the development of other sites. Revised regulation 
studies of lake Nipigon also proceeded throughout the year, and the effects 
of higher water levels were examined. Reconstruction of the government 
dock at Macdiarmid and rip-rapping of Canadian National Railways trackage 
at Orient bay were completed in anticipation of raising the regulated high 
water to elevation 855.0. 

Aguasabon River 

The development of the Aguasabon river as a major source of power 
was under consideration, and detailed studies and layouts were made during 
the year. The Long Lake diversion has increased greatly the value of this 
river as a source of power, as the diverted waters pass through it to lake 
Superior. Near the outfall into the lake, the river drops some 225 feet through 
a series of rapids, and by means of a dam a head of 300 feet may be developed. 
Topographic surveys and diamond drilling were actively proceeding to the 
end of the fiscal year. 




MORE POWER FOR THE THUNDER BAY DISTRICT 
Falls at the mouth of the Aguasabon river 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



81 



The proposed scheme of development would place the power house on 
the shores of lake Superior at Terrace Bay, and connect it to the headworks 
on the artificial lake created by the dam, by a 15-foot diameter tunnel and 
penstock some 2,600 feet long. The peak capacity of the plant will be ap- 
proximately 53,000 horsepower, and construction will extend over a period 
of about two years. 



TAIL 
SHAFT 




METER £,' VALVE'S 

i 



g> S>g>-Q" 



TAYLOR HYDRAULIC AIR COMPRESSOR 

The Taylor hydraulic air compressor plant was constructed in 1910 at Ragged 
Chute on the Montreal river in the vicinity of Cobalt, Ontario, to provide compressed 
air for the silver mining activities in the area. The principle of its operation is 
illustrated in the above sketch. Water enters the plant from the river past the head 
gates, through the racks and is delivered at the intake heads located at the top of 
the two intake shafts. 

Air is introduced into each shaft through a set of 66 short vertical pipes 14 inches 
in diameter, fixed to and discharging through the intake head. This device is adjustable 
vertically and is preferably set to locate the top of the air inlet pipes a few inches 
below the water level at the intake head. 

Passing down the intake shaft the air is compressed as the water pressure 
increases and at the bottom the mixture is deflected horizontally along the tunnel 
where under low velocity the air gradually escapes and eventually collects in the 
air dome at a pressure of approximately 125 pounds per square inch. From this 
point it is conducted through a 24-inch pipe to the valve and meter house and conveyed 
through 20-inch mains to the distribution centers. The water passes up the outlet 
shaft and is discharged to the river at a tailwater level some 47 feet below the 
intake water level. 

When air pressure in the dome rises above normal, the water surface in the 
tunnel is gradually depressed, and surplus air is vented through the blowoff pipe. 



82 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



NORTHERN ONTARIO PROPERTIES 



A scheme for the overall development of the Mississagi river was studied, 
and four major sites with an aggregate capacity of approximately 150,000 
horsepower, to be developed progressively as required by load conditions, 
were investigated. 

A survey party was engaged during the summer supplementing previous 
field information in connection with these sites, and diamond drilling was 
carried out. to examine sub-surface conditions at a proposed storage dam site 
at Rocky Island lake. Field parties were also engaged during the summer 
on several rivers in northern Ontario, and preliminary data were obtained 
of sites for storage and power development. 



Watabeag Lake Dam 

The construction of Watabeag Lake dam, to improve the storage facilities 
on the Abitibi river, was started by the Commission's construction staff 
in August 1945, and was nearing completion at the end of the year. The dam 
is a rock-filled timber crib and earth dam some 200 feet long with a maximum 
height of fifteen feet; it has two sluiceways, one 14 feet wide and another 
8 feet wide used for log-driving purposes. 



Frederick House Dam 

An access road from Connaught was constructed by contract and a 
portion of the provincial highway was raised to accommodate the higher 
water level of Frederick House lake. Negotiations for settlements of claims 
were conducted with owners of property affected by the higher water levels 
on Frederick House and Night Hawk lakes. The increase in the elevations 
of these lakes by one foot will provide an additional 34,000 acre feet of 
storage, and will allow an additional development of 6,700,000 kw-hrs 
energy each year at Abitibi Canyon. 



Northern Ontario Power Company Plants 

In March, 1945, the Commission commenced operation of the generating 
stations and other properties of the Northern Ontario Power Company 
previously acquired under a purchase agreement. These properties comprise 
eight hydro-electric plants, with a total capacity of about 60,000 electrical 
horsepower, complete with transmission lines and distribution facilities. 
Of this installation, five plants of a capacity of 35,000 horsepower are situated 
on the Matabitchuan and Montreal rivers, in the Cobalt area, and the remain- 
ing three on the Mattagami river, in the Timmins area. Included also in the 
purchase was a hydro-pneumatic station, utilized for production of com- 
pressed air, for distribution to mining customers in the neighbourhood of 
Cobalt. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 83 




A POWER DEVELOPMENT ACQUIRED BY HYDRO 
Sandy Fall generating station, Mattagami river — No. 2 Unit 



HYDRAULIC INVESTIGATIONS 

Activities in the field were widespread, and foundation investigations 
and topographic surveys were conducted at numerous sites in preparation 
for the provision of further sources of power supply and storage facilities. 
In this connection surveys were carried out en the Madawaska, French, 
Muskoka, Magnetawan, Mattagami, Groundhog, Abitibi and Kaministiquia 
rivers. 

At Silver falls, on the Kaministiquia river, some thirty miles north-west 
of Fort William, at a site near the outlet from Dog lake where the river 
drops in a series of cascades some 350 feet, diamond drilling has been in 
progress to determine the subsurface rock conditions and enable a plan of 
development to be prepared. 

A study of the French river as a source of power complementary to power 
supplies from the Abitibi river was completed. This brought up to date the 
study made in 1939, which covered the years 1922 to 1936. 

Preliminary examination of the power possibilities of the Magnetawan 
river disclosed the possibility of developing some 30,000 horsepower. 

Data were being compiled, and layouts and preliminary estimates 
of- several other proposed developments were- being carried out at the end 
of the fiscal year. 

Normal maintenance work on structures and hydraulic equipment, and 
routine collection of hydrometric data continued. 

Engineering assistance was given by the Commission upon request to 
various public bodies in regard to hydraulic problems. 



84 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



SECTION VII 



ELECTRICAL ENGINEERING AND CONSTRUCTION 



FOR the first nine months of the fiscal year actual construction work 
continued to be restricted to projects contributing directly to the war 
effort or the maintenance of essential civilian services. A great number of 
undertakings were carried out to accommodate changing load demands or 
for essential maintenance, but major undertakings were few, and the total 
volume of construction was much curtailed. 

After the month of August, the gradual lifting of construction controls 
made it possible to proceed with certain pressing work previously held on the 
deferred list. Continuing shortages of labour and materials, however, limited 
the volume of actual construction achieved. 



Planning Ahead 

Studies relating to supplies of power in the post-war era were continued, 
particular attention being given to the immediate post-war programme. The 
studies have a broad scope, and include various possibilities of load growth 
throughout Ontario during the next ten to fifteen years, the best sequence 
of power developments, and the most suitable over-all arrangement of 
transmission lines and other facilities. As a result of these, and other more 
localized studies, various new projects were authorized in the latter part of 
the year with the assurance that they will fit into a flexible and comprehensive 
long-term plan. The projects authorized represent only the more urgent. 
They include new generating capacity in the Southern Ontario system at 
DeCew Falls and Stewartville ; the integration and tieing together through 
a new station at Scarborough of the Niagara, Georgian Bay and Eastern 
Ontario divisions of the recently consolidated Southern Ontario system; 
augmented power supply to many areas, involving new transmission lines, 
new transformer and distributing stations, and extensions to existing lines 
and stations; and miscellaneous system, line, station, and rural power changes 
and improvements: 

The Commission's network calculator was in constant use in connection 
with these studies, and is now being enlarged, in order to have sufficient 
facilities to represent as one combined unit the three recently amalgamated 
divisions forming the Southern Ontario system. 



.1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



85 



New Generating Capacity 

The fourth unit at Alexander generating station was placed in service 
on October 1, 1945, increasing the station capacity to 60,000 kva. 

Increased Transformer Capacity 

At the end of this section is given a tabulation of the transformer and 
distributing stations where major increases in transformer capacity were 
placed in service. A number of the stations listed are new. Associated with 
many of the transformer changes were alterations and additions to station 
structures, switching, metering and station protection. 

Other transformer changes are in progress, and about 25 new stations 
are either in the design stage or commencing construction. 

Acquired Properties 

Early in the year, properties of the Northern Ontario Power Company 
and the Caledon Electric Company were acquired. The effective dates of 
purchase were November 30, 1944 and December 1, 1944, respectively. The 
work of amalgamating these purchased lines and stations with the Com- 
mission's existing lines and stations in the Abitibi district and the Georgian 
Bay division respectively is proceeding. 

New Transmission Lines 

New transmission lines placed in service include 56.4 miles of 110,000- 
volt wood-pole transmission line to serve the Department of National Defence 
Atomic Research plant near Chalk River, and approximately 27 miles of 
26,400-volt and 44,000-volt transmission lines to serve new customers and 



f^^ C^ ? 





LINE CONSTRUCTION IN THE WINTER 

Wishbone portion of the 110,000-volt, wood-pole transmission line supplying power 

to the Atomic Research Plant near Chalk River, Ontario 



86 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 » 

distributing stations. Substantial progress was made on a 110,000-volt 
steel-tower transmission line from a point near Ottawa 51.3 miles to Cornwall. 
Surveys were begun for the construction of approximately 100 miles of 110,000- 
volt steel-tower transmission lines for the interconnection of the Georgian 
Bay, Eastern Ontario, and Niagara divisions. Authorization was given for a 
110,000-volt line 42.25 miles long between Chatham and Sarnia. With the 
purchase of the Northern Ontario Power Company's properties, some 535 
miles of transmission lines were acquired operating at voltages from 11,000 
to 110,000 volts. 

Tie Line Control 

The establishment of the tie between the Niagara, Georgian Bay, and 
Eastern Ontario divisions through the frequency-changer set at Scarborough, 
added to the existing ties between the Niagara and Georgian Bay divisions 
at Hanover, and the Niagara and Eastern Ontario divisions at Chats Falls, 
will necessitate the installation of a new integrated scheme of tie-line control, 
centred at one point. Extensive study was given to this matter, and estimates 
were prepared. 

Rural Extensions 

Measures were initiated to supply the accumulated demand for distribu- 
tion lines and services in rural power areas resulting from material and labour 
scarcities during the war. An increased programme of construction was 
authorized, and carried out to the limit of available supplies. For a large 
part of the fiscal year it was necessary to restrict new rural power services to 
essential food producers; however, the removal of non-ferrous metal controls, 
in June, 1945, made it possible in the latter part of the year to include instal- 
lations to all classes of rural customers. A summary at the end of this section 
shows the mileage of lines built and the number of additional consumers 
served. Many changes were made to improve voltage regulation and con- 
tinuity of service. 

Communication Systems 

Communication systems are being constantly rehabilitated, unified, and 
extended, to provide adequate service for the ever-increasing requirements 
of the developing power systems. 

Oil Circuit-Breakers 

The continual growth of the systems frequently requires the replacement 
of oil circuit-breakers by new breakers of higher rupturing capacity. Replaced 
breakers, where suitable, are used elsewhere. 

In order to check the calculated short circuit kva developed on the system 
under operating conditions, and the ability of the new oil circuit-breakers 
to interrupt it, staged tests were made in December, 1944, at Burlington 
transformer station on two 138,000-volt-class oil circuit-breakers. The 
tests were made while the system was substantially in normal operation, and 
as far as is known from available records, the current interrupted was greater, 
with one exception, than any breaker had previously been subjected to on a 
staged field test. The results of the test have given valuable information 
with respect to the future purchase and application of oil circuit-breakers 
on the Commission's systems. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



87 




"feJNi^ 



. WAR-TIME LINE CONSTRUCTION IN THE WINTER 
Engineering Assistance 

Engineering assistance was given to a number of municipalities and large 
power customers in connection with the purchase and installation of new 
equipment, changes and additions to existing stations, and the construction 
of new stations. In many cases field construction was carried out. Engineering 
assistance was also given in connection with the approval of electrical instal- 
lations over 600 volts. 



Equipment Deliveries 

In general, electrical engineering and construction work during the 
year was handicapped by the shortage of trained staff* and the time required 
to obtain delivery of equipment and materials. Trained personnel have now 
commenced to return from the services, but the time required to obtain 
deliveries has not shown improvement. 

To ensure equipment deliveries that will tie in with the construction and 
rehabilitation programme authorized during the year, extensive orders were 
placed, or are in process of being placed, for items of major equipment requiring 
a lengthy time to manufacture. Typical of such equipment are three generators 
and one frequency changer; various classes and ratings of power transformers 
and oil circuit-breakers; standard outdoor station structures; transmission 
lines towers; insulators and conductors. The promised delivery dates extend 
over a period of approximately two years. 



88 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

Salvage of Old Poles 

When the shortage of lumber became acute in 1944, the Commission 
investigated the possibilities of converting discarded poles into usable lumber, 
and, as a result, a portable saw mill and planer were set up at the Hamilton 
(Beach road) service building. During the 1945 fiscal year, 785 old poles were 
collected from nearby districts and sawn into lumber and square timber, 
chiefly used for crating purposes, and for permanent cribs and booms in the 
DeCew Falls forebay; 207 saw logs were cut off the Commission's Lambton 
Park Property, and converted into 17,775 fbm of good pine lumber; and 15 
saw logs (mostly oak) were obtained from the transmission line operations 
between Toronto and Hamilton, and Cut up into skids suitable for shipping 
transformers and heavy construction equipment. The continuing shortage 
of lumber, and estimates of the number of discarded poles and other timbers 
expected to become available, indicate an expansion of this undertaking as 
a salvage operation. The results so far achieved denote a welcome source of 
readily available lumber at comparatively low cost, for which many use^ will 
be found in the planned construction programme. 

Further particulars of the more important work carried out and authorized 
are given below, under system headings. 



SOUTHERN ONTARIO SYSTEM 

New Generating Stations 

Authorization was given for the installation at DeCew Falls generating 
station (25-cycle) of the second generating unit, with its associated trans- 
formation and switching equipment. The generator will have a capacity of 
64,000 kva, and will be installed in an extension to the building. It is scheduled 
to be in service during the fall of 1947. Contracts were let for the manufacture 
of the second generating unit and for the power transformers. Similar power 
transformers for Unit No. 1 were also purchased, to replace the temporary 
transformers which were originally used at Allanburg transformer station. 

The construction of a new generating station at Stewartville on the 
Madawaska river, was authorized. This station also is scheduled to be in 
service during the fall of 1947. Two generators, each having a capacity of 
24,000 kva, are now being ordered. 

Additional Frequency Changer Station 

The Scarborough frequency-changer installation will initially include 
one 25,000-kva, 25/60-cycle, 300 rpm, 13,800-volt horizontal type frequency- 
changer, with 25-cycle and 60-cycle transformation and switching. The 
transformer station installation will initially include two 8,000-kva, 25-cycle, 
110,000/26,400-volt, 3-phase transformers, with high-and low-voltage switch- 
ing. These transformers will supplement existing transformation facilities 
now loaded to the limit in the suburban area east and north of Toronto. 
Purchase of major station equipment is under way and the contract for the 
frequency-changer has already been let. 

Exchange of power and energy between the 60-cycle Georgian Bay and 
Eastern Ontario divisions will be effected over new transmission lines con- 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 89 

necting the new station at Scarborough to the existing transformer station 
at Oshawa, and to a new transformer station at Fergusonvale. Transfer of 
power and energy to and from the 25-cycle Niagara division will be effected 
through the Scarborough frequency-changer and over a new transmission line 
connecting the new Scarborough station to Toronto-Leaside transformer 
station. The 60-cycle transmission lines to Oshawa and Fergusonvale are 
scheduled to be completed and temporarily tied together in the early summer 
of 1946. The new Scarborough station and the connecting line to Toronto- 
Leaside are scheduled for completion in the spring of 1947. 

In connection with the above, a new 15,000-kva, 110,000/44,000- volt 
transformer station, with switching and 44,000-volt regulating equipment 
is being planned for Fergusonvale. On the 110,000- volt side it will initially 
be connected to Oshawa transformer station, but will eventually tie fed from 
the new Scarborough station 110,000- volt bus. On the 44,000-volt side it will 
be tied in to the Georgian Bay division through the 44,000-volt bus in the 
existing Fergusonvale auto-transformer station on the same site. 

Authorization was also given for the installation at Oshawa transformer 
station of 110,000-volt switching equipment to control the new line to Scar- 
borough and the existing line from Sidney ; and for the installation at Toronto- 
Leaside transformer station of two 2,500,000-kva oil circuit-breakers and 
associated equipment to control the new connection to Scarborough. The 
work at Oshawa will include the installation of 21,000-kva equipment to 
regulate the voltage of the 44,000-volt power supply. The work at Toronto- 
Leaside will include the replacement of eight existing 1,500,000-kva circuit- 
breakers of 2,500,000-kva rated capacity to provide increased rupturing 
capacity for higher power concentrations. 

New Terminal Station and Service Centre 

Studies of the greater Toronto area have demonstrated the need of a 
220,000-volt terminal transformer station on the western side to provide 
facilities similar to those now provided by Leaside transformer station on the 
eastern side. A suitable undeveloped area of land was purchased in Etobicoke 
township, near Islington, for such a station and for its associated transmission 
line rights-of-way, and also, adjoining the station, for the future establishment 
of a service centre. Because of a re-arrangement of transmission lines west of 
Toronto, the 110,000-volt switching portion of the proposed future 220,000- 
volt terminal station will be constructed first ; and preliminary design, and the 
purchase of switch yard equipment is progressing. Construction of this 
initial portion, and of associated transmission line changes to co-ordinate the 
110,000-volt circuits in the westerly portion of the Toronto metropolitan 
area, is scheduled for completion at the end of 1946. 

Preliminary studies are under way regarding the proposed service centre, 
the purpose of which will be to centralize major repair, maintenance, salvage, 
storage, shop, garage, and other service facilities. Initially, it is only proposed 
to install much needed pole-storage facilities, with railway sidings and access 
roads. 

Other Changes 

The installation of the 40,000-kva synchronous condenser at Essex 
transformer station is almost complete, and it will be placed in service early 



90 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

in 1946. The new control room, and the outdoor equipment which is to 
replace the indoor portion of the 26,400-volt bus and switching equipment, 
will be completed later in 1946. 

The supply of power to the Atomic Research plant of Defence Industries, 
Limited, near Chalk river, involved, in addition to the new transmission line, 
the construction of a 110,000-volt switching station at Haley, and a 3,000-kva, 
110,000/2,400- volt step-down transformer station at the Defence Industries, 
Limited plant. The new stations and line were placed in service at the end of 
April, 1945. 

For the supply of power to an area within the Martintown rural power 
district, a 44,000-volt, wood-pole transmission line was constructed 16 miles 
from Maxville to Plantagenet Springs, where a 1,000 kva, 44,000/8,000- volt, 
step-down distributing station was installed. This area is now supplied from 
Cornwall, but previous to September 30, 1945, it was supplied through 
Tread well. 

Lines and stations in the southern portion of the Eugenia district, 
Georgian Bay division, are being converted from the existing operating 
voltage 'of 22,000 volts to a higher voltage in order to improve voltage regu- 
lation, increase transmission capacity between Eugenia generating and 
Hanover frequency-changer stations, and feed the new station at Orangeville. 
Most of the lines have been re-insulated, and with the completion of changes 
authorized at Eugenia generating station, Hanover frequency-changer 
station, and Dundalk, Durham, Grand Valley, Mount Forest, Orangeville, 
Priceville, and Shelburne distributing stations the circuit voltage will be 
raised to 44,000 volts. 

To provide for increasing loads and new industrial customers in the 
Cornwall area a 110,000-volt steel-tower direct line from Ottawa to Cornwall 
was decided upon. This line is scheduled to be in service, with temporary 
terminal connections, early in 1946. Plans are being prepared for the instal- 
lation at Cornwall switching station of new 110,000-volt switching equipment; 
and for the installation at Cornwall transformer station of an outdoor 15,000 
kva, 110,000/44,000/4,000-volt, self-cooled transformer bank, including a 
spare 5,000-kva unit, 15,000-kva, 44,000-volt regulating equipment, and 
necessary structures, switching and other auxiliary equipment. The new 
transformers and regulator have been purchased, and changes at the two 
stations are scheduled for completion in the summer of 1946. It is planned 
to convert the existing bank of water-cooled transformers to self- cooled 
units and to re-connect them for 11, 000- volt service. 

During the war years it became apparent that, for security of service, 
a 110,000-volt switching station was required in the vicinity of Ottawa. 
With the addition of the new 110,000-volt circuit to Cornwall the need for 
such a station became urgent. Land is being purchased south of Ottawa and 
a new station to be known as Merivale switching station is scheduled to be 
in service during 1946. 

At Hamilton-Gage transformer station a fourth 25,000-kva transformer 
previously held in reserve equipment was connected into service, with the 
necessary high and low- voltage structures and switching equipment. This 
increases the station capacity to 100,000 kva and will make additional power 
available to the Hamilton Hydro-Electric System for a new load at the Steel 
Company of Canada. At Toronto-Fairbank transformer station, to supply 
increasing demands in the north-western Toronto area, the third 25,000-kva, 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 91 

110,000/26,000-volt, 3-phase transformer, previously available as an uncon- 
nected spare, is being permanently connected, and the necessary high and 
low- voltage structures and switching installed. 

A new 8,000 kva, 110,000/26,400- volt transformer station was authorized 
at Caledonia, to improve voltage conditions and to reduce the load on Dundas 
transformer station. The new station will serve Caledonia, and municipalities 
and rural power areas south of that village which are now supplied from 
Dundas. The station is scheduled for completion in 1946. 

Conditions in the St. Catharines-Thorold area are being studied to 
provide a new transformer station. 

Field construction of the 110,000- volt steel-tower transmission line 
between Kent and St. Clair transformer stations will be commenced in 
December, 1945, and is expected to be completed in the summer of 1946. 
In connection therewith, high-voltage switching will be installed at Kent 
transformer station. The work includes a new 110,000-volt outdoor switch 
structure, the extension to this structure of the indoor bus, and the modern- 
ization of station lightning protection. 

Increasing loads at Sidney transformer station were taken care of during 
the war years by installing forced air cooling on the transformers, but the 
limit of capacity to be obtained by this method has been reached and a 
second 15,000-kva, 110,000/44,000/4,000-volt transformer bank, together 
with a 15,000-kva voltage regulator, will be placed in service early in 1946. 
In the Kingston area, the installation of a second 15,000-kva 110,000/44,000/ 
4,000-volt transformer bank at Frontenac transformer station, together with 
a 15,000-kva voltage regulator was authorized, and is scheduled for com- 
pletion late in 1946. 

To meet increased load conditions at West Lome distributing station 
and to improve voltage regulation in the district supplied by St. Thomas 
transformer station, the transmission voltage is being raised from 13,200 
to 26,400 volts. The work, scheduled for completion in 1946, includes the 
installation of two 5,000-kva, 13,200/26,400-volt auto-transformers at 
St. Thomas, the re-insulating of 48.9 miles of transmission line, and the raising 
of the operating voltage at West Lome, Dutton, Shedden, Aylmer, St. 
Thomas Provincial Hospital, and Port Stanly distributing stations. The 
station capacities at West Lome and Port Stanley will be increased. 

Rapidly growing summer resort loads on the west shore of lake Simcoe 
are overloading the existing stations. To assist in carrying these loads 
authorization was given for a new 1,000-kva, 44,000/8,000- volt distributing 
station at Alcona Beach for initial operation at 22,000/8,000 volts. The 
station will be supplied by a new 7.6 mile wood-pole line from the existing 
Barrie-Bradford line. 

With the purchase of the Caledon Electric Company, studies were made 
of the best method of incorporating its properties into the Georgian Bay 
division. Authorization was given for the construction of a new 44,000/ 
12,000- volt step-down station, to be known as Orangeville distributing station 
No. 2; a new 12,000- volt line from Orangeville to Cataract; and the raising 
of the voltage of the Caledon Electric Company lines from 6,600 to 12,000- 
volt operation, with necessary rehabilitation. 

Engineering and purchasing assistance is being given, and construction 
work undertaken, in connection with new municipal stations for the Belleville, 
Chatham, Goderich, and Waterloo Public Utility Commissions, and for the 



92 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

Brantford Township and East York Hydro-Electric Systems. The con- 
struction of Almonte municipal station, referred to in last year's report, 
was completed. Engineering assistance is being given to the Board of Light 
and Heat Commissioners of Guelph in the preparation of drawings for its 
new municipal station No. 5, and engineering assistance to the Peterborough 
Utilities Commission, mentioned last year, was continued. The construction 
of new substations for the Thorold and Picton Public Utilities Commissions 
has been authorized. 

In order that the Ottawa Hydro-Electric System could plan for a new 
substation, which would need to be placed adjacent to a step-down station 
of the Commission, the Commission was requested to determine by an 
analysis of the local system's loads the most suitable location for the two 
stations. As a result of the study a combined site for the two stations was 
purchased, and the Ottawa Hydro-Electric System will shortly construct its 
low- voltage substation. The Commission's station will be known as Ottawa- 
Riverdale transformer station. 

THUNDER BAY SYSTEM 



The fourth 15,000-kva unit at Alexander generating station was placed 
in service on October 1, 1945, increasing the station capacity to 60,000 kva. 

A new 500-kva, 110,000/2,300-volt distributing station is being installed 
at Nipigon to supply power to the village and surrounding area. The new 
power supply will replace the existing supply from step-down transformers 
owned by the Brompton Pulp and Paper Company. 

The site and transformers have been purchased for a new 15,000-kva, 
110,000/22,000-volt transformer station No. 2 at Port Arthur. 

NORTHERN ONTARIO PROPERTIES 

Abitibi District 

Ramore 26,000 /8,000- volt, 3-phase distributing station No. 1 will in 
future supply the Matheson area, and its capacity is being increased from 
75 kva to 150 kva. To supply the Ramore area, a new 75-kva, 26,400/4,600- 
volt single-phase distributing station is being installed on the Ramore trans- 
former station site. It will be known as Ramore distributing station No. 2. 

Equipment was installed at Kirkland Lake transformer station to 
supply separate regulated voltage to the new Timiskaming district and to 
Lake Shore Mines, Ltd. Changes and additions are being made to the 
telephone equipment t3 fa:ilitat3 th* int^rcDrm^tiDn of th^ Abitibi and 
Timiskaming district communication systems. 

Timiskaming District 

This district comprises properties purchased from the Northern Ontario 
Power Company. 

Plans are under way for the amalgamation of the purchased properties 
with the Abitibi district. This will involve changes to and rehabilitation of 
purchased stations and transmission lines in the Timmins-Schum.acher, 
Cobalt, and Kirkland Lake areas; alterations to and rehabilitation of 
purchased generating plants supplying these respective areas; and the 
installation of load totalizing metering in various customers' stations. 

The two 10, 500-kva, 26,400/ 12,000- volt transformer banks and asso- 
ciated equipment at the Hollinger Consolidated Gold Mines which were 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



93 



originally installed by the Company to receive 26,400-volt power were taken 
over by the Commission; and switching, metering, and other additions and 
changes were made to supply power to the Hollinger mines at 12,000 volts, 
and to provide a tie between the Abitibi and Timiskaming districts through 
Schumacher transformer station. The station, as changed, is known as 
Hollinger transformer station, and was put into service during May, 1945. 

Sudbury District 

In connection with the Sudbury rural power district, a new 1,000-kva, 
22,000/12,000-volt distributing station No. 3 was installed at Sudbury; the 
distribution system is being changed from 4,000-volt to 12,000-volt opera- 
tion; and necessary extensions are being made. The existing Sudbury 
distributing stations Nos. 1 and 2 were sold to the Sudbury Hydro-Electric 
Commission, with the exception of certain minor equipment. 

A 10-kva, single-phase, 22,000/220-1 10-volt outdoor station was installed 
for the Canadian National Railways at St. Cloud, and placed in service 
in January, 1945. 

Nipissing District 

A new 1,000-kva, 22,000/12,000-volt distributing station to operate 
initially at 22,000/8,000 volts, was constructed at North Bay to replace 
North Bay rural station, which is being dismantled. 

Transformer capacity at Bingham Chute generating station for the 
Powassan rural power area was increased from 75 kva to 250 kva. 

Authorization was given to increase the capacity of the Sturgeon Falls- 
North Bay 22,000- volt tie line. 

Manitoulin Rural Power District 

Studies are under way regarding possible additional sources of power 
supply to Manitoulin rural power district. 

Patricia District 

A new 600-kva, 44,000/2,300- volt distributing station was installed 
at Red Lake townsite. 

Rainy River District 

The new 450-kva, 44,000/8,000-volt Atikokan distributing station was 
placed in service during Februray, 1945. 

TRANSFORMER CHANGES COMPLETED DURING YEAR ENDED OCTOBER 31, 1945 





] 


[nstalled transformers 






Removed transformers 


Station 




No 


kva 


Ph. 


Total 
kva 


From 


In 
Service 


No 


kva 


To 


Southern Ontario 






















system 






















Aldershot 


.D.S. 


3 


333 


1 


1,000 


New 


Nov. 26, '44 


3 


150 


Rockwood 
D.S. 


Alexandria 


.D.S. 


1 


600 


3 


600 


New 


July 8, '45 


1 


300 


Reserve 


Almonte 


.M.S. 


1 


1,000 


3 


1,000 


New 


Dec. 31/44 








Balderson 


.D.S. 












May 25, '45 


1 


150 


Reserve 


Bowman ville 


D.S. 


1 


1,000 


3 


1,000 


Reserve 


Nov. 1,'44 








Canada Cement 
(Belleville Lehigh). 


D.S] 


1 


1,500 


3 


1,500 


fCornwall 
{ Howard \ 
1 Smith D.S.J 


Dec. 5/44 








Consecon 


.D.S. 


3 


200 


1 


600 


Reserve 


Feb. 4/45 


3 


100 


Stirling 


Cookstown 


D.S. 


1 


150 


3 


150 


Reserve 


Nov. 28/44 


1 


75 


Reserve 



-H.E. 



94 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



TRANSFORMER CHANGES COMPLETED DURING YEAR ENDED OCTOBER 31, 1945 



Installed transformers 



Station 



No 



Southern Ontario 
system — Continued 
Cooksville T.S. 



DeCew Falls . 



G.S. 



Defence Industries Ltd. \ 

Project N.R.X T.S./ 

Dresden D.S. 

Dublin D.S. 



Essex 

Huntsville. . . 
Huntsville . . . 

Island Grove. 

Lindsay 

London 

Midhurst 

Milton 

Milverton . . . 



D.S. 



.T.S. 
No. 2 
.R.S. 

.D.S. 

D.S. 
..T.S. 

D.S. 
.D.S. 
.D.S. 



Newburgh D.S. 

Oakville D.S. 

Oakville (Can. 
Dehydrated Alfalfa)D.S. 

Perth D.S. No. 2 

Plantagenet Springs. . D.S. 
Rockwood D.S. 



Seaforth. 
Stirling . 



D.S 
D.S 



Tavistock. . 
Thornbury. 
Utterson . . . 
Willowdale . 
Winchester . 
Woodbridge 



D.S. 
D.S 
D.S 
D.S 
D.S 
D.S 



Thunder Bay system 

Port Arthur D.S. 

Rosslyn D.S 



Northern Ontario 

Properties 
Timiskaming District 

Hollinger T.S. 



Sudbury District 



Sudbury D.S. No. 3. 

Rainy River District 

Atikokan D.S 



kva 



1,250 
600 

1,000 

333 
300 

5,000 
333 



600 
500 
5,000 
200 
333 
250 

37.5 
200 



200 
333 
150 

75 
100 

667 
75 
200 
1,000 
600 
667 



200 
333 



3,500 



Ph. 



333 
150 



Total 
kva 



3,750 
600 

3,000 

1,000 
300 

5,000 
1,000 



600 

500 
5,000 

600 
1,000 

750 

37.5 

600 



600 

1,000 

450 

225 
300 

2,000 
225 
600 

2,000 
600 

2,000 



200 
1,000 



21,000 



1,000 
450 



From 



Reserve 

New 

New 

Reserve 
Reserve 

Reserve 
Reserve 



Reserve 

Salvage 

Reserve 

Reserve 

New 

Woodbridge 

D.S. 
Rural Stores 
Reserve 



New 
New 
Aldershot 

D.S. 
Reserve 
Consecon 

D.S. 
Reserve 
Reserve 
New 
New 
New 
Reserve 



New 
New 



Holl'g'r 
Gold Mines 

Sudbury 

D.S. No. 1 
Sudbury 

D.S. No. 2 

New 

Rosslyn D.S. 



In 
Service 



Mar. 21/45 
July 5, '45 

Apr. 29/45 

Sep. 
Apr. 

Mar. 

July 
July 



16/45 
17/45 

26/45 
1/45 
1/45 



Removed transformers 



No 



June 30/45 
Julv 7/45 
June 7/45 
Nov. 16/44 
Oct. 28/45 
Apr. 3/45 

Nov. 5/44 
Nov. 12/44 

Feb. 7/45 
May 6/45 
Sep. 30/45 
June 10/45 

Julv 22/45 
June 10/45 

Sep. 23/45 
Aug. 24/44 
June 8/45 
Nov. 30/44 
Feb. 18/45 
Nov. 26/44 



Jan. 
Jan. 



9/45 
3/45 



May 7/45 

Jan. 1/45 
Jan. 1/45 
Aug. 14/45 
Feb. 3/45 



kva 



1,250 

1,250 

250 

333 



75 

75 

5.000 



100 
150 



50 
100 

75 



To 



Salvage 
Reserve 
Reserve 
Reserve 



Salvage 
Reserve 
Reserve 

Reserve 
Reserve 



Reserve 
Reserve 



Salvage 
Reserve 

Reserve 



250 



667 
300 
250 



Reserve 



Reserve 
Reserve 
Milverton 
D.S. 



1,000 
1,000 



Sold to Sud- 
bury H.E.C. 
Sold to Sud- 
bury H.E.C. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



95 



TOTAL MILEAGE OF TRANSMISSION LINES AND CIRCUITS 






Kind 
of 

struc- 
ures 


1 
s 


Jne route 
tructure n 


or 
liles 


Circuit 
miles 


System and voltage 


Total to 
Oct. 31, 

1944 


Addi- 
tions 
1945 


Total to 
Oct. 31, 

1945 


Total to 
Oct. 31, 

1945 


Southern Ontario system 
Niagara division 
220 000-volt ..... 


steel 

wood 
steel 

wood 
<< 

<< 

steel 
wood 
steel 
wood 

wood 

<< 

steel 
wood 

<< 
<< 

steel 
wood 

steel 

wood 

<« 

steel 
wood 

wood 


1.025.12 

812.22 

111.98 

65.85 

35.23 

3.03 

878.16 

252.80 

0.82 

72.39 

34.97 

39.68 

28.02 

14.40 

25.69 

223.42 

2.30 

110.16 

242.08 

82.12 

26.31 

163.23 

280.14 

24.33 

42.26 

502.46 

128.29 

62.48 

59.10 

82.12 

178.21 

113.81 

8.05 

1.45 

362.74 

190.19 

151.35 

46.23 

61.57 

63.16 

343.59 

32.76 

119.81 


"*2!78" 

5.85 

*0,10 

"56." 42* 

*2.05 
16.40 

" *i.*5i' 

li2.'82' 

74.56 

247.30 

100.49 


1,025.12 

812.22 

111.98 

65.85 

35.23 

0.25 

884.01 

252.70 

0.82 

72.39 

34.97 

39.68 

28.02 

14.40 

25.69 

223.42 

2.30 

110.16 

242.08 

82.12 

26.31 

163.23 

336.56 

24.33 

42.80 

465.56 

144.69 

62.48 

59.10 

82.12 

178.21 

113.81 

8.05 

1.45 

362.74 

190. 19 

151.35 

46.23 

61.57 

63.16 

345.10 

32.76 

119.81 

112.82 

74.56 

247.30 

100.49 


1,069.97 


110,000-volt 


1,400.95 


110,000-volt 


113.81 


90 000-voltt 


120.81 


60,000-volti 


35.57 


60,000-volt 


0.25 


26,400-volt 


1,057.28 


13,200-volt 


320.35 


13,200-volt 


1.64 


12,000-volt 


91.26 


Dominion Power district — 44,000 volt. . 
Dominion Power district — 44,000-volt. . 
Dominion Power district — 22, 000-volt. . 
Dominion Power district — 10,000-volt. . 

Georgian Bay division 
110,000-volt 


69.94 
39.68 
28.02 
14.40 

25.69 


44,000-volt 


250.92 


6,600-volt 


2.30 


Severn district 22, 000-volt 


134.46 


Eugenia district— 44,000 & 22,000-volt 
Wasdell district— 22,000-volt 


308.47 
83.46 


Muskoka district — 44,000-volt 

Eastern Ontario division 
110,000-volt 


26.31 
166.54 


110,000-volt 


336.56 


44,000-volt 


24.33 


33,000-volt 


48.48 


Central district, 44,000-volt and less . . . 

St. Lawrence district, 44,000-volt 

Rideau district, 26,400-volt 


538.64 

145.07 

62.48 


Madawaska district, 33,000-volt 

Thunder Bay system 

110,000-volt 


59.10 
164.28 


110,000-volt 


178.21 


44,000-volt. . 


113.81 


22,000-volt 


8.05 


12,000-volt . . . 


1.45 


Northern Ontario Properties 

Abitibi district— 132,000-volt 


725.48 


Abitibi district— 132,000-volt 


190. 19 


Abitibi district— 26,400 & 13,200-volt. . 

Sudbury district— 110,000-volt 

Sudbury district — 22,000-volt 


152.36 
46.23 
61.57 


Nipissing district — 22,000-volt 


80.04 


Patricia district— 44,000-volt 


345.10 


Patricia district— 22,000-volt 


32.89 


Rainy River district— 110,000-volt 

Timiskaming district — 110,000-volt. . . . 


119.81 
225.64 


Timiskaming district — 1 10,000-volt . 




74 56 


Timiskaming district — 44,000-volt 




247.30 


Timiskaming district — 12,000-volt and 
11,000-volt 




170.21 








Totals 




7,104.08 


f610.96 


7,715.04 


9,513.92 



*Removals. fNet Increase. {Former T. & N.P. Co. circuits are now used at various 
voltages ranging from 4,000 volts to 110,000 volts. 

Note: Circuit miles of 220,000-volt line in the province of Quebec connected to H-E.P.C. 
lines = 103.45. Total 220,000-volt system interconnected circuit miles = 1,173.42. 



96 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

TRANSMISSION LINE CHANGES AND ADDITIONS MADE DURING THE YEAR 

ENDED OCTOBER 31, 1945 

SOUTHERN ONTARIO SYSTEM 

HIGH-VOLTAGE LINES 

The 60,000-volt, single-circuit, wood-pole line from Ontario Power transformer station 2.41 
miles to Cyanamid transformer station was removed. 

The 60,000-volt, single-circuit, wood-pole line from Queenston forebay towers 0.37 mile to 
Niagara River switching station was removed. 



LOW-VOLTAGE LINES 
Niagara Division 

Dundas District: — A 26,000-volt line was built from Ancaster junction 2.78 miles to Ancaster 
distributing station. 

London District: — A section of the 26,400-volt line from Delaware junction to Mt. Brydges 
junction 0.06 mile in length was removed by relocation of the line. 

St. Thomas District: — The 13,200-volt line from Aylmer junction to Aylmer distributing station 
was relocated for 0.25 mile. 

A section of the 13,200-volt line from Yarmouth junction to Port Stanley distributing station 
0.03 mile in length was removed by relocation of the line. 

Cooksville District: — A section of the 13,200-volt line from Cooksville Shale junction to 
The Cooksville Company Limited, 0.10 mile in length, was removed. The sky wire was removed 
throughout, a distance of 1.22 miles. 

Kent District: — A section of 26,400-volt line 1.85 miles in length from Prince Albert junction 
to Como junction was relocated and total mileage reduced by 0.02 mile. 

York District:— A 26,400-volt line was built from Long Eranch distributing station 0.36 mile 
to Neptune Meters Ltd. 

Hamilton District:— A 13,200-volt circuit was erected on existing pole lines 2.45 miles and on 
new poles 0.09 mile from Bartonville distributing station to Stoney Creek distribution station. 

Fairbank District: — A 26,400-volt line was built from Base Line junction 1.34 miles to Island 
Grove distributing station. 

A 26,400-volt line was built from Post Road junction 2.91 miles to Department of Public 
Works (Sunnybrook Military Hospital) of which 0.95 mile was built for that customer. 

Thorold District:— The 12,000-volt line from Thorold transformer station 0.05 mile to Provincial 
Paper (steam) distributing station was restrung with heavier conductor. 

The 12,000-volt line from Provincial Paper (steam) distributing station 0.22 mile to Thorold 
distributing station was restrung with heavier conductor. 

Eas ern Ontario Division 

A 110,000-volt, single-circuit, wood-pole line was built from Haley switching station 56.42 
miles to Defence Industries station (N.R.X.) near Chalk River. 

A 33,000-volt wood-pole line was built from Almonte junction 0.54 mile to Almonte station. 
Central District: — A section 0.03 mile in length was added to the 44,000-volt line from Sidney 
transformer station to Brighton distributing station by relocation of the line. 

The 44,000-volt line from Auburn Switching station 2.08 miles to Peterborough was sold 
to Peterborough Utilities Commission. 

St. Lawrence District:— A 44,000-volt line was built from Maxville distributing station 16.4 
miles to Plantagenet Springs distributing station. 

The 44,000-volt line from Sophia junction 12.12 miles to Phillips junction was rebuilt and the 
sky wire was removed. 

The 44,000-volt line from Phillips junction 0.46 mile to Brockville distributing station was 
rebuilt and the skv wire was removed. 



NORTHERN ONTARIO PROPERTIES 

Patricia District:— A 44,000-volt line was built from Madsen Red Lake Gold Mines Limited 
station 1.51 miles to Hasaga Gold Mines Limited station No. 2. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 97 

COMMUNICATIONS— ALL SYSTEMS 
SOUTHERN ONTARIO SYSTEM 

In the Niagara division of the Southern Ontario system, a new four-circuit open-wire tele- 
phone pole line was constructed between the DeCew Falls 66% cycle generating station and 
Turners junction, a distance of 3.31 miles. Between Allanburg junction and Pelham junction, a 
distance of 8.02 miles, a new telephone pole line with six circuits was constructed to replace three 
deteriorated telephone pole lines; and between Pelham junction and Vinemount a telephone pole 
line with two telephone circuits was reconstructed for a distance of 17.55 miles. One circuit between 
Ancaster junction and Ancaster distributing station was erected on the newly constructed 26,400- 
volt pole line; and single telephone circuits were erected between Stoney Creek distributing 
station and Salttleet R.P.D. office, a distance of 1.19 miles, and from Base Line junction to Island 
Grove distributing station for 1.34 miles. 

Two permanent private branch exchanges consisting of 15 lines each were installed in the 
Power Supervisor's office at the Administration building; and at Frontenac transformer station 
in the Eastern Ontario division two private branch exchange turrets consisting of seven and eight 
lines respectively were installed in the station control room and the operators' residence at 
Frontenac. 

At the Toronto-Strachan transformer station the telephone equipment was transferred to the 
new telephone room and new cables were installed. Carrier telephone terminals were placed in 
operation at the Niagara transformer station and Toronto-Strachan transformer station to provide 
a direct telephone communication channel between the Power Supervisor's office at the Adminis- 
tration building and the district load supervisors at Niagara Falls. In addition a four-channel 
telemetering telephone carrier system was installed between Niagara Falls and the Power Super- 
visor's office in Toronto to provide the necessary channels for remote indication of power system 
data to be made available to the new Power Supervisor's organization at Toronto. 

NORTHERN ONTARIO PROPERTIES 
Timiskaming District 

In the Timiskaming district of the Northern Ontario properties, a new three-circuit telephone 
pole line was constructed for a distance of 1.75 miles between Indian Chutes generating station 
and the trunk telephone line between Schumacher and Elk Lake to provide improved inter- 
connection facilities between the New L iskeard and Schumacher districts. 

A private branch telephone exchange together with revised protective equipment was installed 
at Schumacher transformer station to provide interchange telephone facilities with the Com- 
mission's system in the Timmins area. At Indian Chutes generating station a five-line private 
branch exchange along with suitable protective equipment was installed to provide improved 
telephone service for system operation. 




AN ENEMY OF WOOD POLES 
This pine borer, showing head and nippers with which it eats paths through solid 
wood, was found by a field inspector in a pole submitted for power line construction. 
Poles which have been attacked by these borers are not acceptable for the Com- 
mission's use. In 1945 nearly sixty thousand red pine and jack pine poles were utilized 
by the Commission after being rigidly inspected and subsequently pressure treated 
with preservatives. Magnification 10 times 



98 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



DISTRIBUTION LINES AND SYSTEMS 

IN RURAL POWER DISTRICTS 

The following summary shows the mileage of distribution lines con- 
structed by the Commission in rural power districts and the number of 
consumers served. 

The summary indicates a total net increase in construction during the 
year of 1,132 miles of new primary line completed and service given to 12,342 
additional consumers. 

SUMMARY OF CONSTRUCTION IN RURAL POWER DISTRICTS 





At October 31, 1944 




At October 31, 


1945 




Miles 
of 
primary 
line 
con- 
structed 


Number 
of 

con- 
sumers 

re- 
ceiving 
service 


Miles 

Con- 
structed 


of prima 

Under 
con- 
struc- 
tion or 
author- 
ized 


ry line 
Total 


Number of 
consumers 


System and division 
or district 


Re- 
ceiv- 
ing 
ser- 
vice 


Au- 
thor- 
ized 


Total 


Southern Ontario 
System 
Niagara division. . . . 
Georgian Bay 
division 


11,953 

3,093 

4,762 

290 

57 

162 

31 

89 


88,823 

19,768 

30,420 

1,506. 

253 

1,012 

1,477 

959 


12,419 

3,411 

5,082 

301 

66 

165 

34 

91 


306 

175 

246 

1 

7 
2 
3 



12,725 

3,586 

5,328 

302 

73 

167 

37 

91 


95,679 

22,698 

32,532 

1,592 

297 
1,099 
1,645 
1,018 


1,283 

682 

1,038 

11 

24 
9 


1 


96,962 
23,380* 


Eastern Ontario 
division 


33,570 


Thunder Bay System 

Northern Ontario 
Properties 

Abitibi district 

Manitoulin district . 
Sudbury district. . . . 
Nipissing district. . . 


1,603 

321 
1,108 

1,645 
1,019 


Totals 


20,437 


144,218 


21,569 


740 


22,309 


156,560 


3,048 


159.608 



"Includes Caledon Electric as a system consumer. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 99 



SECTION VIII 

RESEARCH— TESTING— INSPECTION 

PRODUCTION AND SERVICE 



WITH the cessation of hostilities in Europe and Japan, the activities 
of the Laboratories toward the war effort ended quickly and about 
one-third of the staff was transferred from war work to the many pressing 
research problems of the Commission that had been deferred during the 
war years. Work was expanded in many fields, including grounding, insula- 
tion, electronics, stress analysis, and the treatment of wood poles. A new 
domestic hot water tank was developed and a new type of heating element 
designed which simplifies maintenance and gives increased efficiency. 

The Commission's post-war programme has also been responsible for 
much new work. Field surveys for the purpose of locating suitable sources 
of concrete aggregate have been carried out in several places where major 
construction projects are planned. Existing structures have teen inspected 
and tested to obtain data on service behaviour as a guide to future design 
and construction. New materials and methods developed during the war 
are being studied to determine whether they can be usefully applied in the 
Commission's work. 

The Hydro undertaking of Ontario is greatly benefited by the efforts of 
engineers and scientists everywhere who contribute to the world's scientific 
knowledge. The scientific staff of the Commission recognizes its obligation to 
add something to this knowledge and the Commission encourages its staff 
to participate actively in the work of scientific societies, standardizing 
organizations and other bodies by the presentation of papers, the contribution 
of scientific data and the preparation of standard specifications. 

Factory inspection and witness testing included a large turbine and 
generator for extension of one of the power plants, a large synchronous 
condenser for another location, power transformers over a very wide range of 
capacity, oil circuit breakers and other equipment for erection in the field. 
Checking of quality of materials and fitting of parts before assembly is a 
very important part of this work. 

The Approvals Laboratory, acting as agent of the Canadian Standards 
Association, has continued the testing of domestic appliances and fittings 
and has co-operated with the Electrical Inspection department for protection 
against electric shock and fire hazard to reduce accidents to a minimum in 
the Province. 



100 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

The rrachine shop and garage at the service building rraintained in 
good condition the large fleet of trucks used by the Commission throughout 
Ontario. The volume of work increased during the year. 

RESEARCH AND TESTING LABORATORIES 

Research 

The Laboratories are involved in study of all research problems of the 
Commission and carry en all testing in connection with investigations. The 
Main Research Committee, consisting of five department heads, deals with 
general matters and institutes research studies. The actual research work 
is conducted, both in the Laboratories and in the field, by subcommittees, 
each prepared to study certain specific problems for which solutions are 
desired by the Commission or by a municipality. 

Electrical Insulation 

Direct current was used in several cases to locate cable faults. This 
technique is valuable for certain types of installation. 

A direct current insulation tester was constructed using rectifier tubes 
and having a voltage range up to 5,000 volts with a maximum short circuit 
current of 20 milliamperes. This equipment will supplement the megger 
for testing insulation. 

Power factor tests were made in the Laboratories on various apparatus 
and plans are being prepared for a field testing program on a substantial 
scale. 

Instruction on the application of the gradient method of testing apparatus 
bushings was given to members of the Operating staff in the field. 

The cause of failure of some suspension insulators in the field was 
investigated. 

The use of impulse testing was advanced and a high voltage, high speed 
electronic oscillograph was ordered to supplement this work. 

The installation of magnetic links at Burlington transformer station 
was greatly extended and useful records of surges caused by lightning were 
obtained. 

Studies and tests were continued to contribute data on test methods for 
insulating oils for the Committee of the American Society for Testing 
Materials. 

Vibration of Line Conductors 

The study of problems associated with the vibration of line conductors 
and the development of methods and equipment to eliminate mechanical 
failure due to fatigue have been the chief activities of a special committee 
of engineers for many years. During the past year this committee was 
less active as a result of the success of the investigations and methods adopted 
in past years. 

Fatigue tests were made on three sizes of hard drawn copper and one 
high-strength copperweld wire conductor. These tests have suggested a 
modification in the material specification for wire. 

A report was prepared entitled: "Fatigue Strength Requirements for 
Galvanized Steel Ground Wire Strand" which indicates the desirability of a 
revision in the present ground wire strand specification to include fatigue 
limit requirements. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



101 




HIGH-VOLTAGE TESTING OF INSULATED WIRE AND CABLE 
Flexible transformer equipment, smooth hand control, 550 to 46,000 volts 

Treatment of Wooden Transmission Structures 

In co-operation with the Canadian Forest Products Laboratories, strength 
tests were made on a number of jack pine poles infected with Red Heart, 
a disease caused by a fungus, Trametis pini, and affecting many strands of 
timber which otherwise would be suitable for pole line construction. This 
work was done with a view to promoting the efficient utilization of the 
timber resources of the Province. 

Special laboratory equipment was constructed for the purpose of studying; 
the effects of fungi on various preservatives. The Canadian Forest Products 
Laboratories supplied standard cultures of two common varieties of fungus. 
These were propagated in agar jelly to provide sufficient inoculum for the 
studies. 

Several hundred poles were inspected in the field to determine the effect 
of different preservatives and methods of treatment. This work included the 
pole test plot at Barrie and the 44-kv power line in the Patricia district from 
Ear Falls generating station to Hudson. 

Domestic Hot Water Tanks and Heaters 

Studies were continued with a view to increasing the service life of hot 
water tanks and heaters and to prepare plans and designs for new flat-rate 
heater installations. 

The sixth annual inspection of the experimental tanks operating under 
domestic service conditions at York station found very little change in the 
past year, the rate of deterioration now being very slow. 

The investigation by accelerated tests of the quality of galvanizing on 
iron and steel was continued on specimens submitted by a manufacturer. 



102 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 




DEVELOPMENTS IN DOMESTIC WATER HEATING EQUIPMENT 
The new water heater developed by the Laboratories with improved appearance, 
increased efficency shown by extensive laboratory tests, and readily replaceable heating 
elements, is at right, with present standard tanks at left. The new design can be 
completely assembled and tested in the factory to simplify installation, and elements of 
various ratings may be used in the double-element flat-rate method of connecting heaters 



A series of corrosive tests, under city water pressure and at various 
elevated temperatures, was conducted on plain iron cut from a used tank, 
on aluminum, on new galvanized iron and on glass-enamelled iron which 
showed a decided loss in gloss. 

Microscopical studies were made on tank steel samples supplied by the 
Toronto Hydro Electric System and on an anodized aluminum tank from 
Arvida, Quebec. 

Tank design was studied in regard to heat damage where the bottom 
is welded to the cylinder. 

Substantial progress was made on the development of a flat-rate water 
heater arrangement designed for quick recovery of water temperature without 
the use of a booster heater. The new strap-on heater element improves the 
efficiency of the system at moderate cost and is readily removed to insert a 
new element or one of higher power without removal of the tank casing and 
thermal insulation. Specifications for a new type of hot water tank were 
prepared. A complete water-heater assembly is being designed to be factory- 
built, shipped and installed as a packaged unit. 

Illumination 

The characteristics of both hot and cold cathode fluorescent tubes were 
studied with a view to recommending suitable illumination equipment and 
satisfactory arrangement of luminaires to municipalities for solution of 
their consumers' lighting problems. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



103 




This new strap-on type of element, as seen through the opening in the cover of the tank, 
requires only a screwdriver to remove and replace with larger element, without dis- 
turbing any of the thermal insulation 



Studies of school classroom lighting were continued and reports prepared 
on semi-direct lighting, indirect lighting, blackboard illumination, fluorescent 
fixtures and suitable spacing of fixtures. 

Masonry Materials 

Study of the thermal and structural behavior of Barrett Chute dam 
was continued to determine the seasonal trends at the point of observation. 
The information obtained may provide assistance in planning future hydraulic 
structures. 

A search for internal cracks at Barrett Chute dam was made by measuring 
the velocity and intensity of waves set up in the dam by standardized 
impulses. An electronic interval timer, capable of measuring in the milli- 
second and micro-second ranges, was developed at the Laboratories for use 
on such concrete structures. 

The study of deterioration of cement in storage which has progressed 
through a number of years was completed and a report prepared on the aging 
of cement. 

Measurements were made to determine the effect of certain properties 
of cements upon the appearance of concrete. 

Geophysical methods for the location of aggregate deposits and the 
investigation of foundation conditions were studied. Equipment was con- 
structed and assembled and measurements were made at fourteen places 
where the results could be checked by drilling and excavation. Seismic 
principles also were employed to determine the distance to solid rock, and 
this method gave promise of being very useful. 



104 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

Paints and Protective Coatings 

A special committee studies the quality of paints required by the Com- 
mission and investigates new materials and formulated paints. 

This committee revised the Hydro standard color chart and new color 
cards were prepared and put into use. 

A number of tests were conducted on non-slip paints to reduce the 
hazard of workmen on the running boards of trucks. A suitable paint 
was recommended and has been used successfully for several months. 

Black exterior transformer finishes were tested and a product was found 
with a longer life than those previously used. 

Petroleum Products 

A committee studies lubricating oils and greases as well as electrical 
insulating oils, all of which the Commission uses in very large quantity. 

In co-operation with the American Society for Testing Materials, 
extensive tests were made to determine the relative accuracy of various 
procedures for measuring the dielectric strength of transformer oil. A second 
co-operative investigation in which many other large public utilities also 
are participating is a study of the deterioration of insulating oils in service. 

Study of test results on most of the insulating oils in the Niagara division 
resulted in improved procedure for the valuation of used insulating oil. 

A study was started to determine the most suitable additives to use 
in lubricating oil to obtain the particular properties desired in the finished 
oil, standard tests for valuating mineral oils not being applicable when 
additives are used. 

Welding 

Under the guidance of the committee on welding, satisfactory work 
was done in repairing by metal spray a discharge ring in the Hanna Chute 
turbine and guide vanes and a shaft at Eugenia generating station. Bronze 
welding on bronze runners also was successful. 

Electronic Applications 

Some important electronic problems were solved in- designing special 
relays and amplifiers for operating oscillographs. The characteristics of 
coaxial cables were studied and tests were made by newly developed methods 
which gave a higher degree of accuracy. 

Grounding 

The resistance of electrical grounds by galvanized and ungalvanized 
rods has received further attention and methods of improving protection 
to operators of air- break switches have been studied from test results with 
grounded galvanized gratings. 

An investigation of electrical circuits on farm premises was started 
with a view to eliminating any hazards found. An extensive program has 
been planned including line surveys, lightning surveys, grounding and other 
tests under abnormal loads and fault conditions. 

Routine Testing, Materials and Equipment Inspection 

The Laboratories do a large amount of routine testing of materials and 
various types of equipment, and inspect, at the factories, power equipment 
being built for the Commission and for the municipalities. These services 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 105 




LOCATING CRACKS IN CONCRETE 
Electrical equipment for studying the attenuation of high 
frequency sound waves. An endeavour is being made to 
employ the echo-ranging principle for the detection and 
locating of cracks in mass concrete. This method resembles 
those used in the recent war for locating submerged 
submarines 

aim to insure highest quality in material and workmanship in the equipment 
together with suitable operating characteristics, reliability in service and 
minimum expense for maintenance. 

Electrical Equipment 

Acceptance tests were supervised and witnessed on one 15,000-kva. 
generator, unit No. 4, in Alexander generating station. This generator had 
been inspected during manufacture together with metal clad switching 
equipment and panels for its control. 

Inspection during manufacture and final electrical witness tests were 
made on 100 power transformers of various ratings up to 20,000 kva., the 
total capacity tested being 129,815 kva., also 9 oil circuit breakers with 
total capacity of 447,300 kva, and 42 air-break disconnecting switches, 
totalling 3,654,500 kva. 

Distribution transformers of all sizes have been inspected at the factories; 
the total quantity was 4,317, almost twice the number tested in the previous 
year. Nearly 200,000 line and bus insulators were inspected. 



106 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

Routine tests in the Laboratories were made on 5,205 pairs of linemen's 
rubber gloves and on 1,880 samples of insulating oil. Special tests were made 
on 757 samples of oil. A total of 1,413 instrument and distribution trans- 
formers were tested, and also 7 motors. Sixty-five thermostats were tested. 
A total of 1,435 insulators were given flashover tests, 1,604 watt hour meters 
were repaired, and 161 indicating instruments were calibrated. 

Mechanical and Structural Equipment 

Important items in mechanical inspection of equipment were for gener- 
ating and transformer stations. 

For Alexander development, a 19,000 horsepower hydraulic turbine and 
15,000 kva. generator were inspected together with two head gates and 
hoists, two stop-log winches and a sump pump. 

For DeCew generating station, inspection included an emergency gate, 
a rack follower, and head works and tail race gantry cranes. 

For Essex condenser station, a 40,000 kva. synchronous condenser and 
a 5 ton crane were inspected. 

In addition to these items, turbine shaft forgings for Coniston, eight 
replacement runners for the Toronto Power Company plant, and 780 torsional 
vibration dampers were examined. 

The tanks for all power transformers and oil circuit breakers were 
inspected for welding, and also 40 welded tanks for a transformer manufacturer . 

Concrete 

Three resident concrete inspectors with three other inspectors and 
assistants supervised the placing of concrete on construction projects at 
Alexander generating station and Essex transformer station, and also some 
concrete work done at Burlington transformer station. These inspectors 
test the aggregates, check the quality of concrete and supervise the placing 
of concrete. 

Field surveys were made at three sites in search of suitable concrete 
materials for proposed construction. 

X-Ray and Microscopical Examinations 

The X-ray laboratory has been active and has given assistance to govern- 
ment departments in examination of castings. 

Radio-graphic inspection was made on 26,464 light metal castings and 
1,740 plastic parts. 

Transmission Line Materials 

Transmission line materials that pass through Strachan Avenue stores 
are inspected at the Laboratories. These include cross arms, brackets, 
insulator pins, clamps, general hardware, wire and cable. Copper wire and 
cable galvanized steel cable, and steel-reinforced aluminum cable amounted 
to 1,746 tons through the year. 

Steel and Timber 

Structural and reinforcing steel for new installations, 532 tons, was 
inspected. A total of 69,395 pine and cedar poles were examined for use in 
extension of distribution systems. 

Chemical Testing 

Chemical tests were made on 123 samples of paints and substitutes used 
by the Commission on construction projects. These were regular routine 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 107 




UNIVERSAL TESTING MACHINE 
New equipment, with capacity of 120,000 pounds, for deter- 
mining tensile and compressive strength of materials and 
mechanical devices and assemblies. As shown, a tensile 
test is being made on a standard metal specimen with 
extensometer attached to indicate stress and resultant 

strain 

tests to insure good lasting qualities and suitable colors. Accelerated aging 
tests are made on the weatherometer at the Laboratories and serve as a 
guide in determining the life of this paint and its protective value. 

Lamps and Lighting Equipment 

The number of lamps examined and tested increased nearly fifteen per- 
cent over last year, the total being 82,501, and life tests were made on 4,450 
lamps. 

New Equipment 

For the most of the year 1945, the Laboratories were restricted by war 
limitations and post-war shortages in the purchase of equipment. Some items 
were obtained however, and parts for other devices designed and built for 
special use. 

A strain indicator was purchased for use with the resistance type strain 
gauge, a 200 inch-pound impact testing machine for plastics, and a Tungar 
battery charger. 



108 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

A motor drive was completed for the 20,000 lb. Olsen compression testing 
machine, also a load maintainer to hold load on a specimen in this machine 
within very close limits for an indefinite period of time. A strain dynamometer 
was designed and constructed. A device was built for detecting nails in logs 
before being run through the sawmills, and equipment completed for testing 
cracks in concrete. A load unit was designed for conditioning soil samples 
for shear tests, and alterations were made in the wire testing machines. 

Specification and Committee Work 

Members of the staff of the Laboratories represented the Commission 
at meetings and conferences ot the following organizations, assisted in 
preparation of specifications, and were active otherwise in committee work. 
Canadian Standards Association, National Research Council, Canadian 
Electrical Association, Engineering Institute of Canada, American Institute 
of Electrical Engineers, American Concrete Institute, American Society 
for Testing Materials, Canadian Manufacturers Association, Canadian 
Radio Technical Planning Board, Canadian Institute of Mining and Metal- 
lurgy, Ontario Municipal Electric Association, Association of Municipal 
Electrical Utilities, Illuminating Engineering Society, Dept. of Munitions 
and Supply, Wartime Bureau of Technical Personnel, Wartime Labour 
Relations Board, Wartime Prices and Trade Board, Dominion Board of 
Fire Underwriters, International Association of Electrical Inspectors. 

APPROVALS LABORATORY 

Acting as agent of the Canadian Standards Association, this laboratory 
takes care of the approvals testing and factory re-examination of electrical 
equipment manufactured for sale in Canada, including products from the 
United States. 

The number of applications for approval of appliances was nearly two 
and a half times as many as in the previous year. This increase was most 
pronounced in the radio and sound devices although the other appliance 
groups were very much larger. 

The volume ol electrical equipment and material inspected was much 
greater than in the previous year, the increase in number of labels sold being 
about 56 per cent., while the amount of wire, cable and conduit inspected 
increased 31 per cent. These figures, indicate a definite return to production 
for civilian consumption. 

In order to take care of this large increase in business, it was necessary 
to enlarge the testing facilities and to increase the number of the testing 
personnel. 

Meetings of the Approvals Administrative Board, Approvals Council, 
Canadian Electrical Code Committees, Part I and Part II, CSA Committee 
on Electric Range Switches and others were attended by the Approvals 
engineer. 

Canadian Electrical Code 

The work associated with the Canadian Electrical Code on Electrical 
Installations includes attendance at meetings of the Central Committee 
and issuing of interim revisions and interpretations. The work on Approvals 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 109 

Specifications for Electrical Equipment covers the preparation of draft 
specifications and interim revisions of published specifications, and also 
requires attendance at meetings of the committee. The work on Radio 
Interference includes preparation of drafts of sections of specifications to 
insure good practice in means of suppressing radio interference and also 
attendance at meetings of the Committee and at meetings of panels and 
subpanels of the Main Committee. 

As a result of recent additions to the staff more time is being devoted 
to specification work. 

ELECTRICAL INSPECTION 

The volume of work relating to the inspection of electrical wiring and 
equipment installations throughout the Province, showed a decided increase. 

Statistical 

A total of 108,234 permits was issued, an increase of 24,871, or 29.8 
per cent. Inspections numbered 175,935, an increase of 25,975, or 17.3 per 
cent. The graph following shows the number of permits issued and inspections 
made since the department was organized in 1916. 

Fires attributed to Electricity 

Every year, numerous investigations are made of fires purported to have 
originated through defective wiring or equipment. In only three instances, 
this year, could it be proved that the fires were of an electrical origin. The 
causes, in brief, were, two grounds in armoured cables and a flat iron left 
on and unattended. There were, possibly, other fires due to electrical causes, 
but direct evidence was destroyed by fire. 

Electrocutions and Fatal Accidents 

Four persons were accidentally electrocuted through contact with elec- 
trical wiring or equipment. One man touched a bare spot in a portable cable, 
circuit potential 575 volts; another man entered a prohibited area and came 
into contact with equipment operating at a potential of 8,000 volts; a woman 
was electrocuted when a defective cord came into contact with the frame of a 
washing machine and a child touched a live conductor underneath the 
house in which it lived. In the last two cases the circuit potential was less 
than 125 volts. 

Accidents — Cattle 

Eight cows were electrocuted in a stable when a defective armoured 
cable, the armour of which was alive, fell across a stanchion support. Circuit 
potential, 120 volts. 

Ground Tests 

A total of 2,526 tests were made of consumers' artificial ground electrodes 
in rural areas, an increase of 176 tests over last year. 

Infractions of Regulations 

Eleven persons or companies were prosecuted for various infractions 
of the rules and regulations governing the installation of electrical wiring and 
equipment. 



110 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

Special Inspection of Equipment 

Six hundred and eighty-two applications were received from manufac- 
turers and distributors of electrical equipment for approval of one or more 
devices not listed as approved by the Canadian Standards Association. 

Reports were made on 719 applications for special inspection of 
equipment. 

Canadian Electrical Code 

Part I of the Canadian Electrical Code is incorporated in The Hydro- 
Electrical Power Commission of Ontario, Rules and Regulations Governing 
Electrical Installations and Equipment. These regulations are law in Ontario 
and are applicable to electrical equipment and installations. The Code is 
re-issued at more or less regular intervals in order to keep abreast with the 
changes and advancements in the industry and engineers and inspectors of 
the Commission take an active part in revisions and re-issuing of the Code. 

Part II of the Code includes specifications covering construction details 
and tests applied to electrical equipment to determine its acceptability from 
a mini-mum fire and accident hazard point of view. New specifications are 
compiled and existing specifications revised from time to time under the 
sponsorship of the Canadian Standards Association. Engineers and inspectors 
of the Commission assist in the compilation of new and revising of existing 
specifications. 

Under the Canadian Broadcasting Act, Regulations for Controlling 
Radio Interference are enforced by the Federal Government. These regu- 
lations are applicable to electrical equipment and apparatus and to wiring 
installations and are therefore of interest to the Commission. 

Quite a voluminous set of draft specifications have been prepared under 
the direction of the Department of Transport of the Federal Government 
and meetings of committees formed to draft these specifications were attended 
by engineers and inspectors of the Commission. 

PRODUCTION AND SERVICE 

The garage was operated through the year on a satisfactory basis, the 
volume of work done being approximately equal to that of previous years 
and including the overhauling of 76 trucks, mounting 29 new truck bodies 
and reconditioning 35 units of gasoline driven equipment for the Construction 
and Operating departments. In addition, 1,528 orders were completed cover- 
ing miscellaneous truck repairs. 

The systematic inspection and repairing of the Commission's fleet of 
395 trucks was continued. The fleet operated a total of 3,241,551 miles 
which represents an increase of 14.5 percent over the previous year. This 
increase in truck mileage was due to the growing demand for electrical power 
necessitating the construction of additional lines and a heavier maintenance 
programme. 

• Thirty-six new trucks were purchased, twenty-one of which were replace- 
ments and the remaining fifteen were additions to the fleet. 

The volume of work in the machine shop and carpenter shop showed 
an increase of approximately ten per cent over the previous year. 

The Commission's direct contribution to the war effort on the Bits and 
Pieces programme terminated in August. The value of work done during 
the year approximated $500,000. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 111 



SECTION IX 

FINANCIAL STATEMENTS 

Relating to 

Properties Operated by The Hydro-Electric Power Commission on 

behalf of Co-operating Municipalities of the Southern Ontario 

System (Niagara, Georgian Bay and Eastern Ontario Divisions) 

and the Thunder Bay System, 

and to 

Northern Ontario Properties Held and Operated by the Commission 
in Trust for the Province of Ontario, and 

The Hamilton Street Railway Company — A Subsidiary of 
the Southern Ontario System 



IN this section of the Report financial statements relating to the activities 
of The Hydro-Electric Power Commission, segregated into certain distinct 
divisions, are presented. The first division relates to those activities on behalf 
of the co-operative municipalities, which are partners in the main Hydro 
undertaking comprising the Southern Ontario system (Niagara, Georgian 
Bay and Eastern Ontario divisions), the Thunder Bay system, and Rural 
Power districts associated with these two systems. The second relates to 
the administration of the Northern Ontario Properties which are held and 
operated by the Commission in trust for the Province of Ontario. The 
third relates to The Hamilton Street Railway Company, a wholly-owned 
subsidiary of the Southern Ontario system. 

Co-operative Systems 

In the Foreword to this Report a brief reference is made to the basic 
principle governing the operations of the Hydro undertaking in supplying 
electrical service at cost, and to the wholesale and retail aspects of the work. 
A description is also given of the systems into which the partner municipalities 
are co-ordinated for securing common action with respect to power supplies, 
through the medium of The Hydro-Electric Power Commission which, 
under The Power Commission Act, functions as their Trustee. 



112 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

Although for the purpose of financial administration the Southern 
Ontario and Thunder Bay systems are separate units, there is a similarity 
of procedure with respect to their operation which enables certain financial 
statements, as for example the various reserves, to be co-ordinated and 
presented in summary tables. 

The first set of tables in Section IX gives collective results for the 
co-operative activities related to the two systems. These tables include a 
balance sheet ; a statement of operations as detailed in the "cost of power" 
tables referred to below; schedules respecting fixed assets, capital expend- 
itures and grants — rural power districts, account with the Provincial 
Treasurer of the Province of Ontario, funded debt issued or assumed, 
power accounts receivable, renewals reserves, contingencies and 
obsolescence reserves, stabilization of rates reserves and sinking fund 
reserves. 

The tables which follow these general financial statements relate more 
particularly to the individual municipality's aspects of the wholesale activities 
of the Commission and for each system show the cost of power to the 
individual municipal utilities, the credit or debit adjustment remaining at 
the end of the fiscal year, and the sinking fund equity that has been acquired 
by the individual municipality. There is also included for each system a 
rural operating statement. 

The charges for power supplied by the Commission to the various muni- 
cipalities vary with the amounts of power used, the distances from the sources 
of supply and other factors. The entire capital cost of the various power 
developments and transmission systems is annually allocated to the connected 
municipalities and other wholesale power consumers, according to the relative 
use made of the lines and equipment. In general each municipality assumes 
responsibility for that portion of property employed in providing and trans- 
mitting power for its use,* together with such expenses — including the cost 
of purchased power if any — as are incidental to the provision and delivery of 
its wholesale power. The annual expenses and the appropriations for reserves 
are provided out of revenues collected in respect of such power, through the 
medium of power bills rendered by the Commission. The municipalities are 
billed at an estimated interim rate each month during the year and credit or 
debit adjustment is made at the end of the year,f when the Commission's 
books are closed and the actual cost payable by each municipality for power 
taken has been determined. 

Included in the municipality's remittance to the Commission for the 
wholesale cost of power — besides such current expenses as those for operation 
and maintenance of plant, for administration, and for interest on capital — are 
sums required to build up reserves for sinking fund, for renewals, and for 
contingencies and obsolescence. The first-mentioned reserve, namely, 
sinking fund, is being created on a 40-year basis for the purpose of liquidating 

*Subject to maximum rate; see footnote on page 138. 

fThe financial year for the Commission ends on October 31. The financial year for the 
municipal electric utilities however, ends on December 31, and the municipal accounts are made 
up to this date, and are so recorded in Section X. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 113 

capital liabilities. The other reserves are, respectively, being created to 
provide funds for the replacing or rebuilding of plant as it wears out; to 
enable the undertaking to replace existing equipment with improved equip- 
ment as it becomes available through advances in science and invention, and 
to meet unforeseen expenses which from time to time may arise. 

The ultimate source of all revenue to meet costs — whether for the larger 
operations of The Hydro- Electric Power Commission or for the smaller local 
operations of the municipalities — is, of course, the consumer. Out of the 
total revenue collected by each municipal utility from its consumers for 
service supplied, only an amount sufficient to pay the wholesale cost of power 
supplied by the Commission as outlined above is remitted to the Commission; 
the balance of municipal electrical revenue is retained to pay for the expense 
incurred by the local utility in distributing the electrical energy to its 
consumers. 

Tabular Data 

The following comments relate to the tabular data presented: 

Balance Sheet. — The first tabular statement given in Section IX 
is a balance sheet showing the assets, and the liabilities and reserves of 
the co-operative systems. 

Statement of Operations. — This statement is a summary of 
operating expenses and fixed charges as shown in the "cost of power" 
tables and rural operating statements relating to the individual systems 
as referred to more particularly below. 

Fixed Assets. — Details are given concerning the various fixed 
assets of each system and of the miscellaneous properties, showing in 
separate classifications the values of plant under construction and in 
service, depreciable and non-depreciable and supplemented by a state- 
ment showing expenditures, adjustments and retirements occurring dur- 
ing the year. 

Capital Expenditures and Grants — Rural Power Districts. — 

This schedule gives summary information respecting the total capital 
expenditures on rural power districts and grants-in-aid of construction 
paid or payable by the Province with respect to such rural districts. 

Account with the Provincial Treasurer. — This schedule lists, 
both for the systems operated on a cost basis, and for the Northern 
Ontario Properties which are held and operated by the Commission in 
trust for the Province, the advances from the Province of Ontario and 
the repayments which have been applied to reduce this liability. It 
should be noted that Provincial advances to finance Northern Ontario 
Properties are shown in memorandum form only on the balance sheet 
of the Commission as the direct liability is carried on the Northern 
Ontario Properties' balance sheet. 

Funded Debt Issued. — This schedule presents a complete list 
of the outstanding securities issued by the Commission on account 
of the systems, and the Northern Ontario Properties. It should be 



114 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

noted that securities issued to finance Northern Ontario Properties are 
shown only in memorandum form on the balance sheet of the Com- 
mission, whilst the direct liability is shown on the balance sheet of 
the Northern Ontario Properties. 

Power Accounts Receivable. — This schedule sets forth the 
amounts collectable from all classes of power consumers and includes 
the annual adjustment figures from the "credit or charge" statements 
for municipalities. The amounts of debit balances three months or more 
overdue are stated. 

Renewals Reserves, 

Contingencies and Obsolescence Reserves, and 

Stabilization of Rates Reserves. 

These schedules show the provisions made to, the expenditures 
from, and the balance to the credit of, these reserves for each of the 
systems and other properties included in the power undertakings 
operated on a cost basis. 

Sinking Fund Reserves. — This schedule summarizes the appro- 
priations of principal and interest with respect to these reserves for each 
of the systems and certain other properties. 

Following these statements, which are common to all systems, there are 
given for each of the co-operative systems four tabular statements as follows: 



Cost of Power statement, which shows the apportionment to each 
municipality of the items of cost summarized in Statement of Operations, 
as well as the apportionment of fixed assets in service listed in the 
balance sheet and the amount of power taken by each municipality. 
It should be noted that the cost of power given in this table is the 
wholesale cost — that is, the cost which the Commission receives for the 
power delivered from the main transformer stations serving the local 
utility. In the case of municipal electrical utilities not directly admin- 
istered by the Commission, the respective costs of power appear in 
Statement "B" of Section X as "cost of power supplied by H-E.P.C." 

Credit or Charge statement, which shows the adjustments made 
in order to bring the amounts paid by each municipal electric utility 
to the actual cost of service. 

Sinking Fund statement, which gives the accumulated total of 
the amounts paid by each municipality as part of the cost of power 
together with its proportionate share of other sinking funds. 

Rural Operating statement, which summarizes for the rural 
power district of the system the various items of cost, and the revenues 
received, in connection with the distribution of electrical energy to 
rural consumers. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 115 



Northern Ontario Properties 

The statements and schedules respecting these properties which are held 
and operated by the Commission in trust for the Province of Ontario include 
the balance sheet, operating account, schedules of fixed assets, renewals 
reserve, contingencies and obsolescence reserve, and sinking fund reserve. 
These schedules are similar in form to the corresponding schedules relating 
to the co-operative systems. 



The Hamilton Street Railway Company 

This is a wholly-owned subsidiary of the Southern Ontario system of the 
Commission. A balance sheet and operating statement are presented. 



Municipal Utilities 

All municipal Hydro utilities have current expenses to meet similar to 
the expenses of the Commission and have adopted the same financial proce- 
dure with respect to their operations. In other words, concurrently with the 
creation of funds to liquidate their debt to the Commission and to provide 
the necessary reserves to protect generating, transforming and transmission 
systems, the municipalities are taking similar action with respect to their 
local Hydro utility systems. 

The balance sheets, operating reports and statistical data appearing in 
Section X, under the heading of "Municipal Accounts," relate to the oper- 
ation of local distribution systems by individual municipalities which have 
contracted with the Commission for their supply of electrical energy. To 
this section there is an explanatory introduction to which the reader is spec- 
ially referred. 



Auditing of Accounts 

The accounts of The Hydro-Electric Power Commission of Ontario are 
verified by auditors specially appointed by the Provincial Government. 
The accounts of the "Hydro" utility of each individual municipality are pre- 
pared according to approved and standard practice and The Public Utilities 
Act requires that they shall be audited by the auditors of the municipal 
corporation. 



116 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 117 

THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 

FINANCIAL ACCOUNTS 

For the year ended October 31, 1945 

Relating to Properties operated on a "Cost Basis" for the Co-operating 

Municipalities and Rural Power Districts which are supplied with 

Electrical Power and Services from the following Properties: 

Southern Ontario System 

Thunder Bay System 

Service and Administrative 
Buildings and Equipment 



STATEMENTS 

Balance Sheet as at October 31, 1945 

Statement of Operations and Cost of Power for the year ended 
October 31, 1945 

Schedules supporting the Balance Sheet as at October 31, 1945: 
Fixed Assets — By Systems and Properties 
Fixed Assets— Changes during year 

Capital Expenditures and Grants — Rural Power Districts 
Account with the Provincial Treasurer of the Province of Ontario 
Funded Debt Issued or Assumed 
Power Accounts Receivable 
Renewals Reserves 

Contingencies and Obsolescence Reserves 
Stabilization of Rates Reserves 
Sinking Fund Reserves 

Statements for Municipalities Receiving Power under Cost Contracts 



118 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

THE HYDRO-ELECTRIC POWER 

SOUTHERN ONTARIO AND 

BALANCE SHEET AS AT 

ASSETS 

Fixed Assets : 

Southern Ontario System $310,002,026.44 

Thunder Bay System 21,603,202. 28 

Service and administrative buildings and equipment 4,299,526. 15 



$335,904,754.87 
Less : Grants-in-aid of construction : 

Province of Ontario — for rural power districts 21,569,175.87 

$314,335,579.00 

Investments: 



The Hamilton Street Railway Company (a wholly-owned 

subsidiary)— capital stock $ 3,000,000. 00 

Other investments 234,125. 00 



Current Assets: 

Cash in banks $ 1,877,646.96 

Employees' working funds 72,840. 80 

Sundry accounts receivable 557,431 . 21 

Power accounts receivable , . 3,659,581 . 77 

Rural power district grants receivable 327,315.69 

Interest accrued. 627,244. 85 

Consumers' and contractors' deposits: 

Cash deposits $ 15,839. 90 

Securities— at par value 1,053,399. 19 

1,069,239.09 



3,234,125.00- 



Prepayments 39,447. 79 



Inventories : 

Construction and maintenance materials and supplies $ 2,989,820.87 

Construction and maintenance tools and equipment 860,788.75 

Office equipment • 126,211.07 



8,230,748.16 



3,976,820.69 



Deferred Assets: 

Agreements and mortgages $ 15,690. 53 

Rural district loans 1,594. 67 

Work in progress — deferred work orders 434,186. 72 

451,471.92 

Unamortized Discount on Debentures: 408,637. 17 

Reserve Fund Investments: 

Investments in government and government guaranteed 
bonds, at amortized cost: 

Employers' liability insurance fund $1,018,810.91 

Pension fund 9,934,371.49 

Other reserves 63,962,296.42 



74,915,478.82: 
$405,552,860. 76 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 119 

COMMISSION OF ONTARIO 
THUNDER BAY SYSTEMS 

OCTOBER 31, 1945 

LIABILITIES AND RESERVES 

Long Term Liabilities (at par of exchange) : 

Funded debt v $106,898,000. 00 

Less — debentures issued to finance Northern Ontario 

Properties 31,973,200.00 

$74,924,800.00 

Advances from the Province of Ontario $94,847,032.76 

Less — advances for Northern Ontario 

Properties. 5,576,436.46 

89,270,596.30 

Purchase agreements 41,829. 94 

$164,237,226.24 

Current Liabilities: 

Accounts and payrolls payable $3,214,802.63 

Power accounts — credit balances 193,521 . 67 

Hamilton Street Railway Company — current account 1,479,196.64 

Northern Ontario Properties — current account. 3,580,875.57 

Advances from the Province of Ontario for rural loans 1,830. 12 

Consumers' and contractors' deposits 1,137,522.58 

Debenture interest accrued 623,345. 57 

Miscellaneous interest accrued 1,261 . 99 

Miscellaneous accruals 445,019. 72 

10,677,376 . 49 

Rural Power Districts — rates suspense, net 3,112,586. 55 

Reserves: 

Renewals $65,878,723.87 

Contingencies and obsolescence 44,010,240.50 

Stabilization of rates 17,143,873 . 90 

Fire insurance 153,819. 50 

Investment— subsidiary 1,528,881 . 21 

$128,715,538.98 

Employers' liability insurance 1,374,197.45 

Pension fund 10,184,881.24 

Savings and retirement fund. . . . : 203,398.29 

Miscellaneous 562,685. 75 

141,040,701.71 



Sinking Fund Reserve : 

Represented by funded debt and provincial advances retired 

through sinking funds 86,484,969.77 

$405,552,860.76 
Auditors' Report 

We have made an examination of the balance sheet of the Southern Ontario and Thunder Bay Systems of The 
Hydro-Electric Power Commission of Ontario, as at October 31, 1945 and of the attached statement of operations for 
the year ended on that date. In connection therewith we reviewed the system of internal control and the accounting 
procedures of the Commission, and, without making a detailed audit of the transactions, have examined or tested 
accounting records of the Commission and other supporting evidence by methods and to the extent we deemed 
appropriate. 

, We report that in our opinion the foregoing balance sheet and related statement of operations (as more fully reported 
upon by us to the Lieutenant-Governor in Council) have been drawn up so as to exhibit a true and correct view of the 
state of the affairs of the Southern Ontario and Thunder Bay Systems of the Commission at October 31, 1945 (subject 
to the trusts which prevail in respect thereto) and the results of their operations for the year ended on that date, accord- 
ing to the best of our information and the explanations given us and as shown by the books. 

CLARKSON, GORDON & CO. 
Toronto, Canada, Chartered Accountants. 

June 12, 1946. 






120 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



THE HYDRO-ELECTRIC POWER 

SOUTHERN ONTARIO AND 

Statement of Operations for the 



Southern Ontario 
system 



Cost of power : 

Cost of power purchased 

Operating, maintenance and administrative expenses 

Interest (including interest on sinking fund, renewals, and other 
reserves and after deducting interest earned on investments) 

Provision for renewals 

Provision for contingencies and obsolescence 

Provision for stabilization of rates 

Provision for sinking fund 



Total 



Amounts received from or billed against municipalities and other 
customers : 

Municipalities (at interim rates) 

Rural power districts 

Companies 

Mining area 

Local distribution system 

Rural lines operated by municipalities 



Total 



Balance, credited or charged to municipalities on annual adjustment 
of the cost of power : 

Credited ' 

Charged 



Net credit . 



$ c. 

10,832,402.63 
6,716,415.39 

10,834,366.33 

2,179,119.56 

10,640,505.26 

'i'iiimi'.'u 



43,976,721.61 



27,760,643.75 

2,568,249.74 

15,292,386.24 

"* 152,068! 18 
92.48 



45,773,440.39 



1,797,094.60 
375.82 

1,796,718.78 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



121 



COMMISSION OF ONTARIO 
THUNDER BAY SYSTEMS 
Year Ended October 31, 1945 



Thunder Bay 
system 


Distribution in rural 
power districts 


Elimination of 

inter-departmental 

billings 


Total 


$ c. 


$ c. 

2,586,926.93 
1,517,904.06 

873.336.43 
416,858.15 


$ c. 
2,586,926.93 


$ c. 
10,832,402.63 


471,028.46 

855,684.95 
161,347.54 
566,797.02 


8,705,347.91 

12,563,387.71 

2,757,325.25 

11,207,302.28 


(48,619.76) 




(48,619.76) 


197,105.20 


222,370.06 


3,193,387.70 


2,203,343.41 


5,617,395.63 


2,586,926.93 


49,210,533 72 


833.995.58 






28,594,639.33 


18,677; 19 

961,802.08 


5,932,452.68 


2,586,926.93 


5,932,452.68 
16,254,188.32 


451,971.46 






451,971.46 








152,068.18 








92.48 










2,266,446.31 


5,932,452.68 


2,586,926.93 


51,385,412.45 


63,102.90 


321,161.27 
6,104.22 




2,181,358.77 






6,480.04 








63,102.90 


315,057.05 




2,174,878.73 









122 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 
Fixed Assets— October 31, 1945 

SOUTHERN ONTARIO SYSTEM 
Embracing Niagara, Georgian Bay and Eastern Ontario Divisions 



Property 



Fixed Assets 



Under 
construction 



In service 



Non- 
depreciable 



Depreciable 



Total 



Power Plants 
Niagara Division: 
Niagara river: 

Queenston-Chippawa . . . 

Ontario Power 

Toronto Power 

Ottawa river: 

Chats Falls 

Des Joachims power site 
surveys 

Power sites ; . . 

Welland canal : 

DeCew Falls 

Long Lake diversion 

Ogoki diversion 

Preliminary river surveys. 



4,182.22 



59.86 



46,696,355.21 
7,281,151.42 
3,823,379.60 

818,263.01 

246,371.46 



50,002:00 
172,991.19 



Georgian Bay Division: 
Muskoka river: (below lake) 

Bala No. 1 and No. 2 

Ragged Rapids 

Big Eddy 

Land and water rights 

Severn river: 

Wasdells 

Big Chute 

Beaver river : 

Eugenia 

Saugeen river : 

Hanover 

Walkerton 

Muskoka river: (above lake) 

South Falls 

Trethewey Falls 

Hanna Chute 

Hollow Lake dam 

Sauble river: 

Lands and rights 

Miscellaneous 



123.49 
9,257.05 



3.00 



Eastern Ontario Division: 
Fenelon river: 

Fenelon Falls 

Otonabee river: 

Auburn 

Lakefield 

Trent river: 

Heely Falls 

Seymour 

Rannev Falls 

Ranney Falls No. 3.. . . 



612.50 
701.18 



$ 



28,750,272.79 

14,443,005.93 

7,621,845.92 

6,372,273.45 



6,526,302.30 

256,910.72 

2,790,000.00 

30,242 . 35 



29,191.00 

70,889.49 

170,467.76 

17,224.03 

15,302.32 
122,540.48 

142,538.73 

10,000.00 
100,372.31 

17,932.95 
51,549.45 
33,256.73 
17,629.88 

4,200.00 



60,000.00 

31,400.00 
19,620.05 



9,699,186.67 

620,828.84 

2,066,062.57 



43,216.77 
1,261,109.55 
1,123,185.37 



133,342.92 
562,596.65 

1,147,783.46 



117,123.34 

436,728.95 

305,718.47 

207,504.10 

29,540.16 



18,596.20 



89,309.83 

290,275.05 
215,969.40 

1,202,112.81 

315,877.79 

1,365,566.77 

54,289.18 



75,450,810.22 
21,724,157.35 
11,445,285.38 

7,190,536.46 

246,371.46 
50,002.00 

16,398,480.16 

877,739.56 

4,856,062.57 

30,242.35 



72,407.77 
1,331,999.04 
1,293,653.13 

17,224.03 

148,768.73 
685,137.13 

1,299,579.24 

10,000.00 
217,495.65 

454,661.90 

357,267.92 

240,760.83 

47,170.04 

4,200.00 
3.00 



149,309.83 

321,675.05 
236,201.95 

1,202,813.99 

315,877.79 

1,365,566.77 

72,885.38 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



123 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 
Fixed Assets— October 31, 1945 

SOUTHERN ONTARIO SYSTEM 
Embracing Niagara, Georgian Bay and Eastern Ontario Divisions 





Fixed Assets 


Property 


Under 
construction 


In service 






Non- 
depreciable 


Depreciable 


Total 


Power Plants — (Continued) 
Trent river: — continued 
Crow river 


$ c. 


$ c. 
1,000.00 


$ c. 


$ c. 
1,000 00 


Hagues Reach 




573,262.30 
837,865.91 
281,426.02 
252,398.83 
250,996:46 

703,003.83 

47,817.10 

127,888.21 

3,815,740.98 
677,329.51 


573,262 30 


Meyersburg 






837,865.91 


Sills Island 




38,679.36 


320,105.38 


Frankford 


598.53 


252,997.36 


Sidney 




250,996 . 46 


Mississippi river: 
High Falls 




13,154.84 

9,929.06 

20,000.00 

701,031.97 
80,825.74 


716,158.67 


Carleton Place 




57,746.16 


Galetta . 




147,888 21 


Madawaska river: 
Barrett Chute 




4,516,782.95 


Calabogie 




758,155.25 


Stewartsville. . 


30,087.81 


30,087.81 


Bark Lake dam 


609,445.13 

17,962.59 

470,000.00 


794,302.40 
1,795.46 


1,403,747.53 


Kaminiskeg Lake dam .... 




19,758.05 


Undeveloped sites 




470,000.00 


Miscellaneous 


13.00 


46,071.28 


46,084.28 


Intangible 


2,217,761.29 


2,217,761.29 












268,631.83 


73,581,477.43 


86,884,635.03 


160,734,744.29 


Transformer Stations 
Niagara Division 


1,515,284.64 

41,377.90 

239,689.37 




48,631,728.94 
2,088,884.16 
4,631,497.64 


50,147,013.58 


Georgian Bay Division 




2,130,262.06 


Eastern Ontario Division 


76,296.26 


4,947,483.27 




1,796,351.91 


76,296.26 


55,352,110.74 


57,224,758.91 


Transmission Lines 
Niagara Division: 
Lines 


172,852.51 




29,530,804.62 


29,703,647.13 


Right-of-way 


8,852,416.49 


8,852,416.49 


Georgian Bay Division 


61,847.49 


2,766,398.47 
6,264,800.63 


2,828,245.96 


Eastern Ontario Division 


476,461.86 


554,086.03 


7,295,348.52 




711,151.86 


9,406,502.52 


38,562,003.72 


48,679,658.10 


Local Systems 
Niagara Division 






109,813.20 

214,248.49 

29,735.10 


109,813.20 


Georgian Bay Division 




8,000.00 
703.00 


222,248.49 


Eastern Ontario Division 




30,436.10 












8,703.00 


353,794.79 


362,497.79 








Sub-total 


2,776,135.60 


83,072,979.21 


181,152,544.28 


267,001,659.09 





124 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 

Fixed Assets— October 31, 1945 

SOUTHERN ONTARIO SYSTEM 

Embracing Niagara, Georgian Bay and Eastern Ontario Divisions 





Fixed Assets 


Property 


Under 
construction 


In serviee 






Non- 
depreciable 


Depreciable 


Total 


Rural Power District 
H-E.P.C. investment 


$ c. 


$ c. 
37,559.97 


$ c. 
21,666,082.22 
21,295,803.14 


$ c. 

21,703,642.19 


Government grants 




21,295,803.14 














37,559.97 


42,961,885.36 


42,999,445.33 








Rural Lines 
Georgian Bay Division 






922.02 


922.02 












2,776,135.60 


83,110,539.18 


224,115,351.66 


310,002,026.44 





Cost 

statements 


Transfers for 
cost purposes 


Fixed assets 
as above 


Cost of Power schedules 


$ c. 
266,863,606.39 
21,841,694.89 
922.02 


$ c. 
138,052.70 
138,052.70 


$ e. 
267,001,659.09 


Rural Operating schedules 


21,703,642.19 


Rural Lines schedules 


922.02 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 

Fixed Assets— October 31, 1945 

THUNDER BAY SYSTEM 





Fixed Assets 


Property 


Under 
construction 


In service 






Non- 
depreciable 


Depreciable 


Total 


Power Plants: 
Nipigon river: 
Cameron Falls 


$ c. 
4,824.52 


$ c. 

857,418.84 
76,898.44 
55,450.41 


$ c. 

9,057,364.53 

6,466,576.28 

442,436.59 


$ c. 
9,919,607.89 


Alexander. . . 


6,543,474.72 


Virgin Falls dam 




497,887.00 










4,824.52 


989,767.69 


15,966,377.40 


16,960,969.61 


Transformer Stations 

Transmission Lines 

Local Systems 


32,493.35 
1,257.58 


353,615.37 

963,337.24 

88,027.26 


933,873.09 
1,722,883.31 


1,319,981.81 

2,687,478.13 

88,027.26 










Sub-total 


38,575.45 


2,394,747.56 


18,623,133.80 

273,372.74 
273,372.73 


21,056,456.81 


Rural Power District: 

H-E.P.C. investment 


273,372.74 


Government grants 






273,372.73 












546,745.47 


546,745.47 




38,575.45 


2,394,747.56 


19,169,879.27 


21,603,202.28 








Cost 
statements 


Fixed assets 
as above 


Cost of Power schedules 


$ c. 
21,056,456.81 
273,372.74 


$ c 
21,056,456.81 


Rural Operating schedules 


273,372.74 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



125 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 

Fixed Assets— October 31, 1945 

ADMINISTRATIVE AND SERVICE BUILDINGS AND EQUIPMENT 





Fixed Assets 


Property 


Under 
construction 


In service 






Non- 
depreciable 


Depreciable 


Total 


Administrative Buildings: 
Toronto: 
University avenue 


$ c. 
21,456.61 


$ c. 
299,976.33 


$ c. 

2,653,020.60 
113,322.00 


$ c. 
2,974,453.54 


Elm and Centre streets 


113,322.00 












21,456.61 


299,976.33 


2,766,342.60 


3,087,775.54 


Service Building and 

Equipment : 
Toronto : 
Strachan avenue. 






586,623.76 
50,000.00 


586,623.76 


1379 Bloor street west 






50,000.00 


Islington service centre 

Cobourg 


2,881.77 




2,881.77 




22,245.08 


22,245.08 


Hamilton . 




550,000.00 


550,000.00 












2,881.77 


550,000.00 


658,868.84 


1,211,750.61 




24,338.38 


849,976.33 


3,425,211.44 


4,299,526.15 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 

Fixed Assets— October 31, 1945 

SUMMARY 







Fixed Assets 




System or Property 


Under 
construction 


In service 






Non- 
depreciable 


Depreciable 


Total 


Southern Ontario system 

Thunder Bay system 


$ c. 
2,776,135.60 
38,575.45 

24,338.38 


$ c. 
83,110,539.18 
2,394,747.56 

849,976.33 


$ c. 
224,115,351.66 
19,169,879.27 

3,425,211.44 


$ c. 
310.002,026.44 
21^603,202. 28 


Service and administrative 
buildings and equipment 


4,299,526.15 




2,839,049.43 


86,355,263.07 


,246,710,442.37 


335,904,754.87 


Less: Grants in aid of construc- 
tion — Province of Ontario for 
rural power districts 








21,569,175.87 














314,335,579.00 



6— H.E. 



126 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



THE HYDRO-ELECTRIC POWER 
STATEMENT SHOWING CHANGES IN FIXED ASSETS 



Class of asset 



SOUTHERN ONTARIO SYSTEM 

Power Plants 
Niagara Division: 

Queenston-Chippawa 

Ontario Power 

Toronto Power 

Chats Falls 

Des Joachims 

DeCew Falls 

Ogoki diversion 

Other properties 

Georgian Bay Division: 

Eugenia 

Ragged Rapids 

Big Eddy 

Big Chute 

South Falls 

Trethewey Falls. .'. 

Other properties 

Eastern Ontario Division : 

Hagues Reach 

Auburn 

Seymour 

Ranney Falls 

Heely Falls 

Meversburg 

High Falls 

Barrett Chute 

Bark Lake dam 

Calabogie 

Stewartsville 

Sills Island 

Intangible and undeveloped sites 

Other properties 



Transformer Stations 

Niagara Division 

Georgian Bay Division 

Eastern Ontario Division 



Transmission Lines 
Niagara Division: 

Lines 

Right-of-way 

Georgian Bay Division 

Eastern Ontario Division 

Local Systems 

Niagara Division 

Georgian Bay Division 

Eastern Ontario Division 

Sub-total 



Balance at 

beginning 

of vear 



$ c. 
470,926.13 
724,157.35 
445.617.02 
190,543.10 
241,277.67 
195,061.11 
852,152.73 
957,459.86 

,290,322 . 19 
331,999.04 
293,568.22 
685,137.13 
454,661.90 
357,267.92 
757,159.00 

573,262.30 
321,675.05 
316,353.92 
,438,167.18 
,202,112.81 
837,865.91 
718,271.42 
,505,922.51 
,390,628.32 
758,455.25 



321,774.20 
687,761.29 
161,430.32 



160,480,990.85 



48,728,269.91 
2,061,653.73 
4,654,676.88 



55,444,600.52 



29,505,445.06 
8,833,707.36 
2,755,335.25 
6,344,013.76 



Expenditure 
during year 



$ c. 
9,975.69 



103.01 



5,093.79 

240,411.23 

3,909.84 

524.05 

9,257.05 

84.91 



2,081.05 



1,142.97 
701 . 18 



10,930.44 
13,119.21 



30,087.81 
829.97 



1,364.85 



329,617.05 



1,526,930.57 

78,484.40 

392,990.27 



1,998,405.24 



224,215.42 

26,663.16 

61,948.13 

1,001,085.52 



47,438,501.43 


1,313,912.23 


237,217.69 

106,072.29 

32,915.21 


7,083.69 

116,183.20 

914.80 


376,205.19 


124,181.69 


263,740,297 . 99 


3,766,116.21 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



127 



COMMISSION OF ONTARIO 

DURING YEAR ENDED OCTOBER 31, 1945 



Adjustment 

for equipment 

re-located 


Retirements 




Values 

recovered 

(stores, sales 

and salvage) 


Charged to 

reserves for 

renewals and 

contingencies 


Balance at 
end of year 


$ c. 


$ c. 
30,091.60 


$ c. 


$ C; 

75,450,810 22 






21,724,157 35 






434.65 


11,445,285.38 




6.64 


7,190,536.46 






246,371.46 


11,934.36 


24,841 . 18 


216.64 


16,398,480.16 
4,856,062.57 








957,983.91 








1,299,579.24 








1,331,999.04 








1,293;653.13 








685,137.13 








454,661.90 








357,267.92 




1,000.00 


210.00 


758,030.05 




573,262.30 








321,675.05 






476.13 
972.00 


315,877.79 


130.00 


16.00 


1,438,452.15 
1,202,813.99 








837,865.91 


2,112.75 






716,158.67 






70.00 


4,516,782.95 






1,403,747.53 






300.00 


758,155.25 






30,087.81 






2,498.79 


320,105.38 






2,687,761.29 


252.00 




560.87 


1,161,982.30 








14,169.11 


55,955.42 


5,739.08 


160,734,744.29 


2,016.79 

10,483.61 

8,039.61 


11,686.48 

1,386.57 

62,013.56 


98,517.21 
18,973.11 
30,130.71 


50,147,013.58 
2,130,262.06 
4,947,483.27 


4,460.79 


75,086.61 


147,621.03 


57,224,758.91 


41,283.25 

2,686.73 

13,503.00 


6,938.25 
2,000.00 


60,358.35 
3,267.30 
2,540.42 

36,355.06 


29,703,647.13 
8,852,416.49 
2,828,245.96 


12,652.04 


743.66 


7,295,348.52 


39,447.48 


9,681.91 


102,521.13 


48,679,658.10 


1,656.00 


136,144.18 




109,813.20 




7.00 


222,248 49 


3,686.00 


7,079.91 


30,436.10 








5,342.00 


143,224.09 


7.00 


362,497.79 


35,081 . 16 


283,948.03 


255,888.24 


267,001,659.09 



128 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



THE HYDRO-ELECTRIC POWER 
STATEMENT SHOWING CHANGES IN FIXED ASSETS 



Class of asset 


Balance at 

beginning 

of year 


Expenditure 
during year 


SOUTHERN ONTARIO SYSTEM— (Continued) 

Rural Power District 
H-E.P.C. investment 


$ c. 
20,109,454.05 
19,756,058.08 


$ c. 
1,669,339.56 


Government grants 


1,614,896.48 








39,865,512.13 


3,284,236.04 


Rural Lines 
Niagara Division 


440.82 
922.02 




Georgian Bay Division 










1,362.84 








Southern Ontario system — Total. 


303,607,172.96 


7,050,352.25 


THUNDER BAY SYSTEM: 

Power plants 


16,312,608.74 

1,257,943.14 

2,685,503.76 

86,529.25 


648,360.87 


Transformer stations 


70,797.42 


Transmission lines 


1,974.37 


Local systems 


1,524.01 






Sub-total 


20,342,584.89 


722,656.67 






Rural Power District 
H-E.P.C. investment 


257,527.51 
257,527.52 


16,146.30 


Government grants 


16,146.28 








515,055.03 


32,292.58 


Thunder Bay system — Total 


20,857,639.92 


754,949.25 






SERVICE AND ADMINISTRATIVE BUILD- 
INGS AND EQUIPMENT: 
Toronto — University avenue 


2,944,742.51 
113,322.00 
574,600.91 
622,245.08 


62,542.01 


— Elm and Centre streets 




— Strachan avenue 


12,022.85 


Other properties and equipment 


2,881.77 






Total 


4,254,910.50 


77,446.63 






Grand total 


328,719,723.38 
20,013,585.60 


7.882,748.13 


Less: Grants in aid of construction: 

Province of Ontario for rural power districts . 


1,555,590.27 


Total fixed assets 


308,706,137.78 


6,327,157.86 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



129 



COMMISSION OF ONTARIO 

DURING YEAR ENDED OCTOBER 31, 1945 



Adjustment 

for equipment 

re-located 


Retirements 




Values 

recovered 

(stores, sales 

and salvage) 


Charged to 

reserves for 

renewals and 

contingencies 


Balance at 
end of year 


$ c. 

2,884.10 

2,884.10 


$ c. 
43,955.71 
43,955.72 


$ c. 
28,311.61 
28,311.60 


$ c. 
21,703,642.19 
21,295,803.14 


5,768.20 


87,911.43 


56,623.21 


42,999,445.33 




440.82 










922.02 












440.82 




922.02 








29,312.96 


372,300.28 


312,511.45 


310,002,026.44 








16,960,969.61 




7,324.80 


1,433.95 


1,319,981.81 




2,687,478.13 






26.00 


88,027.26 










7,324.80 


1,459.95 


21,056,456.81 










301.07 
301.07 


273,372.74 






'273,372.73 












602.14 


546,745.47 










7,324.80 


2,062.09 


21,603,202.28 






29,312 . 96 




3,518.02 


2,974,453.54 






113,322.00 








586,623.76 








625,126.85 










29,312.96 




3,518.02 


4,299,526.15 










379,625.08 


318,091.56 


335,904,754.87 




21,569,175.87 












379,625.08 


318,091.-56 


314,335,579.00 


_ 





Renewals 

Contingencies. 
To operation.. 



157,375.75 

157,301.38 

3,414.43 



130 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 

Capital Expenditures and Grants — Summary at October 31, 1945 

RURAL POWER DISTRICTS 

Statement showing the Total Capital Expenditures in Rural Power Districts to October 

31, 1945; the Grants payable to the Commission by the Province of Ontario in 

respect thereto; and the amounts paid to the Commission on account of such 

Grants to October 31, 1945 








Accumulated 

total to 

October 31, 

1944 


Net 
expenditure 
during year 

1945 


Accumulated 

total to 

October 31, 

1945 


Total capital expenditures less retirements — 
Southern Ontario district 


$ c. 

39,865,512.13 
515,055.03 


$ c. 

3,133,933.20 
31,690.44 


$ c. 
42,999,445 33 


Thunder Bay district 


546,745.47 






Northern Ontario Properties district 


40,380,567.16 
887,452.59 


3,165,623.64 
102,837.15 


43,546,190.80 
990,289.74 








41,268,019.75 


3,268,460.79 


44,536,480.54 


Less: Portion of expenditures not entitled to 
Provincial grant* — 
Southern Ontario district 


353,395.96 


54,443.10 


407,839.06 


Thunder Bay district 




Northern Ontario Properties district 


61,649.03 


22,144.87 


83,793.90 




415,044.99 


76,587.97 


491,632.96 


Balance of expenditures less retirements sub- 
ject to Provincial grants (all districts) .... 


40,852,974.76 


3,191,872.82 


44,044,847.58 


Grants payable by the Province as authorized 
by Order-in-Council (50%) — 
Southern Ontario district and Thunder 
Bay district 


20,013,585.60 
412,901.78 


1,555,590.27 
40,346.14 


21,569,175.87 


Northern Ontario Properties district 


453,247.92 




20,426,487.38 


1,595,936.41 


22,022,423.79 


Amounts paid by the Province to the Commis- 
sion on account of such authorized grants. 


20,460,108.10 


1,235,000.00 


21,695,108.10 


Balance in hands of Commission or (owing by 
the Province) 


33,620.72 


(360,936.41) 


(327,315.69) 







♦Grants not paid by the Province in respect of a summer resort, street lighting systems, 
service buildings, amounts paid for buiness already established and one transformer station, 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



131 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 

Account with The Provincial Treasurer of the Province of Ontario 

As at October 31, 1945 

ADVANCES FROM AND REPAYMENTS TO THE PROVINCE OF ONTARIO 



Advances for Capital Expenditures: 
Cash advances made by the Province to the Com 
mission for capital expenditure purposes during 

the years 1909 to 1934, inclusive 

Cash returned by the Commission to the Province 
on April 30, 1935, to cover the difference between 
advances made by the Province to the Com- 
mission during the year ended October 31, 1934 
and the capital expenditures made out of such 
advances by the Commission in that year.. .... 



Total advances for capital expenditures 



Repayment of Advances— 1926 to 1933: 
Cash repayments made by the Commission an- 
nually to October 31, 1933, in accordance with 
the 1926 debt retirement plan 



Balance of advances at October 31, 1934 (before 
deducting $2,412,398.33 on deposit with the 
Province at that date for debt retirement) .... 

Repayment of Advances— 1934 to 1945: 
Cash repayments made by the Commission under 
a new retirement plan, equal to the maturities 
in the period November 1, 1934 to October 31, 
1945, of Province of Ontario bonds allocated as 
issued for the Commission's purposes — 
Total to October 31, 1944. . . . $93,623,218.38 
During the year ended October 

31, 1945 1,523,882.49 



Balance of advances at October 31, 1945. . . . 

Payable in the following currencies : 

Canadian 

Sterling 

Canadian or United States 

Canadian, United States or Sterling 



Total 



$ c. 



207,250,258.34 



247,507.98 



207,002,750.36 



17,008,616.73 



189,994,133 63 



95,147,100.87 



94,847,032.76 



18,323,686.61 

71,202.66 

8,718,026.01 

67,734,117.48 



94,847,032.76 



Northern 
Ontario 

Properties 
operated for 
the Province 
of Ontario 



$ c. 



8,331,113.46 



74,001.99 



8,257,111.47 



3,061.39 



8,254,050.08 



2,677,613.62 



5,576,436.46 



633,379.20 

768.80 

4,799.73 

4,937,488.73 



5,576,436.46 



Southern 

Ontario and 

Thunder Bay 

system 
operated on a 
"cost basis" 



$ c. 



198,919,144.88 



173,505.99 



198,745,638.89 



17,005,555.34 



181,740,083.55 



92,469,487.25 



89,270,596.30 



17,690,307.41 

70,433.86 

8,713,226.28 

62,796,628.75 



89,270,596.30 



132 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



THE HYDRO-ELECTRIC POWER 



Funded Debt as at 



(Guaranteed as to principal and 






Description 



Date of 
maturity 



Date of 

issue 



2 % Debentures 

2^% Serial debentures, 
2V 2 % " 

3 % " 

1H% Debentures 

3^% 

IH% 

23^% • 
3 % 
2J€% 
2^% 

2 % 

3 % Serial debentures 

3 % Debentures 

3, % " 

3^% " 

2%% " 

4 • % " 

4 % ■ " 

4 % " 

3 % " 

W±% " 



Feb. 1, 

Feb. 15, 

May 1, 

Aug. 1, 

Sept. 1, 

April 1, 

Sept. 1, 

Jan. 1, 

Aug. 1, 

Sept. 1, 

Feb. 1, 

Jan. 1, 

May 1, 

Feb. 1, 

Jan. 1, 

Feb. 1, 

Sept. 1, 

Aug. 1, 

June 1, 

Dec. 1, 

Jan. 1, 

Jan. 1, 



1946 

1946/49 

1946/49 

1946/47 

1946 

1947 

1947 

1948 

1948 

1948 

1949 

1950 

1950/52 

1951 

1953 

1953 

1953 

1957 

1958 

1958 

1960 

1970 



Total Funded Debt (at par of exchange) 



Feb. 1 
Feb. 15 

May 1 

Aug. 1 

Sept. 1 

April 1 

Sept. 1 

Jan. 1 

Aug. 1 

Sept. 1 

Feb. 1 

Jan. 1 

May 1 

Feb. 1 

Jan. 1 

Feb. 1 

Sept. 1 

Aug. 1 

June 1 

Dec. 1 

Jan. 1 

Jan. 1 



1943 
1941 
1942 
1942 
1944 
1937 
1944 
1943 
1938 
1943 
1943 
1945 
1942 
1943 
1943 
1938 
1943 
1917 
1918 
1918 
1945 
1930 



Funded Debt issued to finance: 

Southern Ontario and Thunder Bay Systems $74,924,800.00 

Northern Ontario Properties '. 31,973,200.00 






$106,898,000.00 



Summary of Changes in Funded Debt during year ended October 31, 1945 

Outstanding as at October 31, 1944 $100,274,000. 00 

Redemptions during the year 5,876,000. 00 

$94,398,000.00 
New bond issues during the year 12,500,000. 00 

Outstanding as at October 31, 1945 $106,898,000.00 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



133 



COMMISSION OF ONTARIO 

October 31, 1945 

interest by the Province of Ontario) 



Principal outstanding 






October 31, 1945 


Where payable 


Remarks 


$ c. 
2,000,000.00 


Canada 




7,500,000.00 


Canada 


$1,875,000.00 maturing annually. 


4,000,000.00 


Canada 


$1,000,000.00 maturing annually. 


1,800,000.00 


N.Y. 


$900,000.00 maturing annually. 


2,000,000.00 


N.Y. 




7,934,000.00 


Canada 




2,000,000.00 


N.Y. 




2,000,000.00 


N.Y. 




12,500,000.00 


Canada 


Callable on or after Aug. 1, 1946 at 100. 


4,500,000.00 


N.Y. 




2,000,000.00 


Canada 




5,000,000.00 


Canada 




3,000,000.00 


Canada 


$1,000,000.00 maturing annually. 


6,000,000.00 


Canada 




5,000,000.00 


N.Y. 


Callable on or after Jan. 1, 1951 at 101. 


9,000,000.00 


Canada 


Callable on or after Feb. 1, 1950 at 100. 


3,000,000.00 


N.Y. 


Callable on or after Sept. 1, 1946 at 100. 


8,000,000.00 


C, N.Y., L. 




200,000.00 


Toronto 




100,000.00 


Toronto 




7,500,000.00 


Canada 


Callable on or after Jan. 1, 1955 at 100. 


11,864,000.00 


Canada 




106,898,000.00 





Payable in the following currencies: 

Canadian $78,598,000.00 

Canadian, United States, or Sterling 8,000,000.00 

United States 20,300,000.00 



$106,898,000.00 



134 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



THE HYDRO-ELECTRIC POWER 
Power Accounts Receivable 







Wholesale 


consumers 




System or property 


Interim 
power bills 


Accumulated amount 
standing as a charge or credit 
on October 31,1945 


Net total for 
wholesale 




Charge 


Credit 


consumers 


Southern Ontario System: 

Municipalities 

Companies 


$ c. 
2,695,770.05 
1,135,743.86 


$ c. 
375.82 


$ c. 
1,797,094.60 


$ c. 
899,051.27 
1,135,743.86 


Local and rural 




















3,831,513.91 


375.82 


1,797,094.60 


2,034,795.13 


Thunder Bay System: 
Municipalities 


141,264.29 
114,818.98 




63,102.90 


78,161 39 


Companies 




114,818.98 


Local and rural 




















256,083.27 




63,102.90 


192,980.37 








Grand totals 


4,087,597.18 


375.82 


1,860,197.50 


2,227,775.50 



THE HYDRO-ELECTRIC POWER COMMISSION OF OxNTARIO 
Renewals Reserves — October 31, 1945 





Southern 
Ontario 
system 


Thunder 
Bay 

system 


Service and 
administrative 
buildings and 

equipment 


Totals for power 

undertakings 

operated on a 

"cost basis" 


Balances at November 1, 1944 
Less amount withdrawn in 
respect of rural lines trans- 
ferred 


$ c. 
56,048,260.34 

530.11 


$ c. 
4,209,281.77 


$ c. 
774,801.23 


$ c. 
61,032,343.34 

530.11 












56,047,730.23 
2,590,685.26 


61,031,813.23 


Provision in the year — direct. . 
— indirect 


166,639.99 




2,757,325.25 


26,735.48 
17,591.00 


26,735.48 


Interest ot 4% on reserve 
balances 


2,241,909.21 


168,371.27 


2,427,871.48 






Sub-total 


60,880,324.70 

116,185.97 

156,189.32 
87,429.76 


4,544,293.03 

56.34 

1,082.84 


819,127.71 

2,183.10 

103.59 
1,790.65 


66,243,745.44 


Less: 
Expenditures in the year for 
renewals 


118,425.41 


Amount withdrawn in re- 
spect of assets removed 
from service, etc 


157,375.75 


Adjustment :Sales and trans- 
fer of equipment 


89,220.41 








Balances at October 31, 1945.. 


60,520,519.65 


4,543,153.85 


815,050.37 


65,878,723.87 


Account balances: 

Power plants, transmission 
lines and transformer 
stations 


$ c. 

52,299,039.00 

8,220,931.54 

549.11 


$ c. 

4,489,024.17 
54,129.68 


$ c. 


$ c. 
56,788,063.17 


Rural power districts 




8,275,061.22 


Rural lines 




549.11 


Administrative office buildings 




319,701.01 
495,349.36 


319,701.01 


Service buildings and 
equipment 






495,349.36 












60,520,519.65 


4,543,153.85 


815,050.37 


65,878,723.87 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



135 



COMMISSION OF ONTARIO 
—October 31, 1945 



Retail power 
consumers 


Net total of 

power accounts 

receivable 


Balance sheet figures 


Debit balances 


local and 

rural 
districts 


Debit 
balances 


Credit 
balances 


three months or 
more overdue 


$ c. 


$ c. 
899,051.27 
1,135,743.86 
1,224,691.41 


$ c. 
1,086,735.65 
1,136,035.24 
1,224,691.41 


$ c. 
187,684.38 
291.38 


$ c. 






1,224,691.41 


16,953.71 








1,224,691.41 


3,259,486.54 


3,447,462.30 


187,975.76 


16,953.71 




78,161.39 

114,818.98 

13,593.19 


78,909.03 

119,617.25 

13,593.19 


747.64 
4,798.27 








13,593.19 


2,218.25 








13,593.19 


206,573.56 


212,119.47 


5,545.91 


2,218.25 


1,238,284.60 


3,466,060.10 


3,659,581.77 


193,521.67 


19,171.96 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 
Contingencies and Obsolescence Reserves — October 31, 1945 





Southern 
Ontario 
system 


Thunder 

Bay 
system 


Totals for power 
undertakings 
operated on a 
"cost basis" 


Balances at November 1, 1944 

Less: 

Adjustment of provision for years 1942 
and 1943 


$ c. 
29,118,416.40 

18,013.40 


$ c. 
3,364,500.57 


$ c. 
32,482,916.97 

18,013.40 








Transferred during the year 

Provision in the year as per cost statement . . . 
Interest at 4% on reserve balances 


29,100,403.00 

63,132.74 

10,640,505.26 

1,160,964.28 


3,364,500.57 

1,134.41 
566,797.02 
128,949.18 


32,464,903.57 

64,267.15 

11,207,302.28 

1,289,913.46 


Sub-total 

Less: 

Contingencies met with during the year . . 

Write-off of certain assets no longer in 

service, etc 


40,965,005.28 

807,935,40 
156,322.13 


4,061,381.18 

50,909.18 
979.25 


45,026,386.46 

858,844.58 
157,301.38 


Balances at October 31, 1945 . 


40,000.747.75 


4,009,492.75 


44,010,240.50 


Account balances: 

Power plants, transmission lines, trans- 
former stations and rural power 
districts 

Rural lines 


$ c. 

40,000,487.82 
259.93 


$ c. 
4,009,492.75 


$ c. 

44,009,980.57 
259.93 










40,000,747.75 


4,009,492.75 


44,010,240.50 



136 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 
Stabilization of Rates Reserves — October 31, 1945 





Southern 
Ontario 
system 


Thunder Bay 


Totals for power 




System 


Mining 
area 


undertakings 

operated on a 

'cost basis" 


Balances at November 1, 1944 

Interest at 4% on reserve 

balances 


$ c. 
15,687,464.81 

627,498.59 


$ c. 
439,419.53 

17,576.78 


$ c. 
404,359.57 

16,174.38 


$ c. 
16,531,243.91 

661,249.75 






Deduct : 
Amount appropriated re cost 
of power, in the year, to 
mining area 


16,314,963.40 


456,996.31 


420,533.95 
48,619.76 


17,192,493.66 
48,619.76 










Balances at October 31, 1945.. 


16,314,963.40 


456,996.31 


371,914.19 


17,143,873.90 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 
Sinking Fund Reserves— October 31, 1945 





Southern 
Ontario 
system 


Thunder 
Bay 

system 


Service and 
administrative 
buildings and 

equipment 


Totals for power 

undertakings 

operated on a 

"cost basis" 


Balances at November 1, 1944 

Amount withdrawn in respect 

of rural lines transferred to 

Milton 


$ c. 
75,229,606.22 

440.82 


$ c. 
4,031,435.52 


$ c. 
789,741.23 


$ c. 
80,050,782.97 

440.82 










Provision in the year — direct. . 


75,229,165.40 
2,993,496.03 


4,031,435.52 
199,891.67 


789,741.23 


80,050,342.15 
3,193,387.70 


— indirect 


39,226.23 
31,589.65 


39,226.23 


Interest at 4% on reserve 
balances 


3,009,166.62 


161,257.42 


3,202,013.69 






Balances at October 31, 1945.. 


81,231,828.05 


4,392,584.61 


860,557.11 


86,484,969.77 


Account balances: 

Systems 


78,077,806.17 

3,153,286.07 

735.81 


4,368,815.62 
23,768.99 




82,446,621.79 


Rural power districts 




3,177,055.06 


Rural lines 




735.81 


Administrative office 
buildings 




574,111.33 
286,445.78 


574,111.33 


Service buildings and 
equipment 






286,445.78 












81,231,828.05 


4,392,584.61 


860,557.11 


86,484,969.77 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 137 



THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 



STATEMENTS FOR MUNICIPALITIES 

RECEIVING POWER UNDER COST CONTRACTS 

For the year ended October 31, 1945 



STATEMENTS FOR EACH SYSTEM 

Cost of Power Credit or Charge 

Sinking Fund Rural Operating 



138 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay, 

Statement showing the amount chargeable (upon annual adjustment) to each 

it by the Commission; the amount billed by the Commission against 

or charged to each Municipality in respect of power 



Municipality 



Interim rates 

per horsepower 

collected by 

Commission 

during year 



To 
Dec. 31, 

1944 



From 

Jan. 1, 

1945 



Share of 

capital cost 

of system 



Average 
horse- 
power 
supplied 
in year 
after 
correc- 
tion for 
power 
factor 



Share of operating 



Cost of 
power 
pur- 
chased 



Operating 
main- 
tenance 

and 
adminis- 
trative 
expenses* 



Interest 



Acton 

Agincourt. . 
Ailsa Craig-. 
Alexandria . 
Alliston . . . 



Almonte , 

Alvinston 
Amherstburg. . 
Ancaster Twp. 
Apple Hill. . . . 



Aylmer . 
Ayr — 
Baden . 
Barrie . 
Bath. . . 



Beachville. 
Beamsville . 
Beaverton. 

Beeton 

Belle River 



Belleville. . 
Blenheim. . 
Bloomf ield 

Blyth 

Bolton .... 



Bothwell 

Bowmanville. 

Bradford 

Braeside. . . . 
Brampton . . . 



Brantford 

Brantford Twp. 

Brechin 

Bridgeport. . . . 
Brigden 



$ c. 
28.50 
29.00 
37.00 
45.00 
40.50 



45.00 
32.00 
27.50 
44.00 



Arkona 45.00 

Arnprior.. 28.00 

Arthur 45.00 

Athens 45.00 

Aurora 27.00 



30.00 
32.50 
28.00 
30.00 
45.00 

28.50 
26.00 
39.00 
45.00 
32.50 

25.00 
32.00 
42.00 
42.00 
32.00 

37.00 
29.00 
42.50 



26.00 

23.50 
27.50 
45.00 
30.50 
44.00 



$ c. 
27.50 
27.50 
35.50 
39.00 
37.50 

28.00 
39.00 
31.50 
26.00 
39.00 

39.00 
25.00 
39.00 
39.00 
27.00 

29.00 
32.00 
26.50 
26.50 
39.00 

27.50 
25.00 
36.00 
39.00 
31.50 

22.00 
30.50 
39.00 
39.00 
31.00 

35.50 
26.00 
39.00 
27.00 
25.00 

22.50 
27.00 
39.00 
29.00 
39.00 



$ c. 

339,035.38 
45,831.67 
36,049.93 
88,904.66 

117,553.42 

51,579.93 
34,705.83 
235,810.18 
83,336.70 
12,551.01 

24,031.07 

229,754.61 

56,467.73 

34,539.99 

271,833.91 

204,651.62 

51,298.23 

121,223.78 

750.385,07 

14,848.05 

154,843.69 
87,055.92 
58,929.12 
35,533.09 
46,475.51 

1,174,867.22 

129,306.02 

33,634.05 

41,150.88 

51,745.78 

35,363.33 

554,897.30 

67,802.68 

33,555.21 

544,000.54 

3,799,806.53 

240,641.49 

12,427.72 

38,655.38 

26,318.33 



1,745.5 
236.0 
149.6 
275.6 
462.5 

224.5 

123.8 

1,081.0 

462.0 

49.3 



68. 
1,351. 

179. 

118. 
1,452. 



1,018.2 
231.2 
644.6 

4,442.0 
46.2 

798.9 
521.9 
280.8 
95.7 
206.2 

8,236.4 
635.8 
131.3 

154.4 
231.4 

144.2 

3,097.3 

260.4 

186.5 

3,202.6 

22,768.2 

1,440.3 

51.5 

182.8 

93.1 



10,994.32 

1,486.48 

942.28 

1,735.91 

2,913.13 

1,414.05 

779.77 

6,808.86 

2,909.98 

310.52 

431.46 
8,509.50 
1,128.72 

745.13 
9,150.07 

6,413.30 

1,456.25 

4,060.12 

27,978.67 

291.00 

5,032.00 
3,287.27 
1,768.67 
602.78 
1,298.78 

51,878.32 

4,004.69 

827.01 

972.51 

1,457.51 

908.27 

19,508.86 

1,640.17 

1,174.70 

20,172.10 

143,409.26 
9,071.97 

324.38 
1,151.40 

586.41 



$ c. 

8,603.90 

1,205.36 

1,196.74 

2,462.50 

3,025.63 

1,908.51 
1,655.57 
5,731.33 
2,066.95 
559.98 

582.90 
5,498.63 
1,788.62 
1,011.20 
6,459.08 

5,855.58 

1,463.54 

3,039.97 

17,294.92 

438.88 

3,975.34 
2,232.61 
2,021.66 
561.74 
1,699.49 

28,948.14 
4,078.34 
1,178.42 
1,534.70 
1,576.75 

1,566.79 
18,368.58 

1,969.27 

921.89 

16,288.78 

90,479.52 

10,538.68 

470.96 

1,047.91 

1,012.17 



$ c. 

13,882.33 
1,875.96 
1,477.09 
3,525.33 
4,793.86 

1,927.78 
1,419.31 
9,650.42 
3,414.50 
508.53 

981.49 

9,316.28 

2,295.28 

1,414.34 

11,158.91 

8,392.61 

2,104.60 

4,962.61 

30,396.84 

605.19 

6,340.42 
3,565.72 
2,396.13 
1,437.63 
1,886.99 

47,729.72 
5,302.21 
1,369.57 
1,688.04 
2,127.23 

1,450.62 

22,644.66 

2,771.66 

1,386.39 

22,331.66 

156,206.30 

9,889.91 

502.58 

1,586.71 

1,071.87 



* After crediting the amounts, totalling $7,151.52, required tc reduce the costs of power to 
$39 . 00 per horsepower maximum. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



139 



SYSTEM S.O.—COST OF POWER 

and Eastern Ontario Divisions 

Municipality as the Cost — under Power Commission Act — of Power supplied to 
each Municipality at interim rates, and the balance credited 
supplied to it in the year ended October 31, 1945 



costs and fixed charges 




Revenue 


Amount 












received 
in excess 


chargeable 
to each 


Amount 
billed 


Balance 








credited 




Provision 




of cost of 


munici- 


against 


or 




for 


Provision 


power sold 


pality in 


each 


charged 


Provision 


contin- 


for 


to private 


respect of 


munici- 


to each 


for 


gencies 


sinking 


com- 


power 


pality at 


municipality 


renewals 


and 


fund 


panies 


supplied 


interim 


Credited 




obso- 






to it in 


rates 


(Charged) 








lescence 




Credit 


the year 






$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


3,037.38 


4,670.20 


3,569.00 


1,801.25 


42,955.88 


48,285.68 


5,329.80 


395.89 


623.26 


482.47 


243.54 


5,825.88 


6,548.77 


722.89 


363.94 


421.09 


378.80 


154.38 


4,625.56 


5,343.80 


718.24 


1,269.34 


813.13 


909.11 


284.40 


10,430.92 


11,043.29 


612.37 


1,594.40 


1,289.99 


1,237.78 


477.27 


14,377.52 


17,572.69 


3,195.17 


560.31 


592.13 


491.16 


231.67 


6,662.27 


6,286.45 


(375.82) 


371.53 


364.39 


365.38 


127.75 


4,828.20 


4,962.02 


133.82 


2,196.27 


2,999.82 


2,482.26 


1,115.52 


28,753.44 


34,139.36 


5,385.92 


713.53 


1,209.53 


877.53 


476.75 


10,715.27 


12,133.56 


1,418.29 


169.15 


141.36 


132.13 


50.87 


1,770.80 


1,960.36 


189.56 


277.99 


215.34 


253.01 


70.69 


2,671.50 


2,735.99 


64.49 


2,351.47 


3,471.43 


2,418.48 


1,394.15 


30,171.64 


34,422.60 


4,250.96 


836.17 


530.35 


594.58 


184.92 


6,988.80 


7,170.32 


181.52 


494.41 


339.80 


363.67 


122.08 


4,246.47 


4,718.07 


471.60 


2,277.28 


3,811.32 


2,861.54 


1,499.10 


34,219.10 


39,223.39 


5,004.29 


1,870.75 


2,754.19 


2,152.56 


1,050.72 


26,388.27 


29,689.12 


3,300.85 


498.31 


647.37 


539.97 


238.58 


6,471.46 


7,417.42 


945.96 


1,054.34 


1,710.71 


1,275.58 


665.19 


15,438.14 


17,250.23 


1,812.09 


7,740.41 


11,232.00 


7,900.98 


4,583.86 


97,959.96 


120,234.31 


22,274.35 


220.24 


137.85 


156.32 


47.68 


1,801.80 


1,851.34 


49.54 


1,385.23 


2,155.67 


1,630.03 


824.41 


19,694.28 


22,096.20 


2,401.92 


723.87 


1,334.79 


916.48 


538.57 


11,522.17 


13,131.91 


1,609.74 


719.18 


754.01 


620.49 


289.77 


7,990.37 


10,218.10 


2,227.73 


554.10 


300.66 


374.15 


98.76 


3,732.30 


3,826.15 


93.85 


433.99 


573.72 


484.06 


212,79 


6,164.24 


6,529.29 


365.05 


9,819.07 


20,292.53 


12,366.26 


8,499.45 


162,534.59 


185,211.52 


22,676.93 


1,171.58 


1,723.14 


1,361.06 


656.11 


16,984.91 


19,564.06 


2,579.15 


454.54 


368.39 


354.04 


135.49 


4,416.48 


5,179.51 


763.03 


432.00 


446.39 


433.23 


159.33 


5,347.54 


6,087.59 


740.05 


489.43 


629.16 


544.74 


238.79 


6,586.03 


7,212.39 


626.36 


356.31 


415.93 


372.29 


148.81 


4,921.40 


5,156.15 


234.75 


5,955.01 


8,073.87 


5,841.57 


3,196.22 


77,196.33 


82,123.41 


4,927.08 


929.76 


737.83 


713.78 


268.72 


8,493.75 


10,269.45 


1,775.70 


361.39 


483.82 


353.22 


192.46 


4,488.95 


5,034.38 


545.43 


4,443.29 


8,199.82 


5,726.71 


3,304.89 


73.857,47 


80,554.43 


6,696.96 


30,293.71 


58,459.84 


39,991.72 


23,495.35 


495,345.00 


516,219.90 


20,874.90 


1,920.38 


3,699.47 


2,532.67 


1,486.30 


36,166.78 


39,016.70 


2,849.92 


164.30 


142.96 


130.86 


53.14 


1,682.90 


2,057.15 


374.25 


363.31 


497.52 


406.88 


188.64 


4,865.09 


5,341.13 


476.04 


282.69 


276.21 


277.08 


96.07 


3,410.36 


3,707.63 


297.27 



140 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay, 

Statement showing the amount chargeable (upon annual adjustment) to each 

it by the Commission; the amount billed by the Commission against 

or charged to each Municipality in respect of power 



Municipality 



Interim rates 

per horsepower 

collected by 

Commission 

during year 



To 
Dec. 31, 

1944 



From 

Jan. 1, 

1945 



Share of 

capital cost 

of system 



Average 
horse- 
power 
supplied 
in year 
after 
correc- 
tion for 
power 
factor 



Share of operating 



Cost of 
power 
pur- 
chased 



Operating 
main- 
tenance 
and 

adminis- 
trative 

expenses* 



Interest 



Brighton . . . 
Brockville . . 

Brussels 

Burford .... 
Burgessville . 



Burlington. . . 
Caledonia 
Campbellville . 
Cannington. . . 
Cardinal 



Carleton Place . 
Cayuga ....... 

Chatham 

Chatsworth 

Chesley 



Chesterville. 
Chippawa. . 
Clifford.... 
Clinton .... 
Cobden .... 



Cobourg. . . , 
Colborne . . . 
Coldwater. . 
Collingwood 
Comber 



Cookstown 
Cottam . . . 
Courtright. 
Creemore. . 
Dash wood. 



Delaware. . 

Delhi 

Deseronto . 
Dorchester . 
Drayton . . 



Dresden. 
Drumbo. 
Dublin. . 
Dundalk 
Dundas . 



$ c. 
30.50 
26.00 
41.50 
29.50 
41.00 



27.50 
45.00 
37.50 
29.00 

28.00 
39.00 
26.50 
40.00 
34.00 

33.00 
21.50 
44.50 
32.00 
45.00 

29.50 
33.00 
35.00 
31.00 
39.00 

39.00 
38.00 
44.50 
41.50 
35.50 

30.50 
31.00 
38.00 
33.00 
45.00 

33.50 
33.00 
43.50 
34.00 
22.50 



$ c. 
27.50 
24.50 
39.00 
28.00 
39.00 

24.50 
27.00 
39.00 
34.50 
26.50 

25.50 
39.00 
25.50 
37.50 
31.00 

30.00 
21.50 
39.00 
30.50 
39.00 

26.50 
30.50 
33.50 
27.50 
38.50 

35.50 
38.00 
39.00 
38.50 
34.00 

29.00 
31.00 
35.00 
33.00 
39.00 

32.50 
31.50 
39.00 
31.00 
22.50 



$ c. 
87,472.10 
897,633.94 
42,738.81 
48,790.08 
14,192.66 

243,888.42 
80,066.47 
15,479.82 
44,141.77 
62,991.48 

325,171.17 

42,582.62 

1,383,707.54 

21,361.51 

124,386.16 

65,561.18 
49,920.55 
35,238.94 
154,102.88 
31,880.38 

415,813.18 
50,925.06 
40,068.50 

510,864.12 
37,706.51 

23,371.45 
21,919.90 
17,243.36 
34,889.82 
30,466.81 

15,165.86 
129,335.73 
56,515.44 
24,454.37 
50,858.56 

116,231.01 
21,988.00 
12,876.12 
46,415.83 

513,277.64 



473.8 

5,321.1 

165.3 

258.9 

52.7 

1,434.6 

416.8 

49.1 

215.6 

360.3 

1,959.6 
152.4 

7,726.2 

87.6 

611.6 

309.1 
365.6 
114.3 
722.4 
130.3 



2,413.4 

252 

202 
2,860.6 

151.0 



98.8 

86.6 

54.5 

150.3 

123.8 



79. 
619. 
257. 
117. 
150. 

495.0 

105.9 

47.0 

241.5 

3,177.8 



$ c. 
2,984.31 

33,515.83 

1,041.17 

1,630.72 

331.94 

9,036.06 
2,625.28 
309.26 
1,357.99 
2,269.41 

12,342.86 
959.92 

48,664.75 

551.76 

3,852.26 

1,946.92 
2,302.79 

719.94 
4,550.16 

820.72 

15,201.20 
1,588.52 
1,274.85 

18,017.96 
951.10 

622.31 
"545.46 
343.28 
946.69 
779.77 

500.11 

3,901.39 

1,619.39 

738.83 

945.43 

3,117.84 

667.03 

296.04 

1,521.13 

20,015.89 



$ c. 
2,265.15 

21,116.75 

1,761.42 

1,430.73 

695.26 

7,305.67 
2,144.58 
592.87 
1,699.02 
1,615.75 

7,624.22 

1,449.96 

34,968.44 

587.11 

2,944.52 

1,835.92 
1,156.09 
1,309.38 
4,614.45 
1,166.67 

13,200.91 
1,478.33 
1,204.53 

11,605.36 
1,327.93 

609.88 
707.77 
594.08 
1,141.46 
890.78 

510.49 
3,894.18 
1,905.48 

754.11 
1,397.81 

3,381.28 
882.82 
469.06 

1,581.74 
10,942.69 



$ c. 
3,566.80 

36,772.69 

1,751.80 

1,997.98 

581.90 

10,074.47 

3,293.09 

600.04 

1,794.28 

2,564.56 

13,245.27 
1,757.89 

56,793.08 

871.22 

5,057.46 

2,676.77 
2,042.79 
1,441.91 
6,311.05 
1,294.78 

16,925.73 
2,077.29 
1,632.37 

20,661.72 

1,547.52 

949.68 

899.06 

704.54 

1,419.12 

1,242.55 

619.62 
5,303.77 
2,286.59 
1,000.05 
2,079.89 

4,408.78 

897.54 

504.52 

1,889.62 

21,118.86 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



141 



SYSTEM 

and Eastern Ontario Divisions 



S.O.— COST OF POWER 



Municipality as the Cost — under Power Commission Act — of Power supplied to 
each Municipality at interim rates, and the balance credited 
supplied to it in the year ended October 31, 1945 



costs and fixed charges 




Revenue 


Amount 












received 
in excess 


chargeable 
to each 


Amount 
billed 


Balance 








credited 




Provision 




of cost of 


munici- 


against 


or 




for 


Provision 


power sold 


pality in 


each 


charged 


Provision 


contin- 


for 


to private 


respect of 


munici- 


to each 


for 


gencies 


sinking 


com- 


power 


pality at 


municipality 


renewals 


and 


fund 


panies 


supplied 


interim 


Credited 




obso- 






to it in 


rates 


(Charged) 








lescence 




Credit 


the year 






$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


962.27 


1,259.42 


920.61 


488.93 


11,469.63 


13,287.24 


1,817.61 


9,118.98 


13,567.06 


9,450.43 


5,491.04 


118,050.70 


131,647.59 


13,596.89 


442.74 


474.61 


449.94 


170.58 


5,751.10 


6,512.72 


761.62 


428.20 


688.51 


513.53 


267.17 


6,422.50 


7,305.15 


. 882.65 


151.05 


151.51 


149.42 


54.38 


2,006.70 


2,070.28 


63.58 


1,992.27 


3,688.42 


2,566.77 


1,480.42 


33,183.24 


35,146.46 


1,963.22 


716.63 


1,117.78 


842.86 


430.11 


10,310.11 


11,287.63 


977.52 


163.25 


145.57 


154.58 


50.67 


1,914.90 


1,959.43 


44.53 


530.11 


574.56 


464.78 


222.49 


6,198.25 


7,530.94 


1,332.69 


661.48 


937.94 


663.08 


371.81 


8,340.41 


9,670.29 


1,329.88 


3,247.13 


5,006.59 


3,421.81 


2,022.18 


42,865.70 


50,761.39 


7,895.69 


461.76 


446.41 


448.39 


157.27 


5,367.06 


5,941.99 


574.93 


11,425.44 


20,243.46 


14,565.81 


7,972.95 


178,688.03 


198,293.91 


19,605.88 


283.92 


254.75 


224.93 


90.40 


2,683.29 


3,324.09 


640.80 


1,487.12 


1,639.52 


1,309.71 


631.13 


15,659.46 


19,247.80 


3,588.34 


797.90 


842.48 


690.17 


318.97 


8,471.19 


9,425.28 


954.09 


346.47 


887.56 


525.55 


377.28 


6,883.97 


7,859.32 


975.35 


388.38 


345.04 


371.00 


117.95 


4,457.70 


4,559.63 


101.93 


1,444.72 


1,965.51 


1,622.27 


745.47 


19,762.69 


22,196.82 


2,434.13 


421.22 


363.22 


335.62 


134.46 


4,267.77 


5,210.63 


942.86 


4,306.65 


6,253.09 


4,376.15 


2,490.48 


57,773.25 


65,118.34 


7,345.09 


599.50 


691.73 


536.00 


260.25 


6,711.12 


7,801.40 


1,090.28 


470.23 


541.78 


421.89 


208.86 


5,336.79 


6,828.92 


1,492.13 


5,537.22 


7,335.48 


5,379.02 


2,951.96 


65,584.80 


80,420.82 


14,836.02 


386.96 


427.60 


396.96 


155.82 


4,882.25 


5,827.92 


945.67 


305.68 


275.92 


246.03 


101.96 


2,907.54 


3,559.81 


652.27 


221.64 


247.16 


230.94 


89.37 


2,762.66 


3,290.79 


528.13 


193.04 


165.26 


181.54 


56.24 


2,125.50 


2,176.18 


50.68 


451.90 


409.78 


367.37 


155.10 


4,581.22 


5,862.40 


1,281.18 


308.46 


348.82 


318.59 


127.75 


3,761.22 


4,240.38 


479.16 


133.86 


211.91 


159.42 


81.94 


2,053.47 


2,322.37 


268.90 


1,208.51 


1,681.13 


1,361.35 


639.18 


16,711.15 


19,201.13 


2,489.98 


703.34 


718.30 


594.95 


265.31 


7,562.74 


9,118.86 


1,556.12 


228.49 


317.63 


257.09 


121.05 


3,175.15 


3,871.74 


696.59 


578.74 


471.47 


535.45 


154.89 


5,853.90 


6,007.33 


153.43 


1,019.32 


1,363.72 


1,134.89 


510.81 


13,915.02 


16,174.83 


2,259.81 


205.41 


286.67 


231.30 


109.28 


3,061.49 


3,360.61 


299.12 


129.07 


138.68 


130.17 


48.50 


1,619.04 


1,868.83 


249.79 


533.22 


636.28 


488.73 


249.21 


6,401.51 


7,607.93 


1,206.42 


4,008.76 


8,082.27 


5,404.71 


3,279.29 


66 293.89 


71,500.49 


5,206.60 



142 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay, 

Statement showing the amount chargeable (upon annual adjustment) to each 

it by the Commission; the amount billed by the Commission against 

or charged to each Municipality in respect of power 



Municipality 



Interim rates 

per horsepower 

collected by 

Commission 

during year 



To 
Dec. 31 

1944 



From 

Jan. 1, 

1945 



Share of 

capital cost 

of system 



Average 
horse- 
power 
supplied 
in year 
after 
correc- 
tion for 
power 
factor 



Share of operating 



Cost of 
power 
pur- 
chased 



Operating 
main- 
tenance 
and 

adminis- 
trative 

expenses* 



Interest 



Dunnville 

Durham 

Dutton . ' 

East York Twp 
Elmira 

Elm vale 

Elmwood 

Elora 

Embro 

Erieau 

Erie Beach .... 

Essex 

Etobicoke Twp. 

Exeter 

Fergus 

Finch 

Flesherton 

Fonthill 

Forest 

Forest Hill 

Gait 

Georgetown 

Glencoe 

Goderich 

Grand Valley . . 

Granton 

Gravenhurst. . . 

Grimsby 

Guelph 

Hagersville .... 

Hamilton 

Hanover 

Harriston 

Harrow 

Hastings 

Havelock 

Hensall 

Hespeler 

Highgate 

Holstein 



$ c. 
25.00 
35.50 
32.50 
26.00 
29.00 

36.00 
42.50 
31.00 
33.00 
42.50 

45.00 
30.50 
24.50 
32.00 
29.50 

41.00 
43.00 
29.50 
36.50 
24.50 

24.00 
30.50 
44.50 
34.00 
45.00 

39.50 
25.00 
26.00 
23.50 
28.50 

22.00 
30.00 
36.00 
33.50 
40.00 

45.00 
39.00 
24.50 
37.00 
45.00 



$ c 
25.00 
32.50 
31.50 
24.00 
28.50 

33.00 
39.00 
29.50 
31.50 
39.00 

39.00 
30.50 
24.00 
30.00 
27.50 

38.50 
39.00 
28.00 
36.50 
22.00 

22.50 
29.00 
39.00 
32.50 
39.00 

38.00 
25.00 
26.00 
23.00 
28.00 

20.50 
27.00 
34.50 
33.50 
37.00 

39.00 
37.50 
24.00 
36.50 
39.00 



$ c. 

272,627.85 

83,782.53 

55,977.93 

1,619,727.21 

269,979.18 

33,069.91 
18,682.02 
107,076.18 
30,208.17 
46,427.00 

6,863.21 

127,635.20 

1,464,225.16 

173,368.97 

289,808.87 

23,947.00 

15,568.64 

36,008.63 

146,784.25 

1,194,230.02 

2,028,272.76 
431,863.71 

64,703.23 
413,294.77 

43,433.94 

17,202.96 

222,547.45 

173,933.70 

2,068,118.83 

210,056.13 

25,670,957.68 

250,200.02 

120,120.95 

144,356.36 

34,036.72 

44,410.71 

56,407.27 

501,007.06 

23,701.09 

8,267.75 



1,509.4 

415.3 

270.0 

9,798.7 

1,410.6 

174.8 
68.2 
501.2 
135.1 
174.5 

22.6 
595.2 

8,575.7 
803.6 

1,427.3 

99.0 

71.3 

196.5 

636.6 

7,413.2 

12,028.2 
2,095.2 

218.7 
1,748.5 

167.9 

69.2 

1,327.6 

942.0 

12,397.9 

998.3 

164,376.1 

1,458.5 

483.8 

627.1 

157.8 

174.2 

198.0 

2,980.9 

94.5 

23.1 



$ c. 
9,507.21 
2,615.84 
1,700.64 
61,718.73 
8,884.90 

1,101.01 
429.57 

3,156.89 
850.95 

1,099.12 

142.35 

3,748.97 

54,015.46 

5,061.61 

8,990.08 

623.57 

449.09 

1,237.69 

4,009.73 

46,693.26 

75,761.60 
13,196.96 

1,377.52 
11,013.22 

1,057.55 

435.87 

8,362.11 

5,933.34 

78,090.22 

6,287.96 

1,035,349.99 

9,186.60 

3,047.29 

3,949.89 

993.93 

1,097.23 

1,247.14 

18,775.69 

595.22 

145.50 



$ c. 
6,847.01 
2,783.51 
1,890.06 
36,764.35 
6,447.38 

1.543,02 
802.79 

2,881.09 
959.56 

1,634.89 

266.68 

3,145.56 

35,670.96 

4,973.84 

7,766.27 

867.50 

681.64 

969.92 

4,706.45 

26,587.38 

51,037.79 
11,104.37 

2,488.25 
11,702.07 

1,645.28 

642.34 

5,007.69 

4,613.66 

51,997.99 

5,172.34 

555,056.03 
5,606.83 
4,220.80 
3,890.64 
1,832.77 

2,278.16 

1,831.73 

12,763.87 

795.34 

156.73 



$ c. 

11,232.87 
3,397.61 
2,295.28 

66,144.86 

11,039.68 

1,342.69 
. 765.47 
4,392.03 
1,230.25 
1,899.81 

280.89 
5,232.64 

60,220.24 
7,053.97 

11,870.19 

978.53 

630.88 

1,469.67 

6,012.69 

48,848.52 

83,403.73 
17,708.92 

2,644.81 
16,941.42 

1,770.76 

704.15 

9,143.32 

7,158.38 

85,099.31 

8,659.77 

1,056,379.15 

10,144.65 

4,925.42 

5,912.23 

1,389.31 

1,818.22 

2,300.59 

20,584.18 

971.28 

337.91 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



143 



SYSTEM 

and Eastern Ontario Divisions 



S.O.—COST OF POWER 



Municipality as the Cost — under Power Commission Act — of Power supplied to 
each Municipality at interim rates, and the balance credited 
supplied to it in the year ended October 31, 1945 



costs and fixed charges 




Revenue 


Amount 












received 
in excess 


chargeable 
to each 


Amount 
billed 


Balance 








credited 




Provision 




of cost of 


munici- 


against 


or 




for 


Provision 


power sold 


pality in 


each 


charged 


Provision 


contin- 


for 


to private 


respect of 


munici- 


to each 


for 


gencies 


sinking 


com- 


power 


pality at 


municipality 


renewals 


and 


fund 


panies 


supplied 


interim 


Credited 




obso- 






to it in 


rates 


(Charged) 








lescence 




Credit 


the year 






$ c. 


$ c. 


■ $ c. 


$ c. 


$ c. 


$ c. 


$ c. 


2,404.25 


3,872.85 


2,870.13 


1,557.61 


35,176.71 


37,735.20 


2,558.49 


996.20 


1,096.31 


882.17 


428.56 


11,343.08 


13,693.36 


2,350.28 


521.71 


735.84 


588.81 


278.62 


7,453.72 


8,549.82 


1,096.10 


12,189.02 


24,838.20 


17,049.85 


10,111.64 


208,593.37 


238,765.82 


30,172.45 


2,378.88 


3,752.79 


2,841.67 


1,455.65 


33,889.65 


40,312.46 


6,422.81 


375.42 


461.29 


348.21 


180.38 


4,991.26 


5,854.22 


862.96 


262.07 


208.92 


196.71 


70.38 


2,595.15 


2,699.87 


104.72 


1,018.03 


1,378.47 


1,127.21 


517.21 


13,436.51 


14,905.32 


1,468.81 


294.60 


376.21 


318.01 


139.41 


3,890.17 


4,284.73 


394.56 


485.62 


500.28 


488.72 


180.07 


5,928.37 


6,880.75 


952.38 


75.64 


66.91 


72.25 


23.32 


881.40 


891.55 


10.15 


1,178.03 


1,641.24 


1,344.80 


614.21 


15,677.03 


18,152.07 


2,475.04 


11,987.56 


22,187.12 


15,413.85 


8,849.58 


190,645.61 


206,574.35 


15.928.74 


1,636.36 


2,199.56 


1,811.12 


829.26 


21,907.20 


24,380.05 


2,472.85 


2,672.34 


3,852.72 


3,050.83 


1,472.88 


36,729.55 


39,696.56 


2,967.01 


314.53 


272.09 


252.10 


102.16 


3,206.16 


3,849.69 


643.53 


194.72 


191.82 


163.93 


73.58 


2,238.50 


2,834.78 


596.28 


321.87 


511.29 


379.08 


202.78 


4,686.74 


5,557.09 


870.35 


1,435.29 


1,784.61 


1,545.26 


656.93 


18,837.10 


23,235.01 


4,397.91 


8,729.81 


18,679.76 


12,572.88 


7,649.96 


154,461.65 


166,522.04 


12,060.39 


16,297.61 


30,957.15 


21,351.14 


12,412.35 


266,396.67 


273,739.08 


7,342.41 


4,019.45 


5,664.35 


4,546.27 


2,162.11 


54,078.21 


61,245.47 


7,167.26 


706.64 


648.93 


681.33 


225.68 


8,321.80 


8,730.95 


409.15 


4,101.37 


4,854.90 


4,350.94 


1,804.34 


51,159.58 


57,265.33 


6,105.75 


593.99 


473.23 


457.34 


173.26 


5,824.89 


6,699.99 


875.10 


176.44 


196.32 


180.90 


71.41 


2,264.61 


2,646.59 


381.98 


2,278.95 


3,360.52 


2,343.25 


1,370.00 


29,125.84 


33,190.60 


4,064.76 


1,558.58 


2,466.10 


1,831.12 


972.08 


22,589.10 


24,491.35 


1,902.25 


16,474.10 


31,904.21 


21,769.86 


12,793.86 


272,541.83 


286,225.77 


13,683.94 


1,991.50 


2,735.40 


2,211.86 


1,030.18 


26,028.65 


28,045.66 


2,017.01 


194,195.10 


414,734.78 


270,290.48 


169.625.80 


3,356,379.73 


3,411,810.33 


55,430.60 


2,618.81 


3,744.58 


2,634.93 


1,505.08 


32,431.32 


40,065.68 


7,634.36 


1,208.34 


1,387.85 


1,264.61 


499.25 


15,555.06 


16,796.04 


1,240.98 


1,389.35 


1,767.38 


1,520.91 


647.13 


17,783.27 


21,008.70 


3,225.43 


418.57 


433.25 


358.25 


162.84 


5,263.24 


5,912.21 


648.97 


598. 8C 


495.37 


467.47 


179.76 


6,575.49 


6,980.07 


404.58 


608.54 


576.18 


590.41 


204.32 


6,950.27 


7,481.37 


531.10 


4,014.21 


7,667.85 


5,273.9? 


3,076.10 


66,003.6? 


71,794.10 


5,790.42 


241.38 


267.80 


249.51 


97.52 


3,023.02 


3,458.88 


435.86 


127.56 


69.99 


87.05 


23.84 


1 900. 9C 


)| 925.51 


24.61 



144 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay, 

Statement showing the amount chargeable (upon annual adjustment) to each 

it by the Commission; the amount billed by the Commission against 

or charged to each Municipality in respect of power 



Municipality 



Interim rates 

per horsepower 

collected by 

Commission 

during year 



To 

Dec. 31, 

1944 



From 
Jan. 1, 

1945 



Share of 

capital cost 

of system 



Average 
horse- 
power 
supplied 
in year 
after 
correc- 
tion for 
power 
factor 



Share of operating 



Cost of 
power 
pur- 
chased 



Operating 
main- 
tenance 
and 

adminis- 
trative 

expenses* 



Interest 



Humberstone 
Huntsville. . . 
Ingersoll. . . . 

Iroquois 

Jarvis 

Kemptville . . 
Kincardine . . 
Kingston .... 
Kingsville . . . 
Kirkfield 

Kitchener . . . 
Lakefield. . . . 
Lambeth .... 

Lanark 

Lancaster . . . 

LaSalle 

Leamington. . 

Lindsay 

Listowel .... 
London 

LondonTwp . 
Long Branch. 

Lucan 

Lucknow 

Lynden 

Madoc 

Markdale. . . 
Markham . . . 

Marmora 

Martintown. . 

Maxville .... 
Meaford. . . . 

Merlin 

Merritton . . . 
Midland 

Mildmay 

Millbrook . . . 

Milton 

Milverton . . . 
Mimico 



$ c. 
24.50 
28.00 
25.50 
27.50 
35.50 

35.00 
38.50 
26.00 
32.50 
45.00 

23.50 
28.00 
33.00 
40.00 
45.00 

31. 5C 
32.00 
30.00 
30.50 
23.00 

28.50 
25.50 
31.50 
43.00 
32.00 

42.50 
34.50 
29.50 
36.00 
38.00 

45.00 
35.50 
35.50 
20.50 
29.00 

39.00 
34.00 
28.50 
30.50 
23.50 



$ c 
24.00 
28.00 
25.00 
25.50 
34.50 

32.00 
35.50 
22.50 
32.50 
39.00 

22.50 
25.00 
32.00 
39.00 
39.00 

31.00 
32.00 
26.50 
30.00 
22.50 

27.00 
24.50 
31.00 
39.00 
31.00 

39.00 
31.50 
28.00 
33.00 
36.00 

39.00 
32.50 
34.00 
20.00 
26.00 

35.50 
31.50 
28.00 
30.50 
23.00 



108,950.68 

255,402.54 

618,535.68 

48,801.97 

50,016.28 

86,071. 3S 

187,986.34 

2,478,821.17 

153,050.15 

10,982.36 

4,916,164.56 
80,086.71 
31,981.97 
37,821.98 
18,794.95 

65,129.19 

456,809.19 

714,699.62 

333,068.22 

7,247,390.17 

112,081.60 
256,023.12 

41,483.33 
100,466.91 

25,216.29 

49,087.42 
36,447.19 
79,538.14 
33,835.00 
9,312.84 

35,107.73 

167,180.05 

24,310.45 

1,588,580.61 

759,536.98 

35,014.20 

27,910.92 

288,563.11 

107,211.25 

485,078.50 



604.8 

1,278.8 

3,493.5 

300.5 

189.5 



375.2 

806.7 

16,544.1 

671.1 

26.3 

29,631.8 

462.8 

143.7 

102.7 

58.4 

307.4 

2,010.6 

3,932.9 

1,569.6 

43,539.7 

585.2 
1,494.9 
202.6 
373.2 
122.4 

222.3 
192.6 
398.3 
154.9 
45.0 

116.8 

818.9 

103.4 

11,212.0 

4,638.6 

151.0 
126.0 

1,581.9 
475.0 

3,009.2 



3,809.43 
8,054.73 
22,004.39 
1,892.75 
1,193.60 

2,363.26 

5,081.13 

104,205.74 

4,227.03 

165.65 

186,640.78 

2,915.02 

905.12 

646.87 

367.84 

1,936.21 

12,664.10 

24,772.02 

9,886.38 

274,241.99 

3,685.98 
9,415.87 
1,276.11 
2,350.66 
770.96 

1,400.19 

1,213.12 

2,508.76 

975.66 

283.44 

735.68 
5,157.98 

651.28 
70,620.64 
29,216.99 

951.10 

793.63 

9,963.86 

2,991.87 

18,953.94 



$ c 
2,403.69 
6,122.17 
16,147.62 
1,245.11 
1,801.10 

3,542.02 

5,297.37 

60,501.15 

3,642.70 

60.41 

113,499.97 

2,669.28 

1,077.13 

880.83 

552.95 

1,730.41 

11,773.73 

22,370.04 

9,835.46 

171,492.23 

3,053.42 
6,360.33 
1,276.52 
2,918.28 
686.35 

2,667.05 
1,233.30 
1,969.89 
1,091.19 
362.73 

1,107.88 

5,070.76 

818.70 

35,473.42 

17,936.79 

1,110.02 

901.69 

8,662.51 

3,146.04 

12,299.31 



$ c. 
4,467.58 
10,585.73 
25,399.66 
1,993.97 
2,058.72 

3,514.91 

7,641.76 

100,626.70 

6,275.11 

448.44 

202,016.12 

3,251.29 

1,312.72 

1,398.52 

766.69 

2,664.69 

18,744.57 

29,036.71 

13,668.42 

297,888.04 

4,588.38 
10,512.22 
1,695.77 
4,058.14 
1,030.83 

1,997.41 
1,478.87 
3,260.53 
1,384.43 
377.79 

1,435.50 

6,797.09 

997.51 

65,286.09 

30,723.16 

1,419.26 
1,143.52 

11,748.14 
4,323.21 

19,958.13. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



145 



SYSTEM 

and Eastern Ontario Divisions 



S.O.—COST OF POWER 



Municipality as the Cost — under Power Commission Act— of Power supplied to 
each Municipality at interim rates, and the balance credited 
supplied to it in the year ended October 31, 1945 



costs and fixed charges 




Revenue 


Amount 












received 
in excess 


chargeable 
to each 


Amount 
billed 


Balance 








credited 




Provision 




of cost of 


munici- 


against 


or 




for 


Provision 


power sold 


pality in 


each 


charged 


Provision 


contin- 


for 


to private 


respect of 


munici- 


to each 


for 


gencies 


sinking 


com- 


power 


pality at 


municipality 


renewals 


and 


fund 


panies 


supplied 


interim 


Credited 




obso- 






to it in 


rates 


(Charged) 








lescence 




Credit 


the year 






$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


948.78 


1,602.12 


1,143.09 


624.12 


13,750.57 


14,571.39 


. 820.82 


3,042.36 


3,352.30 


2,703.16 


1,319.64 


• 32,540.81 


35,804.97 


3,264.16 


5,178.78 


9,106.92 


6,511.08 


3,605.07 


80,743.38 


87,636.65 


6,893.27 


478.19 


765.22 


514.33 


310.10 


6,579.47 


7,751.24 


1,171.77 


530.17 


550.89 


526.66 


195.55 


6,465.59 


6,569.46 


103.87 


1,097.96 


1,029.44 


905.91 


387.18 


12,066.32 


12,190.34 


124.02 


2,439.94 


2,192.08 


1,979.39 


832.46 


23,799.21 


29,018.93 


5,219.72 


22,101.46 


41,064.95 


26,091.76 


17,072.47 


337,519.29 


381,711.51 


44,192.22 


1,465.32 


1,888.82 


1,612.52 


692.53 


18,418.97 


21,811.02 


3,392.05 


176.62 


86.08 


115.64 


27.14 


1,025.70 


1,050.25 


24.55 


38,644.52 


76,016.48 


51,741.79 


30,578.15 


637,981.51 


671,725.49 


33,743.98 


833.08 


1,189.25 


842.99 


477.58 


11,223.33 


11,812.74 


589.41 


310.28 


394.86 


336.27 


148.29 


4,188.09 


4,625.62 


437.53 


509.86 


311.72 


358.18 


105.98 


4,000.00 


4,021.46 


21.46 


278.92 


173.59 


197.88 


60.27 


2,277.60 


2,342.81 


65.21 


595.63 


845.27 


685.58 


317.22 


8,140.57 


9,552.29 


1,411.72 


4,364.18 


5,589.72 


4,812.90 


2,074.81 


55,874.39 


64,338.65 


8,464.26 


7,693.15 


10,209.54 


7,486.80 


4,058.51 


97,509.75 


106,535.90 


9,026.15 


3,070.48 


4,322.73 


3,506.27 


1,619.73 


42,670.01 


47,216.23 


4,546.22 


57.366,36 


111,888.02 


76,160.48 


44,930.23 


944,106.89 


983,343.45 


39,236.56 


991.16 


1,558.38 


1,178.17 


603.89 


14,451.60 


15,966.72 


1,515.12 


2,105.47 


3,867.89 


2,695.17 


1,542.64 


33,414.31 


36,894.80 


3,480.49 


383.34 


552.58 


436.11 


209.07 


5,411.36 


6,295.48 


884.12 


1,398.77 


1,063.78 


1,057.87 


385.12 


12,462.38 


14,823.17 


2,360.79 


236.10 


332.06 


265.52 


126.31 


3,195.51 


3,812.88 


617.37 


612.58 


613.16 


'516.75 


229.40 


7,577.74 


8,800.52 


1,222.78 


413.85 


499.56 


383.76 


198.75 


5,023.71 


6,167.01 


1,143.30 


699.48 


1,067.39 


837.29 


411.02 


9,932.32 


11,249.50 


1,317.18 


419.47 


434.98 


356.19 


159.85 


4,502.07 


5,191.14 


689.07 


111.53 


120.82 


98.04 


46.44 


1,307.91 


1,636.20 


328.29 


508.19 


346.98 


369.61 


120.53 


4,383.31 


4,668.53 


285.22 


2,003.85 


2,161.92 


1,760.30 


845.05 


22,106.85 


26,998.80 


4,891.95 


239.79 


291.41 


255.93 


106.70 


3,147.92 


3,544.05 


396.13 


11,326.29 


27,609.17 


16,723.05 


11,570.08 


215,468.58 


225,260.13 


9,791.55 


7,601.82 


11,590.59 


7,997.32 


4,786.74 


100,279.93 


122,893.03 


22,613.10 


453.25 


418.60 


368.68 


155.82 


4,565.09 


5,449.39 


884.30 


348.88 


353.51 


293.78 


130.02 


3,704.99 


4,018.32 


313.33 


2,468.81 


4,100.58 


3,021.07 


1,632.42 


38,332.55 


44,427.03 


6,094.48 


993.02 


1,332.20 


1,105.88 


490.17 


13,402.05 


14,486.23 


1,084.18 


3,783.91 


1 7,643.50 


5,106.37 


3,105.31 


64,639.85 


69,473.41 


4,833.56 



146 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay, 

Statement showing the amount chargeable (upon annual adjustment) to each 

it by the Commission; the amount billed by the Commission against 

or charged to each Municipality in respect of power 



Municipality 



Interim rates 

per horsepower 

collected by 

Commission 

during year 



To 
Dec. 31 

1944 



From 

Jan. 1. 

1945 



Share of 

capital cost 

of system 



Average 
horse- 
power 
supplied 
in year 
after 
correc- 
tion for 
power 
factor 



Share of operating 



Cost of 
power 
pur- 
chased 



Operating 
main- 
tenance 

and 
adminis- 
trative 
expenses* 



Interest 



Mitchell 

Mooref ield 

Morrisburg 

Mount Brydges . . 
Mount Forest. . . . 

Napanee 

Neustadt 

Newbury 

Newcastle 

New Hamburg . . . 

Newmarket. . . . . . 

New Toronto 
Niagara Falls 
Niagara-on-the- 

Lake 

North York Twp. 



Norwich. . . 
Norwood . . . 
Oil Springs. 
Omemee. . . 
Orangeville . 



Orono 

Oshawa 

Ottawa 

(11,000) volts. 

Ottawa 

Otterville 



Owen Sound . 

Paisley 

Palmerston . . 

Paris 

Parkhill 



Penetanguishene. 

Perth 

Peterborough . . . 

Petrolia 

Picton 



$ c. 
29.50 
45.00 
30.50 
32.50 
41.50 

29.00 
39.00 
42.00 
32.50 
29.00 



25.50 
18.50 

22.50 
27.00 

30.00 
34.00 
35.00 
33.00 
40.50 

38.00 
29.50 



Plattsville 

Point Edward. . 
Port Colborne. . 

Port Credit 

Port Dalhousie. 



21.50 
34.50 

30.50 
45.00 
33.00 
24.50 
44.00 

31.00 
28.00 
25.50 
32.50 
34.50 

37.00 
32.00 
24.50 
27.50 
25.50 



& c. 
28.00 
39.00 
28.00 
31.50 
38.50 

25.50 
36.00 
39.00 
29.50 
27.50 

27.25 
24.50 
17.75 

22.50 
24.50 

29.00 
31.50 
35.00 
30.00 
37.50 

37.00 
26.00 



21.50 
33.00 

27.00 
39.00 
33.00 
23.00 
39.00 

28.50 
25.00 
22.00 
32.50 
31.50 

36.00 
32.00 
24.00 
25.50 
24.50 



$ c. 

155,713.20 
21,837.32 
66,275.56 
21,970.48 

136,079.05 

247,592.22 

9,809.53 

10,235.63 

41,627.14 

132,900.74 

213,347.79 
2,119,774.28 
1,310,308.97 

138,249.58 
1,977,535.08 

94,404.15 
32,151.66 
41,822.84 
41,373.11 
183,605.77 

23,659.03 
3,130,107.29 

964.70 

2,484,357.78 

26,153.49 

1,162,486.39 

37,870.76 

152,621.26 

344,672.87 

71,496.86 

199,654.50 
323,748.30 
2,309,665.87 
253,432.96 
297,316.20 

37,458.74 
331,612.63 
331,193.44 
179,673.95 
167,310.26 



800.7 
61.2 
362.8 
106.7 
562.8 

1,528.3 

46.8 

36.7 

204.7 

677.6 

1,124.6 
11,715.8 
11,273.3 

969.4 
10,951.1 

471.7 
175.2 
185.2 
204.5 
806.7 

100.1 
17,859.8 

19,713.1 

18,876.8 

112.7 

6,570.8 
140.6 
649.9 

2,034.8 
247.2 

1,097.3 
1,875.3 
15,668.7 
1,177.1 
1,405.5 

154.8 
1,734.7 
1,838.5 
1,020.7 
1,008.2 



S c. 
5,043.34 

385.48 
2,285.16 

672.07 
3,544.89 

9,626.25 

294.78 

231.16 

1,289.34 

4,267.98 

7,083.48 
73,793.90 
71,006.74 

6,105.93 
68,977.31 

2,971.08 
1,103.53 
1,166.51 
1,288.08 
5,081.13 

630.50 
112,492.90 

216,843.90 

118,898.64 

709.86 

41,387.27 
885.59 

4,093.50 
12,816.52 

1,557.03 

6,911.53 

11,811.89 

98,691.89 

7,414.16 

8,852.77 

975.03 

10,926.29 

11,580.10 

6,429.05 

6,350.31 



$ c. 
4,626.89 

494.85 
1,800.55 

856.24 
4,664.80 

8,180.78 

409.64 

488.13 

1,311.50 

3,417.54 

5,175.53 
59,929.00 
30,286.40 

3,985.97 
46,192.50 

2,557.66 
1,797.61 
1,382.06 
1,108.89 
5,750.15 

813.43 
90,887.43 

19,943.23 

59,562.85 

922.98 

25,461.04 
1,129.61 
4,928.72 
8,777.51 
2,478.51 

4,761.90 
7,924.36 
57,033.19 
7,937.51 
8,860.14 

1,414.26 
14,154.29 
7,061.94 
4,853.13 
4,375.33 



$ c. 
6,372.84 

892.25 
2,703.35 

901.17 
5,545.86 

10,079.43 

397.05 

418.76 

1,703.75 

5,443.81 

8,783.51 
87,244.04 
53,746.40 

5,661.09 
80,916.28 

3,863.46 
1,308.59 
1,713.88 
1,688.75 
7,444.11 

969.80 
127,311.30 

39.87 

101,793.01 

1,069.79 

47,229.83 
1,548.50 
6,277.68 

14,156.57 
2,919.32 

8,112.39 
13,180.59 
94,658. 17 
10,355.09 
12,130.87 

1,530.44 

13,580.78 

13,558.36 

7,337.31 

6,832.44 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



147 



SYSTEM S.O.— COST OF POWER 

and Eastern Ontario Divisions 

Municipality as the Cost — under Power Commission Act — of Power supplied to 
each Municipality at interim rates, and the balance credited 
supplied to it in the year ended October 31, 1945 



costs and fixed charges 


Revenue 
received 
in excess 
of cost of 
power sold 
to private 
com- 
panies 


Amount 
chargeable 

to each 

munici- 
pality in 
respect of 

power 
supplied 

to it in 
the year 


Amount 
billed 

against 
each 

munici- 
pality at 

interim 
rates 


Balance 


Provision 

for 
renewals 


Provision 
for 
contin- 
gencies 
and 
obso- 
lescence 


Provision 

for 

sinking 

fund 


credited 

or 

charged 

to each 

municipality 

Credited 

(Charged) 




Credit 


$ c. 

1,374.92 
252.48 
723.01 
203.74 

1,800.81 


$ c. 

2,140.87 
194.98 
958.68 
288.75 

1,549.33 


$■ c. 

1,639.18 

229,91 

697.66 

• 230.97 

1,432.83 


$ c. 
826.27 
63.15 
374.39 
110.11 
580.77 


$ c. 

20,371.77 
2,386.80 
8,794.02 
3,042.83 

17,957.75 


$ c. 
22,611.57 

2,441.56 
10,299.23 

3,378.71 
21,933.02 


$ c. 
2,239.80 
54.76 
1,505.21 
335.88 
3,975.27 


2,413.78 
119.66 
109.23 
492.46 

1,190.93 


3,906.63 
124.61 
109.71 
559.11 

1,812.34 


2,606.20 
103.30 
107.77 
438.13 

1,398.87 


1,577.11 

48.29 

37.87 

211.24 

699.24 


35,235.96 
1,400.75 
1,426.89 
5,583.05 

16,832.23 


39,844,28 
1,707.76 
1,449.14 
6,123.21 

18,792.08 


4,608.32 

307.01 

22.25 

540.16 

1,959.85 


1,795.17 

18,232.66 

7,248.40 


2,954.69 
30,925.51 
26,345.88 


2,237.86 
22,338.19 
13,794.10 


1,160.52 
12,089.97 
11,633.33 


26,869.72 
280,373.33 
190,794.59 


30,643.99 
288,963.80 
201,459.40 


3,774.27 

8,590.47 

10,664.81 


1,001.21 
16,081.68 


2,329.70 
28,551.07 


1,451.46 
20,809.48 


1,000.36 
11,300.84 


19,535.00 
250,227.48 


21,810.57 
273,406.07 


2,275.57 
23,178.59 


862.57 
351.97 
404.36 
487.70 
2,352.33 


1,274.52 
466.92 
520.50 
555.56 

2,179.73 


993.79 
338.39 
440.29 
435.46 
1,933.26 


486.76 
180.80 
191.11 
211.03 
832.46 


12,036.32 
5,186.21 
5,436.49 
5,353.41 

23,908.25 


13,755.34 
5,591.71 
6,481.13 
6,241.86 

30,630.67 


1,719.02 
405.50 

1,044.64 
888.45 

6,722.42 


306.87 
32,929.95 


281.67 
46,003.77 


249.03 
32,942.55 


103.30 
18,430.19 


3,148.00 
424,137.71 


3,718.82 
475,080.26 


570.82 
50,942.55 


19.30 


4.82 

45,652.17 

313.51 


10.16 

26,148.62 

275.33 




236,861.28 

351,087.11 

3,435.24 


236,861.28 

405,851.00 

3,747.04 




18,511.49 
260.07 


19,479.67 
116.30 


54,763.89 
311.80 


12,499.64 

527.39 

1,492.03 

2,783.61 

780.31 


16,833.81 

401 . 47 

1,843.24 

5,242.62 

725.64 


12,240.13 

398.76 

1,606.71 

3,627.60 

751.54 


6,780.65 
145.09 
670.66 

2,099.79 
255.09 


148,871.07 

4,746.23 

19,571.22 

45,304.64 

8,957.26 


181,214.62 

5,616.13 

21,445.90 

47,300.40 

9,832.92 


32,343.55 

869.90 

1,874.68 

1,995.76 

875.66 


2,197.86 
3,358.76 
20,394.84 
2,384.25 
3,611.23 


2,818.87 
4,829.15 
38,828.78 
3,257.98 
3,759.39 


2,102.22 
3,406.92 
24,428.35 
2,667.95 
3,129.36 


1,132.34 
1,935.19 
16,169.11 
1,214.69 
1,450.39 


25,772.43 
42,576.48 
317,866.11 
32,802.25 
38,893.37 


31,734.88 
47,804.95 
353,134.59 
38,336.32 
44,922.28 


5,962.45 
5,228.47 
35,268.48 
5,534.07 
6,028.91 


380.03 
2,885.58 
2,884.15 
1,510.57 
1,385.42 


432.34 
4,637.80 
4,870.20 
2,663.92 
2,577.65 


394.09 
3,490.84 
3,474.83 
1,891.46 
1,761.35 


159.74 
1,790.10 
1,897.22 
1,053.30 
1,040.40 


4,966.45 
47,885.48 
41,532.36 
23,632.14 
22,242.10 


5,597.46 
55,509.84 
44,284.11 
26,383.51 
24,850.99 


631.01 
7,624.36 
2,751.75 
2,751.37 
2,608.89 



148 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay, 

Statement showing the amount chargeable (upon annual adjustment) to each 

it by the Commission; the amount billed by the Commission against 

or charged to each Municipality in respect of power 



Municipality 



Interim rates 

per horsepower 

collected by 

Commission 

during year 



To 
Dec. 31, 

1944 



From 

Jan. 1, 

1945 



Share of 

capital cost 

of system 



Average 
horse- 
power 
supplied 
in year 
after 
correc- 
tion for 
power 
factor 



Share of operating 



Cost of 
power 
pur- 
chased 



Operating 
main- 
tenance 

and 
adminis- 
trative 
expenses* 



Interest 



Port Dover 

Port Elgin.. .... 

Port Hope 

PortMcNicoll. . 
Port Perry 

Port Rowan .... 

Port Stanley 

Prescott 

Preston 

Priceville 

Princeton 

Queenston. ..... 

Renfrew 

Richmond 

Richmond Hill . . 

Ridgetown 

Ripley 

Riverside 

Rockwood 

Rodney 

Rosseau 

Russell 

St. Catharines.. . 
St. Clair Beach.. 
St. George 

St. Jacobs , 

St. Marys 

St. Thomas 

Sarnia 

Scarborough Twp 

Seaforth 

Shelburne 

Simcoe 

Smiths Falls 

Smithville 

Southampton 

Springfield 

Stamford Twp. . . 

Stayner 

Stirling. 



$ c. 
32.50 
37.00 
30.00 
35.00 
42.50 

37.00 
32.50 
26.50 
24.00 
45.00 

39.00 
23.00 



45.00 
25.50 

31. 5C 

45.00 
30.50 
32.50 
41.50 

45.00 
45.00 
20.50 
35.50 
35.50 

28.50 
30.50 
23.50 
28.00 
26.50 

30.50 
39.50 
25.50 
25.00 
31.00 

35.50 
39.50 
18.50 
35.50 
26.00 



$ c 
31.00 
34.00 
26.00 
32.00 
39.00 

34.50 
32.50 
25.00 
23.00 
39.00 

37.50 
23.00 
28.00 
39.00 
24.00 

30.50 
39.00 
30.00 
31.00 
39.00 

39.00 
39.00 
19.50 
35.00 
35.00 

27.50 
30.00 
23.50 
28.00 
25.00 

29.00 
36.50 
25.00 
23.50 
29.50 

32.50 
39.00 
17.75 
32.50 
23.00 



$ c 

120,348.27 

126,791.64 

490,056.24 

16,183.91 

79,385.99 

31,747.65 

150,484.34 

276,483.19 

719,948.98 

2,449.44 

39,281.21 
19,287.15 
33,714.31 
21,519.64 
104,658.34 

133,994.62 
38,061.56 

294,909.86 
34,430.80 
42,035.64 

20,868. 1C 
22,722.44 
4,215,422.53 
26,497.46 
46,208.91 

68,823.77 

340,425.51 

1,457,536.02 

1,320,504.34 

960,703.67 

213,793.26 

58,430.40 

541,847.37 

494,067.97 

41,022.79 

133,873.11 
19,968.66 

363,627.74 
60,321.81 
50,485.60 



548.3 

550.8 

2,919.8 

93.4 

328.2 



121 

680 
1,611.5 
4,348.1 
10.0 



146.6 
134.1 
206.1 
75.3 
551.9 



643.7 
114.9 
1,370.9 
153.8 
155.3 



32.1 

81.7 

29,726.4 

111.7 

206.5 

372.8 

1,747.0 
8,580.2 
6,697.5 
5,237.5 

1,066.2 

271.5 

3,003.1 

3,176.2 

197.0 

605.8 

77.9 

3,152.1 

303.0 

346.6 



$ c 
3,453.56 
3,469.30 
18,390.84 
588.30 
2,067.22 

763.40 

4,286.24 

10,150.30 

27,387.23 

62.99 

923.38 
844.65 

1,298.15 
474.29 

3,476.23 

4,054.45 
723.72 

8,634.84 
968.73 
978.18 

202. IS 

514.60 

187,236.64 

703.57 

1,300.67 

2,348.14 
11,003.77 
54,043.81 
42,185.31 
32,989.26 

6,715.64 

1,710.09 

18,915.52 

20,005.82 

1,240.84 

3,815.73 

490.67 

19,854.02 

1,908.50 

2,183.12 



$ c. 
3,950.88 
3,227.51 
18,918.71 
543.24 
2,288.95 

1,246.59 

4,634.93 

6,108.86 

18,365.48 

100.05 

1,345.88 
660.75 

1,676.81 
600.42 

2,420.66 

4,111.52 
1,012.82 
6,620.74 
1,220.99 
1,939.44 

(463.41) 

800.80 

95,966.03 

825.14 

1,708.94 

1,719.73 
12,799.82 
40,817.76 
35,386.12 
21,904.29 

6,162.10 

2,163.28 

13,597.01 

11,479.29 

1,098.28 

3,238.33 
880.51 
8,519.25 
1,834.57 
1,390.08 



$ c. 

4,928.44 

5,166.86 

19,943.35 

650.94 

3,242.87 

1,301.49 

6,170.21 

11,317.97 

29,576.00 

98.79 

1,607.12 
790.96 

1,392.91 
879.75 

4,307.59 

5,497.90 
1,543.77 
12,091.87 
1,379.61 
1,723.07 

845.71 

925.53 

173,310.18 

1,086.07 

1,892.75 

2,820.87 
13,964.12 
60,113.20 
53,887.68 
39,424.31 

8,760.20 

2,375.15 

22,268.14 

20,169.32 

1,680.75 

5,441.48 

818.97 

14,924.75 

2,450.62 

2,053.52 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



149 



SYSTEM 

and Eastern Ontario Divisions 



S.O.—COST OF POWER 



Municipality as the Cost — under Power Commission Act — of Power supplied to 
each Municipality at interim rates, and the balance credited 
supplied to it in the year ended October 31, 1945 



costs and fixed charges 




Revenue 


Amount 












received 
in excess 


chargeable 
to each 


Amount 
billed 


Balance 








credited 




Provision 




of cost of 


munici- 


against 


or 




for 


Provision 


power sold 


pality in 


each 


charged 


Provision 


contin- 


for 


to private 


respect of 


munici- 


to each 


for 


gencies 


sinking 


com- 


power 


pality at 


municipality 


renewals 


and 


fund 


panies 


supplied 


interim 


Credited 




obso- 






to it in 


rates 


(Charged) 








lescence 




Credit 


the year 






$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


1,157.67 


1,510.15 


1,266.78 


565.81 


15,701.67 


17,130.56 


1,428.89 


1,634.71 


1,494.25 


1,335.05 


568.39 


15,759.29 


18,942.97 


3,183.68 


4,950.18 


7,494.19 


5,157.43 


3,013.05 


71,841.65 


77,838.15 


5,996.50 


170.87 


238.61 


170.40 


96.38 


2,265.98 


3,040.67 


774.69 


1,050.77 


896.51 


835.89 


338.68 


10,043.53 


12,975.61 


2,932.08 


333.07 


353.14 


334.19 


125.07 


4,206.81 


4,233.81 


27.00 


1,455.91 


1,879.82 


1,582.98 


702 . 23 


19,307.86 


22,117.34 


2,809.48 


2,853.42 


4,146.59 


2,910.37 


1,662.97 


35,824.54 


40,670.25 


4,845.71 


5,692.63 


11,157.63 


7,578.69 


4,486.97 


95,270.69 


100,754.02 


5,483.33 


32.63 


29.05 


25.79 


10.32 


338.98 


400.00 


61.02 


416.99 


418.95 


413.30 


151.28 


4,974.34 


5,530.48 


556.14 


141.73 


327.91 


203.05 


138.38 


2,830.67 


3,083.36 


252.69 


332.01 


522.28 


354.88 


212.68 


5,364.36 


5,771.94 


407.58 


306.04 


215.19 


226.56 


77.70 


2,624.55 


3,008.16 


383.61 


885.95 


1,461.28 


1,101.72 


569.53 


13,083.90 


13,384.92 


301.02 


1,232.58 


1,755.51 


1,410.58 


664.26 


17,398.28 


19,747.17 


2,348.89 


573.25 


345.34 


400.77 


118.57 


4,481.10 


4,588.67 


107.57 


2,723.17 


3,802.97 


3,104.36 


1,414.68 


35,563.27 


41,242.79 


5,679.52 


323.99 


425.07 


354.03 


158.71 


4,513.71 


4,801.37 


287.66 


447.66 


448.51 


442.26 


160.26 


5,818.86 


6,123.63 


304.77 


360.73 


122.24 


217.57 


33.13 


1,251.90 


1,279.60 


27.70 


318.77 


231.94 


239.22 


84.31 


2,946.55 


3,266.97 


320.42 


30,124.71 


73,155.79 


44,391.01 


30,675.78 


573,508.58 


584,869.58 


11.361.00 


258.90 


315.94 


278.94 


115.27 


3,353.29 


3,916.91 


563.62 


450.94 


573.70 


486.40 


213.10 


6,200.30 


7,244.83 


1,044.53 


591.05 


985.07 


724.58 


384.71 


8,804.73 


10,311.83 


1,507.10 


2,969.78 


4,712.25 


3,583.63 


1,802.79 


47,230.58 


52,552.75 


5,322.17 


11,759.08 


22,201.50 


15,327.44 


8,854.23 


195,408.56 


201,634.84 


6,226.28 


11,743.65 


18,000.77 


13,900.90 


6,911.40 


168,193.03 


187,530.22 


19,337.19 


7,939.32 


13,708.10 


10,113.08 


5,404.77 


120,673.59 


132,336.29 


11,662.70 


1,927.55 


2,865.65 


2,250.60 


1,100.25 


27,581.49 


31,180.74 


3,599.25 


724.42 


733.72 


615.24 


280.17 


8,041.73 


10,045.77 


2,004.04 


4,580.98 


7,849.56 


5,702.98 


3,099.01 


69,815.18 


75,335.32 


5,520.14 


4,603.43 


8,018.72 


5,198.90 


3,277.64 


66,197.84 


75,387.39 


9,189.55 


395.67 


. 530.36 


431.89 


203.29 


5,174.50 


5,865.73 


691.23 


1,686.35 


1,631.05 


1,409.61 


625.15 


16,597.40 


19,976.68 


3,379.28 


207.80 


220.24 


210.09 


80.39 


2,747.89 


3,044.43 


296.54 


1,985.54 


7,357.06 


3,828.04 


3,252.77 


53,215.89 


56,365.40 


3,149.51 


710.72 


811.26 


635.15 


312.68 


8,038.14 


9,991.34 


1,953.20 


434.11 


857.61 


531.40 


357.671 


7,092.17 


8,138.42 


1,046.25 



150 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay, 

Statement showing the amount chargeable (upon annual adjustment) to each 

it by the Commission; the amount billed by the Commission against 

or charged to each Municipality in respect of power 



Municipality 



Interim rates 

per horsepower 

collected by 

Commission 

during year 



To 
Dec. 31, 

1944 



From 

Jan. 1, 

1945 



Share of 

capital cost 

of system 



Average 
horse- 
power 
supplied 
in year 
after 
correc- 
tion for 
power 
factor 



Share of operating 



Cost of 
power 
pur- 
chased 



Operating 
main- 
tenance 

and 
adminis- 
trative 
expenses* 



Interest 



Stouffville . 
Stratford. . 
Strathroy. . 
Streetsville . 
Sunderland 



Sutton . . . 
Swansea. . 

Tara 

Tavistock . 
Tecumseh 



Teeswater . . 
Thamesford . 
Thamesville. 
Thedford. . . 
Thornbury. 



Thorndale. . 
Thornton. . . 
Thorold. . . . 
Tilbury 
Tillsonburg . 



Toronto 

Toronto Twp 
Tottenham. . 
Trafalgar 

Area No. 1 
Trafalgar 

Area No. 2 



Trenton 

Tweed 

Uxbridge 

Victoria Harbour 
Walkerton 

Wallaceburg .... 

Wardsville 

Warkworth 

Waterdown 

Waterford 



$ c. 
32.50 
26.00 
28.00 
30.00 
45.00 

39.50 
27.50 
39.50 
30.00 
32.50 

45.00 
33.00 
33.00 
45.00 



44.00 
45.00 
23.00 
30.50 
28.50 

22.60 
27.50 
45.00 

27.50 

28.50 

24.00 
41.50 
43.00 
36.50 
31.00 

30.00 
44.00 
37.00 
27.00 
27.50 



$ c. 
31.00 
25.00 
26.50 
29.00 
39.00 

38.00 
25.00 
36.50 
29.00 
32.00 

39.00 
33.00 
31.50 
39.00 
50.00 

39.00 
39.00 
22.50 
30.00 
26.50 

21.50 
26.00 
39.00 

27.50 

28.50 

21.00 
39.00 
39.00 
33.50 
28.00 

30.00 
39.00 
34.00 
26.00 
27.00 



$ c. 
77,088.72 
1,414,533.36 
304,728.27 
44,027.32 
24,327.59 

87,562.63 
499,519.83 

29,862.40 
145,861.06 
101,744.11 

47,726.72 
53,715.70 
47,866.67 
41,979.58 
15,316.50 

23,897.36 

9,031.83 

476.639,94 

303,520.76 

.303,076.95 

60,983,007.40 

655,065.10 

45,279.80 

96,128.24 

37,367.57 

763,113.07 
78,332.82 
92,067.62 
16,470.35 

194,576.47 

972,676.20 
12,776.96 
19,17 .22 
48,796.70 
88,884.42 



360.4 
7,805.9 
1,619.1 

239.3 
91.4 

329.2 

3,103.1 

127.0 

691.9 

445.7 

179.1 
248.0 
229.8 
133.9 
49.6 

88.0 

32.8 

3,251.5 

1,512.1 
1,612.9 

380,013.3 

3,616.9 

121.4 

471.4 

179.6 

5,490.4 

317.2 

373.8 

80.7 

1,102.2 

4,899.3 

45.6 

86.9 

273.7 

475.4 



$ c. 

2,270.04 
49,166.75 
10,198.17 

1,507.27 
575.70 

2,073.52 

19,545.39 

799.93 

4,358.05 

2,807.31 

1,128.09 

1,562.07 

1,447.43 

843.39 

312.41 

554.28 
206.60 

20,480.11 
9,524.21 

10,159.12 

2,393,576.47 

22,781.64 

764.66 

2,969.19 

1,131.25 

34,582.19 

1,997.94 

2,354.44 

508.30 

6,942.39 

30,859.05 

287.22 

547.35 

1,723.94 

2,994.39 



$ c 
2,349.93 
38,504.86 
8,267.78 
1,693.50 
976.37 

3,281.36 
21,303.42 
1,005.74 
4,638.51 
2,568.37 

1,464.02 
1,702.07 
1,584.02 
1,487.47 
609.14 

1,094.60 

264.93 

10,981.58 

8,793.58 

7,727.42 

1,322,933.47 

17,917.56 

681.46 

2,933.68 

1,066.27 

17,921.33 

3,192.22 

2,756.75 

602.56 

4,538.49 

25,943.76 

609.64 

778.83 

1,381.08 

2,263.19 



$ c. 

3,156.73 
58,160.80 
12,447.42 

1,800.39 
995.02 

3,590.12 
20,449.68 
1,217.13 
5,812.68 
4,173.29 

1,945.73 
2,198.07 
1,962.01 
1,710.53 
552.05 

977.52 

366.46 

19,555.24 

12,422.94 

12,413.35 

2,508,245.05 

26,843.68 

1,851.64 

3,944.05 

1,538.79 

31,044.88 

3,197.42 

3,754.78 

668.86 

7,872.07 

39,717.32 

522.90 

785.44 

2,000.92 

3,644.48 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



151 



SYSTEM 

and Eastern Ontario Divisions 



S.O.-COST OF POWER 



Municipality as the Cost — under Power Commission Act — of Power supplied to 
each Municipality at interim rates, and the balance credite d 
supplied to it in the year ended October 31, 1945 



costs and fixed charges 


Revenue 
received 
in excess 
of cost of 
power sold 
to private 


Amount 
chargeable 
to each 
munici- 
pality in 
respect of 


Amount 
billed 

against 
each 

munici- 


Balance 


Provision 


Provision 

for 

contin- 


Provision 
for 


credited 

or 
charged 
to each 


for 
renewals 


gencies 
and 
obso- 
lescence 


sinking 
fund 


com- 
panies 


power 
supplied 
to it in 
the year 


pality at 
interim 
rates 


municipality 
Credited 
(Charged) 




Credit 


$ c. 

709.72 
11,851.56 

2,657.44 
382.69 
337.02 


$ c. 
973.42 

20,582.52 

4,247.23 

631.95 

257.61 


$ c. 

811.53 
14,890.35 

3,200.14 
463.48 
256.16 


$ c. 

371.91 
8,055.20 
1,670.81 

246.94 
94.32 


$ c. 
9,899.46 
185,101.64 
39,347.37 
6,232.34 
3,303.56 


$ c. 

11,253.63 

196,424.08 

43,296.32 

6,978.64 

3,649.87 


$ c. 

1,354.17 
• 11,322.44 

3,948.95 
746.30 
346.31 


905.49 
3,658.73 

389.48 
1,293.88 

973.31 


940.53 
7,831.34 

357.21 
1,887.46 
1,251.05 


921.84 
5,258.09 

314.43 
1,490.71 
1,071.03 


339.71 
3,202.20 
131.06 
714.00 
459.93 


11,373.15 
74,844.45 
3,952.86 
18,767.29 
12,384.43 


12,561.60 
78,984.09 
4,696.39 
20,174.37 
14,296.65 


1,188.45 
4,139.64 
743.53 
1,407.08 
1,912.22 


661.53 
513.30 
440.49 
468.48 
186.01 


529.26 
682.79 
629.37 
408.44 
140.25 


502.54 
564.76 
503.90 
441.97 
140.65 


184.82 
255.92 
237.14 
138.18 
51.18 


6,046.35 
6,967.14 
6,330.08 
5,222.10 
1,889.33 


7,153.79 
8,183.75 
7,297.49 
5,358.97 
2,481.36 


1,107.44 

1,216.61 

967.41 

136.87 

592.03 


254.68 

126.98 

3,523.87 

2,763.93 

2,653.60 


252.17 

95.65 

8,095.93 

4,096.73 

4,248.33 


251.33 

95.10 

5,017.65 

3,195.17 

3,190.43 


90.81 

33.85 

3,355.34 

1,560.39 

1,664.41 


3,293.77 

1,121.87 

64,299.04 

39,236.17 

38,727.84 


3,494.69 

1,309.99 

73,444.16 

45,495.70 

43,281.25 


200.92 

188.12 

9,145.12 

6,259.53 

4,553.41 


445,215.39 

5,628.38 

706.98 


958,098.05 

9,509.51 

378.36 


641,923.15 

6,895.97 

476.78 


392,149.85 

3,732.41 

125.28 


7,877,841.73 

85,844.33 

4,734.60 


8,242,054.00 

94,919.54 

4,849.20 


364,212.27 

9,075.21 

114.60 


890.05 


1,256.53 


1,008.62 


486.45 


12,515.67 


12,964.42 


448.75 


351.49 


485.59 


392.97 


185.34 


4,781.02 


5,119.32 


338.30 


6,144.30 
1,039.89 
1,229.80 
197.38 
2,088.29 


13,460. 15 

884.92 

1,026.27 

216.19 

2,840.57 


8,032.19 
824.65 
969.42 
173.42 

2,048.75 


5,665.75 

327.33 

385.74 

83.28 

1,137.40 


105,519.29 

10,809.71 

11,705.72 

2,283.43 

25,193.16 


117,993.91 

12,493.60 

14,797.39 

2,738.03 

31,404.38 


12,474.62 

1,683.89 

3,091.67 

454.60 

6,211.22 


8,685.16 
136.61 
239.11 
414.10 
771.81 


13,180.94 

134.56 

237.26 

715.31 

1,263.08 


10,204.73 
134.53 
201.82 
513.82 
935.52 


5,055.77 

47.06 

89.68 

282.44 

490.58 


123,535.19 

1,778.40 

2,700.13 

6,466.73 

11,381.89 


146,977.75 

1,815.34 

2,993.41 

7,161.15 

12,875.62 


23,442.56 

36.94 

293.28 

694.42 

1,493.73 



152 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay, 

Statement showing the amount chargeable (upon annual adjustment) to each 

it by the Commission; the amount billed by the Commission against 

or charged to each Municipality in respect of power 



Municipality 



Interim rates 
per horsepower 
collected by 
Commission 
during year 



To 
Dec. 31, 

1944 



From 

Jan. 1, 

1945 



Share of 

capital cost 

of system 



Average 
horse- 
power 
supplied 
in year 
after 
correc- 
tion for 
power 
factor 



Share of operating 



Cost of 
power 
pur- 
chased 



Operating 
main- 
tenance 

and 
adminis- 
trative 
expenses* 



Interest 



Waterloo 

Watford 

Waubaushene. 

Welland 

Wellesley 



Wellington . 
West Lome. 
Weston 
Westport. . . 
Wheatley. . . 



Whitby 

Wiarton 

Williamsburg . 
Winchester . . . 
Windermere. . 



Windsor. . . . 
Wingham . . 
Woodbridge 
Woodstock . 
Woodville. . 



$ c. 

24.00 

35.50 

33.00 

20.00 

33.50 

33.00 
35.50 
23.00 
45.00 
41.00 

29.00 
45.00 
30.00 
31.00 
45.00 

26. CO 
40.50 
28.50 
24.50 
45.00 



$ c. 

23.00 

35.50 

30.00 

19.50 

32.00 

31.00 
35.50 
22.50 
39.00 
39.00 

25.50 
39.00 
28.50 
28.50 
39.00 

25.00 
37.50 
27.50 
24.50 
39.00 



Wyoming 40.00 39.00 

YorkTwp 24.50 23.00 

Zurich 42.00 39.00 

Ontario Reformatory 

Toronto Transportation Comm.. . 

Totals — Municipalities 



1,082,133.14 
95,439.57 
21,798.98 

1,828,217.34 
30,045.89 

55,593.28 
57,832.12 
870,125.76 
41,586.47 
65,417.54 

271,041.97 

102,329.42 

19,248.64 

' 76,384.91 

17,708.86 

10,248,543.62 

199,739.35 

134,751.55 

1,549,267.91 

20,332.36 

26,833.39 

3,305,327.12 

■ 38,906.07 

56,442.84 

116,838.14 



6,460.2 

406.3 

115.8 

12,697.7 

132.9 

277.1 
258.3 
5,292.0 
118.5 
220.0 

1,564.1 

368.6 

106.3 

385.2 

53.6 

54,430.5 

814.9 

696.9 

9,169.2 

75.5 

103.6 
20,734.5 
136.8 
320.0 
709.9 



$ c. 
40,690.64 
2,559.15 

729.39 
79,978.56 

837.09 

1,745.36 

1,626.95 

33,332.54 

746.39 

1,385.71 

9,851.75 
2,321.69 

669.55 
2,426.25 

337.61 

342,839.49 

5,132.79 

4,389.54 

57,753.72 

475.55 

652.54 

130,599.67 

861.66 

2,015.57 

4,471.42 



$ c. 

25,222.11 
3,265.86 

659.28 
41,586.48 

957.78 

1,447.35 

2,328.02 

19,044.87 

856.50 

2,227.93 

7,633.41 
2,831.90 

597.09 
2,353.45 

495.35 

215,274.18 

5,142.51 

3,737.37 

38,026.49 

753.83 

907.71 

74,116.71 

1,301.80 

1,592.17 

2,891.37 



$ c. 
44,466.62 

3,904.35 

887.77 

75,422.38 

1,228.85 

2,260.54 
2,369.00 
35,786.51 
1,698.76 
2,687.81 

11,022.03 
4,178.88 

788.24 
3,056.68 

7C9.00 

420,771.43 

8,115.74 

5,507.48 

63,662.78 

831.44 

1,099.52 
135,130.02 
1,589.05 
2,307.10 
4,707.97 



Totals — Rural power district. . 

Totals — Companies 

Totals — Local distribution sys. 



Non-operating capital. 
Grand Totals 



197,201,223.59 

20,048,229.44 

46,115,722.98 

722,294.78 



1,209,289.9 

100,628.0 

283,053.7 

2,344.3 



7,709,589.73 

659,139.14 

2,451,745.34 
11,928.42 



4,687,503.95 

514,155.72 

1,444,717.74 
70,037.98 



8,092,735.21 

823,626.43 

1,888,405.94 

• 29,550.53 



264,087,470. 79 
2,776,135.60 



266,863,606.39 



1,595,315.9 



10,832,402.63 



6,716,415.39 



10,834,318.11 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



153 



SYSTEM 

and Eastern Ontario Divisions 



S.O.— COST OF POWER 



Municipality as the Cost — under Power Commission Act — of Power supplied to 
each Municipality at interim rates, and the balance credited 
supplied to it in the year ended October 31, 1945 



costs and fixed charges 




Revenue 


Amount 












received 
in excess 


chargeable 
to each 


Amount 
billed 


Balance 








credited 




Provision 




of cost of 


munici- 


against 


or 




for 


Provision 


power sold 


pality in 


each 


charged 


Provision 


contin- 


for 


to private 


respect of 


munici- 


to each 


for 


gencies 


sinking 


com- 


power 


pality at 


municipality 


renewals 


and 


fund 


panies 


supplied 


interim 


Credited 




obso- 
lescence 






to it in 
the year 


rates 


(Charged) 






Credit 


$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


8,580.09 


16,600.89 


11,389.32 


6,666.52 


140,283.15 


149,677.64 


9,394.49 


942.40 


1,145.27 


1,004.74 


419.28 


12,402.49 


14,423.94 


" 2,021.45 


246.53 


307.45 


229.53 


119.50 


2,940.45 


3,515.81 


575.36 


13,246.83 


31,417.26 


19,245.70 


13,103.23 


247,793.98 


248,705.32 


911.34 


293.28 


367.68 


316.27 


137.14 


3,863.81 


4,284.84 


421.03 


651.49 


738.99 


585.13 


285.95 


7,142.91 


8,670.24 


1,527.33 


563.31 


715.76 


608.36 


266.55 


7,944.85 


9,168.48 


1,223.63 


6,496.04 


13,396.91 


9,160.75 


5,461.01 


111,756.61 


119,528.24 


7,771.63 


634.81 


369.55 


437.77 


122.28 


4,621.50 


4,738.40 


116.90 


709.03 


651.53 


689.14 


227.03 


8,124.12 


8,654.47 


530.35 


2,822.26 


3,986.73 


2,852.54 


1,614.06 


36,554.66 


40,776.88 


4,222.22 


1,443.55 


1,050.91 


1,077.48 


380.37 


12,524.04 


14,735.95 


2,211.91 


208.44 


279.77 


202.62 


109.69 


2,636.02 


3,053.00 


416.98 


859.30 


1,029.62 


788.99 


397.50 


10,116.79 


11,115.90 


999.11 


259.61 


161.29 


182.85 


55.31 


2,090.40 


2,120.20 


29.80 


86,211.91 


144,712.17 


107,875.89 


56,168.85 


1,261,516.22 


1,370,156.62 


108,640.40 


2,661.58 


2,254.93 


2,103.14 


840.93 


24,569.76 


30,941.45 


6,371.69 


1,152.36 


1,848.48 


1,414.79 


719.16 


17,330.86 


19,275.72 


1,944.86 


12,479.94 


23,696.75 


16,308.29 


9,462.04 


202,465.93 


224,645.78 


22,179.85 


283.13 


213.38 


214.09 


77.91 


2,693.51 


3,024.89 


331.38 


277.76 


297.73 


282.50 


106.91 


3,410.85 


4,054.27 


643.42 


23,885.13 


52,138.86 


34,792.58 


21,396.70 


429,266.27 


482,628.29 


53,362.02 


419.46 


398.55 


407.22 


141.17 


4,836.57 


5,394.37 


557.80 


471.16 


833.57 


594.15 


330.22 


7,483.50 


8,639.36 


1,155.86 


928.72 


1,808.96 


1,229.95 


732.57 


15,305.82 


20,785.88 


5,480.06 


1,592,174.34 


3,034,081.96 


2,075,408.22 


(1,227,568.44) 


25,963,924.97 


27,760,643.75 


1,797,094.60 

(375.82) 


195,488.96 


269,837.89 


209,843.37 


(103,841.77) 


2,568,249.74 


2,568,249.74 




381,129.27 


7,328,423.33 


481,127 80 


1,316,836 82 


15,292,386 24 


15,292,386 24 




10,308.55 


8,152.86 


7,516.45 


14,573.39 


152,068.18 


152,Q68.18 




2,179,101.12 


10,640,496.04 


2,773,895.84 




43,976,629. 13 


45,773,347. 91 


1,797,094.60 














(375.82) 



154 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay and 

Statement showing the net Credit or Charge to each Municipality in respect of 

and adjustments made during the year. Also the net amount Credited 

ended October 31, 1945, and the accumulated amount standing 



Municipality 


Date 

commenced 

operating 


Net credit or charge at 
October 31, 1944 




Credit 


Charge 


Acton 


Jan. 1913 
Nov. 1922 
Jan. 1916 
Jan. 1921 
June 1918 

Feb. 1945 
April 1922 
Nov. 1925 
May 1923 
April 1921 

Dec. 1926 
Jan. 1939 
Dec. 1916 
Jan. 1929 
April 1943 

Mar. 1918 
Jan. 1915 
May 1912 
April 1913 
Nov. 1931 

Aug. 1912 
May 1937 
Nov. 1914 
Aug. 1918 
Dec. 1922 

April 1929 
Nov. 1915 
April 1919 
July 1924 
Feb. 1915 

Sept. 1915 
Oct. 1931 
Oct. 1918 
Jan. 1945 
Nov. 1911 

Feb. 1914 
May 1924 
Jan. 1915 
Mar. 1928 
Jan. 1918 


$ c. 

6,376.66 
988.92 
504.82 

1,433.99 

3,422.98 


$ c. 


Agincourt 




Ailsa Craig 




Alexandria 




Alliston 




Almonte 




Alvinston , 


761.31 
5,245.64 
1,684.02 

487.34 

425.17 
8,799.20 
1,340.62 

717.77 
4,217.88 

3,220.64 
855.83 

2,214.62 

30,967.24 

297.58 

2,904.11 
1,836.93 
1,985.37 
1,274.62 
660.84 

42,395.32 

2,311.77 

913.26 

705.04 

571.31 

614.31 

15,469.47 

1,621.62 




Amherstburg ; . . . . 




Ancaster Township 




Apple Hill 




Arkona 




Arnprior 




Arthur 




Athens 




Aurora 




Aylmer V 




Ayr 




Baden 




Barrie 




Bath 




Beachville 




Beamsville 




Beaverton 




Beeton 




Belle River 




Belleville 




Blenheim 




Bloomfield 




Blvth 




Bolton 




Bothwell 








Bradford 




Braeside 




Brampton 


8,575.68 

46,012.05 

3,043.07 

539.88 

566.95 

755.78 




Brantford 




Brechin 






Bridgeport . . . 




Brigden 












1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



155 



SYSTEM 

Eastern Ontario Divisions 



S.O.— CREDIT OR CHARGE 



power supplied to it to October 31, 1944, the cash receipts and payments thereon 
or Charged to each Municipality in respect of power supplied in the year 
as a Credit or Charge to each Municipality at October 31, 1945 



Cash receipts and payments 

on account of such credits 

and charges, also adjustments 

made during the year 


Net amount credited or charged 
upon annual adjustment in 
respect of power supplied in 

the year ended October 31, 1945 


Accumulated amount 
standing as a credit 
or charge on 
October 31, 1945 


Credited 


Charged 


Credited 


Charged 


Credit 


Charge 


$ c. 


$ c. 

6,376.66 
988.92 
504.82 

1,433.99 

3,422.98 


$ c. 

5,329.80 
722.89 
718.24 
612.37 

3,195.17 


$ c. 


$ c. 

5,329.80 
722.89 
718.24 
612.37 

3,195.17 


$ c. 




























375.82 


375.82 




761.31 
5,245.64 
1,684.02 

487.34 

425.17 
8,799.20 
1,340.62 

717.77 
4,217.88 

3,220.64 
855.83 

2,214.62 

30,967.24 

297.58 

2,904.11 
1,836.93 
1,985.37 
1,274.62 
660.84 

42,395.32 

2,311.77 

913.26 

705.04 

571.31 

614.31 

15,469.47 

1,621.62 


133.82 
5,385.92 
1,418.29 

189.56 

64.49 

4,250.96 

181.52 

471.60 

5,004.29 

3,300.85 

945.96 

1,812.09 

22,274.35 

49.54 

2,401.92 

1,609.74 

2,227.73 

93.85 

365.05 

22,676.93 

2,579.15 

763.03 

740.05 

626.36 

234.75 
4,927.08 
1,775.70 

545.43 
6,696.96 

2,849.92 
374.25 
476.04 
297.27 


133.82 
5,385.92 
1,418.29 

189.56 

64.49 

4,250.96 

..181.52 

471.60 

5,004.29 

3,300.85 

945.96 

1,812.09 

22,274.35 

49.54 

2,401.92 

1,609.74 

2,227.73 

93.85 

365.05 

22,676.93 

2,579.15 

763.03 

740.05 

626.36 

234.75 
4,927.08 
1,775.70 

545.43 
6,696.96 

20,874.90 

2,849.92 

374.25 

476.04 

297.27 




















































s 




















































































































8,575.68 

3,043.07 
539.88 
566.95 
755.78 









































156 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay and 

Statement showing the net Credit or Charge to each Municipality in respect of 

and adjustments made during the year. - Also the net amount Credited 

ended October 31, 1945, and the accumulated amount standing 



Municipality 


Date 

commenced 

operating 


Net credit or charge at 
October 31, 1944 




Credit 


Charge 


Brighton . 


Nov. 1929 
April 1915 
July 1924 
June 1915 
Nov. 1916 

Jan. 1945 
Oct. 1912 
Jan. 1925 
Nov. 1914 
July 1930 

May 1919 
Nov. 1924 
Feb. 1915 
Dec. 1915 
July 1916 

April 1914 
Sept. 1919 
May 1924 
Mar. 1914 
Nov. 1925 

Jan. 1932 
Jan. 1933 
Mar. 1913 
Mar. 1913 
May 1915 

May 1918 
Nov. 1926 
Dec. 1923 
Nov. 1914 
Sept. 1917 

Mar. 1915 
May 1938 
Jan. 1931 
Dec. 1914 
Mar. 1918 

April 1915 
Dec. 1914 
Oct. 1917 
Dec. 1915 
Jan. 1911 


$ c. 

2,469.18 

18,331.81 

836.44 

992.68 

261.11 


$ c. 


Brockville 




Brussels 




Burford 




Burgessville . 




Burlington . 




Caledonia 


809.87 

283.83 

1,555.06 

1,776.51 

9,841.89 

124.60 

22,308.01 

614.57 

4,350.54 

1,748.02 
1,014.66 

609.46 
3,216.18 

810.04 

13,440.63 
1,453.43 
1,126.18 

22.289.22 
619.36 

808.43 
382.53 
318.80 
1,192.85 
457.85 

308.91 

2,077.32 

2,394.23 

467.84 ■ 

871.86 

2,611.97 

560.48 

243.38 

1,520.82 

5,127.92 




Campbell ville 




Cannington 




Cardinal 




Carleton Place 




Cavuga 




Chatham 




Chatsworth • 




Chesley 




Chesterville 




Chippawa 




Clifford 




Clinton 




Cobden ' 




Cobourg 




Colborne 




Coldwater 




Collingwood 




Comber 








Cottam 








Creemore 












Delhi 








Dorchester 




Drayton 








Drumbo 




Dublin 




Dundalk 













1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



157 



SYSTEM 

Eastern Ontario Divisions 



S.O.— CREDIT OR CHARGE 



power supplied to it to October 31, 1944, the cash receipts and payments thereon 
or Charged to each Municipality in respect of power supplied in the year 
as a Credit or Charge to each Municipality at October 31, 1945 



Cash receipts and payments 

on account of such credits 

and charges, also adjustments 

made during the year 



Credited 



Charged 



$ c. 

2,469.18 

18,331.81 

836.44 

992.68 

261.11 



809.87 
. 283.83 
1,555.06 
1,776.51 

9,841.89 

124.60 

22,308.01 

614.57 

4,350.54 

1,748.02 
1,014.66 

609.46 
3,216.18 

810.04 

13,440.63 
1,453.43 
1,126.18 

22,289.22 
619.36 

808.43 
382.53 
318.80 
1,192.85 
457.85 

308.91 

2,077.32 

2,394.23 

467.84 

871.86 

2,611.97 

560.48 

243.38 

1,520.82 

5,127.92 



Net amount credited or charged 
upon annual adjustment in 
respect of power supplied in 

the year ended October 31, 1945 



Credited 



$ c. 

1,817.61 

13,596.89 

761-62 

882.65 

63.58 

1,963.22 

977.52 

44.53 

1,332.69 

1,329.88 

7,895.69 

574.93 

19,605.88 

640.80 

3,588.34 

954.09 
975.35 
101.93 
2,434.13 
942.86 

7,345.09 

1,090.28 

1,492.13 

14,836.02 

945.67 

652.27 

528.13 

50.68 

1,281.18 

479.16 

268.90 

2,489.98 

1,556.12 

696.59 

153.43 

2,259.81 

299.12 

249.79 

1,206.42 

5,206.60 



Charged 



$ 



Accumulated amount 
standing as a credit 
or charge on 
October 31, 1945 



Credit 



1,817.61 


13,596.89 


761.62 


882.65 


63.58 


1,963.22 


977.52 


44.53 


1,332.69 


1,329.88 


7,895.69 


574.93 


19,605.88 


640.80 


3,588.34 


954.09 


975.35 


101.93 


2,434.13 


942.86 


7,345.09 


1,090.28 


1,492.13 


14,836.02 


945.67 


652.27 


528.13 


50.68 


1,281.18 


.479.16 


268.90 


2,489.98 


1,556.12 


696.59 


153.43 


2,259.81 


299.12 


249.79 


1,206.42 


5,206.60 



Charge 



$ 



7— H.E. 



158 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay and 

Statement showing the net Credit or Charge to each Municipality in respect of 

and adjustments made during the year. Also the net amount Credited 

ended October 31, 1945, and the accumulated amount standing 



Municipality 


Date 

commenced 

operating 


Net credit or charge at 
October 31, 1944 




Credit 


Charge 


Dunnville 


June 1918 
Dec. 1915 
Sept. 1915 
July 1925 
Nov. 1913 

June 1913 
April 1918 
Nov. 1914 
Jan. 1915 
July 1924 

July 1925 
Nov. 1923 
Aug. 1917 
June 1916 
Nov. 1914 

Feb. 1928 
Dec. 1915 
June 1926 
Mar. 1917 
Jan. 1938 

May 1911 
Sept. 1913* 
Aug. 1920 
Feb. 1914 
Dec. 1916 

July 1916 
Nov. 1915 
Jan. 1942 
Dec. 1910 
Sept. 1913 

Feb. 1911 
Sept. 1916 
July 1916 
Nov. 1923 
June 1931 

Feb. 1921 
Jan. 1917 
Feb. 1911 
Dec. 1916 
May 1916 


$ c. 
2,017.01 
3,249.06 
928.55 
44,764.17 
6,517.12 

1,101.26 
328.33 

1,866.47 
918.50 
904.74 

121.01 

2,633.84 

16,905.13 

3,154.79 

5,226.41 

659.63 

562.75 

898.45 

3,073.55 

25,030.04 

24,089.59 
7,847.82 
1,108.28 
7,809.53 
1,260.99 

347.04 

2,685.50 

1,757.84 

18,817.03 

1,164.32 

279,308.16 

9,914.19 

1,956.97 

2,862.57 

955.45 

962.13 
861.99 
6,852.23 
465.05 
169.59 


$ c. 


Durham . . 




Dutton 




East York Township 




Elmira 




Elmvale 




Elmwood 




Elora 




Embro 




Erieau 




Erie Beach 




Essex 




Etobicoke Township 




Exeter 




Fergus 




Finch 




Flesherton 




Fonthill 




Forest 




Forest Hill 




Gait 




Georgetown 




Glencoe 




Goderich 




Grand Valley 




Granton 




Gravenhurst 




Grimsby 




Guelph 




Hagersville 




Hamilton 




Hanover 




Harriston 




Harrow 




Hastings 




Havelock 




Hensall 




Hespeler 




Highgate 




Holstein 












1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



159 



SYSTEM 

Eastern Ontario Divisions 



S.O.— CREDIT OR CHARGE 



power supplied to it to October 31, 1944, the cash receipts and payments thereon 
or Charged to each Municipality in respect of power supplied in the year 
as a Credit or Charge to each Municipality at October 31, 1945 



Cash receipts and payments 

on account of such credits 

and charges, also adjustments 

made during the year 



Credited 



Net amount credited or charged 
upon annual adjustment in 
respect of power supplied in 

the year ended October 31, 1945 



Charged 


Credited 


$ c. 


$ c. 


2,017.01 


2,558.49 


3,249.06 


2,350.28 


928.55 


1,096.10 


44,764.17 


30,172.45 


6,517.12 


6,422.81 


1,101.26 


862.96 


328.33 


104.72 


1,866.47 


1,468.81 


91S. 50 


394.56 


904.74 


952.38 


121.01 


10.15 


2,633.84 


2,475.04 


16,905.13 


15,928.74 


3,154.79 


2,472.85 


5,226.41 


2,967.01 


659.63 


643.53 


562.75 


596.28 


898.45 


870.35 


3,073.55 


4,397.91 


25,030.04 


12,060.39 


24,089.59 


7,342.41 


7,847.82 


7,167.26 


1,108.28 


409.15 


7,809.53 


6,105.75 


1,260.99 


875.10 


347.04 


381.98 


2,685.50 


4,064.76 


1,757.84 


1,902.25 


18,817.03 


13,683.94 


1,164.32 


2,017.01 


279,308.16 


55,430.60 


9,914.19 


7,634.36 


1,956.97 


1,240.98 


2,862.57 


3,225.43 


955.45 


648.97 


962.13 


404.58 


861.99 


531.10 


6,852.23 


5,790.42 


465.05 


435.86 


169.59 


24.61 



Charged 



Accumulated amount 
standing as a credit 
or charge on 
October 31, 1945 



Credit 



$ c. 
2,558.49 
2,350.28 
1,096.10 

30,172.45 
6,422.81 

862.96 
104.72 
1,468.81 
394.56 
952.38 

10.15 

2,475.04 

15,928.74 

2,472.85 

2,967.01 

643.53 

596.28 

870.35 

4,397.91 

12,060.39 

7,342.41 
7,167.26 

409.15 
6,105.75 

875.10 

381.98 

4,064.76 

1,902.25 

13,683.94 

2,017.01 

55,430.60 

7,634.36 

1,240.98 

3,225.43 

648.97 

404.58 

531.10 

5,790.42 

435.86 

24.61 



Charge 



$ c. 



160 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay and 

Statement showing the net Credit or Charge to each Municipality in respect of 

and adjustments made during the year. Also the net amount Credited 

ended October 31, 1945, and the accumulated amount standing 



Municipality 



Humberstone 

Huntsville 

Ingersoll 

Iroquois 

Jarvis 

Kemptville 

Kincardine 

Kingston 

Kingsville 

Kirkfield 

Kitchener 

Lakefield 

Lambeth 

Lanark 

Lancaster 

LaSalle 

Leamington 

Lindsay 

Listowel 

London 

London Township 
Long Branch .... 

Lucan 

Lucknow 

Lynden 

Madoc 

Markdale 

Markham 

Marmora 

Martintown 

Maxville 

Meaford 

Merlin 

Merritton 

Midland 

Mildmay 

Millbrook 

Milton 

Milverton 

Mimico 



Date 

commenced 

operating 



Oct. 1924 

Sept. 1916 

May 1911 

Feb. 1940 

Feb. 1924 

Dec. 1921 

Mar. 1921 

Nov. 1937 

Nov. 1923 

June 1920 

Jan. 1911 

Aug. 1920 

April 1915 

Sept. 1921 

May 1921 

Nov. 1925 

Nov. 1923 

Mar. 1928 

June 1916 

Jan. 1911 



Net credit or charge at 
October 31, 1944 



Credit 



$ c. 
1,165.46 
1,474.30 
9,272.55 
1,336.25 
515.49 

2,203.80 

6,607.24 

91,967.85 

2,760.24 

193.83 

57,796.66 

2,670.64 

523.29 

437.75 

330.29 

1.304.73 

7,521.63 

19,150.79 

4,880.85 

56,415.44 



Jan. 


1925 


2,095.74 


Jan. 


1931 


3,905.50 


Feb. 


1915 


801.49 


Jan. 


1921 


4,526.69 


Nov. 


1915 


559.96 


Jan. 


1930 


1,674.50 


Mar. 


1916 


1,262.78 


April 


1920 


1,483.47 


Jan. 


1921 


776.61 


May 


1921 


324.83 


Feb. 


1921 


832.83 


Jan. 


1924 


5,875.97 


Dec. 


1922 


411.49 


Nov. 


1920 


19,070.81 


July 


1911 


33,015.39 


Dec. 


1932 


1,269.10 


Dec. 


1938 


545.16 


April 


1913 


6,290.82 


June 


1916 


1,061.10 


May 


1912 


5,223.35 



Charge 






1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



161 



SYSTEM 



S.O.— CREDIT OR CHARGE 



Eastern Ontario Divisions 

power supplied to it to October 31, 1944, the cash receipts and payments thereon 
or Charged to each Municipality in respect of power supplied in the year 
as a Credit or Charge to each Municipality at October 31, 1945 



Cash receipts and payments 

on account of such credits 

and charges, also adjustments 

made during the year 


Net amount credited or charged 
upon annual adjustment in 
respect of power supplied in 

the year ended October 31, 1945 


Accumulated amount 
standing as a credit 
or charge on 
October 31, 1945 


Credited 


Charged 


Credited 


Charged 


Credit 


Charge 


$ c. 


$ c. 
1,165.46 
1,474.30 
9,272.55 
1,336.25 
515.49 

2,203.80 

6,607.24 

91,967.85 

2,760.24 

193.83 

57,796.66 

2,670.64 

523.29 

437.75 

330.29 

1,304.73 
7,521.63 

19,150.79 
4,880.85 

56,415.44 

2,095.74 
3,905.50 

801.49 
4,526.69 

559.96 

1,674.50 

1,262.78 

1,483.47 

776.61 

324.83 

832.83 
5,875.97 

411.49 
19,070.81 
33,015.39 

1,269.10 
545.16 
6,290.82 
1,061.10 
5,223.35 


$ c. 

820.82 
3,264.16 
6,893.27 
1,171.77 

103.87 

124.02 

5,219.72 

44,192.22 

3,392.05 

24.55 

33,743.98 

589.41 

437.53 

21.46 

65.21 

1,411.72 
8,464.26 
9,026.15 
4,546.22 
39,236.56 

1,515.12 
3,480.49 

884.12 
2,360.79 

617.37 

1,222.78 

1,143.30 

1,317.18 

689.07 

328.29 

285.22 
4,891.95 

396.13 

9,791,55 

22,613.10 

884.30 
313.33 

6,094.48 
1,084.18 
4,833.56 


$ c. 


$ c 

820.62 

3,264.16 

6,893.27 

1,171.77 

103.87 

124.02 

5,219.72 

44,192.22 

3,392.05 

24.55 

33,743.98 

589.41 

437.53 

21.46 

65.21 

1,411.72 
8,464.26 
9,026.15 
4,546.22 
39,236.56 

1,515.12 
3,480.49 

884.12 
2,360.79 

617.37 

1,222.78 

1,143.30 

1,317.18 

689.07 

328.29 

285.22 
4,891.95 

396.13 

9,791. 5£ 

22,613.10 

884.30 

313.33 

6,094.48 

1,084.18 

4,833.56 


$ c. 





























































































































































































































































162 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay and 

Statement showing the net Credit or Charge to each Municipality in respect of 

and adjustments made during the year. Also the net amount Credited 

ended October 31, 1945, and the accumulated amount standing 



Municipality 



Mitchell... 

Moorefield 

Morrispurg 

Mount Brydges 

Mount Forest 

Napanee 

Neustadt 

Newbury 

Newcastle 

New Hamburg 

Newmarket 

New Toronto 

Niagara Falls 

Niagara-on-the-Lake . . 
North York Township 

Norwich 

Norwood 

Oil Springs 

Omemee 

Orangeville 

Orono 

Oshawa 

Ottawa 

Otterville 

Owen Sound 

Paisley 

Palmerston 

Paris 

Parkhill 

Penetanguishene 

Perth 

Peterborough 

Petrolia 

Picton 

Plattsville 

Point Edward 

Port Colborne 

Port Credit 

Port Dalhousie 

Port Dover 



Date 

commenced 

operating 



Sept. 1911 

Mar. 1918 

June 1938 

Mar. 1915 

Dec. 1915 

Nov. 1929 

Dec. 1918 

Mar. 1921 

Jan. 1937 

Mar. 1911 

April 1945 

Feb. 1914 

Dec. 1915 

Aug. 1919 

Nov. 1923 

May 1912 

Feb. 1921 

Feb. 1918 

Jan. 1940 

July 1916 

Nov. 1938 

Feb. 1929 

Jan. 1914 

Feb. 1916 

Dec. 1915 

Sept. 1923 

July 1916 

Feb. 1914 

May 1920 

July 1911 

Feb. 1919 

Mar. 1913 

May 1916 

April 1919 

Dec. 1914 

Nov. 1916 

Mar. 1920 

Aug. 1912 

Nov. 1912 

Dec. 1921 



Net credit or charge at 
October 31, 1944 



Credit 



$ c. 
3,054.32 

346.82 
1,876.08 

324.20 
4,140.27 

7,937.83 
434.62 
212.66 
906.86 

2,676.83 



26,357.80 

20,607.86 

2,431.86 

43,517.24 

1,861.70 
1,043.33 
831.97 
1,129.50 
6,601.68 

446.07 

105,819.89 

52,451.00 

549.96 
42,986.59 

904.38 
1,534.04 
4,854.50 
1,142.59 
7,221.62 

10,123.22 

66,249.54 

5,780.10 

8,151.98 

818.67 

7,440.20 
4,182.69 
4,278.45 
3,931.14 
2,160.98 



Charge 



$ 






1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



163 



SYSTEM 

Eastern Ontario Divisions 



S.O.— CREDIT OR CHARGE 



power supplied to it to October 31, 1944, the cash receipts and payments thereon 
or Charged to each Municipality in respect of power supplied in the year 
as a Credit or Charge to each Municipality at October 31, 1945 



Cash receipts and payments 

on account of such credits 

and charges, also adjustments 

made during the year 



Credited 



Charged 



$ c. 
3,054.32 

346.82 
1,876.08 

324.20 
4,140.27 

7,937.83 
434.62 
212.66 
906.86 

2,676.83 



26.357,80 

20,607.86 

2,431.86 

43,517.24 

1,861.70 
1,043.33 
831.97 
1,129.50 
6,601.68 

446.07 

105,819.89 

52,451.00 

549.56 
42,986.59 

904.38 
1,534.04 
4,854.50 
1,142.59 
7,221.62 

10,123.22 

66,249.54 

5,780.10 

8,151.98 

818.67 

7,440.20 
4,182.69 
4,278.45 
3,931.14 
2,160.98 



Net amount credited or charged 
upon annual adjustment in 
respect of power supplied in 

the year ended October 31, 1945 



Credited 



$ c. 
2,239.80 
54.76 
1,505.21 
335.88 
3,975.27 

4,608.32 

307.01 

22.25 

540.16 

1,959.85 

3,774.27 
8,590.47 

10,664.81 
2,275.57 

23,178.59 

1,719.02 
405.50 

1,044.64 
888.45 

6,722.42 

570.82 
50,942.55 
54,763.89 

311.80 
32,343.55 

869.90 
1,874.68 
1,995.76 

875.66 
5,962.45 

5,228.47 

35,268.48 

5,534.07 

6,028.91 

631.01 

7,624.36 
2,751.75 
2,751.37 
2,608.89 
1,428.89 



Charged 



Accumulated amount 
standing as a credit 
or charge on 
October 31, 1945 



Credit 



$ c. 
2,239.80 
54.76 
1,505.21 
335.88 
3,975.27 

4,608.32 

307.01 

22.25 

540.16 

1,959.85 

3,774.27 
8,590.47 

10,664.81 
2,275.57 

23,178.59 

1,719.02 
405.50 

1,044.64 
888.45 

6,722.42 

570.82 
50,942.55 
54,763.89 

311.80 
32,343.55 

869.90 
1,874.68 
1,995.76 

875.66 
5,962.45 

5,228.47 

35,268.418 

5,534.07 

6,028.91 

631.01 

7,624.36 
2,751.75 
2,751.37 
2,608.89 
1,428.89 



Charge 



$ c. 



164 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay and 

Statement showing the net Credit or Charge to each Municipality in respect of 

and adjustments made during the year. Also the net amount Credited 

ended October 31, 1945, and the accumulated amount standing 



Municipality 


Date 

commenced 

operating 


Net credit or charge at 
October 31, 1944 




Credit 


Charge 


Port Elgin. 


Mar. 1931 
Nov. 1929 
Jan. 1915 
Sept. 1922 
Nov. 1926 

April 1912 
Dec. 1913 
Jan. 1911 
Mar. 1920 
Jan. 1915 

Mar. 1921 
Dec. 1944 
Aug. 1928 
June 1925 
Dec. 1915 

Jan. 1921 
Nov. 1922 
Sept. 1913 
Feb. 1917 
July 1931 

Feb. 1926 
April 1914 
Nov. 1922 
Sept. 1915 
Sept. 1917 

May 1911 
April 1911 
Dec. 1916 
Aug. 1918 
Nov. 1911 

July 1916 
Aug. 1915 
Sept. 1918 
Nov. 1940 
Feb. 1931 


$ c. 
3,735.29 
14,435.26 

785.50 
2,055.33 

583.76 

2,317.11 

5,999.00 

10,152.95 

80.00 

769.26 

346.52 


$ c. 


Port Hope 




Port McNicoll 




Port Perry 




Port Rowan 




Port Stanlev 




Prescott 




Preston 




Priceville 




Princeton 




Queenston. 




Renfrew 


- 


Richmond 


461.37 
1,011.44 
2,266.82 

956.53 
5,417.91 
573.93 
667.36 
269.44 

450.25 

50,116.74 

496.28 

942.42 

1,333.38 

5,951.55 

2,113.53 

37,174.43 

14,512.64 

4,207.96 

2,061.35 

6,180.24 

13,126.74 

832 . 27 

4,170.26 




Richmond hill 




Ridgetown 




Ripley 




Riverside 




Rockwood 




Rodney 




Rosseau 




Russell 




St. Catharines 




St. Clair Beach 




St. George . . 




St. Jacobs ; 




St. Marys 




St. Thomas 




Sarnia 




Scarborough Township 




Seaforth 




Shelburne 




Simcoe 








Smith ville 




Southampton 









1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



165 



SYSTEM 



S.O.-CREDIT OR CHARGE 



Eastern Ontario Divisions 

power supplied to it to October 31, 1944, the cash receipts and payments thereon 
or Charged to each Municipality in respect of power supplied in the year 
as a Credit or Charge to each Municipality at October 31, 1945 



Cash receipts and payments 

on account of such credits 

and charges, also adjustments 

made during the year 


Net amount credited or charged 
upon annual adjustment in 
respect of power supplied in 

the year ended October 31, 1945 


Accumulated amount 
standing as a credit 
or charge on 
October 31, 1945 


Credited 


Charged 


Credited 


Charged 


Credit 


Charge 


$ c. 


$ c. 
3,735.29 
14,435.26 

785.50 
2,055.33 

583.76 

2,317.11 

5,999.00 

10,152.95 

80.00 

769.26 

346.52 


$ c. 
3,183.68 
5,996.50 
774.69 
2,932.08 
27.00 

2,809.48 

4,845.71 

5,483.33 

61.02 

556.14 

252.69 
407.58 
383.61 
301.02 
2,348.89 

107.57 

5,679.52 

287.66 

304.77 

27.70 

320.42 
11,361.00 

563.62 
1,044.53 
1,507.10 

5,322.17 

6,226.28 

19,337.19 

11,662.70 

3,599.25 

2,004.04 
5,520. 14 
9,189.55 
691.23 
3,379.28 


$ c. 


$ c. 
3,183.68 
5,996.50 
774.69 
2,932.08 
27.00 

2,809.48 

4,845.71 

5,483.33 

61.02 

556.14 

252.69 
407.58 
383.61 
301.02 
2,348.89 

107.57 

5,679.52 

287.66 

304.77 

27.70 

320.42 

11,361.00 

563.62 

1,044.53 

1,507.10 

5,322.17 

6,226.28 

19,337.19 

11,662.70 

3,599.25 

2,004.04 
5,520.14 
9,189.55 
691.23 
3,379.28 


$ c. 





































































461.37 
1,011.44 
2,266.82 

956.53 
5,417.91 
573.93 
667.36 
269.44 

450.25 

50,116.74 

496.28 

942.42 

1,333.38 

5,951.55 

3,245.15 

37,174.43 

15,975.89 

4,207.96 

2,061.35 

6,180.24 

13,126.74 

832.27 

4,170.26 


























































































1,131.62 












1,463.25 





















































166 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO 

Embracing Niagara, Georgian Bay and 

Statement showing the net Credit or Charge to each Municipality in respect of 

and adjustments made during the year. Also the net amount Credited 

ended October 31, 1945, and the accumulated amount standing 



Municipality 


Date 

commenced 

operating 


Net credit or charge at 
October 31, 1944 




Credit 


Charge 


Spring ville 


Aug. 1917 
Nov. 1916 
Oct. 1913 
Jan. 1930 
Sept. 1923 

Jan. 1911 
Dec. 1914 
Dec. 1934 
Nov. 1914 
Aug. 1923 

Oct. 1937 
Feb. 1918 
Nov. 1916 
Nov. 1922 
Dec. 1920 

Feb. 1914 
Oct. 1915 
May 1922 
Sept. 1944 
Mar. 1914 

Nov. 1918 
Jan. 1921 
April 1915 
Aug. 1911 
June 1911 

Aug. 1913 
Oct. 1918 
Nov. 1936 
Nov. 1936 
Sept. 1931 

Dec. 1930 
Sept. 1922 
July 1914 
Feb. 1931 
Feb. 1915 


$ c. 

297.48 
5,928.82 
2,186.13 
1,658.87 
1,639.71 

16,985.19 

6,450.01 

921.08 

583.12 

1,544.22 

10,885.24 

891.13 

2,269.02 

1,761.78 

1,289.62 

1,075.56 
939.87 
803.63 


$ c. 


Stamford Township 




Stayner 




Stirling 




Stouffville 




Stratford 




Strathroy • . • 




Streetsville 




Sunderland 




Sutton 




Swansea 




Tara ' 


- 


Tavistock 




Tecumseh 




Teeswater 




Thamesford 




Thamesville 




Thedford 




Thornbury 




Thorndale 


514.35 




Thornton 


264.66 

8,166.18 

6,801.81 

6,258.01 

716,501.97 

12,781.44 
803.41 
791.70 
221.48 

25,365.59 

2,135.46 

2,648.85 

593.73 

7,593.56 

19,606.49 




Thorold 




Tilbury 




Tillsonburg 




Toronto 








Tottenham 




Trafalgar Twp. Area N,o. 1 




Trafalgar Twp. Area No. 2 












Uxbridge 








Walkerton 




Wallaceburg 












1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



167 



SY6TEM 



S.O.— CREDIT OR CHARGE 



Eastern Ontario Divisions 

power supplied to it to October 31, 1944, the cash receipts and payments thereon 
or Charged to each Municipality in respect of power supplied in the year 
as a Credit or Charge to each Municipality at October 31, 1945 



Cash receipts and payments 

on account of such credits 

and charges, also adjustments 

made during the year 


Net amount credited or charged 
upon annual adjustment in 
respect of power supplied in 

the year ended October 31, 1945 


Accumulated amount 
standing as a credit 
or charge on 
October 31, 1945 


Credited 


Charged 


Credited 


Charged 


Credit 


Charge 


$ c. 


$ c. 

297.48 
5,928.82 
2,186.13 
1,658.87 
1,639.71 

16,985.19 

6,450.01 

921.08 

583.12 

1,544.22 

10,885.24 

891.13 

2,269.02 

1,761.78 

1,289.62 

1,075.56 
939.87 
803.63 


$ c. 

296.54 
3,149.51 
1,953.20 
1,046.25 
1,354.17 

11,322.44 

3,948.95 

746.30 

346.31 

1,188.45 

4,139.64 
743.53 
1,407.08 
1,912.22 
1,107.44 

1,216.61 
967.41 
136.87 
592.03 
200.92 

188.12 

9,145.12 

6,259.53 

4,553.41 

364,212.27 

9,075.21 

114.60 

448.75 

338.30 

12,474.62 

1,683.89 

3,091.67 

454.60 

6,211.22 

23,442.56 


$ c. 


$ c. 

296.54 
3,149.51 
1,953.20 
1,046.25 
1,354.17 

11,322.44 

3,948.95 

746.30 

346.31 

1,188.45 

4,139.64 
743.53 
1,407.08 
1,912.22 
1,107.44 

1,216.61 
967.41 
136.87 
592.03 
200.92 

188.12 

9,145.12 

6,259.53 

4,553.41 

364,212.27 

9,075.21 

114.60 

448.75 

338.30 

12,474.62 

1,683.89 

3,091.67 

454.60 

6,211.22 

23,442.56 


$ c. 
















































































































514.35 

264.66 

8,166.18 

6,801.81 

6,258.01 

716,501.97 

12,781.44 
803.41 
791.70 
221.48 

25,365.59 

2,135.46 

2,648.85 

593.73 

7,593.56 

19,606.49 







































































































168 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 






SOUTHERN ONTARIO 



Embracing Niagara, Georgian Bay and 

Statement showing the net Credit or Charge to each Municipality in respect of 

and adjustments made during the year. Also the net amount Credited 

ended October 31, 1945, and the accumulated amount standing 



Municipality 


Date 

commenced 

operating 


Net credit or charge at 
October 31, 1944 




Credit 


Charge 


Wardsville 


June 1921 
Oct. 1923 
Nov. 1911 
April 1915 
Dec. 1910 

Sept. 1917 
Dec. 1914 
Sept. 1917 
Nov. 1916 
April 1919 

Jan. 1917 
Aug. 1911 
Nov. 1931 
Feb. 1924 
Jan. 1926 

May 1931 
April 1915 
Jan. 1914 
June 1930 
Oct. 1914 

Dec. 1920 
Dec. 1914 
Jan. 1911 
Nov. 1914 
Nov. 1916 

Jan. 1941 
Sept. 1917 
Sept. 1913 
Jan. 1927 


$ c. 

227.26 

385.25 

911.58 

1,601.09 

14,143.25 

2,281.83 
814.79 

7,113.71 
612.54 

1,801.32 

950.65 

9,125.95 

704.81 

992.28 

8,984.08 

1,845.90 
353.19 

2,120.90 

297.02 

154,331.93 

7,259.47 

2,616.72 

21,057.17 

574.56 

484.06 

82,579.89 

540.40 

1,271.26 

5,609.28 


$ c. 


Warkworth 




Waterdown 




Waterford 




Waterloo 




Watford 




Waubaushene 




Welland 




Wellesley 

Wellington. 

West Lome 








Weston 




Westport 

Wheatley 

Whitby 








Wiarton 




Williamsburg 




Winchester 




Windermere 




Windsor 




Wingham 




Woodbridge 




Woodstock 




Woodville 




Wyoming 








Zurich 








Toronto Transportation Commission 










3,043,169.00 












1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



169 



SYSTEM 

Eastern Ontario Divisions 



S.O.— CREDIT OR CHARGE 



power supplied to it to October 31, 1944, the cash receipts and payments thereon 
or Charged to each Municipality in respect of power supplied in the year 
as a Credit or Charge to each Municipality at October 31, 1945 



Cash receipts and payments 

on account of such credits 

and charges, also adjustments 

made during the year 


Net amount credited or charged 
upon annual adjustment in 
respect of power supplied in 

the year ended October 31, 1945 


• Accumulated amount 
standing as a credit 
or charge on 
October 31, 1945 


Credited 


Charged 


Credited 


Charged 


Credit 


Charge 


$ c. 


$ c. 

227.26 

385.25 

911.58 

1,601.09 

. 14,143.25 

2,281.83 
814.79 

7,113.71 
612.54 

1,801.32 

950.65 

9,125.95 

704.81 

992.28 

8,984.08 

1,845.90 

353.19 

2,120.90 

297.02 

154,331.93 

7,259.47 

2,616.72 

21,057.17 

574.56 

484.06 

82,579.89 

540.40 

1,271.26 

5,609.28 


$ c. 

36.94 

293.28 

694.42 

1,493.73 

9,394.49 

2,021.45 
575.36 
911.34 
421.03 

1,527.33 

1,223.63 

7,771.63 

116.90 

530.35 

4,222.22 

2,211.91 

416.98 

999.11 

29.80 

108,640.40 

6,371.69 

1,944.86 

22,179.85 

331.38 

643.42 

53,362.02 

557.80 

1,155.86 

5,480.06 


$ c. 


$ c. 

36.94 

293.28 

694.42 

1,493.73 

9,394.49 

2,021.45 
575.36 
911.34 
421.03 

1,527.33 

1,223.63 

7,771.63 

116.90 

530.35 

4,222.22 

2,211.91 

416.98 

999.11 

29.80 

108,640.40 

6,371.69 

1,944.86 

22,179.85 

331.38 

643.42 

53,362.02 

557.80 

1,155.86 

5,480.06 


$ c. 




















































































































































































2,594.87 


3,045,763.87 


1,797,094.60 


375.82 


1,797,094.60 


375.82 



170 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO SYSTEM S.O.— SINKING FUND 
Embracing Niagara, Georgian Bay and Eastern Ontario Divisions 
SINKING FUND 

Statement showing Sinking Fund paid by each Municipality in the periods mentioned 

hereunder, as part of the cost of power delivered thereto, together with the 

proportionate share of other sinking funds provided out of other revenues 

of the system; and interest allowed thereon to October 31, 1945 



Municipality 



Acton 

Agincourt 

Ailsa Craig 

Alexandria 

Alliston 

Almonte 

Alvinston 

Amherstburg 

Ancaster Township . 
Apple Hill 

Arkona 

Arnprior 

Arthur 

Athens 

Aurora 

Aylmer 

Ayr 

Baden 

Barrie 

Bath 

Beachville 

Beamsville 

Beaverton 

Beeton 

Belle River 

Belleville 

Blenheim 

Bloomf ield 

Blyth 

Bolton 

Bothwell 

Bowman ville 

Bradford 

Braeside 

Brampton 

Brantford 

Brantford Township 

Brechin 

Bridgeport 

Brigden 



Period of 
years ended 
Oct. 31, 1945 



28 years 

22 " 

25 " 

21 " 

22 " 

1 

22 " 

22 " 

22 " 

21 " 

19 " 

7 " 

24 " 
17 " 

3 " 

22 " 

26 " 
28 " 

27 " 
14 " 

28 " 
9 " 

26 " 

22 " 

23 " 

17 " 

25 " 

17 " 
22 " 
25 " 

25 " 
14 " 

22 " 

1 " 

29 " 

26 " 

22 " 
26 " 

18 " 

23 " 



Amount 



$ c. 
108,576.51 
17,095.45 
21,677.45 
42,065.95 
36,024.42 

576.46 

21,585.92 

82,598.43 

26,821.13 

4,844.51 

9,298.81 

17,413.36 

27,694.82 

9,784.72 

9,302.04 

66,526.27 

22,255.15 

47,251.55 

239,496.99 

3,368.02 

61,477.02 
10,669.19 
29,487.82 
22,249.52 
16,082.00 

281,704.20 

55,791.56 

9,620.90 

14,873.86 

25,449.49 

24,100.93 
105,562.03 

26,526.94 

424.08 

252,620.68 

1,397,841.42 
56,942.63 
10,492.16 
10,167.76 
16,688.68 



Municipality 



Brighton 

Brockville .... 

Brussels 

Burford 

Burgessville . . 

Burlington. . . 
Caledonia .... 
Campbellville. 
Cannington. . . 
Cardinal 

Carleton Place 

Cayuga 

Chatham 

Chats worth. . . 
Chesley 

Chesterville. . . 
Chippawa .... 

Clifford 

Clinton 

Cobden 

Cobourg 

Colborne 

Cold water. . . . 
Collingwood. . 
Comber 

Cookstown. . . 

Cottam 

Courtright.. . . 
Creemore. . . . 
Dashwood 

Delaware 

Delhi 

Deseronto 
Dorchester. . . 
Drayton 

Dresden 

Drumbo 

Dublin 

Dundalk 

Dundas 



Period of 
years ended 
Oct. 31, 1945 



16 years 

25 " 

22 " 

25 " 

24 " 

1 " 

28 " 

21 " 

26 " 

16 " 

21 " 

21 " 

25 " 

25 " 

24 " 

26 " 

24 " 

22 " 

26 " 

10 " 

14 " 

13 " 

27 " 
27 " 

25 " 

22 " 

19 " 

22 " 

26 " 

23 " 

25 " 
8 " 

15 " 

26 " 

22 " 

25 " 

26 " 

23 " 
25 " 
29 



Amount 



18,879.41 

262,853.15 

19,248.10 

20,463.41 

7,627.36 

3,111.84 
33,809.83 

4,110.07 
22,239.09 
10,285.38 

117,244.64 
14,820.62 

591,214.08 

6,875.44 

53,235.09 

37,050.07 
25,177.07 
11,133.14 
68,950.53 
3,362.84 

81,172.87 

7,788.55 

20,969.77 

203,439.59 

25,909.29 

8,130.78 

6,934.03 

8,292.92 

17,244.40 

12,470.13 

5,150.93 
13,101.16 
11,760.42 
11,234.72 
18,870.83 

47,120.61 
9,878.54 
8,089.83 

19,029.85 
210,587.45 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



171 



SOUTHERN ONTARIO SYSTEM 



S.O.— SINKING FUND 



Embracing Niagara, Georgian Bay and Eastern Ontario Divisions 
SINKING FUND 

Statement showing Sinking Fund paid by each Municipality in the periods mentioned 

hereunder, as part of the cost of power delivered thereto, together with the 

proportionate share of other sinking funds provided out of other revenues 

of the system, and interest allowed thereon to October 31, 1945 



Municipality 



Dunnville 

Durham 

Dutton 

East York Township, 
Elmira 



Elmvale. . 
Elm wood. 
Elora 
Embro. . . 
Erieau . . . 



Period of 
years ended 
Oct. 3 1,1945 



Erie Beach 

Essex 

Etobicoke Township 

Exeter 

Fergus 



Finch 

Flesherton. 
Fonthill... 
Forest. . . . 
Forest Hill 



Gait 

Georgetown. . 

Glencoe 

Goderich .... 
Grand Valley . 

Granton 

Gravenhurst . 

Grimsby 

Guelph 

Hagersville . . 



Hamilton . 
Hanover . 
Harriston. 
Harrow. . 
Hastings . 



Havelock. 
Hensall . . 
Hespeler . 
Highgate. 
Holstein. . 



23 years 

25 

25 

21 

27 

27, 
22 
26 
26 
22 

21 
22 
23 
24 
26 

18 
25 
20 
23 
22 

29 
27 
22 
26 
24 

24 
25 
4 
29 
27 

29 
24 
24 
22 
15 

17 
24 
29 
24 
24 



Amount 



95,275.44 

44,547.78 

28,748.91 

449,042.50 

.112,670.54 

21,166.32 
6,280.49 
53,490.66 
16,340.14 
10,586.66 

2,469.87 

48,286.40 

370,592.23 

63,358.97 

98,129.69 

6,857.80 

9,248.53 

10,422.59 

51,281.11 

298,266.01 

823,104.10 
157,088.95 

29,876.30 
181,816.16 

17,574.28 

11,396.47 

49,063.15 

8,675.55 

976,154.62 

110,208.77 

7,787,342.91 

119,146.41 

50,071.92 

40,311.74 

6,226.90 

17,432.98 

24,561.07 

179,448.30 

13,766.77 

3,830.53 



Municipality 



Humberstone . 
Huntsville. . . 
Ingersoll .... 

Iroquois 

Jarvis 



Kemptville 
Kincardine . 
Kingston. . 
Kingsville . 
Kirkfield.. 



Kitchener 
Lakefield. 
Lambeth . 
Lanark. . . 
Lancaster . 



LaSalle. . . . 
Leamington . 
Lindsay. . . . 
Listowel. . . . 
London .... 



London Township . 

Long Branch 

L|ican 

Lucknow 

Lynden 



Madoc 

Markdale. . 
Markham. . 
Marmora. . . 
Martintown 



Maxville . 
Meaford. . 
Merlin . . . 
Merritton 
Midland. . 



Mildmay . 
Millbrook 
Milton. . . 
Milverton 
Mimico. . 



Period of 
years ended 
Oct. 3 1,1945 



22 years 

24 " 
29 " 

6 " 
22 " 

21 

21' " 

8 " 

22 " 
21 

29 " 

17 " 

25 " 
21 " 

21 " 

20 " 

22 " 
17 " 

24 " 
29 " 

21 

15 "' 

25 " 
21 

25 " 

16 " 
24 " 
22 " 

17 " 

21 " 

21 " 

21 •" 
22 

24 " 

27 " 

13 " 

7 " 

27 " 
24 " 

28 " 



Amount 



$ c. 
33,627.48 
89,916.53 
273,372.05 
3,220.78 
22,443.30 

30,424.25 

64,724.56 

225,931.62 

61,425.22 

4,595.89 

1,963,869.78 

20,286.19 

14,288.81 

9,136.30 

8,592.30 

21,461.11 

137,253.63 

159,931.98 

118,686.41 

3,568,695.09 

33,222.35 
48,147.63 
25,938.50 
30,666.95 
18,168.86 

12,527.42 

15,285.42 

29,374.59 

8,799.93 

3,087.48 

13,759.74 

47,346.67 

16,211.00 

300,379.83 

323,307.88 

6,090.54 
2,006.48 

144,676.33 
59,212.62 

208,296.05 



172 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



SOUTHERN ONTARIO SYSTEM S.O.— SINKING FU\ T D 
Embracing Niagara, Georgian Bay and Eastern Ontario Divisions 
SINKING FUND 

Statement showing Sinking Fund paid by each Municipality in the periods mentioned 

hereunder, as part of the cost of power delivered thereto, together with the 

proportionate share of other sinking funds provided out of other revenues 

of the system, and interest allowed thereon to October 31, 1945 



Municipality 



Mitchell 

Mooref ield 

Morrisburg 

Mount Brydges 

Mount Forest 

Napanee 

Neustadt 

Newbury 

Newcastle 

New Hamburg 

Newmarket 

New Toronto 

Niagara Falls 

Niagara-on-the-Lake 
North York Township 

Norwich 

Norwood 

Oil Springs 

Omemee 

Orangeville 

Orono 

Oshawa 

Ottawa 

Otterville 

Owen Sound 

Paisley 

Palmerston 

Paris 

Parkhill 

Penetanguishene .... 

Perth 

Peterborough 

Petrolia 

Picton 

Plattsville 

Point Edward 

Port Colborne 

Port Credit 

Port Dalhousie 

Port Dover 



Period of 
years ended 
Oct.31,1945 



29 years 
22 
8 
25 
25 

16 
22 
22 
9 
29 

1 
26 
25 
22 

22 

28 

17 

22 

6 

24 

7 
17 
30 
24 
25 

21 
24 
26 
22 
29 

21 
17 
24 
17 
26 

23 
24 
28 
24 
22 



Amount 



$ c. 
65,554.34 
8,865.11 
4,912.48 
11,072.05 
49,103.00 

65,618.22 
8,715.92 
6,221.50 
4,433.69 

70,114.57 

2,665.15 

707,943.24 

806,229.74 

48,056.91 

304,381.95 

51,761.00 
9,122.15 

33,953.24 
3,094.14 

66,932.91 

2,139.58 

847,523.30 

363,690.62 

12,801.17 

332,313.06 

16,026.27 
63,035.14 
163,053.06 
27,939.79 
91,967.97 

104,273.63 

505,787.84 

144,101.49 

81,956.92 

13,557.02 

97,246.03 
146,480.90 
61,802.90 
56,226.52 
39,677.28 



Municipality 



Port Elgin 

Port Hope 

PortMcNicoll 

Port Perry 

Port Rowan 

Port Stanley 

Prescott 

Preston 

Priceville 

Princeton 

Queenston 

Renfrew 

Richmond 

Richmond Hill 

Ridgetown 

Ripley 

Riverside 

Rockwood. 

Rodney 

Rosseau 

Russell 

St. Catharines 

St. Clair Beach 

St. George 

St. Jacobs 

St. Marys 

St. Thomas 

Sarnia 

Scarborough Twp, . . 
Seaforth 

Shelburne 

Simcoe 

Smiths Falls 

Smith ville 

Southampton 

Springfield 

Stamford Township 

Stayner 

Stirling , 

Stouff ville 



Period of 
years ended 
Oct.31,1945 



15 vears 

16 * " 
26 " 
21 

19 " 

28 " 
26 " 

29 " 

21 " 

26 " 

22 " 
1 

18 " 

21 " 
25 " 

21 

23 " 
27 

23 
15 

20 " 

24 " 

23 " 
25 

23 

29 " 

29 " 

24 " 

22 " 
29 

24 " 

25 " 

22 " 
5 " 

15 "■ 

23 " 

24 " 

27 " 

16 " 
22 " 



Amount 



21,939.79 
97,110.60 
9,133.17 
26,682.54 
10,293.74 

59,638.95 

74,955.69 

370,506.68 

1,374.56 

14,038.64 

10,005.74 

433.19 

4,840.84 

31,099.61 

61,501.36 

11,894.97 

118,698.43 

15,909.62 

19,596.98 

5,570.57 

8,145.00 

1,035,940.22 

9,982.89 

20,052.65 

24,548.74 

185,826.64 
710,710.04 
908,450.66 
292,323.09 
87,031.49 

27,730.34 

166,913.05 

152,362.30 

2,582.67 

20,658.81 

12,594.79 
145,578.78 
24,689.96 
13,645.92 
25,365.36 



1-946 



THE HYDRO-ELECTRIC POWER COMMISSION 



173 



SOUTHERN ONTARIO SYSTEM 



S.O— SINKING FUND 



Embracing Niagara, Georgian Bay and Eastern Ontario Divisions 

SINKING FUND 

Statement showing Sinking Fund paid by each Municipality in the periods mentioned 

hereunder, as part of the cost of power delivered thereto, together with the 

proportionate share of other sinking funds provided out of other revenues 

of the system, and interest allowed thereon to October 31, 1945 



Municipality 



Stratford 

Strathroy 

Streetsville 

Sunderland 

Sutton 

Swansea 

Tara 

Tavistock 

Tecumseh 

Teeswater 

Thamesford 

Thamesville 

Thedford 

Thornbury 

Thorndale 

Thornton 

Thorold 

Tilbury 

Tillsonburg 

Toronto. 

Toronto Township. . . 

Tottenham 

Trafalgar Twp., Area 

No. 1 

Trafalgar Twp., Area 

No. 2 

Trenton 

Tweed 

Uxbridge 

Victoria Harbour 

Walkerton 

Wallaceburg 

Wardsville 

Warkworth 

Waterdown 

Waterford 

Waterloo 



Period of 
years ended 
Oct.31,.1945 



29 years 

26 " 
11 

26 " 

22 " 

20 " 

22 " 

24 " 

23 " 

21 " 

26 " 

25 " 

22 " 
1 

26 " 

22 
23 

25 " 

29 " 

29 " 

27 " 
22 



9 
14 

15 
21 
26 
15 
25 

22 
17 
29 
25 
29 



Amount 



$ c. 

836,581.19 

129,460.33 

5,972.20 

14,223.65 

25,279.00 

136,042.70 
12,341.36 
65,448.63 
38,484.30 
18,015.03 

24,499.11 
24,735.44 
14,081.23 
159.50 
12,041.12 

4,792.72 

153,637.53 

75,938.57 

I 127,785.93 

27,314,558.46 

178,013.26 
15,614.68 

11,590.86 

4,218.68 
142,131.47 

15,790.60 

29,002.48 

9,239.53 

35,045.00 

284,691.25 

5,253.06 

5,860.76 

30,819.93 

46,033.43 

390,559.54 



Municipality- 



Watford 

Waubaushene. 

Welland 

Wellesley 

Wellington. . . 



West Lome. 
Weston. . . . 
Westport. . . 
Wheatley. . . 
Whitby.... 



Wiarton 

Williamsburg , 
Winchester. . 
Windermere . 
Windsor 



Wingham. . 
Woodbridge 
Woodstock . 
Woodville. . 
Wyoming. . 



York Township 

Zurich 

Ontario Reformatory 

Toronto Transporta- 
tion Commission. . . 

Sandwich, Winsdor & 
Amherstburg Rly. . 



Period of 
years ended 
Oct. 3 1,1945 



23 years 

26 " 

23 " 

24 " 
17 " 

24 " 

29 " 

14 

22 

17 " 

15 " 
25 

26 " 

16 " 
26 " 

21 " 

26 " 

29 " 

26 " 

24 " 

25 " 
23 

11 

24 " 
23 



Amount 



$ c. 
35,345.84 
6,860.21 
478,199.43 
22,058.52 
15,435.49 

34,450.28 

348,529.64 

8,175.00 

20,661.20 

78,526.49 

23,034.31 
8,897.95 

28,284.96 

3,861.40 

4,413,572.74 

57,088.97 
47,207.21 
596,424.96 
13,805.41 
11,618.04 

1,103,271.83 
18,784.37 
10,449.21 

226,334.99 

222,255.84 



Total Municipalities $74,316,236.42 

Total— Rural Power Dis- 
trict 6,914,855.82 



Grand Total , . .$81,231,092.24 



174 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

SOUTHERN ONTARIO SYSTEM 
Embracing Niagara, Georgian Bay and Eastern Ontario Divisions 

RURAL POWER DISTRICT 
Operating Account for the year ended October 31, 1945 

Revenue from customers in rural power district $5,878,120.05 

Cost of power as provided to be paid under Power Commission Act. .$2,568,249.74 

Cost of operation, maintenance and administration 1,495,703.47 

Interest 861,856.28 

Provision for renewals 411,565 . 70 

Provision for sinking fund 219,583 . 59 

5,556,958.78 

Balance $ 321,161.27 

Rates Suspense Account — as at October 31, 1945 

Balance at credit November 1, 1944 $2,705,225.47 

Interest on account balances 108,070. 91 

Operating balance for the year 321,161 . 27 

Adjustments made during the year $ 3,968. 46 

Balance at credit October 31, 1945 3,130,489. 19 

$3,134,457.65 $3,134,457.65 






1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



175 



SOUTHERN ONTARIO SYSTEM— Rural Lines 

Georgian Bay Division 

Statement showing Interest, Renewals, Contingencies and Obsolescence and Sinking 

Fund charged by the Commission to the Municipality that operates 

the rural line for the year ended October 31, 1945 















Total 














interest, 










Provision 




renewals, 




Capital 




Provision 


for con- 


Provision 


contingencies 


Operated by 


cost 


Interest 


for 


tingencies 


for 


and 








renewals 


and ob- 
solescence 


sinking 
fund 


obsolescence, 

and 

sinking fund 

charged 




$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


$ c. 


Brechin 


922.02 


48.22 


18.44 


9.22 


16.60 


92.48 



Statement showing the total Sinking Fund in respect of the line, together with 
interest allowed thereon to October 31, 1945 



Operated by 


Period of years 

ended 
October 31, 1945 


Amount 


Brechin 


27 years 


$ c. 
735.81 







176 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



THUNDER BAY 

Statement showing the amount chargeable (upon annual adjustment) to each 

it by the Commission; the amount billed by the Commission against 

or charged to each Municipality in respect of power 



Municipality 



Fort William. 
Nipigon Twp . 
Port Arthur . . 



Interim rates 

per horsepower 

collected by 

Commission 

during year 



To 
Dec. 31 

1944 



From 

Jan. 1, 

1945 



g c. $ c. 
21.00 20.00 
28.00 28.00 
21.00 20.00 



Totals — Municipalities 

Totals — Rural power district. . . 

Totals— Companies 

Totals — Rainy River district 

(N.O.P.) 

Totals — Mining area (mines).. . . 
Totals — Mining area (townsites). 



Non-operating capital. 
Grand Totals 



Share of 

capital cost 

of system 



2,864,647.85 

37,740.55 

4,160,866.47 



7,063,254.87 

177,015.15 

8,919,163.73 

2,882,659.25 

1,694,902.23 

280,886.13 



21,017,881.36 
38,575.45 



21,056,456.81 



Average 
horse- 
power 
supplied 
in year 
after 
correc- 
tion for 
power 
factor 



16,683.6 

243.8 

24,310.7 



41,238.1 

834.1 

52,959.4 

18,311.7 

6,067.5 

598.9 



120,009.7 



Share of operating 



Operating 
main- 
tenance 

and 
adminis- 
trative 
expenses 



$ c. 
56,093.53 

1,969.59 
81,351.30 



139,414.42 

3,445.19 

209,349.80 

52,394.73 
46,212.11 
20,212.21 



471,028.46 



Interest 



$ c. 
116,869.31 
1,520.12 
169,789.55 



288,178.98 

7,285.76 

359,389.04 

117,758.45 
71,170.79 
11,901.93 



855,684.95 



Provision 

for 
renewals 



$ c. 
24,008.81 
294.42 
34,783.90 



59,087.13 

1,687.69 

71,395.66 

22,540.66 

6,040. 19 

596.21 



161,347.54 



THUNDER BAY 



Statement showing the net Credit or Charge to each Municipality in respect of power 

made and interest added during the year; also the net amount Credited or Charged 

1945, and the accumulated amount standing as a Credit 



Municipality 


Date 

commenced 

operating 


Net credit or charge at 
October 31, 1944 




Credit 




Charge 


Fort William 


Oct. 1926 
Jan. 1925 
Dec. 1910 


$ c. 
34,889.56 

1,153.43 
52,777.73 




$ c. 


Township of Nipigon 






Port Arthur . 












Totals 




88,820.72 








• 


' 





1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



177 



SYSTEM 



T.B.—COST OF POWER 



Municipality as the Cost — under Power Commission Act — of Power supplied to 
each Municipality at interim rates, and the balance credited 
supplied to it in the year ended October 31, 1945 



costs and fixed charges 


Cost in 

excess of 

revenue 

from 

power 

sold to 

private 

companies 


Amount 
chargeable 
to each 
munici- 
pality in 
respect of 
power 
supplied 
to it in 
the year 


Amount 
billed 
against 

each 
munici- 
pality at 
interim 
rates 




Provision 
for 
contin- 
gencies 
and 
obso- 
lescence 


Provision 

for 

stabilization 

of rates 


Provision 
. for 
sinking 
fund 


Balance 
credited 
to each 
municipality 
Credited 


Debit 




$ c. 
79,431.12 


$ c. 


$ c. 
28,529.85 
373.93 
41,431.63 


$ c. 
7,131.17 
104.21 
10,391.28 


$ c. 
312,063.79 

5,404.20 
453,424.69 


$ c. 
336,765.49 

6,827.11 
490,402.98 


$ c. 
24,701.70 


1,141.93 




1,422.91 


115,677.03 




36,978.29 


196,250.08 




70,335.41 

1,768.40 

87,231.35 

28,582.47 

8,362.17 

825.40 


17,626.66 

356.52 

(17,983.18) 


770,892.68 

18,677.19 

961,802.08 

233,941.70 

175,800.51 

42,229.25 


• 833,995.58 

18,677.19 

961,802.08 

233,941.70 

175,800.51 

42,229.25 


63,102.90 


4,133.63 






252,419.41 




12,665.39 




82,680.23 


(38,664.98) 
(9,954.78) 






18,648.28 


























566,797.02 


(48,619.76) 


197,105.20 




2,203,343.41 


2,266,446.31 


63,102.90 









SYSTEM 



supplied to it to October 31, 1944, the cash receipts and payments thereon, adjustments 
to each Municipality in respect of power supplied in the year ended October 31, 
or Charge to each Municipality at October 31, 1945 



Cash receipts and payments 

on account of such credits 

and charges, also adjustments 

made during the year 


Net amount credited or charged 
upon annual adjustment in 
respect of power supplied in 

the year ended October 31, 1945 


Accumulated amount 

standing as a credit 

or charge on 

October 31, 1945 


Credited 


Charged 


Credited 


Charged 


Credit 


Charge 


$ c. 


$ c. 
34,889.56 
1,153.43 
52,777.73 


$ c. 
24,701.70 
1,422.91 
36,978.29 


$ c. 


$ c. 
24,701.70 
1,422.91 
36,978.29 


$ c. 


■ • 




















88,820.72 


63,102.90 




63,102.90 














178 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



THUNDER BAY SYSTEM 

SINKING FUND 

Statement showing Sinking Fund paid by each Municipality in the periods mentioned 
hereunder, as part of the cost of power delivered thereto, together with the pro- 
portionate share of other sinking funds provided out of other revenues of 
the system, and interest allowed thereon to October 31, 1945 



Municipality 


Period of years ended 
October 31, 1945 


Amount 


Fort William 


19 years 
19 years 
19 years 


$ c. 
1,171,934.65 


Township of Nipigon 


11,761.25 


Port Arthur 


3,155,534.36 






Total — Municipalities 


4,339,230.26 


Total — Rural power district 




53,354.35 








Grand total 


4,392,584.61 









THUNDER BAY SYSTEM 

RURAL POWER DISTRICT 

Operating Account for year ended October 31, 1945 

Revenue from customers in rural power district $54,332. 63 

Cost of power as provided to be paid under Power Commission Act $18,677. 19 

Cost of operation, maintenance and administration 22,200. 59 

Interest 11,480. 15 

Provision for renewals 5,292 . 45 

Provision for sinking fund 2,786. 47 

60,436.85 

Balance : ($6,104.22) 



Rates Suspense Account as at October 31, 1945 

Balance at debit, November 1, 1944 $11,226. 74 

Interest on account balances 452 . 64 

Operating balance for the year 6, 104 . 22 

Adjustments made during the year 119. 04 

Balance at debit, October 31, 1945 $17,902. 64 

$17,902.64 $17,902.64 

m 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 179 



NORTHERN ONTARIO PROPERTIES 
(Operated by The Hydro-Electric Power Commission of Ontario) 

FINANCIAL ACCOUNTS 

For the year ended October 31, 1945 

Relating to Power Properties which are held and operated by the 

Commission in trust for the Province of Ontario, and which 

are situated in the following Northern Districts: 

Abitibi Timiskaming Sudbury Nipissing 

Patricia Rainy River Rural Power 



STATEMENTS 

Balance Sheet as at October 31, 1945 

Operating Account for the year ended October 31, 1945 

Schedules supporting the Balance Sheet as at October 31, 1945 
Fixed Assets — By Districts 
Fixed Assets — Changes during year 
Renewals Reserve 

Contingencies and Obsolescence Reserve 
Sinking Fund Reserve 



180 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

THE HYDRO-ELECTRIC POWER 
NORTHERN ONTARIO 

Held and Operated by The Hydro-Electric Power 
BALANCE SHEET AS AT 

ASSETS 

Fixed Assets: 

Abitibi district $28,779,642 . 88 

Timiskaming district 12,560,799.00 

Sudbury district 4,383,743. 19 

Nipissing district 1,413,433.92 

Patricia district 4,439,474. 10 

Rainy River district 1,539,636.88 

Rural Power district 990,289. 74 






$54,107,019.71 
Less: Grants-in-aid of construction: 

Province of Ontario — for rural power district 453,247.92 



Current Assets: 

Employees' working funds. ' $ 14,345. 00 

The Hydro-Electric Power Commission of Ontario — current 

account 3,580,875.57 

Sundry accounts receivable 13,992 . 23 

Power accounts receivable 542,448. 71 

Interest accrued 15,234.38 

Consumers' deposits — securities: 

Bonds at par value $975,200.00 

Stocks at market value 229,392 . 50 

1,204,592.50 



$53,653,771.79 



Prepayments 87,500.45 



Inventories: 

Maintenance materials and supplies $ 307,012 . 33 

Maintenance tools and equipment 88,296. 63 



5,458,988.84 



395,308.96 



Deferred Assets: 

Work in progress — deferred work orders 201,766. 86 

Unamortized Discount on Debentures 95,873. 85 

Investments (Including sinking fund investment of $1,512,879.99) 

Investments in Province of Ontario bonds at amortized cost 1,591,938.93 



$ 61,397,649.23 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 181 

COMMISSION OF ONTARIO 
PROPERTIES 

Commission of Ontario in trust for the Province of Ontario 
OCTOBER 31, 1945 

LIABILITIES AND RESERVES 

Long Term Liabilities (at par of exchange) : 

Funded debt in the hands of the public $ 31,973,200.00 

Advances from the Province of Ontario for capital purposes 5,576,436.46 

Purchase agreements 6,013. 36 

$ 37,555,649.82 



Current Liabilities: 

Power accounts — credit balances $ 2,467. 02 

Consumers' deposits 1,357,886 . 22 

Debenture interest accrued . . ' 175,205 . 66 

Miscellaneous accruals 24,932 . 50 



1,560,491.40 



Reserves: 



Renewals. $ 4,624,236. 40 

Contingencies and obsolescence 3,315,100.61 

Miscellaneous 284,499. 76 



8,223,836.77 



Sinking Fund Reserves: 

Represented by: 

Funded debt and provincial advances retired through sinking 

funds $ 11,967,475.01 

Sinking fund investment 1,512,879. 99 

13,480,355.00 

Surplus ' 577,316.24 



$ 61,397,649.23 
Auditors' Report 

We have made an examination of the balance sheet of the Northern Ontario Properties, held and operated by The 
Hydro-Electric Power Commission of Ontario in trust for the Province of Ontario, as at October 31, 1945 and of the 
attached statements of operations and surplus for the year ended on that date. In connection therewith we reviewed 
the system of internal control and the accounting procedures of the Commission, and, without making a detailed audit 
of the transactions, have examined or tested accounting records of the Commission and other supporting evidence 
by methods and to the extent we deemed appropriate. 

Wc report that in our opinion the foregoing balance r l f and related statements of operations and surplus as 
more fully reported upon by us to the Lieutenant-Governor in « uncil) have been drawn up so as to exhibit a true and 
correct view of the state of the affairs of the Northern Ontark Properties operated by the Commission at October 31 , 
1945 ana '.he results of their operation for the year ended on that dale, according to the best of our information and the 
explanatk ns given us and as shown by the books. 

CLARKSON, GORDON & CO. 
Toronto, Canada, Chartered Accountants. 

June 12, 1946. 



182 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 

NORTHERN ONTARIO PROPERTIES 

Held and operated by The Hydro-Electric Power Commission of Ontario 
in trust for the Province of Ontario 

Statement of Operations for the year ended October 31, 1945 

Revenue: 

Power sold to private companies and customers $6,155,380.99 

Cost of Operation : 

Power purchased $297,042.29 

Operating, maintenance and administrative expenses 1,835,999. 18 

Interest (including interest on sinking fund, renewals, and other 

reserves and after deducting interest earned on investments) 1,808,982 . 38 

Provision for renewals 455,409 . 98 

Provision for contingencies and obsolescence 480,161 . 45 

Provision for sinking fund 1,496,103 . 48 

$6,373,698 . 76 

Net loss on operations for year $218,317. 77 

Statement of Surplus for the year ended October 31, 1945 

Balance at credit November 1, 1944 $971,351.38 

Transferred from reserves 1,223 . 40 

$972,574.78 

Less: 

Net loss on operations for year ended October 31, 1945 $218,317. 77 

Adjustment of previous year's billing for power supplied.. . . 176,940.77 

395,258 . 54 

Balance at credit October 31, 1945 $577,316.24 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



183 



NORTHERN ONTARIO PROPERTIES 

Held and Operated by The Hydro -Electric Power Commission of Ontario 
in trust for the Province of Ontario 



Fixed Assets— October 31, 1945 



Property 



Under 
construction 



Fixed Assets 



In service 



Non- 
depreciable 



Depreciable 



Total 



Abitibi : 
Power Plants: 
Abitibi river: 

Abitibi Canyon 

Frederick House dam . . . 
Dasserat Lake diversion. 



Transformer Stations 
Transmission Lines . . 
Local Systems 



Timiskaming : 
Power Plants : 
Matabitchuan river: 

Matabitchuan 

Storage dams 

Montreal river : 

Upper Notch 

Fountain Falls 

Ragged Chute 

Hound Chute 

Indian Chute 

Storage dams 

Mattagami river : 

Sandy Falls. 

Wawaitin 

Lower Sturgeon 

Storage dams 

Intangible 



Transformer Stations 

Transmission Lines 

Office and Service Buildings . 
Local Distribution Systems . . 



43,915.14 
20,354.90 



c. 



5,530,862.63 

124,532.31 

4,220.89 



c. 



13,449,596.21 

687,012.13 

34,471.80 



19,024,373.98 

831,899.34 

38,692.69 



64,270.04 



5,659,615.83 



14,171,080.14 



19,894,966.01 



8,010.23 
26,893.80 



215,856.69 
830,142.02 



2,068,589.86 

5,643,216.50 

91,967.77 



2,292,456.78 

6,500,252.32 

91,967.77 



99,174.07 



6,705,614.54 



21,974,854.27 



28,779,642.88 



10.20 



3,240.00 



2,438.59 



4,860.00 
3,240^00 



53,250.00 

1,944.00 

1,548,713.78 



635,795.00 
134,000.00 

1,377,565.00 
349,751.00 
976,000.00 
446,454.00 
408,635.00 
165,000.00 

520,955.00 
764,212.00 
772,773.00 
161,056.00 



639,045.20 
134,000.00 

1,382,425.00 
349,751.00 
976,000.00 
449,694.00 
411,073.59 
165,000.00 

520,955.00 
764,212.00 
826,023.00 
163,000.00 
1,548,713.78 



2,448.79 



1,615,247.78 



6,712,196.00 



8,329,892.57 



10,955.69 
446.16 
161.06 



290,360.00 



1,169,119.46 

1,909,945.71- 

152,680.00 

697,238.35 



1,180,075.15 

2,200,751.87 

152,841.06 

697,238.35 



14,011.70 



1,905,607.78 



10,641,179.52 



12,560,799.00 



184 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



NORTHERN ONTARIO PROPERTIES 

Held and operated by The Hydro-Electric Power Commission of Ontario 
in trust for the Province of Ontario 



Fixed Assets — October 31, 1945 





Under 
construction 


Fixed Assets 




Property 


In service 


Total 




Non- 
depreciable 


Depreciable 




Sudbury: 
Power Plants: 
Wanapitai river: 
Coniston 


1,029.38 
782.37 


13,597.20 

13,323.00 

33,000.00 

25.00 

830,514.53 

44,531.27 


732,799.66 
387,797.21 
656,001.78 
194,870.00 


747 426 24 


McVitties 


401,902 58 


Stinson 


689,001 78 


Storage dam 




194,895 00' 


Intangible 




830,514 53 


Sturgeon river: 

Crystal Falls and Storage dams 




938,588.02 


983,119.29 










1,811.75 


934,991.00 


2,910,056.67 


3,846,859.42 


Transformer Stations 






77,703.38 
458,280.12 


77,703.38. 


Transmission Lines 


900.27 




459,180.39 








Nipissing : 
Power Plants: 
South river: 
Nipissing 


2,712.02 


934,991.00 

11,089.60 

12,105.05 

119,307.09 


3,446,040.17 

242,559.52 

243,097.51 

334,834.33 

76,122.70 

1,096.64 


4,383,743.19 
253,649.12. 


Bingham Chute 


366.01 


255,568 57 


Elliot Chute 


454,141.42 


Storage dams 




76,122.70 


Miscellaneous 






1,096.64 


Intangible 




69,478.34 


69,478.43 












366.01 


211,980.08 


897,710.70 


1,110,056.79 


Transformer Stations 


15.74 
753.04 




52,759.87 

212,358.38 

35,270.45 


52,775.61 


Transmission Lines 




213,111.42 


Local Systems 


2,219.65 


37,490.10 










1,134.79 


214,199.73 


1,198,099.40 


1,413,433.92 


Patricia : 
Power Plants: 
English river: 
Ear Falls 




566.75 

39,297.44 


1,813,931.46 
556,026.69 


1,814,498.21 


Albany river: 

Rat Rapids 




595,324.13 












39,864.19 


2,369,958.15 


2,409,822.34 








Transformer Stations 


4,840.48 

424.28 

1,100.03 




167,214.17 

1,806,492.50 

49,580.30 


172,054.65 


Transmission Lines 




1,806,916.78 


Local System 




50,680.33 










6,364.79 


39,864.19 


4,393,245.12 


4,439,474.10 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



185 



NORTHERN ONTARIO PROPERTIES 

Held and operated by The Hydro-Electric Power Commission of Ontario 
in trust for the Province of Ontario 



Fixed Assets— October 31, 1945 





Under 
construction 


Fixed Assets 




Property 


In service 


Total 




Non- 
depreciable 


Depreciable 




Rainy River: 
Transformer Stations 


$ c. 
309.26 
744.60 


$ c. 


$ c. 
147,106.30 
1,113,545.40 
31,905.24 


$ c. 
147,415.56 


Transmission Lines 


246,026.08 


1,360,316.08 


Local System 


31,905.24 












1,053.86 


246,026.08 


1,292,556.94 


1,539,636.88 


Northern Ontario Properties 

Rural Power District: 
Transformer Stations 






10,820.23 
526,221.59 
453,247.92 


10,820.23 


H-E.P.C. investment 






526,221.59 


Government grants 






453,247.92 
















990,289.74 


990,289.74 











SUMMARY 








Under 
construction 


Fixed Assets 




Property 


In service 






Non- 
depreciable 


Depreciable 


Total 


Abitibi district 

Timiskaming district 


$ c. 
99,174.07 
14,011.70 
2,712.02 
1,134.79 
6,364.79 
1,053.86 


$ c. 

6,705,614.54 

1,905,607.78 

934,991.00 

214,199.73 

39,864.19 

246,026.08 


$ c. 

21,974,854.27 
10,641,179.52 
3,446,040.17 
1,198,099.40 
4,393,245.12 
1,292,556.94 
990,289.74 


$ c. 
28,779,642.88 
12,560,799.00 


Sudbury district 


4,383,743 19 


Nipissing district 


1,413,433.92 


Patricia district 


4,439,474 . 10 


Rainy river district 


1,539,636.88 


Rural power district 


990,289.74 












124,451.23 


10,046,303.32 


43,936,265.16 


54,107,019.71 


Less:Grants-in-aid of constructior 


i: Province of Ontario for rural power district.. 


453,247.92 








53,653,771.79 






186 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



NORTHERN ONTARIO 
STATEMENT SHOWING CHANGES IN FIXED ASSETS 



Class of Asset 


Balance at 

beginning 

of year 


Expenditure 
during year 


Power Plants: 

Abitibi district 


$ c. 
19,871,769.34 


$ c. 
73,196.67 




8,329,892 57* 


Sudbury district 


3,844,376.78 
1,116,198.89 
2,408,351.66 


4,393.85 


Nipissing district 


7,477.88 


Patricia district 


1,264.09 






Transformer Stations: 

Abitibi district. 

Timiskaming district 


27,240,696.67 


8,416,225.06 


2,282,147.71 


13,968.00 
1,180,075.15* 


Sudbury district 


157,165.08 

44,457.09 
166,572.81 
130,406.44 


23,336.92 


Nipissing district 


8,475.50 


Patricia district 


5,743.84 


Rainy River district 


17,009.12 






Transmisson Lines: 

Abitibi district 

Timiskaming district 


2,780,749.13 


1,248,608.53 


6,486,138.43 


20,752.60 
2,197,750.80* 


Sudbury district 


457,930.12 

212,520.54 

1,798,004.00 

1,334,383.44 


900.27 


Nipissing district 


765.62 


Patricia district 


8,912.78 


Rainy River district 


32,487.70 






Local Systems: 

Abitibi district 


10,288,976.53 


2,261,569.77 


90,485.28 


1,618.49 


Timiskaming district 


697,238.35* 


Nipissing district 


36,814.03 
49,309.48 
16,440.75 


676.07 


Patricia district 


1,382.85 


Rainy River district 


15,464.49 






Office and Service Buildings: 

Timiskaming district 


193,049.54 


716,380.25 




152,841.06* 








Rural Power District: 

Transformer station 


10,820.23 
463,730.58 
412,901.78 




H-E.P.C. investment < 


62,749.91 


Government grants 


40,605.04 








887,452.59 


103,354.95 


Less: Grants in aid of construction: 
Province of Ontario for rural power districts . 


41,390,924.46 


12,898,979.62 


412,901.78 


40,346.14 




40,978,022.68 


12,858,633.48 



* Purchase of Northern Ontario Power Company assets included. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



187 



PROPERTIES 

DURING YEAR ENDED OCTOBER 31, 1945 



Adjustment 

for equipment 

re-located 


Retirements 




Value 

recovered 

(stores, sales 

and salvage) 


Charged to 

reserves 

and operation* 


Balance at 
end of year 


$ c. 


$ c. 


$ c. 
50,000.00 


$ c. 
19,894,966.01 






8,329,892.57 






1,911.21 

13,530.49 

5.41 


3,846,859.42 




89.49 


1,110,056.79 


212.00 


2,409,822 . 34 








212.00 


89.49 


65,447 .11 


35,591,597.13 




699.60 


2,959.33 


2,292,456.78 




1,180,075.15 


350.00 


93,378.89 


9,069.73 

156.98 

50.00 


77,703.38 
52,775.61 


212.00 




172,054.65 






147,415.56 










562.00 


94,078.49 


12,236.04 


3,922,481 . 13 


3,001.07 
3,001.07 


47.73 


3,589.91 


6,500,252.32 
2,200,751.87 


350.00 






459,180.39 




40.00 


134.74 


213,111.42 




1,806,916.78 




6,555.06 




1,360,316.08 








350.00 


6,642.79 


3,724.65 


12,540,528.86 






136.00 


91,967.77 






697,238.35 








37,490.10 






12.00 


50,680.33 






31,905.24 














148.00 


909,281.79 














152,841.06 
















10,820.23 




38.50 
38.49 


220.40 
220.41 


526,221.59 




453,247 92 








76.99 


440.81% 


990,289 74 








100,887 .76 


81,996.61 


54,107,019 71 












453,247.92 












100,887.76 


81,996.61 


53;653,771.79 



Renewals 

Contingencies. 
Sinking Fund . 
Operation 



9,650.84 

69,685.32 

2,219.64 

440.81 



81,996.61 



% This item charged to operation. 



188 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 






NORTHERN ONTARIO PROPERTIES 

Held and Operated by The Hydro -Electric Power Commission of Ontario 
in trust for the Province of Ontario 



Renewals Reserve — October 31, 1945 

Balance at November 1, 1944 $4,017,885.21 

Provision in the year $ 455,409.98 

Interest at 4% on reserve balance 160,715.39 

616,125.37 

$4,634,010.58 
Less : 

Expenditures in the year $ 123 . 34 

Amount withdrawn in respect of assets removed 

from service etc 9,650. 84 

9,774 . 18 

Balance at October 31, 1945 $4,624,236. 40 



Contingencies and Obsolescence Reserve — October 31, 1945 

Balance at November 1, 1944 $2,812,472 . 50 

Provision in the year $ 480,161.45 

Interest at 4% on reserve balance 114,424.62 

594,586 . 07 

$3,407,058.57 
Less: 

Contingencies met with during the year $ 22,272. 64 

Amount withdrawn in respect of assets removed 

from service etc 69,685. 32 

91,957.96 

Balance at October 31, 1945 $3,315,100. 61 






Sinking Fund Reserve— October 31, 1945 

Balance at November 1, 1944 $11,542,444.45 

Provision in the year $1,496.103. 48 

Interest at 4% on reserve balance 444,544. 40 

1,940,647.88 

$13,483,092.33 
Less: 

Amount withdrawn in respect of assets removed 

from service etc $ 2,219. 64 

Adjustment in the year 517. 69 

2,737.33 

Balance at October 31, 1945 $13,480,355.00 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 189 



THE HAMILTON STREET RAILWAY COMPANY 

(A wholly-owned Subsidiary of The Hydro-Electric Power Commission 
of Ontario — Southern Ontario System) 



FINANCIAL ACCOUNTS 



For the year ended October 31, 1945 



Balance Sheet as at October 31, 1945 
Operating Statement for the year ended October 31, 1945 



8— H.E. 



190 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



THE HAMILTON STREET 



(A Wholly-Owned Subsidiary of The Hydro-Electric 
BALANCE SHEET AS AT 



ASSETS 
Fixed Assets: 

Properties, road and equipment, buses, franchises, etc $ 4,591,892.95 



Current Assets: 

The Hydro-Electric Power Commission of Ontario — 

current account $ 1,479,196. 64 

Conductors' and employees' advances 20,800.00 

Accounts receivable 3,323. 11 

Interest accrued. 225.00 

Prepayments 8,198. 16 

1,511,742.91 

Materials and Supplies . 104,781 . 93 

Insurance Reserve Fund Investments: 

Investments in Province of Ontario and Dominion of Canada bonds at 

amortized cost .*. 104,757.89 

$ 6,313,175.68 






1946 THE HYDRO-ELECTRIC POWER COMMISSION 191 

RAILWAY COMPANY 

Power Commission of Ontario — Southern Ontario System) 

OCTOBER 31, 1945 

LIABILITIES 
Capital stock: 

Authorized— 80,000 shares of $50.00 par value each $ 4,000,000 . 00 

Issued— 64,100 shares of $50. 00 par value each $ 3,205,000. 00 

Current Liabilities: 

Rentals accrued '• 1,123.00 

Reserves: 

Depreciation — road and equipment $ 2,848,104.96 

Insurance 130,283.70 

Miscellaneous 75,220. 96 

3,053,609.62 

Surplus 53,443.06 

Notes: (1) Certain liabilities for wages, salaries, purchase of supplies and expenses 
have been provided for in the accounts of The Hydro-Electric Power 
Commission of Ontario and the indebtedness of the Commission to 
the Company has been adjusted accordingly. 
(2) Subsequent to October 31, 1945 the share capital of the company was 
reduced by decreasing the par value of each share from $50 to $25 and 
by paying to the shareholders the sum of $1,602,500, being $25 per 
share on each of the 64,100 issued shares. 



$ 6,313,175.68 
Auditors' Report 

We have made an examination of the balance sheet of The Hamilton Street Railway Company as at October 31, 
1945, and of the attached statements of operations and surplus for the year ended on that date. In connection therewith 
we reviewed the system of internal control and the accounting procedures of the company and, without making a 
detailed audit of the transactions, have examined or tested accounting records of the company and other supporting 
evidence by methods and to the extent we deemed appropriate. 

We report that in our opinion, subject to the adequacy of the accumulated reserve for depreciation, the above 
balance sheet and related statements of operations and surplus have been drawn up so as to exhibit a true and correct 
view of the state of the affairs of The Hamilton Street Railway Company at October 31, 1945 and the results of its 
operations for the year ended on that date, according to the best of our information and the explanations given us and 
as shown by the books. 

CLARKSON, GORDON & CO., 
Toronto, Canada, • Chartered Accountants. 

May 16, 1946. 



192 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



THE HAMILTON STREET RAILWAY COMPANY 

(A Wholly-Owned Subsidiary of The Hydro-Electric Power Commission 
of Ontario — Southern Ontario System) 



Statement of Operations for the year ended October 31, 1945 



Revenues: 



Transportation $ 2,339,758. 58 

Other operations 18,282 . 56 

$ 2,358,041.14 

Expenses: 

Maintenance of way and structures $ 97,113.86 

Maintenance of equipment 293,939. 72 

Electric power and motor fuel . . 208,282. 97 

Transportation expenses 556,586. 91 

General and miscellaneous expenses. 180,263. 80 

Taxes (municipal and franchise). 114,264.94 

$ 1,450,452.20 

Provision for depreciation 251,608 . 00 

$ 1,702,060.20 

Net Revenue for Year Ended October 31,1945 $ 655,980. 94 



Statement of Surplus for the year ended October 31, 1945 

Balance at credit November 1, 1944 $ 21,199. 78 

Net revenue for year ended October 31, 1945 655,980.94 

$ 677,180.72 
Less: 

Additional provision for depreciation in respect of prior years. $500,000 . 00 

Dividend paid 123,737.66 

623,737 . 66 

Balance at credit October 3l| 1945 $ 53,443. 06 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 193 



SECTION X 

MUNICIPAL ACCOUNTS 

and 

Statistical Data Relating to Hydro-Electric Distribution Systems 

Operated by Individual Municipalities Served by 

The Hydro-Electric Power Commission 

of Ontario 

The Municipal Accounts section of this report presents in summary, 
and individually, the results of the operation of the local electrical utilities 
in municipalities owning their own distributing systems and operating with 
energy supplied by or through The Hydro-Electric Power Commission. 

Financial statements prepared from the books of these Hydro utilities 
are submitted herein to show how each has operated during the past year, 
and its financial status at the present time. Other tables give useful statis- 
tical information respecting average costs for the various classes of service 
and the rates in force. 

The books of account of the electrical utilities in all municipalities which 
have contracted with The Hydro-Electric Power Commission of Ontario for 
a supply of power are kept in accordance with an accounting system, designed 
by the Commission. During the year 1945 this standard method of account- 
ing was installed in Almonte, Braeside, Burlington, Newmarket, Renfrew 
and Thornbury. 

Periodical inspections are made of the books of all Hydro electrical 
utilities and local officials are assisted in the improvement of their office 
routine with a view of standardizing, as far as possible, the methods employed. 
In the majority of the smaller municipalities much of the book-keeping for the 
electrical utilities is performed by representatives of the municipal accounting 
department of the Commission as a measure of economy. This arrangement 
insures the correct application of the standard accounting system, with re- 
sultant uniformity in classification of revenues and expenditures; secures 
true reflections of the actual operating results for the year, and greatly 
enhances the comparative values of the reports. 

The first financial statement in this section presents consolidated balance 
sheets for the past eight years. Similar data for earlier years since 1913 were 
published in the Report for 1943. This consolidated statement combine 



194 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

the balance sheets of all local municipal Hydro utilities receiving power 
under cost contracts. It is worth noting that the total plant value has 
increased from $10,081,469.16 in 1913 to $106,346,101.06 in 1945, and the 
total assets from $11,907,826.86 to $221,284,434.19. The liabilities have not 
increased in the same proportion as the assets, rising from $10,468,351.79 
to a maximum of $52,685,316.86 in 1932, and receding to $16,277,777.29 
in 1945. The reasons for this are the regular fulfilment of debt retirement 
schedules under serial debenture provisions or by maturity of sinking funds, 
and also the fact that much of the cost of the increasing plant value has been 
financed out of reserves and surplus without increasing the capital liabilities 
of the respective utilities. By this procedure the funds of the systems are 
used to best advantage. Examination of the results will also show that there 
is a steady decline in the percentage of net liabilities to total assets; being 
from 88.0 per cent in 1913 to 7.0 per cent in 1945. The equities in The 
Hydro-Electric Power Commission's systems automatically acquired through 
the inclusion of sinking funds as part of the cost of power are not taken into 
account in arriving at these percentages. 

The second financial statement presents consolidated operating reports 
for the past eight years and combines the results from all local municipal 
Hydro utilities receiving power under cost contracts. After providing for 
every cost of operation and fixed charges, including the standard provision for 
depreciation, the combined operating reports show a net surplus of $4,445,- 
939.08 for 1945. (See also diagrams in Foreword to Report.) 

The five statements, "A" to "E", following the two consolidated reports 
show the financial status of each municipal utility and the results of opera- 
tions, giving classified information respecting revenue, operating costs, 
number of consumers and consumption, cost of power to municipalities, 
power and lighting rates charged to consumers, etc. In statements "A" and 
"B", the municipalities are arranged alphabetically under each system; 
in statement "D" the municipalities are arranged in three groups — cities, 
towns and small municipalities; in statements "C" and "E" all municipalities 
are arranged alphabetically. (Statement "C" suspended, see below.) 

Statement "A" presents the balance sheet of each electrical utility. 
The plant values are shown under the general subdivisions specified in the 
standard accounting system and the other items on the positive side of the 
ledger which are included in total assets are self-explanatory. 

In conformity with a policy of service at cost to the customer, refunds 
by cash or credit are made during the year in many municipalities from 
surplus funds accrued to the credit of municipal services, such as street 
lighting, water works, sewage disposal, etc., and to individual customers. 
The total thus returned to customers during the year 1945 amounted in 
round figures to $925,000.00. 

The reserves for depreciation, and the acquired equity in The Hydro- 
Electric Power Commission's systems, are listed individually and totalled; 
and under the heading "surplus" are included not only the operating surplus 
but the accumulation of sinking fund applicable to debenture debt and also 
the amount of debentures already retired out of revenue. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 195 

The depreciation reserve now amounts to 36.1 per cent of the total depre- 
ciable plant, while the depreciation reserve and surplus combined have 
already reached the sum of $123,025,231.05, being equal to 115.6 per cent 
of the total plant cost. 

Statement "B" shows the detailed operating report for each municipal 
electrical utility. It gives annual revenues from the various classes of con- 
sumers; the items of expenditure which make up the total annual expenditure 
and the sums set aside for depreciation. The population served by each local 
utility and the number of consumers of each class are also shown. 

The item ''cost of power supplied by H-E.P.C." in this statement in- 
cludes the debit or credit balances ascertained by the annual adjustment of 
the cost of power supplied to the municipalities by the Commission. * 

Of the 304 municipal electrical utilities included in this statement, 298 
received from consumers revenue sufficient to meet in full all operating ex- 
penses, interest, debt retirement instalments, and standard depreciation 
reserve allocation and to yield an aggregate net surplus of $4,451,006.96 for 
the year; 5 were able to defray out of revenue all such charges except a portion 
of the standard depreciation allocation aggregating $1,742.80, in the case of 
1 utility the revenue was less than the total operating expenses, interest and 
debt retirement instalments by $36.68. - 

Statement "C". Conditions respecting street lighting were not back 
to normal throughout 1945, the statement is therefore again omitted in 
this year's Report. 

Statement "D" presents statistics relating to the supply of electrical 
energy to consumers in Ontario municipalities served by the Commission. It 
shows the revenue, kilowatt-hour consumption, number of consumers, average 
monthly consumption, average monthly bill and the net average cost per 
kilowatt-hour both for domestic and for commercial light service in each 
municipality. For power service this statement shows the revenue,- the 
number of consumers and the average horsepower supplied by the municipal 
utility, f For further reference to this informative statement, consult the 
special introduction to it on page 310. 

Statement "E" presents the cost per horsepower of the power provided 
for and delivered to the municipalities by the Commission, and the local rates 
to consumers in force in the respective municipalities, during the year 1945, 
for domestic service, for commercial light service and for power service. 

*In 1939 and 1940 a number of municipalities asked permission to take power cost adjust- 
ments into the following year, to facilitate the earlier closing of their books. On this account, 
from 1941 on, with few exceptions the Balance Sheet shows the previous year's equity in Hydro 
Commission properties; and the Cost of Power in the Operating Statement includes the previous 
year's adjustments. 

fThe statistics include retail power only. Wholesale industrial power as supplied by the 
Commission direct, is reported in Section IX. 



196 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



CONSOLIDATED 



Year 


1938 


1939 


1940 






Number of municipalities included 


288 


293 


295 


Assets 
Lands and buildings 


$ c. 

10,894,019.12 

23,614,597.80 

23,371,092.61 

6,134,283.64 

10,494,789.40 

9,539,413.66 

2,697,047.84 

1,516,059.81 

4,444,880.40 

497,974.74 

4,897,097.67 


$ c. 

11,030,623.50 

23,780,655.18 

23,925,362.60 

6,202,371.87 

10,855,346.75 

9,838,600.98 

2,798,171.62 

1,518,035.24 

4,147,280.84 

498,650.81 

4,894,655.59 


$ c. 
11,218,258.69 


Substation equipment 


24,282,151.78 


Distribution system — overhead 

Distribution system — underground .... 
Line transformers 


24,653,458.44 
6,214,957.69 
11,030,643.29 . 


Meters. 


9,927,971.40 


Street lighting equipment — regular .... 
Street lighting equipment — ornamental. 
Miscellaneous construction expenses . . . 
Steam or hydraulic plant 


2,879,996.65 

1,534,320.08 

4,341,259.94 

498,575.87 


Old plant 


1,332,606.12 






Total plant 


98,101,256.69 

3,043,609.87 

4,832,322.57 

4,106,655.16 

1,393,158.18 

10,397,958.20 

44,254,118.64 

178,534.60 


99,489,754.98 

3,107,087.65 

4,850,531.80 

4,774,816.58 

1,496,275.62 

11,032,594.44 

48,615,296.94 

156,520.39 


97,914,199.95 


Bank and cash balance 


4,462,197.18 


Securities and investments 


5,315,855.49 


Accounts receivable 


4,715,848.86 


Inventories 


1,630,987.28 


Sinking fund on local debentures 

Equity in H-E.P.C. systems 

Other assets 


5,829,573.87 

52,457,676.76 

258,395.70 






Tota 1 assets 


166,307,613.91 


173,522,878.40 


172,584,735.09 






Liabilities 
Debenture balance 


29,987,512.34 

3,334,802.82 

108,753.61 

3,120,619.84 


27,962,685.51 

3,100,565.26 

180,064.81 

2,998,174.20 


20,636,363.20 


Accounts payable 


3,095,613.25 


Bank overdraft 


187,038.91 


Other liabilities 


3,004,624.22 






Total liabilities 


36,551,688.61 


34,241,489.78 


26,923.638.58 


Reserves 

For equity in H-E.P.C. systems 

For depreciation 


44,254,118.64 

22,583,476.69 

2,814,785.08 


48,615,296.94 

24,046,526.92 

3,090,471 . 34 


52,457,676.76 
25,733,628.33 


Other reserves 


3,326,591.65 






Total reserves 


69,652,380.41 


75,752,295.20 


81,517,896.74 






Surplus 
Debentures paid 


30,890,189.93 
10,397,958.20 
18,815,396.76 


32,866,660.82 
11,032,594.44 
19,629,838.16 


37,245,922.84 


Local sinking fund 


5,829,573.87 


Operating surplus 


21,067,703.06 






Total surplus 


60,103,544.89 


63,529,093.42 


64,143,199.77 


Total liabilities, reserves and surplus. . . 


166,307,613.91 


173,522,878.40 


172,584,735.09 


Percentage of net debt to total assets . . 


22.4 


19.3 


17.4 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



197 



BALANCE SHEET 



1941 


1942 


1934 


1944 


1945 


296 


297 


298 


298 


304 


$ c. 

11,488,173.96 

24,896,262.26 

25,228,363.52 

6,391,399.25 

11,817,440.89 

10,644,655.81 

2,940,055.38 

1,540,369.82 

4,366,893.41 

445,118.58 

1,329,860.41 


$ c. 

11,546,286.55 

25,359,352.47 

25,572,132.86 

6,446,133.75 

12,209,624.79 

10,938,305.73 

2.928,896.30 

1,543,717.00 

4,091,006.92 

422,172.72 

1,028,830.05 


$ c. 

11,664,887.81 

25,392,202.96 

25,773,224.22 

6,451,393.47 

12,353,367.17 

11,117,612.15 

2,903,704.11 

1,542,294.82 

3,740,027.08 

397,576.71 

936,561.90 


$ c. 

11,713,108.74 

25,805,344.10 

26,075,416.77 

6,385,742.19 

12,698,080.21 

11,339,479.64 

2,926,365.70 

1,542,819.42 

3,414,557.25 

368,022.38 

820,607.24 


$ c. 

11,879,469.56 

26,201,620.92 

26,835,864.78 

6,539,797.63 

13,360,997.73 

11,742,720.68 

3,066,246.06 

1,551,628.63 

3,469,256.69 

1,005,980.83 

692,517.55 


101,088,593.29 

2,991,173.27 
8,368,139.57 
4,116,252.29 
1,984,025.53: 
5,530,647.79 
52,458,225.18 
226,034.26 


102,086,459.14 

2,482,945.50 

12,592,455.09 

3,614,066.68 

2,047,430.38 

5,445,199.46 

57.080,491.77 

197,190.92 


102,272,852.40 

2,341,996.68 

17,037,057.29 

3,347,449.72 

1,750,799.42 

5,028,551.56 

62,031,673.13 

537,366.80 


103,089,543.64 

1,947,073.36 

21,245,620.67 

3,710,514.76 

1,622,866.57 

4,880,499.77 

69,486,548.01 

192,661.46 


106,346,101.06 

1,744,827.39 

27,530,379.33 

3,682,108.35 

1,735,925.21 

4,952,718.62 

75,002,351.38 

290,022.85 


176,763,091.18 


185,546,238.94 


194,347,747.00 


206,175,328.24 


221,284,434.19 


17,805,415.36 

3,088,145.27 

302,744.63 

2,987,132.70 


16.184,642.53 

2,399,404.91 

105,571.05 

2,806,844.10 


13,657,032.51 

2,699,630.77 

118,834.40 

2,618,742.94 


11,612,359.10 

1,701,420.70 

174,491.81 

2,584,979.26 


10,612,595.02 

2,528,081.42 

429,585.64 

2,707,515.21 


24,183,437.96 


21,496,462.59 


19,094,240.62 


16,073,250.87 


16,277,777.29 


52,458,225.18 

27,795,985.72 

3,592,384.90 


57,080,491.77 

29,840,207.73 

4,907,609.88 


62,031,673.13 

32,138,469.64 

5,449,398.96 


69,486,548.01 

34,006,953.37 

6,308,596.82 


75,002,351.38 

36,331,919.08 

6,979,074.47 


83,846,595.80 


91,828,309.38 


99,619,541.73 


109,802,098.20 


118,313,344.93 


39,943,340.75 

5,530,647.79 

23,259,068.88 


41,183,741.27 

5,445,199.46 

25,592,526.24 


43,552,091.22 

5,028,551.56 

27,053,321.87 


45,475,788.84 

4,880,499.77 

29,943.690.56 


47,340,018.06 

4,952,718.62 

34,400,575.29 


68,733,057.42 


72,221,466.97 


75,633,964.65 


80,299,979.17 


86,693,311.97 . 


176,763,091.18 


185,546,238.94 


194,347,747.00 


206,175,328.24 


221,284,434.19 


14.6 


11.9 


10.0 


7 -4 


7.0 



198 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



CONSOLIDATED 



Year 


1938 


1939 


1940 






Number of municipalities included 


288 


293 


295 


Earnings 
Domestic service 


$ c. 

12,607,601.30 

6,727,374.48 

10,527,631.36 

1,677,069.34 

1,813,555.27 

26,588.18 

602,012.80 


$ c. 

13,038,748.37 

7,077,144.74 

10,957,719.66 

1,760,977.25 

1,831,090.33 

28,874.86 

595,235.49 


$ c. 
13,705,710 79 


Commercial light service 


7,642,679 90 


Commercial power service : . 


12,458,439.08 


Municipal power 


1,741,235 23 


Street lighting 


1,842,443 63 


Merchandise 


56,818 83 


Miscellaneous 


577,959 98 






Total earnings 


33,981,832.73 


35,289,790.70 


38,025,287.44 






Expenses 
Cost of power supplied by H-E.P.C. . . . 
Substation operation 


20,575,457.95 
493,651.06 
351,013.94 

921,064.94 

94,040.92 

384,357.58 

483,012.96 

373,065.44 
309,626.97 
987,040.66 
931,120.05 
430,609.32 
84,111.05 
1,642,663.25 

2,424,098.70 


21,855,595.20 
516,987.25 
377,013.25 

943,859.59 

95,577.72 

386,145.71 

488,980.55 

384,071.55 
317,467.64 

1,008,065.66 

966,550.98 

463,456.65 

80,263.46 

1,594,040.32 

2,420,441.30 


23,756,863.14 
544,234.10 


Substation maintenance 


322,375.73 


Distribution system, operation and 
maintenance 


930,055.53 


Line transformer maintenance 

Meter maintenance 


101,617.16 
372,562.74 


Consumers' premises expenses 


568,135.41 


Street lighting, operation and mainten- 
ance . . : 


366,911.70 


Promotion of business 


293,022.17 


Billing and collecting 


1,020,648.93 


General office, salaries and expenses. . . . 
Undistributed expense 


960,065.70 
555,414. 26 


Truck operation and maintenance 

Interest 

Sinking fund and principal payments on 
debentures 


79,848.64 
1,464,381.29 

2,389,723.60 






Total expenses 


30,484,934.79 


31,898,516.83 


33,725,860.10 






Surplus 

Depreciation and other reserves 


3,496,897.94 
2,451,529.46 


3,391,273.87 
2,524,364.33 


4,299,427.34 
2,644,127.10 


Surplus less depreciation 


1,045,368.48 


866,909.54 


1,655,300.24 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



199 



OPERATING REPORT 



1941 


1942 


1943 


1944 


1945 


296 


297 


298 


298 


304 


14,287,828.19 

7,885,693.81 

14,591,053.03 

1,832,379.38 

1,880,560.01 

58,695.51 

526,771.53 


14,874,937.14 

7,604,860.27 

15,433,320.91 

2,026,826.92 

1,820,216.28 

50,276.58 

680,825.29 


14,933,681.48 

6,713,348.61 

15,687,273.31 

2,031,027.12 

1,686,149.29 

31,300.28 

782,170.04 


15,371,752.19 

7,219,403.43 

16,222,143.48 

2,111,454.22 

1,729,320.48 

35,378.31 

897,433.28 


15,543,145.28 
8,150,923.90 

15,544,685.89 

2,134,062.24 

1,922,281.13 

65,590.57 

1,097,719.02 


41,062,981.46 


42,491,263.39 


41,864,950.13 


43,586,885.39 


44,457,808.03 


26,017,260.84 
552,820.54 
316,677.27 

993,886.44 
114,304.18 
409,252.72 
604,642.97 

379,905.55 

262,910.03 

1,074,173.90 

1,053,367.83 

480,317.80 

93,032.89 

1,027,985.34 

2,248,937.42 


26,459,900.78 
581,259.02 
361,643.95 

1,087,818.81 
133,888.95 
440,877.18 
513,565.10 

397,614.93 

193,692.33 
1,171,345.63 
1,067,535.39 

553,599.71 
99,379.20 

973,383.83 

2,006,148.29 


26,587,877.32 
612,227.01 
370,797.74 

1,143,720.84 
145,094.88 
443,307.27 
527,810.36 

380,405.50 

171,894.14 
1,226,185.63 
1,117,334.29 

510,448.34 
94,830.33 

844,161.48 

1,871,119.81 


26,937,460.31 
611,878.05 
419,983.12 

1,147,646.14 
145,701 . 29 
445,437.44 
513,953.14 

445,945.93 
156,566.54 
1,264,759.35 
1,139,174.46 
522,204.17 
104,222.84 
707,925.20 

1,564,537.45 


26,633,166.70 
654,305.46 

423,473.57 

1,243,381.36 
155,240.82 
470,203.18 
581,603.20 

487,565.20 
171,063.89 
1,305,542.48 
1,201,915.79 
640,831.75 
123,720.21 
710,300.94 

1,255,825.57 


35,629,475.72 


36,041,653.10 


36,047,214.94 


36,127,395.43 


36,058,140.12 


5,433,505.74 
2,933,730.99 


6,449,610.29 
3,586,198.82 


5,817,735.19 
3,867,107.58 


7,459,489.96 
3,521,114.82 


8,399,667.91 
3,953,728.83 


2,499,774.75 


2,863,411.47 


1,950,627.61 


3,938,375.14 


4,445,939.08 



200 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM 



TVTnnicinalitv 


Acton 
1,876 


Agincourt 
P.V. 


Ailsa 

Craig 

434 


Alexandria 
1,904 


Alliston 


Population 


1,542 






Assets 


$ c. 

1,627.38 

2,318.36 

27,799.70 


$ c. 


$ c. 


$ c. 
202.00 


$ c. 








675.73 


Distribution system — overhead 


9,697.92 


7,957.08 


28,512.12 


30,527.37 


Line transformers 


16,944 . 56 

13,174.14 

2,530.79 


5,952.83 
3,651.28 
1,030.30 


3,814.67 

2,877.91 

457.58 


10,034.52 
8,893.42 
2,233.59 


10,490.74 


Meters 


9,872.42 


Street light equipment, regular. . . . 
Street light equipment, ornamental 
Miscellaneous construction expense 


1,598.99 


1,680.56 


23.30 


492.36 


5,520.56 


2,555.64 


Old plant 








4,466.89 


7,846.49 












Total plant 


66,075.49 

40.00 

25,000.00 

792.63 

1,191.29 


20,355.63 

188.81 

14,000.00 

1,540.43 


15,599.60 

1,483.94 

9,500.00 

798.99 


59,863.10 

1,582.21 
33,000.00 
•2,588.29 


63,567.38 


Bank and cash balance 


594.15 


Securities and investments 

Accounts Receivable 


20,500.00 
197.46 




9.49 


Sinking fund on local debentures 










Equity in H-E.P.C. systems. ..... 


100,331.07 

1.57 


15,887.80 


20,424.82 


39,473.20 


33,279.73 












Total assets 


193,432.05 


51,972.67 


47,807.35 


136,506.80 


118,148.21 






Liabilities 

Debenture balance 










4,461.32 


Accounts payable 


218.43 

103.67 

1,009.49 


502.74 


281.86 


2.68 


501.22 






Other liabilities 




140.00 


1,054.71 


419.00 








Total liabilities. . . .... 


1,331.59 


502.74 


421.86 


1,057.39 


5,381.54 






Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


100,331.07 

15,589.91 

2,200.00 


15,887.80 
5,267.08 
1,542.90 


20,424.82 
8,595.48 


39,473 20 

25,755.83 

1,858.06 


33,279.73 
21,093.09 


Other reserves . . ... 


7,832.51 








Total reserves 


118,120.98 


22,697.78 


29,020.30 


67,087.09 


62,205.33 






Surplus 

Debentures paid 


14,500.00 


8,072.65 


6,883.38 


48,133.84 


35,538.68 


Local sinking fund. . 




Operating surplus 


59,479.48 


20 699.50 


11.481.81 


20,228.48 


15,022.66 






Total surplus 


73.979,48 


28.772.15 


18 365.19 


68,362.32 


50,561.34 






Total liabilities, reserves and surplus. 


193,432.05 


51972.67 


47 807.35 


136,506.80 


118,148.21 


Percentage of net debt to total assets . 








1.1 


6.3 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



201 



'A' 



Hydro Municipalities as at December 31, 1945 



Almonte 
2,136 


Alvinston 
620 


Amherst- 
burg 
2,709 


Ancaster 
V.A. 


Apple Hill 
P.V. 


Arkona 
376 


Arnprior 
4,049 


$ c. 

7,037.25 

1,349.94 

33,602.22 


$ c. 
133.56 


$ c. 


$ c. 


$ c. 
169.06 


$ c. 


$ c. 










16,969.97 


40,708.09 


21,664.39 


3,009.09 


10,165.20 


29,537.69 


17,239.09 

12,345.80 

5,980.06 


3,801.25 
3,934.84 
•1,301.74 


23,732.59 

17,921.18 

2,070.17 

5,598.72 

5,042.27 


16,482.63 
7,017.60 
1,547.72 


1,421.37 

1,376.05 

421.12 


2,892.78 

2,078.18 

750.31 


12,774.55 

15,627.88 

6,119.35 


500.00 
105,153 80 


890.94 


702.02 


218.18 


247.77 


105.39 










709.55 


1,030.30 














183,208.16 
1,643.79 


27,032 . 30 

1,270.16 

11,000.00 

145.30 


95,073.02 

2,180.83 

41,350.00 

1,326.55 


47,414.36 

3,468.79 

7,500.00 

1,322.48 

115.31 


7,324.42 

1,757.12 

4,000.00 

84.87 


17,164.54 

270.08 

4,000.00 

22.06 


64,164.86 


24,950.00 
2,052.28 
3,823 . 73 


39,000.00 

360.16 

1,613.54 
















20,359. 14 


76,639.86 
7.12 


24,776.99 
52.00 


4,513.13 


8,672.86 


13,924.59 
















215,677.96 


59,806.90 


216,577.38 


84,649.93 


17,679.54 


30,129.54 


119,063.15 


31,258.25 




2,617.48 
518.70 


4,279.33 
1,735.80 






16,879.57 


860.77 


22.36 


42.72 


2.30 


125.84 
3,284.26 


758 . 17 


79.00 


6,753.64 


293.17 




28.00 


2,035.48 








32,877.19 


101.36 


9,889.82 


6,308.30 


42.72 


30.30 


22,325.15 




11,642.65 
59.50 


33,437.90 
10,513.56 


14,008.88 
38.69 


3,286.31 


5,078.77 




40,482.36 


8,503.16 
10,000.00 










40,482.36 


32,061.29 


120,591.32 


38,824.56 


7,799.44 


13,751.63 


32,427.75 


40,741.75 


23,529.24 


29,436.12 


9,830.95 


6,000.00 


13,112.83 


38,589.56 


101,576.66 


4,115.01 


56,660.12 


29,686.12 


3,837.38 


3,234.78 


25,720.69 


142,318.41 


27,644.25 


86,096.24 


39,517.07 


9,837.38 


16,347.61 


64,310.25 


215,677.96 


59,806.90 


216,577.38 


84,649.93 


17,679.54 


30,129.54 


119,063.15 


15.2 


0.3 


3.2 


10.5 


0.4 


0.1 


21.2 



202 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Arthur 
836 


Athens 
643 


Aurora 
2,990 


Aylmer 

2,474 


Ayr 


Population 


718 






Assets 

Lands and buildings 


$ c. 


$ c. 


$ c. 

1,000.00 

1,400.00 

27,536.79 


$ c. 
11,147.41 


$ c. 
125.00 










Distribution system — overhead. . . . 
Distribution system — underground. 


18,698.67 


14,510.07 


31,051.58 


13,258.38 


Line transformers 


5,068.24 

4,694.20 

796.21 


2,800.57 

3,338.46 

698.90 


23,724.92 

15,930.08 

6,227.00 


21,076.80 

14,736.31 

5,251.52 


7,483.72 


Meters. . . . 


4,770.03 


Street light equipment, regular 

Street light equipment, ornamental 
Miscellaneous construction expense 
Steam or hydraulic plant . 


1,162.14 


321.48 


1,185.31 


862.13 


1,902.27 


822.49 


Old plant 


1,086.62 






6,469.47 


4,002.53 










Total plant 


30,665.42 

6.55 

9,500.00 

69.53 


22,533.31 

291.39 

7,500.00 

48.80 


76,680.92 

778.51 

12,000.00 

392.33 


91,635.36 

1,531.49 

17,000.00 

1,252.39 

282.01 


31,624.29 


Bank and cash balance 


1,092.02 


Securities and investments 

Accounts Receivable 


3,500.00 
541.56 


Inventories . 














Equity in H-E.P.C. systems 

Other assets . . 


25,992.45 


9,015.48 


5,662.07 


61,525.82 
543.83 


20,795.52 












Total assets 


66,233.95 


39,388.98 


95,513.83 


173,770.90 


57,553.39 






Liabilities 

Debenture balance 


4,844.40 
0.33 


3,160.61 
407.32 


1.47 


3,003.67 
781.31 


1,422.68 


Accounts payable 


1,200.00 


Bank overdraft 




Other liabilities 


425.00 




478.00 


869.66 


23.00 








Total liabilities 


5,269.73 


3,567.93 


479.47 


4,654.64 


2,645.68 






Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


25,992.45 
21,732.87 


9,015.48 

7,066.67 

206.06 


5,662.07 
36,405.85 


61,525.82 

25,197.48 

9,578.99 


20,795.52 
9,109.28 


Other reserves 


517.29 










Total reserves 


47,725.32 


16,288.21 


42,067.92 


96,302.29 


30,422.09 






Surplus 

Debentures paid 


20, 155. 60 


10,839.39 




35,698.25 


16,080.70 


Local sinking fund 




Operating surplus 


*6,916.70 


8,693.45 


52,966.44 


37.115.72 


8,404.92 






Total surplus 


13,238.90 


19,532.84 


52,966.44 


72,813.97 


24,485 62 






Total liabilities, reserves and surplus. 


66,233.95 


39,388.98 


95,513.83 


173,770.90 


57,553.39 


Percentage of net debt to total assets. 


14.0 


11.7 


0.5 


4.1 


• 7.2 



Deficit. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



203 



"A" — Continued 



Hydro Municipalities as at December 31, 1945 



Baden 
P.V. 


Barrie 
10,469 


Bath 
296 


Beachville 
P.V. 


Beamsville 
1,306 


Beaverton 
786 


Beeton 

542 


$ c. 
660.64 


$ c. 

16,550.75 

18,884.56 

75,636.67 

66,582.89 

54,571 . 16 

60,418.40 

13,418.36 


$ c. 


$ c. 
176.13 


$ c. 


$ c. 
499.50 


$ c. 








428 50 


10,030.70 


7,181.04 


15,641.53 


17,865.67 


24,802.09 


12,018.92 


8,647.60 

4,743 . 66 

738.66 


1,694.15 

1,141.83 

554.37 


4,841.14 

3,979.94 

444.23 


10,530.03 
8,524.96 
2,892.74 


9,303.64 
7,525.82 
1,316.79 


2,985.94 
2,446.25 
1,169.54 


33.57 


2,072.96 


727.38 


95.76 




2,160.66 


1,428 98 




































24,854.83 

360.69 
6,500.00 


308,135.75 

5,280.41 

105,000.00 

1,849.66 

6,134.99 


11,298.77 
. 935.54 


25,178.73 

509.79 

17,500.00 

1,388.10 


39,813.40 

1,023.65 

16,000.00 

175.32 


45,608.50 

2,456.94 

7,200.00 

20.24 


20,478.13 

1,013.72 
11,500.00 


801.62 
12.06 


47.25 


150.02 














43,972.18 


221,065.67 
25,485.24 


3,071.30 


57,253.32 


9,186.94 


27,654.46 


20,999.05 














76,501.38 


672,951.72 


15,352.86 


101,829.94 


66,199.31 


82,940.14 


54,140.92 




1,926.84 
718.22 


3,566.61 








2,657.27 


72.86 


57.15 


481.99 


199.69 


480.40 








10.00 


5,390.28 


80.00 




743.01 


645.17 


. 95.00 








82.86 


8,035.34 


3,646.61 


57.15 


1,225.00 


844.86 


3,232.67 


43,972.18 
5,078.17 
1,000.00 


221,065.67 

147,346.71 

35,250.62 


3,071.30 
3,025.67 


57,253.32 
10,938.38 


9,186.94 
9,944.25 


27,654.46 

21,079.94 

400.00 


20,999.05 

12,436.69 

1,590.68 












50,050.35 


403,663.00 


6,096.97 


68,191.70 


19,131.19 


49,134.40 


35,026.42 


5,000.00 


63,438.84 


3,933.39 


5,536.66 


37,500.00 


15,000.00 


12,342.73 


.21,368.17 


197,814.54 


1,675.89 


28,044.43 


8,343.12 


17,960.88 


3,539.10 


26,368.17 


261,253.38 


5,609.28 


33,581.09 


45,843.12 


32,960.88 


15,881.83 


76,501.38 


672,951.72 


15,352.86 


101,829.94 


66,199.31 


82,940.14 


54,140.92 


0.3 


1.8 


29.7 


0.1 

» 


2.1 


1.5 J 


9.8 



204 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality . 


Belle River 

845 


Belleville 
15,642 


Blenheim 
1,873 


Bloom- 
fleld 
618 


Blyth 


Population 


632 






Assets 


$ c. 
204.20 


$ c. 

43,632.50 

89,268.14 

141,191.49 


$ c. 
14,465.35 

1,264.64 
36,056.14 


$ c. 


$ c. 








Distribution system — overhead 


22,198.75 


11,246.97 


11,942.56 


Line transformers 


6,059.74 
5,835.37 
1,662.57 


50,468.91 
73,977.10 
24,066.25 


16,585.16 

12,851.52 

3,859.04 

1,482.97 

532.42 


2,125.82 
3,397.38 
1,040.99 


2,664.45 


Meters 


3,237.27 


Street light equipment, regular 

Street light equipment, ornamental 
Miscellaneous construction expense 
Steam or hydraulic plant 


1,554.68 


212.25 


13,606.02 


1,403.42 


254.59 


Old plant 
























Total plant 


36,172.88 

825.51 

7,000.00 

74.11 


436.210.41 

1,237.74 
90,000.00 
17,121.99 
11,266.70 


87,097.24 

634.59 

6,000.00 

321.62 

702.28 


19,214.58 

698.00 

12,100.00 

59.55 


19,653.55 


Bank and cash balance 




Securities and investments 

Accounts Receivable . 


10,000.00 
631.22 






Sinking fund on local debentures 








Equity in H-E.P.C. systems 

Other assets 


14,922.69 


255,969.76 


52,104.74 


8,862.47 


13,828.82 














Total assets 


58,995.19 


811,806.60 


146,860.47 


40,934.60 


44,113.59 






Liabilities 
Debenture balance 








1,553.54 
0.24 




Accounts payable 




777.50 


1,716.95 


1,040.28 


Bank overdraft 




837.50 


Other liabilities 


220.00 


12,537.70 


1,881.72 


138.00 


200.00 






Total liabilities. . . 


220.00 


13,315.20 


3,598.67 


1,691.78 


2,077.86 






Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation. 


14,922.69 

12,112.06 

1,100.00 


255,969.76 
88,999.55 
17,915.69 


52,104.74 

28,022.46 

7,221.65 


8,862 47 
8,493.16 


13,828.82 
8,091.31 


Other reserves 










Total reserves 


28,134.75 


362,885.00 


87,348.85 


17,355.63 


21,920.13 






Surplus 

Debentures paid 


8,500.00 


176,000.00 


14,000.00 


9,646.46 


16,032.52 


Local sinking fund. . 




Operating surplus 


22,140.44 


259,606.40 


41,912.95 


12,240.73 


4,083.08 


Total surplus 


30,640.44 


435,606.40 


55,912.95 


21,887.19 


20,115.60 






Total liabilities, reserves and surplus. 


58,995.19 


811,806.60 


146,860.47 


40,934.60 


44,113.59 


Percentage of net debt^to total assets. 













1946 THE HYDRO-ELECTRIC POWER COMMISSION 



205 



4 A" — Continued 



Hydro Municipalities as at December 31, 1945 



Bolton 
609 


Bothwell 
605 


Bowmanville 
3,820 


Bradford 
1,034 


Braeside 
367 


Brampton 
6,157 


Brantford 
34,372 


$ c. 


$ c. 


.$ c. 
35,685.49 
894.47 
50,233.39 


$ c. 


$ c. 


$ c. 

5,665.93 
35,006.39 
56,367.24 


$ c 
115,881 10 






388.50 
23,909.40 




318,577 03 


11,526.25 


7,779.84 


3,157.90 


289,792.28 


5,363.31 

4,422.07 

887.89 


3,359.08 
3,924.17 
3,571.49 
1,131.22 
868.55 


13,923.80 

22,861.04 

8,433.47 


6,503.93 

7,161.20 

672.98 


1,541.91 

1,279.90 

43.02 


43,179.75 
34,951.40 
12,334.99 


227,135.52 

175,081 . 19 

27,724.92 

37 500 00 


1,043.48 


2,660.69 


2,172.88 




3,612.98 


15,791 06 








1,554.60 












32,400 00 
















24,797.60 

874.06 
13,500.00 


20,634.35 

16.12 

15,000.00 

60.99 


134,692.35 

10,487.86 

100,000.00 

4,151.39 

7,274.57 


40,808.89 

507.63 

12,800.00 

1,423.65 


6,022.73 
423.03 


191,118.68 

257.71 

67,200.00 

331.60 

156.71 


1,239,883.10 

3,393.03 
288,500 00 


137.05 


1,285.55 


24,144.57 
13 896 09 












23,862.34 


22,763.32 


94,753.51 
1.73 


24,725.21 
45.00 




236,228.03 
6.84 


1,297,306 73 






162 66 










63,171.05 


58,474.78 


351,361.41 


80,310.38 


7,731.31 


495,299.57 


2,807,286.18 








4,090.88 
346.80 


5,798.52 
1,414.70 






63.77 




455.37 


444.86 
2,465.09 
1,670.00 


6,192.14 






146.89 


1,252.17 


1,769.32 


707.21 


120.00 


64,253.59 


210.66 


1,252.17 


2,224.69 


5,144.89 


7,333.22 


4,579.95 


70,545.73 


23,862.34 


22,763.32 

9,991.99 

15.13 


94,753.51 
23,651.60 


24,725.21 

16,288.19 

2,629.88 




236,228.03 
87,108.64 
25,054.55 


1,297,306 73 


9,990.18 


120.00 


542,412.27 
47,768 53 








33,852.52 


32,770.44 


118,405.11 


43,643.28 


120.00 


348,391.22 


1,887,487.53 


12,500.00 


5,534.19 


71,000.00 


21,109.12 


201.48 


69,050.64 


530,000.00 


16,607.87 


18,917.98 


159,731.61 


10,413.09 


76.61 


73,277.76 


319,252.92 


29,107.87 


24,452.17 


230,731.61 


31,522.21 


278.09 


142,328.40 


849,252.02 


63,171.05 


58,474.78 


351,361.41 


80,310.38 


7,731.31 


495,299.57 


2,807,286.18 


0.5 


0.3 


0.9 


9.2 


94.8 


1.8 


2.2 



206 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 






Municipality 


Brantford 
Twp. 
V.A. 


Brechin 
P.V. 


Bridgeport 
P.V. 


Brigden 
P.V. 


Brighton 
1,581 


Population 






Assets 

Lands and buildings 


$ c. 

228.15 
16,620.00 
85,403.34 


$ c. 


$ c. 


$ c. 
1,482.03 


$ c. 
600.00 


Substation equipment 








Distribution system — overhead. . . . 
Distribution system — underground 


2,135.59 


10,618.09 


8,867.44 


20,834.17 


Line transformers 


24,492.27 

24,988.47 

7,529.00 


1,495.73 
889.42 
248.55 


4,294.28 
3,682.10 
1,656.87 


3,818.17 

2,634.62 

509.23 


8,190 52 


Meters 

Street light equipment, regular. . . . 
Street light equipment, ornamental 
Miscellaneous construction expense 
Steam or hydraulic plant. 


9,032.32 
1,305.85 


7,817.74 


546.92 


623.09 


1,090.03 


578.59 


Old plant 
























Total plant 


167,078.97 

281.00 

43,280.00 

1,047.87 

2,207.40 


5,316.21 

2,605.05 

500.00 

58.90 

24.12 


20,874.43 

340.55 

7,000.00 

135.83 


18,401.52 

559.76 

7,800.00 

169.47 


40,541 . 45 


Bank and cash balance 




Securities and investments 

Accounts Receivable 


19,000.00 
3,203.58 


Inventories 


4,433.04 


Sinking fund on local debentures 








Equity in H-E.P.C. systems 

Other assets 


51,791.08 


9,943.97 


9,318.68 
52.51 


15,746.38 


17,094.98 
32.79 












Total assets 


265,686.32 


18,448.25 


37,722.00 


42,677.13 


84,305.84 






Liabilities 

Debenture balance 


60,000.00 

349.31 

5,829.84 

1,853.40 


458.86 
253.48 


2,238.06 

33.74 

168.13 

280.00 




3,506.46 


Accounts payable 


57.65 


54.99 


Bank overdraft. . . . 


844.66 


Other liabilities 


37.85 


15.00 


1,109.39 






Total liabilities 


68,032.55 


750.19 


2,719.93 


72.65 


5,515.50 






Reserves 

For equity in H-E.P.C. systems. . . 
For depreciation 


51,791.08 

40,046.67 

104.82 


9,943.97 
2,647.59 

47.11 


9,318.68 
8,638.14 


15,746.38 

6,948.17 

97.24 


17,094.98 
8,477.27 


Other reserves . . 


4,227.45 








Total reserves 


91,942.57 


12,638.67 


17,956.82 


22,791.79 


29,799.70 






Surplus 

Debentures paid 


57,125.66 


2,752.06 


10,129.97 


8,000.00 


21,493.54 


Local sinking fund 




Operating surplus 


48,585.54 


2,307.33 


6,915.28 


11,812.69 


27,497.10 






Total surplus 


105,711.20 


5,059.39 


17,045.25 


19,812.69 


48,990.64 






Total liabilities, reserves and surplus. 


265,686.32 


18,448.25 


37,722.00 


42,677.13 


84,305.84 


Percentage of net debt to total assets. 


31.8 


0.8 


9.6 


0.3 


8.2 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



207 



"A" — Continued 



Hydro Municipalities as at December 31, 1945 



Brockville 
11,112 


Brussels 
730 


Burford 
P.V. 


Burgess- 
ville 
P.V. 


Burlington 
4,311 


Caledonia 
1,395 


Campbell 
ville 
P.V. 


$ c. 
45,591 . 03 


$ c. 


$ c. 
202.00 


$ c. 


$ c. 
12,500.00 
3,900.00 
90,706.52 


$ c. 
656.01 


$ c. 


39,212 30 






102,747.67 


15,640.85 


9,921.61 


3,864.16 


20,505.76 


3,084.60 


56,887.58 
56,135.33 
28,035.84 


4,656.44 
4,887.33 
1,707.79 


7,284.86 

4,865.77 

437.14 


3,137.18 

1,510.28 

261.02 


36,603.41 

23,301.62 

3,822.78 


7,869.29 
9,187.07 
2,082.68 


1,323.46 
891.74 
335.61 


608.52 


1,537.56 


684.04 


457.22 


7,646.87 


803.00 


6.82 








, 






















329,218.27 

11,151.01 

110,000.00 

1,601.75 

5,146.60 


28,429.97 

1,633.26 

14,000.00 

239.79 


23,395.42 

523.73 

8,000.00 

79.96 


9,229.86 

234.99 

3,800.00 

6.42 


178,481.20 

3,713.42 

17,500.00 

8,164.54 


41,103.81 

1,400.18 

8,700.00 

236.10 

1,697.13 


5,642.23 

33.58 

4,100.00 

27.02 














241,712.49 


18,014.76 
0.22 


19,087.99 


7,171.08 




31,546.74 


3,785.41 


408.31 


*40,i63.62 














699,238.43 


62,318.00 


51,087.10 


20,442.35 


247,962.78 


84,683.96 


13,588.24 










160,500.00 
7,179.86 






1,753.49 




38.96 


316.59 


59.49 


28.85 








2,749.70 


115.28 


100.30 


15.00 


2,867.75 


382.19 








4,503.19 


115.28 


139.26 


331.59 


170,547.61 


441.68 


28.85 


241,712.49 


18,014.76 
11,603.00 


19,087.99 
6,333.24 
1,000.00 


7,171.08 
4,636.19 




31,546.74 
7,556.69 


3,785.41 


106,186.47 
13,917.81 


19,305.50 
40,103.62 


1,960.71 












361,816.77 


29,617.76 


26,421.23 


11,807.27 


59,409.12 


39,103.43 


5,746.12 


226,657.54 


21,000.00 


9,000.00 


3,500.00 




4,624.00 


5,447.77 








106,260.93 


11,584.96 


15,526.61 


4,803.49 


18,006.05 


40,514.85 


2,365.50 


332,918.47 


52,584.96 


24,526.61 


8,303.49 


18,006.05 


45,138.85 


7,813.27 


699,238.43 


62,318.00 


51,087. 1C 


20,442.35 


247,962.78 


84,683.96 


13,588.24 


0.9 


0.3 


0.4 


2.5 


82.0 


0.8 


0.3 



Not used in figuring net debt to total assets. 



208 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality. 
Population. . 



Assets 

Lands and buildings 

Substation equipment 

Distribution system — overhead. . . . 
Distribution system — underground 

Line transformers 

Meters 

Street light equipment, regular. . . . 
Street light equipment, ornamental 
Miscellaneous construction expense 

Steam or hydraulic plant 

Old plant 



Total plant . 



Bank and cash balance 

Securities and investments 

Accounts Receivable 

Inventories 

Sinking fund on local debentures 
Equity in H-E.P.C. systems. . . . 
Other assets 



Total assets. 



Liabilities 

Debenture balance. 
Accounts payable. . 

Bank overdraft 

Other liabilities 



Total liabilities. 



Reserves 

For equity in H-E.P.C. systems. 

For depreciation 

Other reserves 



Total reserves. 



Surplus 

Debentures paid. . . 
Local sinking fund. 
Operating surplus . 



Total surplus 

Total liabilities, reserves and surplus. 
Percentage of net debt to total assets. 



Canning- 
ton 
718 



12,310.47 



6,472.92 
5,209.81 
1,096.47 



508.73 



25,598.40 

1,939.03 

7,000.00 

393.00 

240.15 



>0,858. 07 



56,028.65 



>52.82 



60.00 



312.82 



20,858.07 

15,297.06 

564.05 



36,719.18 



15,000.00 



3,996.65 



18,996.65 



56,028.65 



0.9 



Cardinal 
1,641 



14,240.25 



4,132.27 

3,974.67 

520.65 



542.17 
3,474 .80 



Carleton 
Place 

4,217 



$ c 
13,390.32 

2,471.63 
47,969.70 



14,832.32 

20,565.69 

6,780.17 



3,095.26 



26,884.81 

935.31 

5,500.00 
186.90 



9,120.59 



42,627.61 



1,611.12 
217.10 



5.00 



4,833.22 



9,120.59 

4,506.73 

51.52 



13,678.84 



10,388.88 



13,726.67 



24,115.55 



42,627.61 



14.4 



5,289.19 



114,394.28 

6,362.79 

47,500.00 

856.41 

1,986.70 



108,729.13 



279,829.31 



7,767.66 
3,072.06 



1,790.40 



12,630.12 



108,729.13 

29,591.47 

878.98 



139,199.58 



58,232.34 



69,767.27 



127,999.61 



279,829.31 



7.4 



Cayuga 
652 



$ 



21,585.86 



7,893.44 
4,635.80 
1,357.57 



196.15 



35,668.82 

1,845.30 

5,200.00 

124.28 

373.07 



13,763.78 
1.49 



56,976.74 



2,455.32 



745.00 



3,200.32 



13,763.78 

10,268.28 

160.46 



24,192.52 



20,000.00 



9,583.90 



29,583.90 



56,976.74 



7.4 



Chatham 
17,807 



$ c. 

120,444.01 

137,358.67 

149,289.10 

92,852.98 

109,961.76 

85,215.37 

21,749.52 

35,426.10 

32,814.46 



42,752.31 



827,864.28 

50.00 

200,000.00 

28,615.51 

8,964.16 



551,646.76 



1,617,140.71 



62,282.96 



27,205.61 
43,276.58 



132,765.15 



551,646.76 

225,125.70 

97,828.16 



874,600.62 



307,717.04 



302,057.90 



609,774.94 



1,617,140.71 



9.4 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



209 



A"— Continued 



Hydro Municipalities as at December 31, 1945 



1 

Chatsworth j 
323 


Chesley 
1,550 


Chesterville 
1,050 


Chippawa 
1,251 


Clifford 
436 


Clinton 
2,037 


Cobden 

627 


S c. 
364 89 


$ c. 

6,000.00 

2,305.58 

22,746.63 


$• c. 
335.00 


$ c. 
1,434.46 


$ c. 


$ c. 
10,227.74 
11,473.46 
26,731.09 


$ c. 








5,250.67 


10,697.76 


16,284.07 


8,353.86 


4,945.65 


2,309.52 

2,038.18 

573.12 


9.948.94 
8,531.40 
2,506.98 


4,641.14 

5,333.10 

593.64 


9,521.89 
6,428.70 
3,141.60 


2,025.61 
2,679.28 
1,014.93 


13,300.33 

12,077.28 

5,705.10 


2,090. 10 

1,909.26 

499.69 


517.48 


3,309.73 


662.37 


529.00 


37.44 


4,229.52 


45.86 














2 853 85 
















11,053.86 
586 96 


55,349.26 


22,263.01 

107.45 

14,000.00 

1,736.30 

681.35 


37,339.72 

1,764.66 

11,500.00 

122.40 

80.65 


14,111.12 

415.93 

5,000.00 

48.00 


83,744.52 

1,059.98 

28,500.00 

818.33 

3,688.05 


12,344.41 

1,356.49 

2,000.00 

41.37 


3,000.00 
56.29 


13,000.00 

49.84 

835.81 










6,362.72 


49,704.81 


34,848.52 


23,569.82 
0.76 


10,306.45 


64,474.80 


2,863.18 














21,059.83 


118,939.72 


73,636.63 


74,378.01 


29,881.50 


182,285.68 


18,605.45 










3,826.82 
891.41 

5.00 




1,338.57 


33.07 


33.69 
1,597.59 


♦ 42.90 
102.00 


970.00 


525.83 
651.45 






170.36 


157 50 








203.43 


1,631.28 


144.90 


970.00 


4,723.23 


1,177.28 


1,496.07 


6,362.72 

4,845.45 


49,704.81 

20,764.50 

3,500.00 


34,848.52 
9,609.67 


23,569.82 
8,856.21 


10,306.45 
4,771.42 


64,474.80 
27,628.58 
10,930.24 


2,863.18 
613.27 












11,208.17 


73,969.31 


44,458.19 


32,426.03 


15,077.87 


103,033.62 


3,476.45 


5,400.00 


27,500.00 


6,500.00 


13,350.00 


4,173.18 


44,500.00 


6,464.70 


4,248.23 


15,839.13 


22,533.54 


27,631.98 


5,907.22 


33,574.78 


7,168.23 


9,648.23 


43,339.13 


29,033.54 


40,981.98 


10,080.40 


78,074.78 


13,632.93 
















1.4 


2.3 


0.4 


1.8 


24.1 


1.0 


9.5 



210 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Cobourg 
5,022 


Colborne 
872 


Coldwater 
580 


Colling- 
wood 
6,318 


Comber 


Population 


P.V. 






Assets 

Lands and buildings 


$ c. 
31,397.70 

1,668.35 
86,567.66 


$ c. 


$ c. 
275.00 


$ c. 
15,950.08 
24,954.35 
63,282.78 


$ c. 
62 00 


Substation equipment 






Distribution system — overhead. . . . 
Distribution system — underground . 


11,284.81 


10,017.75 


8,018.82 


Line transformers 


28,474.09 
33,589.41 
14,168.37 


2,175.11 
3,865.17 
1,702.99 


6,108.01 

3,530.46 

775.02 


26,682.53 

29,891.80 

3,354.59 


5,441 92 


Meters 


3,214 64 


Street light equipment, regular. . . . 
Street light equipment, ornamental 


423.35 


Miscellaneous construction expense 
Steam or hydraulic plant 


3,025.81 


2,555.90 


164.28 


822.52 


1,015.01 


Old plant 
























Total plant . 


198,891 39 

17,720.13 

45,000.00 

4,723.34 

4,750.76 


21,583.98 

1,190.04 

5,500.00 

362.18 

1,718.38 


20,870.52 

1,374.96 
3,500.00 
1,710.25 


164,938.65 

8,497.53 

40,000.00 

440.53 

575.00 


18,175.74 


Bank and cash balance 


25.00 


Securities and investments 

Accounts Receivable 


9,500.00 
12.02 


Inventories 




Sinking fund on local debentures . . 






Equity in H-E.P.C. systems 


72,961.31 
36.50 


6.881.47 
180.37 


19,683.64 


189,397.78 


24,475.92 










Total assets 


344,083.43 


37,416.42 


47,139.37 


403,849.49 


52,188.68 






Liabilities 

Debenture balance 


45,873.28 
17.00 


5,723.33 








Accounts payable 


79.43 


233.76 


382.52 


Bank overdraft 




227.49 


Other liabilities 


4,360.32 


315.00 


271.37 


3,401.03 


38.10 






Total liabilities ...... 


50,250.60 


6,038.33 


350.80 


3,634.79 


648.11 






Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


72,961.31 

51,316.37 

1,500.00 


6,881.47 
4,583.90 


19,683.64 

13,312.12 

80.00 


189,397.78 

82,696.46 

174.29 


24,475.92 
9,144.51 


Other reserves 


25.36 








Total reserves 


125,777.68 


11,465.37 


33,075.76 


272,268.53 


33,645.79 






Surplus 

Debentures paid 


60,120.22 


6,471.26 


7,000.00 


38,183.42 


7,700.00 


Local sinking fund 




Operating surplus 


107,934.93 


13,441.46 


6,712.81 


89,762.75 


10,194.78 






Total surplus 


168,055.15 


19,912.72 


13,712.81 


127,946. 17 


17,894.78 






Total liabilities, reserves and surplus. 


344,083.43 


37,416.42 


47,139.37 


403,849.49 


52,188.68 


Percentage of net debt to total assets. 


18.5 


19.8 


1.3 


1.7 


2.3 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 211 



"A" — Continued 



Hydro Municipalities as at December 31, 1945 



Cookstown 
P.V. 


Cottam 
P.V. 


Courtright 
357 


Creemore 
661 


Dashwood 
P.V. 


Delaware 
P.V. 


Delhi 
2,063 


$ c. 
70 00 


$ c. 
475.63 


$. c. 


$ c. 


$ c. 


$ c. 


$ c. 
2,472.54 


392 95 












9,928.99 


11,359.30 


6,772.36 


7,741.76 


3,899.45 


5,440.45 


30,546.50 


2,892.99 

2,741.65 

919.69 


3.802.11 

2,774.12 

366.43 


1,225.40 

1,191.54 

470.44 


3,676.20 

3,475.13 

358.56 


2,400.81 

2,159.96 

364.52 


1,819 08 

1,510.15 

205.24 


18,105.83 

12,893 92 

4,541.57 


1,513.26 


481 . 18 


583.66 


43.20 


291 . 87 


203.81 


3,233.72 














28,518 74 
















18,459.53 
850.94 


19,258.77 


10,243.40 


15,294.85 

125.26 

7,000.00 

81.77 


9,116.61 

525.11 

6,500.00 

18.59 


9,178.73 

559.63 

2,500.00 

10.11 


100,312.82 
2,228.24 


11,000.00 
611.74 


3,303.36 
382.51 


7,500.00 
20.57 


23,500.00 

25.00 

2,570.65 
















7,545.39 


6,413.64 


7,779.49 


16,173.00 


11,638.94 


4,770.52 


11,061.99 
1.39 
















38,467.60 


29,358.28 


25,543.46 


38,674.88 


27,799.25 


17,018.99 


139,700.09 


1,323.23 


713.86 

82.88 

166.30 

180.60 






221.74 
55.36 




64,723.18 


37.41 


14.13 

85.41 

5.00 


1.56 


43.36 


240.49 


115.00 


232.38 




10.00 


1,676.79 








1,475.64 


1,143.64 


104.54 


233.94 


277.10 


53.36 


66,640.46 


7,545.39 
10,341.15 


6,413.64 

5,685.43 

37.95 


7,779.49 
3,369.77 

5.24 


16,173.00 

7,617.95 

50 33 


11,638.94 
4,461.25 


4,770.52 

1,433.63 

27.24 


11,061.99 

14,455.23 

7,097 12 










17,886.54 


12,137.02 


11,154.50 


23,841.28 


16,100.19 


6,231.39 


32,614.34 


12,176.77 


8,286.36 


8,138.35 


2,823.61 


3,178.26 


4,000.00 


20,276.82 


6,928.65 


7,791.26 


6,146.07 


11,776.05 


8,243.70 


6,734.24 


20,168.47 


19,105.42 


16,077.62 


14,284.42 


14,599.66 


11,421.96 


10,734.24 


40,445.29 


38,467.60 


. 29,358.28 


25,543.46 


38,674.88 


27,799.25 


17,018.99 


139,700.09 


4.8 


4.9 


0.5 


1.0 


1.7 


0.4 


51.8 



212 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM 


— Continued 








Municipality 


Deseronto 
1,100 


Dorchester 
P.V. 


Drayton 
518 


Dresden 
1,532 


Drumbo 


Population 


P.V. 


Assets 
Lands and buildings 


$ c. 
597.41 
161.18 
11,046.14 


$ c. 


$ c. 


$ c. 
405.30 
523.00 
21,874.24 


$ c. 


Substation equipment 








Distribution system — overhead 

Distribution system — underground - 


9,461.36 


10,236.94 


4,762.72 


Line transformers 


4,174.56 

6,038.92 

432.60 


3,237.06 

3,049.12 

928.18 


4,750.43 

3,754.97 

833.21 


11,108.42 
9,284.21 
1,729.55 


1,801.50 


Meters 


2,156.10 


Street light equipment, regular. . . . 
Street light equipment, ornamental 
Miscellaneous construction expense 
Steam or hydraulic plant 


284.27 


508.20 


328.41 


428.74 


2,194.45 


235.58 


Old plant 
























Total plant 


22,959.01 

.1.851.06 

6,000.00 

2,259.33 

573.89 


17,004.13 

61.08 

6,500.00 

163.08 

57.98 


20,004.29 

883.53 

7,000.00 

50.82 


47,119.17 

2,183.84 

9,500.00 

913.14 

1,810.56 


9,240.17 


Bank and cash balance 


4,140.50 


Securities and investments 

Accounts Receivable 


5,000.00 
0.31 


Inventories 




Sinking fund on local debentures . . 






Equity in H-E.P.C. systems 

Other assets 


10,642.11 


10,512.56 


17,575.34 


44,036.20 


9,237.50 














Total assets 


44,285.40 


34,298.83 


45,513.98 


105,562.91 


27,618.48 






Liabilities 

Debenture balance 






1,270.34 
724.47 






Accounts payable 


115.34 


323.26 


156.94 


87.22 


Bank overdraft 




Other liabilities 


328.01 


32.00 




353.00 










Total liabilities . 


443.35 


355.26 


1,994.81 


509.94 


87.22 






Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


10,642.11 
5,002.39 


10,512.56 
4,940.95 
1,537.56 


17,575.34 
11,414.90 


44,036.20 
7,247.52 
4,011.46 


9,237.50 
6,681.70 


Other reserves 












Total reserves 


15,644.50 


16,991.07 


28,990.24 


55,295.18 


15,919.20 






Surplus 

Debentures paid 


15,000.00 


4,300.00 


8,229.66 


11,423.24 


4,500.00 


Local sinking fund. . 




Operating surplus 


13,197.55 


12,652.50 


6,299.27 


38,334.55 


7,112.06 






Total surplus 


28,197.55 


16,952.50 


14,528.93 


49,757.79 


11,612.06 






Total liabilities, reserves and surplus. 


44,285.40 


34,298.83 


45,513.98 


105,562.91 


27,618.48 


Percentage of net debt to total assets. 


1.3 


1.5 


7.1 


0.8 


0.5 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



213 



A"— Continued 



Hydro Municipalities as at December 31, 1945 



Dublin 
P.V. 


Dundalk 
650 


Dundas 
5,588 


Dunnville 
4,305 


Durham 
1,957 


Dutton 
791 


East York 
Twp. 
V.A. 


$ c. 


$ c. 


$ . c. 
19,401.77 
24,228.53 
55,893.38 


$ c. 

3,495.43 
39,710.85 
42,391.28 


$ c. 
210.28 
546.02 

24,505.64 


$ c. 
75.11 


$ c. 
38,170.70 






106,472.59 


6,023.19 


8,776.11 


10,170.67 


405,425.10 


2,502.55 

1,279.91 

539.86 


4,345.50 
3,676.05 
1,205.41 


29,796.86 

28,181.26 

11,562.33 

J, 154. 52 

4,172.17 


25,522.02 

23,400.66 

9,910.87 


10,673.64 
8,306.16 
1,545.06 


4,348.03 

3,675.92 

754.38 


127,693.43 

190,312.92 

36,800.41 


787.06 


• 291.49 


7,028.43 


941.72 


288.17 


15,111.00 








10,717.62 




















11,132.57 

1,580.64 

1,500.00 

113.12 


18,294.56 

1,491.04 

9,000.00 

76.19 


174,390.82 

8,003.45 

32,000.00 

409.44 

286.12 


162,177.16 

35.00 

42,000.00 

680.14 

1,313.03 


46,728.52 

2,804.52 

12,000.00 

435.52 

31.73 


19,312.28 

142.29 

11,500.00 

12.61 


919,986.15 

7,882.18 

7,000.00 

39,171.37 

15,585.95 










7,636.35 


17,739.77 


196,130.13 
325.73 


89,299.82 


41,834.44 
8.23 


26,978.37 


411,797.76 












21,962.68 


46,601 . 56 


411,545.69 


295,505.15 


103,842.96 


57,945.55 


1,401,423.41 






6,779.29 

118.27 

2,383.26 

2,234.40 










70.65 


228.62 


259.97 




34,582.32 








16.00 




10,594.77 


24.00 


187.36 


13,008.44 






16.00 70.65 


10,823.39 


11,515.22 


283.97 


187.36 


47,590.76 


7,636.35 
6,804.15 


17,739.77 
9,481.51 
1,300.00 


196,130.13 

86,737.63 

183.97 


89,299.82 
53,426.83 
16,500.00 


41,834.44 
20,435.10 


26,978.37 

11,728.68 

33.23 


411,797.76 

183,091.22 

3,199 12 








14,440. 50j 28,521.28 


283,051.73 


159,226.65 


62,269.54 


38,740.28 


598,088.10 


i 
6,200.00 5,955.96 


53,000.00 


68,720.71 


25,800.00 


8,407.49 


349,763.36 


1,306.181 12,053.67 

i 


64,670.57 


56,042.57 


15,489.45 


10,610.42 


405,981.19 


7,506.18 18,009.63 


117,670.57 


124,763.28 


41,289.45 


19,017.91 


755,744.55 


21,962.68 


46,601.56 


411,545.69 


295,505.15 


103,842.96 


57,945.55 


1,401,423.41 


0.1 0.2 

i 


4.5 


5.6 


0.4 


0.6 


4.8 



214 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Elmira 
2,186 


Elmvale 
P.V. 


Elmwood 
P.V. 


Elora 

1,167 




Population 


445 


Assets 

Lands and buildings 


$ c. 
7,540.68 


$ c. 
106.25 
2,273.07 
10,202.26 


$ c. 


$ c. 
1,524.54 


$ c. 


Substation equipment 






Distribution system — overhead 

Distribution system — underground 


38,448.79 

540.21 

25,580.83 

16,067.91 

2,323.27 


5,539.47 


18,737.42 


10,960.81 


Line transformers 


4,561.25 

4,764.64 

447.17 


2,033.80 

1,443.62 

700.49 


8,526.59 
7,230.93 
1,513.11 


6,408.26- 

2,542.22 

535.7a 


Meters 


Street light equipment, regular. . . . 
Street light equipment, ornamental 


Miscellaneous construction expense 
Steam or hydraulic plant 


803.79 


526.13 


1,093.62 


1,079.33 


69.45 


Old plant 


2,168.08 




















Total plant 


93,473.56 

3,347.36 

42,500.00 

119.92 


22,880.77 

1,784.21 

11,200.00 

43.69 


10,811.00 

779.73 

2,600.00 

211.91 


38,611.92 

362.32 

18,500.00 

17.74 

243.34 


20,516 47 


Bank and casi balance 

Securities and investments 

Accounts Receivable 


1,492.20 

3,000. oa 

39 39 


Inventories 




Sinking fund on local debentures . . 










Equity in H-E.P.C. systems 

Other assets 


105,089.34 
15.75 


19,953.56 


5,824.87 


50,166.36 


15,356.54 












Total assets 


244,545.93 


55,862.23 


20,227.51 


107,901.68 


40,404 60 






Liabilities 

Debenture balance 


3,277.81 
160.85 










Accounts payable 


73.24 


41.64 


769.20 
170.91 
321.25 


154.14 


Bank overdraft 




Other liabilities 


802.65 




25.00 


40.00' 






Total liabilities 


4,241.31 


73.24 


66.64 


1,261.36 


194.14 


Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


105,089.34 

38,691.88 

9,000.00 


19,953.56 

12,713.97 

3.68 


5,824.87 
4,398.90 


50,166.36 
21,818.92 


15,356.54 
7,957.02 


Other reserves 


9.58 










Total reserves 


152,781.22 


32,671.21 


10,223.77 


71,985.28 


23,323.14 






Surplus 

Debentures paid 


33,890.69 


7,000.00 


7,200.00 


13,000.00 


7,500.00 


Local sinking fund 




Operating surplus 


53,632.71 


16,117.78 


2,737.10 


21,655.04 








Total surplus 


87,523.40 


23,117.78 


9,937.10 


34,655.04 


16,887.32 






Total liabilities, reserves and surplus. 


244,545.93 


55,862.23 


20,227.51 


107,901.68 




Percentage ot net debt to total assets. 


3.0 


0.2 


0.5 


2.2 


0.8 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 215 



''A" — Continued 



Hydro Municipalities as at December 31, 1945 



Erieau 

228 


Erie Beach 
23 


Essex 
1,986 


Etobicoke 
Twp. 
V.A. 


Exeter 
1,794 


Fergus 
2,624 


$ c. 


$ c. 


$ c. 
609. 3C 


$ c. 
1 37,100.9c 
3,001.ic 
369,616.47 


$ c. 
10,132.02 


$ c. 








12,697.36 


2,605.67 


42,048.71 

442.55 

18,434.74 

14,171.25 

1,707.88 

7,205.06 

765.91 




33,039.11 


36,614.62 


4,530.77 

4,047.6? 

435.74 


925.32 
1,069.16 


129,991.43 
106,020. 1C 

25,293.17 
2,689.44 

19,510.63 


15,480.95 

10,800.10 

4,902.87 


25,890.03 

16,400.05 

6,126.75 








379.90 


375.03 


2,074,46 


715.30 












2,546.59 














22,091.46 

2,400.29 

1,000.00 

43.69 


4,975.18 

610.48 

1,500.00 

82.23 


85,385.40 

2,319.97 

34,000.00 

573.06 


693,223.42 

1,545.83 
52,000.00 
25,235.04 
17,485.84 


76,429.51 

1,676.72 

18,500.00 

1,300.87 

1,840.76 


88,293.34 

1,052.62 

33,000.00 

196.60 

129.44 










9,645.81 


2,297.14 
2.92 


44,918.71 


338,384.68 
75.87 


58,887.04 
1,000.00 


90,900.54 








35,181.25 


9,467.95 


167,197. 14 


1,127,950.68 


159,634.90 


213,572.54 




271.86 
71.17 


10,762.85 
189.61 


29,590.72 
32,072.57 
22,674.55 
10,686.27 




1,790.45 


233.63 


521.01 


139.57 


35.00 




7,802.73 


545.00 


. 631.85 








268.63 


343.03 


18,755.19 


95,024.11 


1,066.01 


2,561.87 


9,645.81 

6,772.44 

39.16 


2,297.14 
1,132.43 


44,918.71 

32,403.96 

7.328.29 


338,384.68 

175,862.65 

30,721.43 


58,887.04 

23,222.92 

8,534.06 


90,900.54 
22,106.75 
10,198.59 








16,457.41 


3,429.57 


84,650.96 


544,968.76 


90,644.02 


123,205.88 


6,883.13 


3,028.14 


11,737.15 


236,104.68 


20,000.05 


40,209.55 


11,572.08 


2,667.21 


52,053.84 


251,853.13 


47,924.82 


47,595.24 


18,455.21 


5,695.35 


63,790.99 


487,957.81 


67,924.87 


87,804.79 






167,197.14 


















2.1 



216 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Finch 
393 


Flesherton 
341 


Fonthill 
1,009 


Forest 


Forest Hill 


Population 


1,573 13,484 






Assets 
Lands and buildings .... 


$ c. 


$ c. 
408.78 


'$ c. 


$ c. 
6,576.61 


$ C. 
39,501.92 


Substation equipment. . . . 






80,767.90 


Distribution system — overhead. . . . 
Distribution system — underground 


8,162.17 


6,017.57 


14,386.01 


24,076.98 


205,719.39 
2,169 95 


Line transformers 


2,486.47 

2,366.22 

504.07 


3,232.45 

2,533.77 

817.68 


6,614.12 
6,297.68 
1,927.02 


14,382.10 

12,594.16 

2,663.94 


116,582.68 


Meters 


71,241.29 


Street light equipment, regular. . . . 
Street light equipment, ornamental 


9,779.95 
16,795.63 


Miscellaneous construction expense 
Steam or hydraulic plant 


16.24 


934.47 


402.46 


921.74 


13,002.91 


Old plant 






3,500.00 
















Total plant 


13,535.17 

631.06 

3,500.00 

44.55 


13,944.72 

764.99 

9,000.00 

4.49 

9.80 


33,127.29 

2,377.92 

2,000.00 

145.17 


61,215.53 

3,971.28 

30,510.00 

676.86 

1,693.10 


555,561.62 


Bank and cash balance 


487.19 


Securities and investments. . . 
Accounts Receivable. . 


179,000.00 
1,979.40 


Inventories .... 


10,199.79 


Sinking fund on local debentures 








Equity in H-E.P.C. systems 

Other assets 


6,315.47 


8,709.14 


9,585.43 


47,590.37 
6.83 


271,996.64 












Total assets 


24,026.25 


32,433.14 


47,235.81 


145,663.97 


1,019,224.64 






Liabilities 

Debenture balance 


1,128.90 
46.03 




1,586.33 
63.97 




223,072.89 


Accounts payable 


32.40 


39.77 


4,549.96 


Bank overdraft 




Other liabilities 


100.95 


71.00 


374.30 


159.46 


28,658.58 






Total liabilities 


1,275.88 


103.40 


2,024.60 


199.23 


256,281.43 


Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


6,315.47 

3,521.61 

2.91 


8,709.14 
6,017.92 


9,585.43 
6,413.59 


47,590.37 

27,893.37 

6,087.59 


271,996.64 
160,608.57 


Other reserves . . 


750.00 










Total reserves. . 


9,839.99 


14,727.06 


15,999.02 


81,571.33 


433,355.21 






Surplus 

Debentures paid 


5,871 . 10 


6,700.00 


20,913.67 


23,357.13 


139,708.71 


Local sinking fund 




Operating surplus .... 


7,039.28 


10,902.68 


8,298.52 


40,536.28 


189,879.29 






Total surplus .... 


12,910.38 


17,602.68 


29,212.19 


63,893.41 


329,588.00 






Total liabilities, reserves and surplus . 


24,026.25 


32,433.14 


47,235.81 


145,663.97 


1,019,224.64 


Percentage of net debt to total assets. 


7.2 


0.4 


5.4 


0.2 


32.8 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



217 



'A"— Continued 



Hydro Municipalities as at December 31, 1945 



Gait 
14,693 


Georgetown 

2,448 


Glencoe 

752 


Goderich 
4,987 


Grand Valley 
576 


Granton 
P.V. 


$ c. 
203,650.78 


$ c. 
5,041.05 


$ c. 
3,457.66 


$ c. 
13,569.89 
35,493.52 
73,934.13 


$ c. 
36.50 


$ c. 


162,216.49 




298,697.02 
4,653.65 


39,160.21 


23,762.95 


12,473.53 


4,489.45 


160,379.34 
92,148.10 
72,587.24 


30,035.76 

19,049.02 

4,598.54 


9,120.60 
4,935.19 
2,118.44 


28,544.99 

25,039.25 

9,159.76 


3,819.98 
4,046.62 
1,051.12 


1,515.11 

1,837.00 

180.78 


11,582.55 


2,438.65 


1,162.70 


5,394.82 


250.70 


113.08 




2,209.80 




14,622.15 














1,005,915.17 

350.00 

165,000.00 

1,795.84 

26,405.62 


102,533.03 

3,811.13 

25,818.62 

1,153.90 


44,557.54 

717.99 

15,100.00 

168.97 

460.34 


205,758.51 

15,097.93 

65,000.00 

746.52 

# 981.09 


21,678.45 

1,648.62 

11,000.00 

71.52 


8,135.42 

473.87 

5,200.00 

88.49 










766,522.01 
740.32 


145,910.21 
0.36 


27,992.19 


170,000.86 
16.43 


16,397.26 


10,758.92 
28.05 










1,966,728,96 


279,227.25 


88,997.03 


457,601.34 


50,795.85 


24,684.75 








16,515.16 
303.31 






801 . 16 
15,055.93 


356.47 


40.55 


94.79 


415.14 


5,524.60 


2,287.11 


346.59 


3,456.63 












21,381.69 


2,643.58 


387.14 


20,275.10 


94.79 


415.14 


766,522.01 

440,436.83 

40,861.60 


145,910.21 
31,418.52 


27,992.19 

16,862.46 

1,855.34 


170,000.86 

115,158.24 

6,819.63 


16,397.26 

12,485.09 

1,000.00 


10,758.92 

4,576.45 

60.00 








1,247,820.44 


177,328.73 


46,709.99 


291,978.73 


29,882.35 


15,395.37 


518,001.95 


20,000.00 


20,112.88 


79,572.89 


11,000.00 


3,500.00 


179,524.88 


79,254.94 


21,787.02 


65,774.62 


9,818.71 


5,374.24 


697,526.83 


99,254.94 


41,899.90 


145,347.51 


20,818.71 


8,874.24 


1,966,728.96 


279,227.25 


88,997.03 


457,601.34 


50,795.85 


24,684.75 


1.8 


2.0 


0.6 


7.0 


0.3 


3.0 



218 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Gravenhurst 
2,405 


Grimsby 
1,993 


Guelph 
23,225 


Hagersville 
1 588 


Population 






Assets 

Lands and buildings 


$ c. 
10,072.27 
10,936.03 
40,833.02 

1,941.77 
16,037.39 
15,018.10 

4,472.25 


$ c. 


$ c. 

14,744.58 
167,353.59 
282,729.55 

28,847.47 
123,275.76 
121,886.37 

45,090.67 


$ c. 


Substation equipment 




864 37 


Distribution system — overhead 

Distribution system — underground. . . 


39,502.66 


21,667.71 


Line, transformers 


23,647.07 

18,370.29 

2,551.81 

1,925.00 

1,327.00 


12,382 70 


Meters 


11,084 69 


Street light equipment, regular 

Street light equipment, ornamental . . 


1,252.45 


Miscellaneous construction expense. . 
Steam or hydraulic plant 


2,017.68 


12,599.10 


955.37 


Old plant 




















Total plant 


101,328.51 

1,769.26 

22,000.00 

208.43 

1,321.68 


87,323.83 
3,393.36 


796,527.09 

17,915.65 

65,000.00 

5,499.03 

25,535.22 


48,207 29 


, Bank and cash balance 


4,598.78 


Securities and investments 


32,000.00 


Accounts Receivable 


15.33 
104.75 


158.41 


Inventories 




Sinking fund on local debentures .... 




Equity in H-E.P.C. systems 

Other assets 


#1,437.96 


6,237.04 


913,148.29 
1,772.29 


103,478.47 
38 










Total assets 


171,065.84 


97.074.31 


1,825,397.57 


188,443.33 






Liabilities 

Debenture balance 




19,641.79 
360.48 






Accounts payable 


721.41 


26,845.67 




Bank overdraft 




Other liabilities 


1,065.00 


3,525.27 


2,863.32 


594.11 






Total liabilities 


1,786.41 


23,527.54 


29,708.99 


594.11 






Reserves 

For equity in H-E.P.C. systems 

For depreciation 


44,437.96 

38,530.59 

8,072.91 


6,237.04 
7,967.50 


913,148.29 

235,297.52 

823.19 


103,478.47 
20,104.43 


Other reserves . 


6,000.00 








Total reserves 


91,041.46 


14,204.54 


1,149,269.00 


129,582.90 






Surplus 

Debentures paid 


63,968.41 


65,702.21 


145,000.00 


8,000.00 


Local sinking fund 




Operating surplus 


14,269.56 


*6,359.98 


501,419.58 


50,266.32 






Total surplus 


78,237.97 


59,342.23 


646,419.58 


58,266.32 






Total liabilities, reserves and surplus. . . 


171,065.84 


97,074.31 


1,825,397.57 


188,443.33 


Percentage of net debt to total assets. . . 


1.4 


29.0 


3.3 


0.7 



Deficit. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



219 



A" — Continued 



Hydro Municipalities as at December 31, 1945 



Hamilton* 
174,222 


Hanover 
3,165 


Haniston 
1,242 


Harrow 
1,122 


Hastings 
698 


Havelock 
876 


Hensall 
601 


$ c. 
976,475 . 85 


$ c. 

3,894.32 

9,271.19 

51,702.99 


$ c. 
395.25 
600.00 

23,179.11 


$ c. 
2,318.16 


$ c. 


$ c. 


$ c. 


2,238,379. 75 




572.90 
20,064.33 




1,370,518.09 
878,969.21 


21,077.90 


17,575.11 


12,645.26 


1,034,413.13 
889,454.44 
298,403.84 


24,072.39 

19,439.75 

2,350.30 


9,730.05 

10,037.80 

1,332.00 


11,607.82 

8,807.93 

970.46 


3,530.56 
4,132.89 
1,283.74 


3,588.07 
6,228.29 
1,883.33 


6,811.35 

4,295.90 

612.83 


42,615.78 


5,665.18 


736.99 


90.79 


681.82 


4,273.87 


534.69 


::::::::::: 




1,001.43 




1,733.13 


2,420.45 


400.00 










7,729,230.29 

284,432.85 

1,500,000.00 

404,351.70 

213,557.80 


116,396.12 

3,480.79 

70,186.28 

1,209.07 

192.42 


47,012.63 

2,129.22 

10,400.00 

607.76 

220.89 


44,873.06 

2,028.73 

9,200.00 

155.52 

210.02 


28,937.25 

650.98 

7,000.00 

113.97 


39,031.24 

62,06 

19,000.00 

2.14 


• 25,300.03 

767.24 

14,000.00 

14.36 










7,787,342.91 
97,724.32 


111,497.43 


46,753.36 


37,069.78 


5,585.28 


16,249.35 


22,976.38 
















18,016,639.67 


302,962.11 


107,123.86 


93.537.11 


42,287.48 


74,344.79 


63,058.01 


426,000.00 




1,638.91 
0.01 




8,778.47 
571.09 




652.05 


328,436.64 


26.13 


404.56 


432.73 


688.05 


35,200.31 


966.81 


95.82 


310.71 


406.47 


165.00 


30.00 


789,636.95 


992.94 


1,734.74 


715.27 


9,756.03 


597.73 


1,370.10 


7,787,342.91 
1,946,537.27 
1,893,489.38 


111,497.43 
79,687.51 
12,500.00 


46,753.36 
17,143.31 


37,069.78 

13,864.39 

136.30 


5,585.28 
7,506.88 


16,249.35 
15,094.53 


22,976.38 
12,867.77 












11,627,369.56 


203,684.94 


63,896.67 


51,070.47 


13,092.16 


31,343.88 


35,844.15 


3,634,275. 19 


87,500.00 


24,179.12 


12,000.00 


12,221.53 


32,900.00 


11,347.95 


1,965,357.97 


10,784.23 


17,313.33 


29,751.37 


7,217.76 


9,503.18 


14,495.81 


5,599,633.16 


98,284.23 


41,492.45 


41,751.37 


19,439.29 


42,403.18 


25,843.76 


18,016,639.67 


302,962.11 


107,123.86 


93,537.11 


42,287.48 


74,344.79 


63,058.01 


7.7 


0.5 


2.9 


1.3 


26.6 


1.0 


3.4 



* Includes 1945 power adjustment & equity in H-E.P.C. systems. 



220 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality , 

Population 


Hespeler 
3,021 


Highgate 
301 


Holstein 
P.V. 


Humber- 
stone 
3,287 


Huntsville 
2,810 






Assets 

Lands and buildings 


$ c. 

4,857.00 
38,946.53 
33,197.28 


$ c. 


$ c. 


$ c. 


$ c. 
353 52 


Substation equipment 








647.30 


Distribution system — overhead. . . . 
Distribution system — underground . 


8,348.47 


2,419.26 


25,529.85 


24,657.22 


Line transformers 


32,225.97 

15,204.26 

8,368.76 


2,324.00 

2,001.63 

453.91 


1,352.91 
851.60 
170.44 


15,597.89 

12,335.14 

1,005.54 


14,570 37 


Meters 


14,738 52 


Street light equipment, regular. . . . 
Street light equipment, ornamental 


7,661.47 


Miscellaneous construction expense 
Steam or hydraulic plant 


2,751.74 


491.60 


188.31 


671.36 


978.31 


Old plant 










5,156.20 














Total plant 


135,551.54 

3,689.95 

30,000.00 

525.87 

560.76 


13,619.61 

38.04 

6,000.00 

14.45 


4,982.52 

287.45 
4,500.00 


55,139.78 

1,591.74 

30,500.00 

235.14 


68,762.91 


Bank and cash balance 


3,593.81 


Securities and investments 

Accounts Receivable 


7,000.00 
2,789.51 


Inventories 




4,299.24 


Sinking fund on local debentures . . 










Equity in H-E.P.C. systems 

Other assets . . 


166,386.29 


12,962.85 


3,591.06 


31,014.04 


83,391.82 
8 35 














Total assets 


336,714.41 


32,634.95 


13,361.03 


118,480.70 


169,845.64 






Liabilities 

Debenture balance 


8,685.21 
451.71 










Accounts payable 




0.35 


362.31 


508.00 


Bank overdraft 






Other liabilities 


850.00 


80.00 




2,113.84 


1,079.42 








Total liabilities 


9,986.92 


80.00 


0.35 


2,476.15 


1,587.42 


Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


166,386.29 

30,994.88 

154.46 


12,962.85 
7,376.32 


3,591.06 
2,306.74 


31,014.04 

11,112.83 

6,000.00 


83,391.82 
20,398.49 


Other reserves 


345.22 










Total reserves 


197,535.63 


20,339.17 


5,897.80 


48,126.87 


104,135.53 






Surplus 

Debentures paid 


68,885.30 


5,000.00 


2,762.05 


32,000.00 


21,133.54 


Local sinking fund 




Operating surplus 


60,306.56 


7,215.78 


4,700.83 


35,877.68 


42,989.15 






Total surplus 


129,191.86 


12,215.78 


7,462.88 


67,877.68 


64,122.69 






Total liabilities, reserves and surplus . 


336,714.41 


32,634.95 


13,361.03 


118,480.70 


169,845.64 


Percentage of net debt to total assets. 


6.0 


0.4 


0.0 


2.5 


1.8 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



221 



A"— Continued 



Hydro Municipalities as at December 31, 1945 



Ingersoll 
5,823 


Iroquois 
925 


Jarvis 
557 


Kemptville 
1,158 


Kincardine 
2,189 


Kingston 
32,463 


$ c. 
16,291.49 


$ c. 
281.20 
100.00 

9,774.55 


$ c. 


$ c. 
4,520.39 


$ c. 

6,531.80 

2,794.20 

47,158.10 


$ c. 
264,614.53 


51,488.29 




280,567.65 


59,936.36 


10,099.84 


21,134.09 


249,361.12 
201,800.27 


45,942.59 

32,294.82 

5,302.83 

4,597.59 


3,474.83 

4,709.78 

565.84 


5,281.09 

3,183.75 

931.82 


8,105.41 
8,860.77 
1,090.07 


15,158.17 

13,314.45 

6,221.97 


108,881.88 

149,920.80 

80,339.04 


7,731.09 


1,230.36 


60.00 


5,635.88 


4,830.09 


44,776.53 
17,665.40 




575.00 




















223,585.06 

7,739.00 

9,477.70 

807.54 

1,551.81 


20,711.56 

2,252.25 

5,000.00 

1,069.17 

381.22 


19,556.50 

1,382.80 

13,500.00 

173.00 


49,346.61 

2,221.72 

15,000.00 

1,701.67 

1,392.71 


96,008.78 

50.00 

33,000.00 

260.94 

1,684.84 


1,397,927.22 

2,745.13 

480.000.00 

45,178.97 

15,487.01 








255,320.80 


2,492.58 


21,004.46 


28,245.94 


60,037.18 


186,109.61 
2,903.26 














498,481.91 


31,906.78 


55,616.76 


97,908.65 


191,041.74 


2,130,351.20 












10,282 00 


9,213.35 


0.48 


569.55 


1,093.61 


85.10 
416.19 
469.00 


241.27 


7,264.94 


256.34 




200.11 


23,665.33 








16,478.29 


256.82 


569.55 


1,293.72 


970.29 


34,188.60 


255,320.80 

35,250. 19 

4,390.07 


2,492.58 
4,255.18 
2,000.00 


21,004.46 
7,326.84 


28,245.94 
16,311.88 


60,037.18 

40,855.54 

7,564.07 


186,109.61 
428,150.94 
255,501 . 92 










294,961.06 


8,747.76 


28,331.30 


44,557.82 


108,456.79 


869,762.47 


79,800.00 




10,500.00 


25,000.00 


64,200.00 


301,618.00 


107,242.56 


22,902.20 


16,215.91 


27,057.11 


17,414.66 


924,782.13 


187,042.56 


22.902.20 


26,715.91 


52,057.11 


81,614.66 


1,226,400.13 












2,130,351.20 


5.0 


0.9 


1.1 


1.9 


0.7 


1.8 



9— H.E. 



222 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality. . . 


Kingsville 
2,335 


Kirkfield 
P.V, 


Kitchener 
36,165 


Lakefield 


Population 


1,327 






Assets 
Lands and buildings 


$ c. 
8,600.27 


$ c. 


$ c. 
279,953.06 
425,926.92 
454,511.09 

81,173.44 
273,600.36 
265,785.11 

80,496.18 
126,922.86 

24,861.21 


$ c. 
3,137 97 


. Substation equipment 






Distribution system — overhead 

Distribution system — underground. . . 


35,714.45 


5,179.43 


25,634.44 


Line transformers . 


17,176.18 

17,101.71 

1,470.29 

19,200.00 

949.86 


757.90 
822.47 
379.00 


7,595 56 


Meters 


8,475.73 


Street light equipment, regular 

Street light equipment, ornamental . . 
Miscellaneous construction expense. . 
Steam or hydraulic plant. 


1,958.01 


234.11 


3,717.93 


Old plant 






52,363.91 


3,445.25 










Total plant 


100,212.76 

2,023.24 

32,500.00 

194.93 


7,372.91 

716.16 

3,000.00 

18.40 


2,065,594.14 

16,722.52 

175,000.00 

81,353.33 

44,402.42 


53,964.89 


Bank and cash balance 


1,871.60 


Securities and investments 


21,000.00 


Accounts Receivable 


187.54 


Inventories . 




Sinking fund on local debentures .... 








Other assets .... 


57,267.04 


4,298.33 


1,827,759.13 
225.13 


18,526.31 










Total assets 


192,197.97 


15,405.80 


4,211,056.67 


95,550.34 






Liabilities 
Debenture balance .... 


16,553.58 
169.84 




120,800.00 
76,252.69 


10,660.81 


Accounts payable. ... .... 


28.72 


55.49 


Bank overdraft 




Other liabilities 


23,269.77 




129,605.42 


609.53 








Total liabilities . . 


39.993.19 


28.72 


326,658.11 


11,325.83 






Reserves 

For equity in H-E.P.C. systems 

For depreciation . .... 


57,267.04 

36,846.63 

5,388.66 


4,298.33 

4,721.25 

200.00 


1,827,759.13 

574,433.23 

7,166.74 


18,526.31 
18,827.93 


Other reserves 










99,502.33 


9,219.58 


2,409,359.10 


37,354.24 






Surplus 

Debentures paid 


16,946.42 


6,000.00 


616,350.00 


22,839.19 


Local sinking fund 




Operating surplus .... 


35,756.03 


157.50 


858,689.46 


24,031.08 






Total surplus 


52,702.45 


6,157.50 


1,475,039.46 


46,870.27 






Total liabilities, reserves and surplus. . . 


192,197.97 


15,405.80 


4,211,056.67 


95,550.34 


Percentage of net debt to total assets. . . 


17.1 


0.3 


8.9 


14.7 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



223 



"A"— Continued 



Hydro Municipalities as at December 31, 1945 



Lambeth 
P.V. 


Lanark 
670 


Lancaster 
518 


La Salle 
1,020 


Leamington 
5,456 


Lindsay 
7,680 


Listowel 
3,209 


$ c. 


$ c. 


$ c. 


$ c. 
1,210.68 


$ c. 
20,612.59 

7,101.97 
62,866.49 
17,209.04 
29,693.87 
32,901.81 

1,814.66 
14,478.49 

1,296.31 


$ c. 
10,777.68 
3,176.56 
109,747.95 


$ c. 
1,459.49 










9,680.25 


10,663.83 


8,789.65 


24,174.92 


51,035.08 
5,522.87 


2,990.87 
2,864.51 
1,053.80 


4,455.99 

2,773.92 

782.64 


1,922.25 

2,076.98 

650.65 


7,680.97 
5,836.94 
1,054.22 


39,316.59 
37,649.78 
10,869.46 


25,522.31 

19,571.26 

3,605.91 

1,539.79 


315.71 




1,068.55 


1,554.77 


4,222.95 


1,607.43 




































16,905.14 

303.19 
4,000.00 


18,676.38 
319.07 


14,508.08 

1,417.65 

1,500.00 

38.93 


41,512.50 

666.81 

6,000.00 

424.06 

11.99 


187,975.23 

100.00 

68,500.00 

716.22 

3,828.93 


215,760.97 

7,930.62 

90.317,22 

408.77 

265.47 


109,864.14 

432.44 
23,000.00 


4.49 




706.26 






106.66 










13,363.40 


8,402.98 


8,050.22 


19,846.16 


126,612.32 


145,145.09 


110,176.71 
3.33 
















34,576.22 


27,398.43 


25,514.88 


68,461.52 


387,732.70 


459,828.14 


244,289.54 












28,407.69 




82.53 




26.94 


225.87 


363.59 

1,292.19 

17,736.34 


42.47 








586.00 


185.00 


140.00 


162.53 


975.58 


3,509.55 


1,972.23 


267.53 


140.00 


189.47 


1,201.45 


19,392.12 


31,917.24 


2,600.70 


13,363 40 
7,229.31 
1,218.59 


8,402.98 
1,204.44 


8,050.22 
3,776.68 


19,846.16 

15,913.73 

182.17 


126,612.32 
54,226.34 
21,872.05 


145,145,09 
63,820.48 


110,176.71 

60,192.49 

2,500.00 










21,811.30 


9,607.42 


11,826.90 


35,942.06 


202,710.71 


208,965.57 


172,869.20 


4,000.00 


7,316.57 


9,970.42 


15,500.00 


48,000.00 


101,592.31 


43,189.89 


8,497.39 


10,334.44 


3,528.09 


15,818.01 


117,629.87 


117,353.02 


25,629.75 


12,497.39 


17,651.01 


13,498.51 


31,318.01 


165,629.87 


218,945.33 


68,819.64 


34,576.22 


27,398.43 


25,514.88 


68,461.52 


387,732.70 


459,828.14 


244,289.54 


1.3 


0.7 


1.1 


2.5 


2.0 


10.1 


0.8 



224 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


London 
81,158 


London 
Twp. 
V.A. 


Long 

Branch 

5,253 


Lucan 
583 


Lucknow 


Population 


932 






Assets 

Lands and buildings 


$ c. 

456,380.39 

1,019,724.35 

841,358.63 

421,731.09 

452,140.77 

414,032.15 

74,051.20 

92,286.12 

144,546.69 


$ c. 


$ c. 


$ c. 
375.45 


$ c. 


Substation equipment 








Distribution system — overhead. . . . 
Distribution system — underground. 
Line transformers 


24,867.44 


63,631.35 


11,866.24 


21,600.71 


9,665.55 
6,991.42 
1,884.85 


19,511.65 

24,679.56 

6,225.76 


4,626.28 
4,423.46 
4,549.30 


12,475.71 


Meters 


6,176.82 


Street light equipment, regular. . . . 
Street light equipment, ornamental 
Miscellaneous construction expense 
Steam or hydraulic plant. . 


1,509.55 


1,663.09 


1,257.66 


565.83 


2,212.90 


Old plant : . 




1,733.80 


















Total plant 


3,916,251.39 

1,000.00 

1,256,500.00 

189,293.56 

78,036.55 

128,831.44 

3,342,299.85 

1,403.44 


46,806. 15 

1,749.17 

6,000.00 

516.18 


115,305.98 

309.83 
40,000.00 
14,645.61 


26,406.56 

1,054.14 

10,500.00 

36.37 


43,975.69- 


Bank and cash balance 


2,110.23 


Securities and investments 

Accounts Receivable 


10,000.00 
344.56 


Inventories. . 




Sinking fund on local debentures . . 

Equity in H-E.P.C. systems 

Other assets 










30,597.92 


43,158.15 


24,447.51 


28,333.92 












Total assets 


8,913,616.23 


85,669.42 


213,419.57 


62,444.58 


84,764.40 






Liabilities 

Debenture balance 


7,526.44 

19,822.17 

116,263.19 

100,670.29 


820.52 
720.38 


1,278.18 
4,635.50 






Accounts payable 


153.66 


79.06 


Bank overdraft 




Other liabilities 


612.24 


2,309.83 


242.00 


5.00 






Total liabilities 


244,282.09 


2,153.14 


8,223.51 


395.66 


84.06 






Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


3,342,299.85 

1.807,768.14 

527,541.99 


30,597.92 

14,733.42 

3.82 


43,158.15 
32,278.43 
16,210.08 


24,447.51 
11,491.18 


28,333.92 
7,176.43 


Other reserves . . 


6,750.00 








Total reserves 


5,677,609.98 


45,335. 16 


91,646.66 


35,938.69 


42,260.35 






Surplus 
Debentures paid 


1,574,373.56 

128,831.44 

1,288,519.16 


18,179.48 


39,026.42 


11,213.62 


19,713.16 


Local sinking fund 




Operating surplus 


20,001.64 


74,522.98 


14,896.61 


22,706.83 


Total surplus 


2,991,724.16 


38,181.12 


113,549.40 


26,110.23 


42,419.99 


Total liabilities, reserves and surplus. 


8,913,616.23 


85,669.42 


213,419.57 


62,444.58 


84,764.40 


Percentage of net debt to total assets. 


2.8 


3.9 


4.8 


1.0 


0.1 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



225 



'A" — Continued 



Hydro Municipalities as at December 31, 1945 



Lynden 
P.V. 


Madoc 
1,094 


Markdale 
700 


Markham 
1,210 


Marmora 
938 


Martintown 
P.V. 


Maxville 
801 


$ c. 
241.18 


$ c. 
100.00 


$ c. 


$ c. 


$ c. 


$ c. 
126 . 15 


$ c. 




780.80 
11,485.61 






407.79 


4,869.69 


12,206.87 


20,327.15 


14,161.87 


2,932.57 


12,012.76 


3,136.23 

2,385.92 

597.61 


3,761.56 
5,732.26 
1,577.14 


6,472.80 
5,164.75 
1,390.15 


10,303.45 

8,558.50 

833.91 


3,808.11 
4,094.77 
1,193.23 


759.39 

1,166.25 

354.94 


2,391.79 
3,394.83 
1,950.24 


203.57 


14.75 


593.31 


1,510.50 


2,268.82 


690.21 


2,406.35 






2,080.65 




573.62 
















11,434.20 

386.50 

5,000.00 

35.96 


23,392.58 

. 4,085.83 

12,000.00 

340.38 


27,968.07 

868.60 

12,155.13 

160.56 


41,533.51 

997.59 

16,000.00 

212.18 


26,100.42 

2,208.50 

8,000.00 

73.11 

462.68 


6,029.51 

927.66 

3,500.00 

184.26 


22,563.76 

388.39 

9,100.00 

65.62 














17,170.03 


11,467.51 


14,258.16 


27,294.20 


8,062.40 


2,858.02 


12,832.45 
















34,026.69 


51,286.30 


55,410.52 


86,037.48 


44,907.11 


13,499.45 


44,950.22 


















65.11 


400.29 






19.60 












34.00 


520.00 


182.00 


280.00 


295.00 


5 00 


144.66 


34.00 


585.11 


582.29 


280.00 


295.00 


24.60 


144.66 


17,170.03 
4,908.07 


11,467.51 
3,289.83 


14,258.16 

11,445.28 

1,000.00 


27,294.20 
9,992.70 
3,032.39 


8,062.40 
7,449.49 


2,858.02 

2,728.66 

81.02 


12,832.45 

7,925.09 

366. 36 










22,078.10 


14,757.34 


26,703.44 


40,319.29 


15,511.89 


5,667.70 


21,123.90 


4,495.00 


14,000.00 


9,000.00 


11,373.63 


17,666.11 


6,000.00 


16,000.00 


7,419.59 


21,943.85 


19,124.79 


34,064.56 


11,434.11 


1,807.15 


7,681.66 


11,914.59 


35,943.85 


28,124.79 


45,438.19 


29,100.22 


7,807.15 


23,681.66 


34,026.69 


51,286.30 


55,410.52 


86,037.48 


44,907.11 


13,499.45 


44,950.22 


0.2 


1.5 


1.4 


0.5 


0.8 


0.2 


0.4 



226 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Meaford 
2,671 


Merlin 
P.V. 


Merritton 
3,450 


Midland 
6,636 


Mildmay 
725 


Population 






Assets 
Lands and buildings . . 


$ c. 
1,144.18 
3,849.47 

34,410.78 


$ c. 


$ c. 
6,764.41 
96,695.94 
43,954.64 


$ c. 

19,983.57 

85,315.20 

100,249.57 


$ c. 


Substation equipment 






Distribution system — overhead — 
Distribution system — underground. 


9,674.65 


6,547.28 


Line transformers 


10,044.37 

11,642.93 

3,778.42 


4,065.36 

3,010.03 

570.46 


15,667.90 

18,964.20 

5,170.02 


31,142.11 
43.700.58 
19,322.71 


2,614.95 


Meters. '. 


3,392.11 


Street light equipment, regular. . . . 
Street light equipment, ornamental 
Miscellaneous construction expense 
Steam or hydraulic plant . 


583.24 


3,038.98 


468.84 


1,633.88 


751.09 


1,064.13 


Old plant 










849.00 














Total plant 


67,909.13 

1,079.30 

28,000.00 

193.28 

18.65 


17,789.34 

1,400.13 

15,200.00 

19.41 

40.27 


188,850.99 

9,242.96 

77,000.00 

834.87 

852.79 


300,464.83 

27,828.66 

67,500.00 

6,839.80 

5,007.53 


15,050.71 


Bank and cash balance 




Securities and investments 

Accounts Receivable 


10,000.00 


Inventories 




Sinking fund on local debentures . . 




Equity in H-E.P.C. systems 

Other assets ... 


43,533.88 
9.97 


15,303.64 


268,650.79 
55.60 


301,488.60 
356.27 


5,446.62 








Total assets 


140,744.21 


49,752.79 


545,488.00 


709,485.69 


30,497.33 






Liabilities 
Debenture balance 










5,498.78 


Accounts payable 


189.28 


138.50 


129.37 


695.86 


63.42 


Bank overdraft 


5.27 


Other liabilities 


1,070.26 


95.00 


613.49 


1,462.12 


20.00 






Total liabilities 


1,259.54 


233.50 


742.86 


2,157.98 


5,587.47 






Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


43,533.88 

22,465.74 

46.65 


15,303.64 

6,346.64 

23.40 


268,650.79 
43,885.38 
27,000.00 


301,488.60 

231,909 38 

1,317.99 


5,446.62 
3,719.00 


Other reserves 








Total reserves 


66,046.27 


21,673.68 


339,536. 17 


534,715.97 


9,165.62 






Surplus 

Debentures paid 


49,360.20 


13,122.36 


32,186.21 


111,944.99 


6,804.72 


Local sinking fund. . 




Operating surplus 


24,078.20 


14,723.25 


173,022.76 


60,666.75 


8,939.52 






Total surplus 


73,438.40 


27,845.61 


205,208.97 


172,611.74 


15,744.24 






Total liabilities, reserves and surplus. 


140,744.21 


49,752.79 


545,488.00 


709,485.69 


30,497.33 


Percentage of net debt to total assets . 


1.3 


0.7 


0.3 


0.5 


22.3 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



227 



A"— Continued 



Hydro Municipalities as at December 31, 1945 



Millbrook 
673 


Milton 
1,955 


Milverton 
970 


Mimico 
8,400 


Mitchell 
1,531 


Moorefield 
P.V. 


Morrisburg 
1,436 


$ c. 


$ c. 
13,864.88 
16,456.16 
24,574.87 


$ c. 
761.88 


$ c. 
20,455.40 
43,269.83 
87,572.67 


$ c. 
19,125.54 
16,526.28 
33,297.62 


$ c. 


$ c. 
4,980.00 






4,457.21 


6,746.49 


13,046.95 


3,383.69 


12,047.83 


1,772.56 

2,212.13 

595.65 


17,264.05 

16,405.19 

5,478.13 


11,607.59 

5,907.32 

848.75 


47,317.25 
38,267.40 
10,626.83 


15,686.77 

14,686.98 

7,377.93 


2,873.96 

1,759.63 

295.88 


6,198.15 

8,049.21 

795.00 


79.92 


3,278.34 


588.05 


6,244.51 


2,532.87 


351.20 


659.23 














3,364.41 
















11,406.75 

1,884.31 

4,000.00 

18.65 


97,321.62 

2,420.21 

38,000.00 

860.87 

4,053.79 


32,760.54 

1,474.45 

6,500.00 

278.94 


253,753.89 

3,719.88 

55,000.00 

1,292.86 


109,233.99 

4,599.47 

27,400.00 

2,764.77 

5,066.09 


8,664.36 

892.16 

1,500.00 

32.41 


40,551.04 

924.74 

8,000.00 

66.29 














1,600.80 


135,629.06 


55,698.34 
4.51 


194,275.33 
177.18 


61,164.37 
3.93 


8,280.72 


3,920.17 










18,910.51 


278,285.55 


96,716.78 


508,219.14 


210,232.62 


19,369.65 


53,462.24 














3,148 28 


227.55 


182.58 


148.34 


136.60 


110.60 


95.31 


360.09 


202.67 


691.15 




5,670.00 


327.00 


3.00 


1,568.31 








430.22 


873.73 


148.34 


5.806.60 


437.60 


98.31 


5,076.68 


1,600.80 
1,242.21 


135,629.06 
32,309.85 
10,177.02 


55,698.34 
10,163.90 


194,275.33 
97,174.60 
18,135.87 


61,164.37 

52,113.00 

1,267.05 


8,280.72 
3,785.73 


3,920.17 
3,630.32 
6,927.13 










2,843.01 


178,115.93 


65,862.24 


309,585.80 


114,544.42 


12,066.45 


14,477.62 


9,000.00 


33,046.41 


9,500.00 


127,000.00 


22,295.22 


4,500.00 


31,425,00 


6,637.28 


66,249.48 


21,206.20 


65,826.74 


72,955.38 


2,704.89 


2,482.94 


15,637.28 


99,295.89 


30,706.20 


192,826.74 


95,250.60 


7,204.89 


33,907.94 


18,910.51 


278,285.55 


96,716.78 


508,219.14 


210,232.62 


19,369.65 


53,462.24 


2.5 


0.6 


0.4 


1.8 


0.2 


0.9 


10.2 



228 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 

Population 


Mount 

Brydges 

P.V. 


Mount 
Forest 
1,753 


Napanee 
3,298 


Neustadt 
418 


Newbury 
233 


Assets 

Lands and buildings 


$ c. 


$ c. 
3,726.00 
686.75 
23,437.06 


$ c. 
16,354.36 

2,358.27 
49,838.80 


$ c. 


$ c. 


Substation equipment 








Distribution system — overhead 

Distribution system — underground . 


8,117.78 


10,767.70 


6,945.58 


Line transformers 


1,845.43 
2,994.35 
1,385.36 


8,601.56 
9,391.42 
2,397.89 


12,952.66 

20,460.63 

4,732.62 


4,350.29 

2,773.65 

496.41 


1,571.26 


Meters 

Street light equipment, regular. . . . 
Street light equipment, ornamental 


1,435.35 
881.47 


Miscellaneous construction expense 
Steam or hydraulic plant 


105.90 


1,893.72 


6,337.40 


1,495.88 


515.77 


Old plant .. v .. 




3,810.95 


















Total plant 


14,448.82 

959.60 

14,000.00 

131.92 


53,945.35 

2,365.49 

13,000.00 

268.90 

563.46 


113,034.74 

100.00 

12,800.00 

15,634.90 

7,494.12 


19,883.93 

984.12 

13,700.00 

62.27 


11,349.43 


Bank and cash balance 


808.90 


Securities and investments 

Accounts Receivable 


6,500.00 
13.05 


Inventories 




Sinking fund on local debentures . . 








Equity in H-E.P.C. systems 

Other assets 


10,385.13 


45,631.10 


60,030. 15 
4.30 


8,264.27 


5,865.18 












Total assets 


39,925.47 


115,774.30 


209,098.21 


42,894.59 


24,536.56 






Liabilities 

Debenture balance . . 




586.98 








Accounts payable. . . 


779.93 




254.50 




Bank overdraft. . . 




3,873.26 
1,130.94 




Other liabilities 


175.66 


375.00 


153.85 


35.00 






Total liabilities 


955.59 


961.98 


5,004.20 


408.35 


35.00 






Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


10,385.13 

6,296.00 

97.38 


45,631.10 

28,603.81 

1,500.00 


60,030.15 

22,191.68 

2,500.00 


8,264.27 
12,259.74 


5,865.18 
6,152.91 


Other reserves 










Total reserves 


16,778.51 


75,734.91 


84,721.83 


20,524.01 


12,018.09 






Surplus 

Debentures paid 


4,220.00 


30,371.62 


70,000.00 


17,000.00 


9,754.39 


Local sinking fund. . . . 




Operating surplus 


17,971.37 


8,705.79 


49,372.18 


4,962.23 


2,729.08 






Total surplus 


22,191.37 


39,077.41 


119,372.18 


21,962.23 


12,483.47 






Total liabilities, reserves and surplus. 


39,925.47 


115,774.30 


209,098.21 


42,894.59 


24,536.56 


Percentage of net debt to total assets. 


3.2 


1.3 


3.4 


0.9 


0.2 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



229 



"A"— Continued 



Hydro Municipalities as at December 31, 1945 



Newcastle 
690 


New 

Hamburg 

1,454 


Newmarket 
3.956 


New Toronto 
8,374 


Niagara 
Falls 
19,138 


Niagara-on- 

the-Lake 

1,802 


$ c. 
107.37 


$ . c. 

4,226.21 

1,217.05 

25,130.17 


$ c. 
4,000.00 
5,000.00 

51,073.07 


$ c. 
45,514.80 


S c. 
133,097.32 
283,208.06 
212,675.82 


$ c. 
2,320.00 
24,212.17 


15,297.34 


103,302.00 
17,198.72 
51,782.67 
43,239.26 
14,860.87 


40,913.26 


4,673.83 

4,111.36 

976.31 


11,237.41 

11,233.67 

2,274.20 


26,906.01 

21,131.75 

5,790.00 


197,736.75 
122,961.26 
118,502.09 


23,664.93 

14,669.42 

4,603.40 


435.00 


234.21 


2,025.00 


6,665.89 


20.715.75 


3,895.27 




5,242.56 




















25,601.21 

349.12 
9,000.00 


60,795.48 

50.00 

20,100.00 

370.23 

750.78 


115,925.83 
1,711.52 


282,564.21 

14,162.77 

134,000.00 

869.17 

3,294.91 


1,088,897.05 

38,951.90 

230,000.00 

1,245.08 

10,864.44 


114,278.45 
2,333.21 


31.02 
145.13 


1,339.34 


1,080.63 
5,514.19 








3,767 10 


65,825.24 
423.94 




654,955.44 


757,838.84 
835.62 


44,458.78 




201.12 


41 








38,893.58 


148,315.67 


119,177.81 


1,089,846.50 


2,128,632.93 


167,665.67 






5,000.00 
5,008.98 




31,405.13 
1,914.86 


16,666 09 


0.74 


66.75 
939.27 
206.00 


0.50 


1,270.40 






6,470.28 


18,977.09 


444.30 








0.74 


1,212.02 


10,008.98 


6,470.78 


52,297.08 


18,380.79 


3,767.10 


65,825.24 

21,584.67 

1,633.83 




654,955.44 
94,148.51 
33,376.15 


757,838.84 

361,899.76 

15,638.35 


44,458.78 


11,833.97 


40,944.49 


22,582.60 
691 40 








15,601.07 


92,043.74 


40,944.49 


782,480. 10 


1,135,376.95 


67,732.78 


14,000.00 


17,729.08 




8,000.00 


658,837.87 


31,835 33 








9,291.77 


37,330.83 


68,224.34 


292,895.62 


282,121.03 


49.716.77 


23,291.77 


55,059.91 


68,224 34 


300,895.62 


940,958.90 


81,552.10 


38,893.58 


148.315.67 


119,177.81 


1,089,846.50 


2,128.632.93 


167,665.67 


0.0 


1.4 


8.4 


1.5 


3.8 


15.0 



230 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality. 
Population. . 



North 

York Twp. 

V.A. 



Norwich 
1,199 



Norwood 
694 



Oil 

Springs 
426 



Omemee 
598 



\SSETS 

Lands and buildings 

Substation equipment 

Distribution system — overhead. . . . 
Distribution system — underground. 

Line transformers 

Meters 

Street light equipment, regular. , . . 
Street light equipment, ornamental 
Miscellaneous construction expense 

Steam or hydraulic plant 

Old plant 



$ c. 
35,906.55 



S c. 
4,660.42 



$ 



518,238 24 



11,926.99 



457. 
24,495. 



$ c. 

6,299.16 

2,461.78 

15,252.52 



$ 



360.32 
14,116.62 



169,170.92 

119,888.85 

156.00 

29,900.05 

26,647.53 



8,481.83 
8,467.71 
4,685.64 



4,966. 
6,315. 
1,886. 



6,724.50 

4,336.41 

308.24 



7,324.64 

3,825.05 

805.48 



639.91 



3,615. 

2,447 i 



1,473.81 



1,405.00 



51 



Total plant. 



Bank and cash balance 

Securities and investments 

Accounts Receivable 

Inventories 

Sinking fund on local debentures. 
Equity in H-E.P.C. systems. 
Other assets 



899,908.14 

21,535.40 

205,000.00 

14,100.03 

23,729.46 



38,862.50 

2,592.87 

14,000.00 

1,458.05 

2,321.62 



44,184.37 



2,148. 

20,500. 

303. 



36,856.42 

1,225.94 

8,500.00 

85.60 

143.94 



27,837.11 

1,463.93 

8,000.00 

37.78 



268,665.03 
82,627.70 



48,642.30 



8,381.91 



32,156.33 
12.00 



2,481.71 



Total assets 

Liabilities 
Debenture balance. 
Accounts payable. . 

Bank overdraft 

Other liabilities 



1,518,565.76 



107,877.34 



75,518.65 



78,980.23 



39,820.53 



113,872.21 
87,993.78 



170.08 



10,139.27 
1,146.01 



120.47 



41,550.56 



355.32 



603.98 



27.56 



22.05 

150 ! 32 



Total liabilities. 



243,416.55 



525.40 



11,889.26 



148.03 



172.37 



Reserves 
For equity in H-E.P.C. systems. 

For depreciation 

Other reserves 



268,665.03 

222,089.15 

1,659.36 



48,642.30 

12,289.22 

543.91 



8,381.91 
18,674.67 



32,156.33 

13,977.71 

1,285.23 



2,481.71 
13,952.12 



Total reserves. 



492,413.54 



61,475.43 



27,056.58 



47,419.27 



16,433.83 



Surplus 

Debentures paid. . . 
Local sinking fund. 
Operating surplus . 



Total surplus 

Total liabilities, reserves and surplus. 
Percentage of net debt to total assets 



414,149.66 



13,756.00 



26,960.73 



368,586.01 



32,120.51 



9,612.08 



782,735.67 



45,876.51 



36,572.81 



1,518,565.76 107,877.34 



75,518.65 



17.5 



0.9 



17.4 



16,721.31 



12,000.00 



14,691.62 



31,412.93 



78,980.23 



0.3 



11,214.33 



23,214.33 



39,820.53 



0.5 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 231 



"A" — Continued 



Hydro Municipalities as at December 31, 1945 



Orangeville 
2,559 


Orono 
P.V. 


Oshawa 
26,824 


Ottawa 
163,829 


Otterville 
P.V. 


Owen Sound 
13,402 


$ c. 
2,585.07 


$ c. 


$ c. 

72,407.61 

67,336.66 

308,052.95 


$ 'c. 
489,838.82 
1,045,499.00 
937,538.47 
267,966.63 
423,421.94 
324,853.06 
125,029.06 


$ c. 


$ c. 
28,270.25 


1,169.00 






17,962.64 


38,001.93 


5,801.51 


8,912.95 


130,846.72 


13,120.87 

15,431.35 

7,532.55 


1,462.79 
2,166.82 
1,070.35 


90,870.47 

141,466.96 

19,975.92 


5,193.47 
3,378.61 
1,722.75 


75,679.06 
73,583.89 
31,045.57 


6,027.82 




19,308.03 


36,291.08 


629.69 


1,039.94 












6,431.65 






26,982.00 












83,868.59 

1,600.78 

23,000.00 

466.69 

186.38 


10,501.47 

1,201.74 

5,000.00 

32.47 


725,850.25 

7,852.52 

285,000.00 

75,796.06 

33,312.76 


3,650,438.06 

331,377.13 
1,140,000.00 
116,623.50 
38,331.88 
246,700.77 
317,653.52 


19,837.47 

119 42 

7,500.00 

923.09 


385,410.07 

22,824.69 

32,500.00 

5,565.31 

9,177.97 










62,204.95 


1,781.27 
215.41 


776,725.94 
69.62 


12,002.90 


305,361.90 
338.30 










171,327.39 


18,732.36 


1,904,607.15 


5,841,124.86 


40,382.88 


761,178.24 






18,000.00 
58,283.56 


109,485.25 
75,617.58 






139.54 


311.25 


860.10 


19,122.60 


153.00 




26,831.53 




96.38 


7,851 79 










292.54 


311.25 


103,115.09 


185,102.83 


956.48 


26,974.39 


62,204.95 
38,836.87 


1,781.27 

751.17 

1,000.00 


776,725.94 

133,577.91 

75,800.87 


317,653.52 

1,901,006.51 

615,092.33 


12,002.90 
8,514.51 


305,361.90 

112,194:47 

10,335 90 








101,041.82 


3,532.44 


986,104.72 


2,833,752.36 


20,517.41 


427,892.27 


35,900.00 


8,000.00 


292,000.00 


870,514.75 

246,700.77 

1,705,054.15 


4,500.00 


141,000.00 


34,093.03 


6,888.67 


523,387.34 


14,408.99 


165,311.58 


69,993.03 


14,888.67 


815,387.34 


2,822,269.67 


18,908.99 


306,311.58 


171.327.39 


18,732.36 


1,904,607.15 


5,841,124.86 


40,382.88 


761,178.24 


0.3 


1.9 


9.1 


1.4 


3.4 


5.9 



232 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 

Population 


Paisley 

577 


Palmer- 
ston 
1,396 


Paris 

4,524 


Parkhill 
801 


Penetan- 

guishene 

4,018 


Assets 
Lands and buildings 


$ c. 


$ c. 


$ c. 
12,570.15 
49,995.08 
57,962.00 


$ c. 


$ c. 
2,288.05 


Substation equipment 


1,923.46 
12,627.48 


1,346.28 
33,515.83 


7,161.13 


Distribution system — overhead. . . 
Distribution system — underground. 


18,610.95 


53,409.56 


Line transformers 


2,940.75 
3,521.48 
1,045.51 


11,406.81 
9,102.09 
6,855.26 


31,080.27 
23,137.77 
14,112.53 


8,065.41 
5,299.27 
1,188.53 


22,228.35 


Meters 

Street light equipment, regular. . . . 
Street light equipment, ornamental 


18,815.13 
3,942.13 


Miscellaneous construction expense 
Steam or hydraulic plant. . 


803.73 


907.85 


1,071.93 


1,566.99 


831.52 


Old plant . . . 
























Total plant 


22,862.41 

2,139.62 
7,500.00 

57.41 


63,134.12 

1,544.80 

16,250.00 

448.14 

2,587.36 


189,929.73 

25.00 

45,000.00 

347.08 


34,731.15 

1,066.30 

10,000. 00 

282.96 


108,675.87 


Bank and cash balance 


1,073.41 


Securities and investments 

Accounts Receivable 


38,000.00 
1,187.80 


Inventories 


140.48 


Sinking fund on local debentures . . 










Equity in H-E.P.C. systems 

Other assets 


14,975.09 


58,828.37 
18.40 


152,550.33 
316.78 


26,052.24 
0.45 


86,008.49 








Total assets 


47,534.53 


142,811.19 


388,168.^2 


72,133.10 


235,086.05 






Liabilities 

Debenture balance 












Accounts payable 


89.32 


3,442.18 


227.12 
168.35 


3.00 


198.24 


Bank overdraft 




Other liabilities . 


51.03 


260.42 


139.07 


957.00 








Total liabilities 


140.35 


3,702.60 


395.47 


142.07 


1,155.24 






Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


14,975.09 
7,807.85 
1,000.00 


58,828.37 

18,896.14 

401.89 


152,550.33 

95,750.92 

120.22 


26,052.24 

12,444.73 
2,700.00 


86,008.49 
56,268.84 


Other reserves 


16,884.90 


Total reserves 


23,782.94 


78,126.40 


248,421.47 


41,196.97 


159,162.23 






Surplus 

Debentures paid 


16,000.00 


27,000.00 


92,000.00 


14,630.02 


36,982.95 


Local sinking fund. . 




Operating surplus 


7,611.24 


33,982.19 


47,351.98 


16,164.04 


37,785.63 






Total surplus 


23,611.24 


60,982.19 


139,351.98 


30,794.06 


74,768.58 


Total liabilities, reserves and surplus . 


47,534.53 


142,811.19 




72,133.10 


235,086.05 


Percentage of net debt to total assets. 


0.4 


4.4 


0.2 


0.3 


0.8 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



233 



A' ' — Continued 



Hydro Municipalities as at December 31, 1945 



Perth 
4,230 


Peter- 
borough 
27,871 


Petrolia 
2,684 


Pic ton 
3,690 


Plattsville 
P.V. 


Point Edward 
1,221 


$ c. 
5,109.34 


$ c. 

82,688.86 
124,548.59 
386,316.98 


$ c. 
12,823.65 

5,956.75 
51,112.86 


$ c. 
10,901.23 

2,004.66 
42,970.74 


$ c. 


S c. 


6,961.44 






50,031.23 


4,932.39 


23,073.65 


27,875.28 

24,365.27 

5,046.05 


170,461.73 

151,383.29 

64,279.23 


37,201.26 

18,346.25 

6,822.58 


17,754.02 
22,922.57 
10,579.80 


2,432.95 

2,745.44 

158.29 


7,918.41 
7,408.39 
3,693.72 


5,519.46 


5,452.50 


5,639.49 


3,977.51 


580.47 


1,337.32 


23,354.70 
























148,262.77 

V ,738. 65 
82,500.00 

3,459.49 
14,330. 12 


985,131.18 

150.00 

315,000.00 

43,641.77 

30,869.38 

131,547.78 

457,121.37 

73.20 


137,902.84 

13,967.21 

15,000.00 

2,109.13 

4,477.02 


111,110.53 

795.81 

51,500.00 

1,875.21 

7,316.23 


10,849.54 

1,032.03 

9,500.00 

65.42 


43,431.49 

1,379.61 

21,000.00 

1,516.92 

829.65 








96,302.12 


135,563.75 
133.56 


75,282.26 


12,600.11 


89,515.48 










352,593.15 


1,963,534.68 


309,153.51 


247,880.04 


34,047.10 


157,673.15 


22,996.77 


171,300.00 

34,878.08 

5,818.65 

515.00 










9.00 


115.40 




14.16 


390.14 








3,112.42 


1,267.56 


4,391.37 




397.09 


26,118.19 


212,511.73 


1,382.96 


4,391 . 37 


14.16 


787.23 


96,302.12 

77,247.98 
4,284.63 


457,121.37 

286,031.16 

1,206.74 


135,563.75 

50,924.63 

167.51 


75,282.26 
29,465.48 
14,468.91 


12,600.11 
4,999.39 


89,515.48 

20,524.06 

4,272. 20 








177,834.73 


744,359.27 


186,655.89 


119,216.65 


17,599.50 


114,311.74 


85,403.23 


329,310.67 
131,547.78 
545,805.23 


50,000.00 


5,730.32 


5,237.00 


17,000.00 


63,237.00 


71,114.66 


118,541.70 


11,196.44 


25,574.18 


148,640.23 


1,006,663.68 


121,114.66 


124,272.02 


16,433.44 


42,574.18 


352,593.15 


1,963,534.68 


309,153.51 


247,880.04 


34,047.10 


157,673.15 


10.1 


15.5 


0.8 


2.5 


0.1 


1.2 



234 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Port 
Colborne 

7,187 


Port 
Credit 
2,249 


Port 

Dalhousie 

1,747 


Port 
Dover 
2,001 


Port 


Population 


Elgin 
1,276 




Assets 
Lands and buildings 


$ c. 
30,022.28 


$ c. 
675.00 


$ c. 


$ c. 
248.75 


$ c. 
Ill 25 


Substation equipment 






Distribution system — overhead. . . . 
Distribution system — underground. 


88,394.80 


40,654.42 


23,494.98 


39,404.42 


27,870.57 


Line transformers 


32,941.91 
30,535.14 
5,300.06 
16,611.59 
10,857.16 


17,408.38 

15,250.40 

5,180.06 


15,420.89 

13,459.95 

1,083.91 


16,313.32 

13,636.23 

2,767.73 


7,955.37 
8,966.31 
2,270.59 


Meters 


Street light equipment, regular. . . . 
Street light equipment, ornamental 


Miscellaneous construction expense 
Steam or hydraulic plant. '. 


1,094.19 


2,522.70 


1,825.92 


220.30 


Old plant 


9,929.60 




6,018.38 




4,213 00 










Total plant 


224,592.54 

1,941.04 

115,000.00 

920.21 

3,544.66 


80,262.45 

3,501.53 

10,000.00 

689.01 


62,000.81 

5,459.74 

15,000.00 

931.94 

87.25 


74,196.37 

216.77 

10,000.00 

1,634.90 

74.28 


51,607.39 


Bank and cash balance 


5,181.68 


Securities and investments 

Accounts Receivable 


11,500.00 
64.50 


Inventories 




Sinking fund on local debentures . . 






Equity in H-E.P.C. systems 


136,834.17 
69.45 


57,234.26 


52,002.03 
41.85 


36,732.87 
26.24 


19,611.03 








Total assets 


482,902.07 


151,687.25 


135,523.62 


122,881.43 


87,964.60 






Liabilities 
Debenture balance 


10,213.84 
207.81 


1,311.12 
293.15 






14,590.82 


Accounts payable 


3,184.25 


135.00 


3,370.20 


Bank overdraft 




Other liabilities 


20,466.45 


1,154.07 


1,286.17 


709.00 








Total liabilities 


30,888.10 














Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


136,834. 17 
67,873.32 
37,584.98 


57,234.26 

24,235.07 

7,889.44 


52,002.03 

12,382.25 

214.16 


36,732.87 
20,640.00 


19,611.03 
13,651.43 


Other reserves 










Total reserves 


242,292.47 


89,358.77 


64,598.44 


57,372.87 


33,262.46 






Surplus 
Debentures paid 


135,786. 16 


13,188.88 


22,500.00 


29,000.00 


27,409. 18 


Local sinking fund 




Operating surplus 


73,935.34 


46,381.26 


43,954.76 


35,664.56 


9,331.94 






Total surplus 


209,721.50 


59,570. 14 


66,454.76 


64,664.56 


36,741.12 






Total liabilities, reserves and surplus. 


482,902.07 


151,687.25 


135,523.62 


122,881.43 


87,964.60 


Percentage of net debt to total assets. 


4.3 


2.9 


5.4 


1.0 


26.3 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



235 



A"— Continued 



Hydro Municipalities as at December 31, 1945 



Port Hope 
4,881 


Port 

McNicoll 

825 


Port Perry 
1,275 


Port Rowan 
584 


Port Stanley 
833 


Prescott 
3,318 


$ c. 
11,691.21 


S c. 
369.08 


$ c. 


$ c. 


S c. 
1,574.60 

27,744 'A\ 


$ c. 
2,761.54 


3,100.00 


2.564.65 
20,781.59 


10,97L72 




57,832.22 


12,541.05 


43,480.00 


24,300.09 

31,108.37 

3,727.46 


2.049.80 

3,739.82 

696.26 


5,894.64 
5,566.24 
1,850.51 


1,883.34 

2,948.57 

893.23 


14,015.19 

13,631.85 

2,189.82 


21,942.48 

21,745.48 

2,302.03 


6,726.26 


643.80 


172.87 


721.93 


6,520.29 


661.49 


























138,485.61 

3,236.88 

35,000.00 

499.36 

2,975.85 


20,039.81 

234.97 

1,000.00 

185.34 


36,830.50 

516.25 

11,000.00 

124.30 


17,418.79 

166 12 

8,500.00 

26.27 


65,676.16 

1,921.17 

22,000.00 

974.42 

14.00 


92,893.02 

5,480.69 
7,000.00 
2,130.77 












87,349.81 


8,583.92 


24,732.64 


9,532.21 


55,574.44 


68,685.62 














267,547.51 


30,044.04 


73,203.69 


35,643.39 


146,160.19 


176,190.10 






1,594.37 
219.20 


1,758.28 








317.74 


177.01 


547.92 








6,853.55 


248.40 


602.00 


240.00 


331.42 


490.40 


6,853.55 


566.14 


2,415.57 


1,998.28 


508.43 


1,038.32 


87,349.81 
36,086.13 


8,583.92 
6,853.11 


24,732.64 
15,596.93 


9,532.21 
6,166.15 


55,574.44 

22,233.70 

5,075.23 


68,685.62 
59,703.69 












123,435.94 


15,437.03 


40,329.57 


15,698.36 


82,883.37 


128,389.31 


79,000.00 


7,300.00 


18,287.29 


9,241.72 


18,950.00 


12,170.99 


58,258.02 


6,740.87 


12,171.26 


8,705.03 


43,818.39 


34,591.48 


137,258.02 


14,040.87 


30,458.55 


17,946.75 


62,768.39 


46,762.47 


267,547.51 


30,044.04 


73,203.69 


35,643.39 


146,160.19 


176,190.10 


3.8 


2.6 


5.0 


7.7 


0.6 


1.0 . 



236 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Preston 
6,707 


Priceville 

PV. 


Princeton 
P.V. 


Queenston 
P.V. 


Renfrew 


Population 


5,673 






Assets 

Lands and buildings 


$ c. 


$ c. 
68.00 


$ c. 


$ c. 


$ c. 
6,592 26 


Substation equipment 


57,211.70 
94,042.55 






16,038 65 


Distribution system — overhead. . . . 
Distribution system — underground. 


5,609.84 


4,478.31 


8,868.77 


36,320.47 


Line transformers 


56,618.30 

45,040.20 

6,502.32 


1,120.36 
707.08 
317.88 


3,473.44 

1,675.78 

207.93 


3,499.29 

1,971.61 

447.84 


36,352.80 


Meters 


27,484 10 


Street light equipment, regular. . . . 
Street light equipment, ornamental 


22,358.76 


Miscellaneous construction expense 
Steam or hydraulic plant 


8,577.44 


833.90 


80.37 


2,565.95 


4,037.00 
496,804.65 


Old plant 


32,126.75 




















Total plant 


300,119.26 

12,521.29 

43,000.00 

14,325.13 

5,744.34 


8,657.06 

531.79 

2.500.0 

19.53 


9,915.83 

1,451.68 

7,000.00 

9.28 


17,353.46 

540.84 

7,500.00 

50.08 


645,988 69 


Bank and cash balance 


24,451 19 


Securities and investments 




Accounts Receivable 


13,145.38 


Inventories 




Sinking fund on local debentures . . 










Equity in H-E.P.C. systems. . . . 


347.380.71 
3.82 


1,293.24 
4.00 


13,047.73 


9,376.67 




Other assets 












Total assets 


723,094.55 


13,005.62 


31,424.52 


34,821.05 


683,585.26 






Liabilities 

Debenture balance 


6,948.17 
10,349.68 






427.24 
0.50 


94,254.72 


Accounts payable 

Bank overdraft 


108.96 


21.21 


1,504.80 


Other liabilities 


1,221.73 






70.00 












Total liabilities 


18,519.58 


108.96 


21.21 


497.74 


95,759.52. 


Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation. 


347,380.71 

165,911.35 

427.76 


1,293.24 
4,030.31 


13,047.73 
3,627.04 


9,376.67 
5,922.53 




114,834.75 


Other reserves 


3,769.42 












Total reserves ; . . 


513,719.82 


5,323.55 


16,674.77 


15,299.20 


118,604.17 






Surplus 

Debentures paid 


145,851.83 


7,000.00 


3,550.00 


9,072.76 


416,982.01 


Local sinking fund 




Operating surplus 


45,003.32 


573.11 


11,178.54 


9,951.35 


52,239.56 


Total surplus 


190.855.15 


7,573.11 


14,728.54 


19,024.11 


469,221.57 


Total liabilities, reserves and surplus. 


723,094.55 


13,005.62 


31,424.52 


34,821.05 


683,585.26 


Percentage of net debt to total assets. 


4.9 


0.9 


0.1 


1.9 


14.0 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



237 



"A"— Continued 



Hydro Municipalities as at December 31, 1945 



Richmond 
412 


Richmond 
Hill 
1,454 


Ridgetown 
1,911 


Ripley 
358 


Riverside 
5,686 


Rockwood 
P.V. 


Rodney 
718 


$ c. 


$$ c. 


. $ c. 
3,666.13 
1,024.24 
25,662.29 


$ c. 


$. c. 
11,371.12 


$ c. 
79.00 


$ c. 




600.00 
15,033.75 




7,061.44 


10.847.32 


90,635.34 


9,223.41 


12,289.98 


1,696.28 

1,829.10 

194.48 


11,845.34 
7,592.13 
1,338.88 


12,970.07 

11,188.06 

6,976.68 

1,431.73 

2,304.40 


5,607.47 

2,406.60 

844.33 

1,235 .37 


31,000.02 
30,603.45 

19,163:24 
8,124.21 


3,823.65 

3,793.97 

731.82 


4,270.82 
4,297.92 
3,533.02 


612.67 




416.54 


863 08 




































11,393.97 
998.56 


36^410. 10 

1,244.08 

11,500.00 

202.32 


65,223.60 

50.00 

18,000.00 

235.50 

469.80 


20,941.09 
2,609.84 


190,897.38 

100.00 

42,000.00 

11,349.39 

5,752.84 


18,068.39 

755.57 

4,600.00 

6.32 

130.27 


25,254.82 

772.44 
7,200 00 


72.83 


125.87 
















4,409.30 


28,642.50 


57,544.43 


11,010.13 


110,647.31 


14,901.11 


18,361.26 
















16,874.66 


77,999.00 


141,523.33 


34,686.93 


360,746.92 


38,461.66 


51,588.52 


1,514 98 






3,562.27 
0.32 




1,018.22 
64.56 






229.02 


1,975.69 

790.98 

2,321.73 


5,636.68 

7,863.74 

21,379.35 


148.80 






74.87 


534.28 


623.83 


173.72 


310.00 


1,589.85 


763.30 


5,088.40 


4,186.42 


34,879.77 


1,256.50 


458.80 


4,409.30 
3,091.48 


28,642.50 
4,312.68 
3,069.37 


57,544.43 

23,812.03 

9,713.45 


11,010.13 
5,443.49 


110,647.31 
60,379.31 
11,512.33 


14,901.11 
8,424.26 


18,361.26 

6,057.33 

73.15 










7,500.78 


36,024.55 


91,069.91 


16,453.62 


182,538.95 


23,325.37 


24,491.74 


4,985.02 


12,200.00 


19,455.99 


10,409.67 


82,500.00 


3,481.78 


8,500.00 


2,799.01 


29,011.15 


25,909.03 


3,637.22 


60,828.20 


10,398.01 


18,137.98 


7.784.03 


41,211.15 


45,365.02 


14,046.89 


143,328.20 


13,879.79 


26,637.98 


16,874.66 


77,999.00 


141,523.33 


34,686.93 


360,746.92 


38,461.66 


51,588.52 


12.8 


1.5 


4.4 


17.7 


6.8 


5.3 


1.4 



238 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



.SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Rosseau 
179 


Russell 
P.V. 


St. 

Catharines 

34,541 


St. Clair 

Beach 

230 


St. George 
P.V. 


Population 






Assets 

Lands and buildings 


$ c. 


$ c. 


$ c. 

31,162.35 

165,257.36 

300,969.58 


$ c. 


$ c. 


Substation equipment 










Distribution system — overhead 

Distribution system — underground. 


7,857.44 


8,215.46 


10,177.92 


6,233.91 


Line transformers : . . 


2,314.23 
1.317.86 
. 623.60 


2,070.00 

1,951.09 

589.70 


211,470.74 

157,495:78 

24,760.94 

29,486.71 

4,795.65 


3,594.68 
2,467.50 


3,919.64 


Meters 


3,722.10 


Street light equipment, regular. . . . 


355.08 


Street light equipment, ornamental 
Miscellaneous construction expense 






1,081.84 


1,209.25 




374.18 


Steam or hydraulic plant 






Old plant 






20,000.00 
















Total plant 


13,194.97 

1,643.23 
2,500.00 


14,035.50 

1,341.69 

6,000.00 

38.78 


945,399.11 

25,448.09 

413,000.00 

49,876.42 

18,258.17 


16,240. 10 

184.48 

5,500.00 

340.92 


14,604.91 


Bank and cash balance 


940.26 


Securities and investments 

Accounts Receivable. . 


9,750.00 
10.99 


Inventories 






Sinking fund on local debentures . . 










Equity in H-E.P.C. systems 

Other assets 


5,135.38 


7,571.87 


942,552.65 
404.27 


9,289.91 


18,738.26 












Total assets 


22,473.58 


28,987.84 


2,394,938.71 


31,555.41 


44,044.42 






Liabilities 

Debenture balance . 


7,038.18 




19,250.00 
83,848.28 






Accounts payable 


284.58 


450.53 


1.40 


Bank overdraft 






Other liabilities 


40.00 


20.00 


33,501.65 


415.00 


395.00 






Total liabilities 


7,078.18 


304.58 


136,599.93 


865.53 


396.40 


Reserves 

For equity in H-E.P.C. systems. . . 

For depreciation. 

Other reserves 


5,135.38 

3,846.23 

68.74 


7,571.87 
4,322.39 


942,552.65 

327,536.02 

52,893.37 


9,289.91 

6,466.25 

34.74 


18,738.26 
4,678.60 
2,000.00 


Total reserves 


9,050.35 


11,894.26 


1,322,982.04 


15,790.90 


25,416.86 






Surplus 

Debentures paid 

Local sinking fund. . 


5,961.82 


10,000.00 


282,772.91 


6,341.45 


6,000.00 


Operating surplus 


383.23 


6,789.00 


652,583.83 


8,557.53 


12,231.16 






Total surplus . . 


6,345.05 


16,789.00 


935,356.74 


14,898.98 


18,231.16 






Total liabilities, reserves and surplus. 


22,473.58 


28,987.84 


2,394,938.71 


31,555.41 


44,044.42 




40.8 


1.4 


7.5 


3.9 


1.6 






1946 THE HYDRO-ELECTRIC POWER COMMISSION 



239 



*A" — Continued 



Hydro Municipalities as at December 31, 1945 



St. Jacobs 
P.V. 


St. Marys 
4,005 


St. Thomas 
17,773 


Sarnia 
20,082 


Scarborough 
Two. 
V.A. 


Seaforth 
1,724 


$ c. 


$ c. 
19,194.78 
33,252.02 
65,545.95 


$ c. 

79,093.04 

132,123.56 

129,093.33 

63,236.47 

74,357.73 

82,368.93 

23,141.88 

3,693.04 

3,452.90 


$ c. 
146,696.90 
232,315.20 
239,796.05 

13,463.71 
103,999:83 

98,328.43 

29,255.03 
8,271.83 

31,243.03 


$ c. 

21,446.77 

18,309.47 

349,608.75 


$ c. 
1,836.39 




8,930.07 


8,104.74 


32,416.73 


4,927.21 

4,007.54 

396.19 


38,627.43 

28,796.03 

6,657.10 


114,762.28 
96,690.34 
22,514.07 


15,528.24 

12,207.95 

5,789.27 


481.22 


6,887.55 


4,030.14 


828.35 




20,696.85 




















17,916.90 
855.07 


219,657.71 

25.00 

25,000.00 

797.64 

7,547.00 


590,560.88 

175.00 

171,000.00 

25,048.71 

19,267.82 


903,370.01 

300.00 

170,000.00 

7,239.30 

26,636.27 


627,361.82 


77,537.00 
3,603.30 


10,000.00 
8.54 


205,000.00 
16,684.64 


13,000.00 
2,016.59 
1,304.48 








22,771.65 


174,595.42 
358.16 


665,502.48 


857,697.18 
4,000.20 


269,442.34 


81,130.57 










51,552.16 


427,980.93 


1,471,554.89 


1,969,242.96 


1,118,488.80 


178,591.94 




10,182.16 

16,111.66 

424.14 

1,214.00 








8,390.20 




989.26 

7,069.04 

19,169.26 


1,013.43 

4,135.45 

20,297.30 


18,098.64 

325.51 

61,891.93 


232.90 




628.78 








27,931.96 


27,227.56 


25,446.18 


80,316.08 


9,251.88 






22,771.65 
5,238.23 


174,595.42 

85,927.56 

3,205.93 


665,502.48 

261,646.80 

25,440.77 


857,697.18 

265,872.57 

66,178.14 


269.442.34 

198,353.63 

59,200.38 


81,130.57 

26,597.60 

322.90 






28,009.88 


263,728.91 


952,590.05 


1,189,747.89 


526,996.35 


108,051.07 


. 6,000.00 


104,078.22 


138,944.07 


338,000.00 


290,568.27 


26,609.80 


17,542.28 


32,241.84 


352,793.21 


416,048.89 


220,608.10 


34,679.19 


23,542.28 


136,320.06 


491,737.28 


754,048.89 


511,176.37 


61,288.99 


51,552.16 


427,980.93 


1,471,554.89 


1,969,242.96 


1,118,488.80 


178,591.94 


0.0 


11.1 


2.9 


1.6 


9.5 


9.5 



240 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality. 
Population. . 



Shelburne 
985 



Simcoe 
6,047 



Smiths 
Falls 
7,708 



Smith- 
ville 
P.V. 



Southamp- 
ton 
1,596 



Assets 

Lands and buildings 

Substation equipment 

Distribution system — overhead 

Distribution system — underground. 

Line transformers 

Meters 

Street light equipment, regular 

Street light equipment, ornamental 
Miscellaneous construction expense 

Steam or hydraulic plant 

Old plant 



$ c 
800.00 
566.60 

15,649.81 



8,934.72 
7,018.28 
1,106.93 



2,189.46 



$ c. 

10,701.89 

41,527.90 

63,620.23 

1,412.24 

47,429.77 

40,557.93 

14,833.69 

3,500.00 

6,414.11 



$ c 
9,646.57 
4,765.59 
95,666.34 



$ c. 
25.00 



11,063.51 



27,746.94 



42,048.15 

40,123.44 

9,634.74 



4,118.05 
4,569.15 
1,630.00 



11,876.55 

10,839.11 

2,813.94 



2,118.26 



305.10 



275.71 



927.92 



1,878.98 



2,477.00 



Total plant. 



Bank and cash balance 

Securities and investments 

Accounts Receivable 

Inventories 

Sinking fund on local debentures . 
Equity in H-E.P.C. systems. . . . 
Other assets 



36,265.80 

509.94 

15,500.00 

130.35 



230,925.68 

30.00 

72,500.00 

2,182.19 

6,107.03 



204,003.09 

8,938.76 

98,000.00 

1,447.81 

242.05 



23,564.79 

2,351.27 

12,500.00 

25.21 

255.00 



56,054.25 

1,982.81 

8,500.00 

140.58 

478.90 



25,973.02 



153,912.55 



140,342.89 



1,996.08 



18,287.53 



Total assets. 



78,379.11 



465,657.45 



452,974.60 



40,692.35 



85,444.07 



Liabilities 

Debenture balance. 
Accounts payable. . 
Bank overdraft — 
Other liabilities 



87.45 



102.45 



7,573.10 
1,055.61 
4,511.26 

5,145.14 



491.32 



4,665.40 
54.34 



4,253.27 
73.43 



167.50 



85.00 



4.74 



Total liabilities. 



189.90 



18,285.11 



658.82 



4,804.74 



4,331.44 



Reserves 
For equity in H-E.P.C. systems. 

For depreciation — 

Other reserves 



25,973.02 

19,829.34 

1,500.00 



153,912.55 

52,144.77 
26,300.00 



140,342.89 

109,984.86 

5,456.63 



1,996.08 
7,868.91 



18,287.53 
12,699.36 



Total reserves. 



47,302.36 



232,357.32 



255,784.38 



9,864.99 



30,986.89 



Surplus 

Debentures paid. . . 
Local sinking fund. 
Operating surplus : 



19,920.00 
10,966 .85 



67,861.80 
147, 153 .22 



122,787.33 
* 73,744.' 07 



10,334.60 
15,688.02 



28,746.66 
21,379.08 



Total surplus 

Total liabilities, reserves and surplus . 
Percentage of net debt to total assets. 



30,886.85 



215,015.02 



196,531.40 



26,022.62 



50,125.74 



78,379.11 



465,657.45 



452,974.60 



40,692.35 



85,444.0/ 



0.4 



4.8 



0.2 



12.4 



6.5 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



241 



'A' ' — Continued 



Hydro Municipalities as at December 31, 1945 



Springfield 
401 


Stamford 
Twn. 
V.A. 


Stayner 
1,162 


Stirling 
984 


Stouffville 
1,295 


Stratford 
17,161 


$ c. 


$ c. 
8,682.41 
38,143.09 
175,045.41 


$ c. 


$ c. 
8,522.88 
8,034.64 
7,322.19 


$ c. 


$ c. 
141,455.78 




200.00 
16,849.59 




183,365.75 


10,276.05 


15,694.81 


156,608.30 
22,971.15 


3,289.47 

2,405.60 

609.47 


71,427.55 
54,122.04 
11,557.12 


7,189.33 
7,614.09 
1,095.02 


5,549.60 
5,710.58 
3,203.33 


6,677.94 
6,342.81 
1,813.21 


114,789.70 
94,539.95 
25,809.76 


918.57 


11,098.72 


310.33 


1,301.20 


662.92 


17,566.60 




13,743.66 








31,520.00 












17,499.16 


383,820.00 

24,111.61 

36,000.00 

12,248.12 

6,219.36 


33,258.36 


39,644.42 

8,086.28 

12,500.00 

768.05 

1,445.24 


31,191.69 

162.02 
17,500.00 


788,626.99 
13,986.30 


5,500.00 
819.77 


11,000.00 
193.72 


248,000.00 

10,912.46 

9,833.96 








28,772 06 


11,879.90 


135,147.22 
462.74 


23,018.93 


12,483.49 


23,477.79 


787,235.59 
2,385.83 












35,698.83 


598,009.05 


67,471.01 


74,927.48 


72,331.50 


1,889,753.19 


695.13 


34,905.77 
928.98 








50,000.00 


2.69 


192.29 
204.96 
364.00 




110.34 


969.75 


44.85 






10.00 


8,138.95 


402.93 


480.60 


4,835.90 


752.67 


43,973.70 


761.25 


402.93 


590.94 


55,805.65 


11,879.90 
4,364.91 


135,147.22 

106,522.64 

44,271.00 


23,018.93 

18,141.25 

43.11 


12,483.49 
11,099.05 


23,477.79 
5,527.95 
4,350.96 


787,235.59 

425,843.70 

30,781 16 








16,244.81 


285,940.86 


41,203.29 


23,582.54 


33,356.70 


1,243,860.45 


8,804.87 


205,372.40 


9,867.59 


10,000.00 


14,673.90 


405,800.00 
28,772 06 


9,896.48 


62,722.09 


15,638.88 


40,942.01 


23,709.96 


155,515.03 


18,701.35 


268,094.49 


25,506.47 


50,942.01 


38,383.86 


590,087.09 


35,698.83 


598,009.05 


67,471.01 


74,927.48 


72,331.50 


1,889,753.19 


3.2 


9.5 


1.7 


0.6 


1.2 


2.5 



242 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Strathroy 
3,001 


Streets- 
ville 
707 


Sunder- 
land 
P.V. 


Sutton 
894 


Swansea 
7,110 


Population 




Assets 
Lands and buildings 


$ c. 

9,373.61 
29,660.70 
50,498.65 


$ c. 
8,925.69 
1,172.04 
9,610.37 


$ c. 


$ c. 


$ c. 
3,583.83 


Substation equipment 






Distribution system — overhead — 
Distribution system — underground. 


4,528.58 


22,756.43 


82,450.67 


Line transformers 


29,165.15 

18,285.82 

6,238.53 


7,687.40 
4,708.47 
1,619.31 


1,841.08 

2,431.99 

670.57 


10,165.34 
7,717.15 
1,995.15 


55,884.69 
38,196.01 
13,652.09 


Meters 


Street light equipment, regular 

Street light equipment, ornamental 


Miscellaneous construction expense 
Steam or hydraulic plant 


3,071.06 


879.65 
10,641.55 


142.22 


1,664.34 


5,390.15 


Old plant 




675.00 














Total plant 


146,293.52 

6,785.58 

29,000.00 

297.30 

1,365.99 


45,244.48 

3,154.88 

2,000.00 

519.16 


9,614.44 

263.08 
4,000.00 


44,973.41 

932.04 

11,000.00 

245.75 


199,157.44 

12,083.12 

65,000.00 

1,191.34 


Bank and cash balance 


Securities and investments 

Accounts Receivable 


Inventories 




Sinking fund on local debentures . . 










Equity in H-E.P.C. systems 

Other assets 


120,812.52 


5,209.42 


13,396.88 


23,300.08 


124,620.77 
16 42 














Total assets 


304,554.91 


56,127.94 


27,274.40 


80,451.28 


402,069 09 






Liabilities 
Debenture balance 


9,771.05 
173.02 








50,170.85 


Accounts payable 


91.87 


86.20 


324.73 


2,452 86 


Bank overdraft 




Other liabilities 


1,1.96.59 


369.11 


30.00 


30.00 


4,946 41 






Total liabilities 


11,140.66 


460.98 


116.20 


354.73 


57,570.12 






Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


120,812.52 

54,549.80 

1,034.16 


5,209.42 
9,123.93 
2,621.35 


13,396.88 

7,006.02 

59.25 


23,300.08 

13,097.77 

1,645.84 


124,620.77 


Other reserves 


230.47 






Total reserves 


176,396.48 


16,954.70 


20,462.15 


38,043.69 


192,755.21 






Surplus 
Debentures paid 


44,117.80 


17,545.08 


4,770.00 


26,000.00 


52,496.11 


Local sinking fund 




Operating surplus 


72,899.97 


21,167.18 


1,926.05 


16,052.86 








Total surplus 


117,017.77 


38,712.26 


6,696.05 


42,052.86 


151,743.76 






Total liabilities, reserves and surplus. 


304,554.91 


56,127.94 


27,274.40 


80,451.28 


402,069.09 


Percentage of net debt to total assets. 


3.9 


0.9 


0.8 


0.6 


20.7 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



243 



A"— Continued 



Hydro Municipalities as at December 31, 1945 



Tara 
482 


Tavistock 
1,037 


Tecumseh 
2,794 


Teeswater 
846 


Thamesford 
P.V. 


Thamesville 

777 


Thedford 
573 


$ c. 


$ c. 
3,752.33 


$ c. 
1,232.16 


$ c. 


$ c. 


$ c. 
681.69 


$ c. 




330.31 
18,065.27 






11,685.44 


13,967.31 


40,935.71 


8,398.15 


13,626.41 


10,765.46 


3,518.91 
2,381.18 
2,721 . 65 


8,855.00 
6,868.09 
1,152.93 


11,955.50 
15,598.16 


6,795.07 
4,039.04 
1,495.82 


4,420.97 
3,579.70 

485.47 


5,773.60 
4,930.28 
2,376.70 


4,915.12 
3,343.78 
1,110 94 




4,760.95 
2,474.70 




1,431.20 


984.05 


1,744.35 


285.22 


231.25 


1,799.60 








4,976.86 






433.78 














21,738.38 

554.02 

10,500.00 

58.73 


35,579.71 

15.00 

13,500.00 

25.91 

685.36 


76,957.18 

50.00 

15,000.00 

2,442.12 

332.76 


37,446.72 

177.68 

11,500.00 

26.12 


17,169.51 

234.57 
4,000.00 


27,619.93 

868.69 

16,500.00 

253.26 


22,368.68 

1,373.65 

12,000.00 

103 26 


















11,517.96 


61,245.22 
252.00 


35,811.47 


16,673.50 


22,923.19 


23,215.61 


13,065.76 














44,369.09 


111,303.20 


130,593.53 


65,824.02 


44,327.27 


68,457.49 


48,911.35 




371.72 
301.35 
437.53 












ii6.80 


1,398.39 

404.33 

5,396.00 


2.38 


20.95 


200.40 


213.67 




46.00 


92.00 


426.00 


11.39 








116.80 


1,110.60 


7,198.72 


48.38 


112.95 


626.40 


225.06 


11,517.96 
11,790.30 


61,245.22 

16,248.27 

1,000.00 


35,811.47 

22,344.70 

5,989.57 


16,673.50 

13,095.67 

1,000.00 


22,923.19 
7,321.78 


23,215.61 

13,824.74 

164.86 


13,065.76 
7,009.54 








23,308.26 


78,493.49 


64,145.74 


30,769.17 


30,244.97 


37,205.21 


20,075.30 


15,500.00 


5,628.28 


26,000.00 


28,000.00 


5,358,03 


11,187.80 


16,500.00 


5,444.03 


26,070.83 


33,249.07 


7,006.47 


8,611.32 


19,438.08 


12,110.99 


20,944.03 


• 31,699.11 


59,249.07 


35,006.47 


13,969.35 


30,625.88 


28,610.99 


44,369.09 


111,303.20 


130,593.53 


65,824.02 


44,327.27 


68,457.49 


48,911.35 


0.3 


2.2 


2.7 


0.1 


0.5 


1.4 


0.6 



244 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Thorn- 
bury 
803 


Thorn- 
dale 
P.V. 


Thornton 
P.V. 


Thorold 
5,517 


Tilbury 
1,995 


Population 






Assets 
Lands and buildings 


$ c. 


$ c. 


$ c. 


$ c. 
10,837.37 

2,572.33 
44,792.09 


$ c. 
1 1 987 47 


Substation equipment 


2,164.11 
11,000.00 








Distribution system — overhead. . . . 
Distribution system — underground. 


4,004.45 


6,846.75 


17,913.17 


Line transformers 


7,100.00 
4,000.00 
1,035.00 


2,315.45 

2,137.34 

181.19 


1,764.80 

1,076.25 

433.25 


25,388.83 

26,071.23 

3,326.51 


14 944 73 


Meters 


9 147 95 


Street light equipment, regular. . . . 
Street light equipment, ornamental 


1,080.92 


Miscellaneous construction expense 
Steam or hydraulic plant 


21.60 
36,000.00 


148.95 


300.35 


1,997.59 


1,480.89 


Old plant 






















Total plant 


61,320.71 
6,408.89 


8,787.38 

284.69 

4,000.00 

24.44 


10,421.40 

900.29 

2,500.00 

14.19 


114,985.95 

6,151.00 

85,800.00 

277.83 

2,713.97 


56,555 13 


Bank and cash balance 




Securities and investments 


22 000 00 


Accounts Receivable 


11.42 


462 87 


Inventories. 


16 76 


Sinking fund on local debentures . . 










Equity in H-E P C. systems. . . . 




11,304.18 


4,504.96 


141,715.85 
135.25 


69 393 15 


Other assets 




15 96 












Total assets 


67,741.02 


24,400.69 


18,340.84 


351,779.85 


148,443 87 






Liabilities 
Debenture balance. . . 


6,755.92 
2,852.31 










Accounts payable 




18.06 


7,339.88 


157.74 


Bank overdraft 




701 . 56 


Other liabilities 




476.57 




2,604.50 


27.25 










Total liabilities 


9,608.23 


476.57 


18.06 


9,944.38 


886.55 






Reserves 
For equity in H-E.P.C. systems. . . 




11,304.18 

5,568.82 

424.04 


4,504.96 
6,953.57 


141,715.85 
43,684.86 


69,393.15 


For depreciation 


3,929.82 


22,689.63 


Other reserves 


5,648.60 












Total reserves 


3,929.82 


17,297.04 


11,458.53 


185,400.71 


97,731.38 


Surplus 

Debentures paid 


49,244.08 


3,086.48 


7,500.00 


5,000.00 


14,000.00 


Local sinking fund 




Operating surplus 


4,958.89 


3,540.60 


* 635. 7 5 


151,434.76 


35,825.94 


Total surplus 


54,202.97 


6,627.08 


6,864.25 


156,434.76 


49,825.94 


Total liabilities, reserves and surplus. 


67,741.02 


24,400.69 


18,340.84 


351,779.85 


148,443.87 


Percentage of net debt to total assets. 


14.2 


3.6 


0.1 


4.7 


1.1 



Deficit. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



245 



'A"— Continued 



Hydro Municipalities as at December 31, 1945 



Tillsonburg 
4,031 


Toronto* 
676,887 


Toronto Twp. 
V.A. 


Tottenham 

454 


Trafalgar 

Twp. 
No. 1 V.A. 


Trafalgar 

Twp. 
No. 2 V.A. 


$ c. 
4,824.27 


$ c. 
5,551,160.48 
14,806,106.11 
6,990,314.30 
4,113,524.59 
3,710,160.13 
3,159,688.93 
439,263.25 


$ c. 
8,072.99 


$ c. 


$ c. 
156.34 
839.61 

24,384.10 


$ c. 


21,899.54 


358.50 
9,127.77 




54,436.09 


228,598.87 


12,799.83 


30,884.35 
25,748.51 
12,519.72 


96,058.56 

59,618.32 

6,991.25 


1,797.12 

2,905.98 

496.86 


13,765.21 

6,839.88 

36.11 


3,415.30 
1,989.56 






1,450.32 


2,104,947.74 


3,076.61 


1,322.82 


1,466.20 


312.70 






619.65 


286.45 














151,762.80 
50.00 


40,875,165.53 

299,563.70 

10,850,128 54 

1,883,045.69 

459,473.82 

4,205,854.26 

27,314,558.46 

14,535.51 


403,036.25 

11,141.52 

39,000.00 

684.64 


16,295.50 

185.98 

4,000.00 

0.20 


47,487.45 

2,360.35 

9,000.00 

599.96 

25.92 


18,517.39 


38,500.00 

529.13 

1,696.25 


6,000.00 
132.81 










119,214.12 


163,214.48 


14,511.32 


10,003.01 


3,612.95 












311,752.30 


85,902,325.51 


617,076.89 


34,993.00 


69,476.69 


28,263.15 


8,181.09 


7,443,100.00 
1,111,211.37 


8,933.30 
12,051.51 


1,088.61 
417.53 




4,399.63 


57.60 
2,756.43 


22.60 


629.89 
147.43 


4,139.61 


345,166.06 


6,757.54 


243.00 


20.00 








15,134.73 


8,899,477.43 


27,742.35 


1,749.14 


42.60 


5,176.95 


119,214.12 
42,248.62 
12,221.79 


27,314,558.46 

14,088,177.98 

1,189,651.57 


163,214.48 

180,882.18 

2,067.20 


14,511.32 
9,407.77 


10,003.01 
24,895.09 


3,612.95 
5,642.09 










173,684.53 


42,592,388.01 


346,163.86 


23,919.09 


34,898.10 


9,255.04 


37,818.91 


22,853,442.76 
4,205,854.26 
7,351,163.05 


95,066.70 


11,878.49 


19,426.41 


5,061.52 


85,114.13 


148,103.98 


}2, 553. 72 


15,109.58 


8,769.64 


122,933.04 


34,410,460.07 


243,170.68 


9,324.77 


34,535.99 


13,831.16 


311,752.30 


85,902.325,51 


617,076.89 


34,993.00 


69,476.69 


28,263.15 


7.9 


8.6 


6.1 


8.5 


0.0 


21.0 



* Includes 1945 power adjustment and equity, f Deficit. 



246 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Trenton 
9,849 


Tweed 
1,250 


Uxbridge 
1,439 


Victoria 

Harbour 

894 


Walker- 


Population 


ton 
2,723 


Assets 

Lands and buildings 


$ c. 

5,139.41 

49,132.98 

121,793.04 


$ c. 


$ c. 

40.00 

2,657.65 

15,823.13 


$ c. 


$ c. 


Substation equipment 








Distribution system — overhead. . . . 
Distribution system — underground. 


17,006.35 


10,801.58 


42,914.08: 


Line transformers 


28,322.48 
43,624.55 
18,966.48 


4,939.93 
6,711.95 
2,251.51 


5,728.64 
6,560.92 
1,505.99 


2,371.26 

3,843.29 

366.32 


16,027.21 


Meters 

Street light equipment, regular. . . . 
Street light equipment, ornamental 


14,848.26. 
2,771.24 


Miscellaneous construction expense 


8,682.46 




924.90 


666.37 


1,960.50 


Steam or hydraulic plant . 






Old plant 










4,897.60 














Total plant 


275,661.40 

3,264.03 

105,500.00 

911.33 

4,841.01 


30,909.74 

1,683.10 

12,000.00 

993.43 

1,377.13 


33,241.23 

2,774.24 

9,000.00 

292.38 

37.61 


18,048.82 

1,268.09 

5,300.00 

94.35 


83,418.89 


Bank and cash balance 


7,511.92 


Securities and investments 

Accounts Receivable 


20,000.00 
551.62 


Inventories 


1,356.08 


Sinking fund on local debentures . . 






Equity in H-E.P.C. systems 

Other assets. . . . 


126,935.79 
163.99 


14,274.45 


26,818.31 


8,687.93 


31,324.49 












Total assets 


517,277.55 


61,237.85 


72,163.77 


33,399.19 


,144,163.00 






Liabilities 

Debenture balance 










25,659.06 


Accounts payable 


229.58 


462.54 


466.21 


54.50 


176.57 


Bank overdraft 




Other liabilities 


6,463.91 


332.00 


457.00 




234.00 








Total liabilities 


6,693.49 


794.54 


923.21 


54.50 


26,069.6^ 


Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


126,935.79 
71,310.89 
26.500.00 


14,274.45 
4,061.35 
1,937.58 


26,818.31 

10,875.23 

2,486.77 


8,687.93 
8,363.46 


31,324.49 
19,262.39 


Other reserves . . 


37.15 








Total reserves 


224,746.68 


20,273.38 


40,180.31 


17,051.39 


50,624.03 






Surplus 

Debentures paid 


165,000.00 


19,000.00 


16,207.59 


6,500.00 


37,340.94 


Local sinking fund 




Operating surplus 


120,837.38 


21,169.93 


14,852.66 


9,793.30 


30,128.40 






Total surplus 


285,837.38 


40,169.93 


31,060.25 


16,293.30 


67,469.34 






Total liabilities, reserves and surplus. 


517,277.55 


61,237.85 


72,163.77 


33,399.19 


144,163.00 


Percentage of net debt to total assets. 


1.7 


1.7 


2.0 


0.2 


23.1 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



247 



"A"- Continued 



Hydro Municipalities as at December 31, 1945 



Wallace- 
burg 
5,088 


Wardsville 
226 


Warkworth 
P.V. 


Waterdown 
916 


Waterford 
1,352 


Waterloo 
9,460 


Watford 
972 


$ c. 
46,008.56 


$ c. 


$ c. 


$ c. 
200.00 


$ c. 
1,323.44 


$ c. 
17,404.89 
99,841.54 
97,578.05 


$ c. 
100.00 


12,857.49 








79,809.30 


5,415.22 


5,845.45 


16,618.52 


16,856.81 


17,968.55 


56,842.47 
32,660.97 
12,734.41 


1,619.80 

1,504.13 

662.94 


1,397. i6 

2,263.98 

338.08 


8,648.48 
6,936.79 
1,104.66 


9,556.74 
7,864.83 
3,231.62 


67,267.10 

48,891.42 

14,318.75 

3,106.80 

5,402.34 


8,853.62 
6,718.12 
2,757.32 


3,995.10 


488.73 


609.19 


9.77 


402.30 


2,677.14 






3,618.02 






23,880.17 














244,908.30 

75.00 

70,500.00 

3,499 85 

13,974.51 


9,690.82 

169.02 

5,000.00 

790.19 


14,071.88 

440.11 

4,700.00 

26.96 


33,518.22 

2,638.44 

9,000.00 

304.73 


39,235.74 

1,376.62 

14,000.00 

54.41 

297.95 


377,691.06 

7,246.09 

104,000.00 

1,527.90 

916.40 


39,074.75 

758.37 

15,300.00 

574.63 

727.91 












262,139.47 

703 20 


4,905.00 


5,409.54 


29,040.50 
31.25 


43,189.69 


362,226.63 


32,871.86 
509.61 














595,800.33 


20,555.03 


24,648.49 


74,533.14 


98,154.41 


853,608.08 


89,817.13 






5,435.48 










228.51 


131.64 


31.51 


180.30 


10.00 


129.63 


1,821.04 






3,502.35 




28.00 


109.28 




3,106.80 


291 . 20 










5,551.90 


131.64 


5,463.48 


140.79 


180.30 


3,116.80 


420.83 


262,139.47 
77,245.36 
30,879.17 


4,905.00 

4,331.43 

25.22 


5,409.54 
4,094.52 


29,040.50 
10,861.21 


43,189.69 

15,342.80 

2,500.00 


362,226.63 

191,823.21 

735.26 


32,871.86 

14,675.19 

109.17 










370,264.00 


9,261.65 


9,504.06 


39,901.71 


61,032.49 


554,785.10 


47,656.22 


71,536.58 


7,562.40 


5,564.52 


8,000.00 


7,745.53 


106,000.00 


9,055.77 


148,447.85 


3,599.34 


4,116.43 


26,490.64 


29,196.09 


189,706.18 


32,684.31 


219,984.43 


11,161.74 


9,680.95 


34,490.64 


36,941.62 


295,706.18 


41,740.08 


595,800.33 


20,555.03 


24,648.49 


74,533.14 


98,154.41 


853.608.08 


89,817.13 


1.7 


0.8 


28.4 


0.3 


0.3 


0.0 


0.8 



248 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 

Population 


Waubau- 
shene 
P.V. 


Welland 
15,780 


Wellesley 
P.V. 


Welling- 
ton 
909 


West 

Lome 

791 


Assets 

Lands and buildings 


$ c. 


$ c. 

77,006.74 

117,054.79 

188,249.39 

8,044.90 

122,887.78 

83,391.09 

11,793.06 

40,273.85 

9,192.13 


$ c. 


$ c. 

200.00 

499.80 

16,424.13 


$ c. 
2,526.50 


Substation equipment 








Distribution system — overhead. . . . 
Distribution system — underground. 


10,197.44 


7,878.24 


13,556.06 


Line transformers 


3,136.34 

3,448.39 

303.35 


3,153.94 

3,174.66 

545.11 


5,362.87 
6,935.39 
1,349.61 


7,180.45 


Meters 

Street light equipment, regular. . . . 
Street light equipment, ornamental 
Miscellaneous construction expense 
Steam or hydraulic plant 


5,139.70 
881.46 


273.24 


177.75 


1,563.47 


438.19 


Old plant . . 








2,477.92 














Total plant 


17,358.76 

390.87 

700 00 

73.93 


657,893.73 

21,488.99 

238,839.38 

1,727.52 

16,104.97 


14,929.70 

287.48 

7,500.00 

0.38 


34,813.19 

328.92 

12,000.00 

19.09 


29,722.36 


Bank and cash balance 


233.21 


Securities and investments 

Accounts Receivable 


9,000.00 
134.99 


Inventories 


360.36 


Sinking fund on local debentures . . 










Equity in H-E.P.C. systems 

Other assets . .... 


6,333.35 


436,662.77 
36.03 


20,857.46 
0.73 


14,177.96 


32,445.94 










Total assets 


24,856.91 


1,372,753.39 


43,575.75 


61,339.16 


71,896.86 






Liabilities 

Debenture balance 








2,028.01 

48.74 




Accounts payable 


150.00 


1,191.16 


6.73 


285.39 


Bank overdraft 




Other liabilities 




53,051.93 




46.25 


116.10 










Total liabilities 


150.00 


54,243.09 


6.73 


2,123.00 


401.49 






Reserves 
For equity in H-E.P.C. systems. . . 
For depreciation 


6,333.35 

4,476.32 

125.00 


436,662.77 

236,752.75 

3,675.65 


20,857.46 
5,463.98 


14,177.96 
13,610.36 


32,445.94 
11,272.19 


Other reserves . 


65.12 










Total reserves 


10,934.67 


677,091 . 17 


26,321.44 


27,788.32 


43,783.25 






Surplus 

Debentures paid 


3,500.00 


275,000.00 


7,500.00 


14,971.99 


8,000.00 


Local sinking fund 




Operating surplus 


10,272.24 


366,419.13 


9,747.58 


16,455.85 


19,712.12 






Total surplus 


13,772.24 


641,419.13 


17,247.58 


31,427.84 


27,712.12 






Total liabilities, reserves and surplus. 


24,856.91 


1,372,753.39 


43,575.75 


61,339.16 


71,896.86 


Percentage of net debt to total assets. 


0.8 


1.6 


0.0 


4.5 


1.0 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



249 



"A" — Continued 



Hydro Municipalities as at December 31, 1945 



Weston 
6,333 


Westport 
663 


Wheatley 
716 


Whitby 

4,641 


Wiarton 
1,709 


Williams- 
burg 
P.V. 


Winchester 
959 


$ c. 
11,903 31 


$ c. 


$ c. 
52.50 


$ c. 

6,619.20 
34,288.16 
63,163.13 


$ c. 


$ c. 


$ c. 
299.85 


72,093 84 




333.57 
22,628.44 






75,593.10 


7,755.76 


17,948.57 


3,471.38 


10,922.82 


61,262.35 
34,808.04 
28,905.57 


1,864.78 

2,028.86 

733.02 


6,080.28 
5,038.84 
7,626.61 


18,083.86 
23,290.74 
12,800.45 


7,690.31 
8,354.48 
2,914.96 


1,978.92 

2,391.10 

174.61 


4,906.59 

6,275.72 
719.87 


5,164.80 


1,285.07 


1,070.13 


6,934.35 


5,123.83 


35.38 


315.52 




1,713.00 




1,340.13 


1,870.35 




1,100.00 










289,731.01 

2,859.92 

31,500.00 

650.76 

597.12 


15,380.49 

485.59 

5,000.00 

4.46 


37,816.93 

1,846.73 

8,500.00 

100.33 

162.87 


166,520.02 

1,739.46 

57,000.00 

2,330.11 

511.82 


48,915.94 

2,153.75 

19,000.00 

697.77 


8,051.39 

1,167.07 

23,000.00 

22.94 


24,540.37 

3,245.01 
10,500.00 

54.44 












324,382.89 


7,396.36 


19,123.53 
253.58 


72,192.00 


20,977.67 


8,322.06 


26,297.70 














649,721.70 


28,266.90 


67,803.97 


300,293.41 


91,745.13 


40,563.46 


64,637.52 




6,270.34 




3,256.69 
371.08 


17,365.41 
116.18 








3,267.98 


24.91 


266.11 








822.22 


235.00 


244.57 


1,471.43 


212.21 


358.34 


10.00 


822.22 


6,505.34 


3,512.55 


5,099.20 


17,693.80 


383.25 


276.11 


324,382.89 

62,125.25 

361 . 53 


7,396.36 
3,108.92 


19,123.53 

9,148.69 

62.71 


72,192.00 
36,583.14 


20,977.67 
9,953.98 
2,996.25 


8,322.06 

4,323.88 

327.28 


26,297.70 
12,087.18 










386,869.67 


10,505.28 


28,334.93 


108,775.14 


33,927.90 


12,973.22 


38,384.88 


70,032.44 


8,729.66 


13,000.00 


73,355.81 


20,034.59 


2,750.00 


10,650.00 


191,997.37 


2,526.62 


22,956.49 


113,063.26 


20,088.84 


24,456.99 


15,326.53 


262,029.81 


11,256.28 


35,956.49 


186,419.07 


40,123.43 


27,206.99 


25,976.53 


649,721.70 


28,266.90 


67,803.97 


300,293.41 


91,745.13 


40,563.46 


64,637.52 


0.3 


31.2 


7.2 


2.2 


25.0 


1.2 


0.7 



250 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Windermere 
100 


Windsor 
117,031 


Wingham 
2,051 


Woodbridge 
1,089 


Population 






Assets 

Lands and buildings 


$ c. 


$ c. 

599,609.45 

1,414,642.70 

1,391,066.71 

227,541.83 

614,157.03 

597,956.85 

102,536.51 

1,021,495.33 

175,253.59 


$ c. 
21,513.45 

4,863.91 
42,235.73 


$ c. 


Substation equipment 






Distribution system — overhead 

Distribution system — underground. . . 


9,980.66 


20,081.44 


Line transformers 


3,751.74 

1,235.36 

247.26 


21,879.07 
17,625.70 
11,317.69 


8 258 44 


Meters 


6,917 67 


• Street light equipment, regular 

Street light equipment, ornamental . . 


624.03 


Miscellaneous construction expense. . 
Steam or hydraulic plant 


533.63 


6,080.39 
14,711.99 
12,320.02 


705.13 


Old plant 




166,440.66 










Total plant 


15,748.65 

547.03 

4,400.00 

14.78 


6,310,700.66 

1,075.00 

1,509,609.84 

141,068.50 

187,478.37 

81,458.03 

4,120,207.86 


152,547.95 


36,586.71 


Bank and cash balance 


537 51 


Securities and investments 


14,000.00 


Accounts Receivable 


1,900.00 
8,292.84 


112 45 


Inventories 




Sinking fund on local debentures .... 






Other assets ' 


3,517.48 


52,573.28 


43,776.58 












Total assets 


24,227.94 


12,351,598.26 


215,314.07 


95,013.25 






Liabilities 
Debenture balance 


5,225.30 
424.69 


283,689.08 

121,335.41 

148,665.79 

1,143,276.65 


14,828.69 

0.83 

973.32 

677.15 




Accounts payable 


2,229.01 


Bank overdraft .... 




Other liabilities .... 




646.57 








Total liabilities 


5,649.99 


1,696,966.93 


16,479.99 


2,875.58 






Reserves 

For equity in H-E.P.C. systems 

For depreciation . .... 


3,517.48 
4,985.37 


4,120,207.86 

1,856,766.24 

569,607.60 


52,573.28 
45,209.66 


43,776.58 
13,886.98 


Other reserves . . .... 


5,200.00 












8,502.85 


6,546.581,70 


97,782.94 


62,863.56 






Surplus 

Debentures paid .... 


6,538.00 


2,300,142.97 

81,458.03 

1,726,448.63 


82,276.81 


8,499.97 


Local sinking fund 




Operating surplus 


3,537.10 


19,774.33 


20,774.14 






Total surplus 


10,075.10 


4,108,049.63 


101,051.14 


29,274.11 






Total liabilities, reserves and surplus. . . 


24,227.94 


12,351,598.26 


215,314.07 


95,013.25 


Percentage of net debt to total assets. . . 


27.3 


8.3 


10.1 


5.6 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



251 



A'— Continued 



Hydro Municipalities as at December 31, 1945 



Woodstock 
12,916 


Woodville 
381 


Wyoming 
480 


York Twp. 
V.A. 


Zurich 
P.V. 


SOUTHERN 
ONTARIO 
SYSTEM 

SUMMARY 


$ c. 
44,201 83 


$ c. 


$ c. 
50.00 


$ c. 

76,503.47 
344,887.42 
829,231.97 


$ c. 


$ c. 
11,135,520.97 


134,846.07 






25,444,678.45 


136,691.12 


3,560.96 


11,470.26 


7,373.89 


25,464,745.05 
6,539,797.63 


81,305.44 
72,133.62 
22,895.71 


2,167.24 

2,234.83 

548.71 


3,194.98 

3,488.42 

548.49 


368,120.66 

364,157.31 

71,181.61 


2,844.27 

2,920.32 

471.82 


12,926,097.93 

11,262,253.98 

2,779,359.43 

1,551,628.63 


6,100.45 


251.91 


853.52 


55,305.22 


347.29 


3,377,496.36 
680,977.39 










150.00 


692,517.55 












498,174.24 


8,763.65 

1,146.19 

5,000.00 

495.54 


19,605.67 

292.65 

2,600.00 

50.88 


2,109,387.66 


14,107.59 

303.75 

9,500.00 

152.25 


101,855,073.37 
1,732,817.22 


133,000.00 

3,640.44 

355 03 


461,500.00 
57,647.42 
40,978.05 


26,134,426.07 
3,552,960.71 
1,631,665.07 










4,823,164.34 


554,454.69 
265.30 


13,040.99 


10,861.71 


1,019,808.89 


17,620.36 


71,015,455.54 
283,938.60 














1,189,889.70 


28,446.37 


33,410.91 


3,689,322.02 


41,683.95 


211,029,500.92 








64,985.67 
74,047.35 
25,627.83 
33,709.73 


723.18 
58.66 


10,228,887.43 


2,955.60 
3,001.67 


462.26 


155.61 


2,390,657.93 
422,369.51 


9,443.47 


22.00 


116.06 


10.00 


2,603,381.71 


15,400.74 


484.26 


271.67 


198,370.58 


791.84 


15,645,296.58 


554,454.69 

235,170.63 

65,141.61 


13,040.99 

4,052.16 

957.22 


10,861.71 
6,723.53 


1,019,808.89 

803,412.51 

14,641.05 


17,620.36 
7,982.89 


71,015,455.54 

34,898,799.28 

6,535,295.85 










854,766.93 


18,050.37 


17,585.24 


1,837.862,45 


25,603.25 


112,449,550.67 


127,385.63 


5,500.00 


9,700.00 


424,388.98 


4,868.43 


45,971,078.01 
4,823,164.34 


192,336.40 


4,411.74 


5,854.00 


1,228,700.01 


10,420.43 


32,140,411.32 


319,722.03 


9,911.74 


15,554.00 


1,653,088.99 


15,288.86 


82,934,653.67 


1,189,889.70 


28,446.37 


33,410.91 


3,689,322.02 


41,683.95 


211,029,500.92 


2.4 


3.1 


1.2 


7.4 


3.3 


6.9 



252 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 



Balance Sheets of Electrical Departments of 



THUNDER BAY SYSTEM 



Municipality 

Population 


Fort William 
28,642 


Nipigon 
Twp. 
V.A. 


Port Arthur 
24,469 


THUNDER 

BAY 

SYSTEM 

SUMMARY 


Assets 

Lands and buildings. ... 


$ c. 
105,692.48 
150,522.43 
256,027.42 


$ c. 
215.03 


$ c. 
468,753.16 
311,881.37 
528,157.63 


$ c. 
574,660.67 


Substation equipment 


462,403.80 


Distribution system — overhead 

Distribution system — underground. . . 


18,911.38 


803,096.43 


Line transformers ... 


113,747.53 

103,641.01 

50,020.00 


5,453.41 
4,699.16 
2,436.86 


126,967.35 

127,731.50 

83,830.13 


246,168.29 


Meters .... 


236,071.67 


Street light equipment, regular 

Street light equipment, ornamental . . 


136,286.99 


Miscellaneous construction expense . . 
Steam or hydraulic plant. . 


16,283.76 


300.00 


32,575.23 
325,003.44 


49,158.99 
325,003.44 


Old plant. 


















Total plant 


795,934.63 


32,015.84 

627.72 

11,000.00 

657.29 


2,004,899.81 


2,832,850.28 


Bank and cash balance 


627.72 


Securities and investments 


251,300.00 

36,043.69 

36,050.39 

129,554.28 

1,051,765.28 

1,200.00 


821,653.26 
43,841.56 
25,097.67 


1,083,953.26 




80,542 . 54 


Inventories. . 


61,148.06 


Sinking fund on local debentures .... 

Equity in H-E.P.C. systems 

Other assets ... 




129,554.28 


10,252.85 
25.08 


2,924,877.71 
4,142.71 


3,986,895.84 
5,367.79 






Total assets 


2,301,848.27 


54,578.78 


5,824,512.72 


8,180,939.77 






Liabilities 

Debenture balance 


250,000.00 

34,827.48 

3,270.03 

36,029.35 






250,000.00 


Accounts payable. ... ... 




48,501.20 
3,035.37 


83,328.68 


Bank overdraft .... 




6,305.40 


Other liabilities 


171.24 


36,200.59 








Total liabilities. . . 


324,126.86 


171.24 


51,536.57 


375,834.67 






Reserves 

For equity in H-E.P.C. systems 

For depreciation 


1,051,765.28 

212,538.45 

63,498.50 


10,252.85 
6,558.13 
3,500.00 


2,924,877.71 
787,647.33 
150,751.04 


3,986,895.84 
1,006,743.91 


Other reserves 


217,749.54 






Total reserves. . . ... 


1,327,802.23 


20,310.98 


3,863,276.08 


5,211,389.29 






Surplus 

Debentures paid 


124,209.11 
129,554.28 
396,155.79 


10,000.00 


642,100.00 


776,309.11 


Local sinking fund 


129,554.28 


Operating surplus .... .... 


24,096.56 


1,267,600.07 


1,687,852.42 






Total surplus . 


649,919.18 


34,096.56 


1,909,700.07 


2,593,715.81 






Total liabilities, reserves and surplus . . . 


2,301,848.27 


54,578.78 


5,824,512.72 


8,180,939.77 


Percentage of net debt to total assets. 


17.4 


0.4 


1.9 


6.1 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



253 



"A" — Concluded 



Hydro Municipalities as at December 31, 1945 



NORTHERN ONTARIO DISTRICTS 



Capreol 
1,675 


North Bay 
15,827 


Sioux Lookout 
1,723 


Sudbury 
35,372 


NORTHERN 

ONTARIO 

DISTRICTS 

SUMMARY 


ALL 

SYSTEMS 

GRAND 

SUMMARY 


$ c. 
450.00 


$ c. 

56,591.17 

71,146.87 

152,703.43 


$ c. 


$ c. 
112,246.75 
213,661.48 
392,204.84 


$ c. 
169,287.92 
294,538.67 
568,023.30 


$ c. 
11,879,469.56 


9,730 . 32 




26,201,620.92 


13,664.22 


9,450.81 


26,835,864.78 
6,539,797.63 


6,474.57 
5,691.91 
1,126.26 


47,358.72 
85,088.92 
29,613.45 


4,181.51 
6,308.05 
1,794.15 


130,716.71 
147,306.15 
118,065.78 


188,731.51 
244,395.03 
150,599.64 


13,360,997 . 73 

11,742,720.68 

3,066,246.06 

1,551,628.63 


729.90 


24,239.21 


688.00 


16,944.23 


42,601.34 


3,469,256.69 
1,005,980.83 












692,517.55 














37,867.18 


466,741.77 

453.20 
84,500.00 
19,789.50 
11,636.70 


22,422.52 
5,097.33 


1,131,145.94 

5,831.92 

217,500.00 

27,827.11 

30,843.29 


1,658,177.41 

11,382.45 

312,000.00 

48,605.10 

43,112.08 


106,346,101.06 
1,744,827.39 


10,000.00 


27,530,379.33 


229.89 


758.60 
632.09 


3,682,108.35 
1,735,925.21 




4,952,718.62 












75,002,351.38 




716.46 






716.46 


290,022.85 










48,097.07 


583,837.63 


28,910.54 


1,413,148.26 


2,073,993.50 


221,284,434.19 




67,000.00 
2,653.47 




66,707.59 
49,778.62 


133,707.59 

54,094.81 

910.73 

67,932.91 


10,612,595.02 


1,331.32 
910 73 


331.40 


2,528,081.42 
429,585.64 


445.00 


31,271.25 


2,610.80 


33,605.86 


2,707,515.21 


2,687.05 


100,924.72 


2,942.20 


150,092.07 


256,646.04 


16,277,777.29 












75,002,351.38 


96.09 


51,696.01 


137.81 


174,099.17 


226,029.08 


36,331,919.08 
6,979,074.47 


7,917.40 


303,996.82 


2,526.14 


337,964.61 


652,404.97 


118,313,344.93 


19,000.00 


173,000.00 




400,630.94 


592,630.94 


47,340,018.06 






4,952,718.62 












34,400,575.29 


37,492.62 


178,916.09 


23,442.20 


925,091.58 


1,164,942.49 


86,693,311.97 












221,284,434.19 












7.0 



10— H.E. 



254 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM 



Municipality 


Acton 
1,876 


Agincourt 
P.V. 


Ailsa 

Craig 

434 


Alexandria 
1,904 


Alliston 


Population , 


1,542 


Earnings 

Domestic service 

Commercial light service 

Commercial power service 

Municipal power s 

Street lighting 


$ c. 

14,980.46 

6,168.47 

30,637.21 

784.78 

2,024.49 

69.99 

632.50 


$ c. 

6,231.92 
1,533.34 

775.70 


$ c. 

2,880.69 
1,111.79 
1,711.11 


$ c. 

7,694.17 
4,779.17 
4,104.96 
827.15 
1,952.33 


$ c. 

12,779.34 

8,293.81 

4,006.36 

911.24 


804.00 


696.00 


2,001 . 00 


Merchandise 


1.74 


Miscellaneous 


442.95 


362.71 


1,121.64 


974.70 


Total earnings 


55,297.90 


9,787.91 


6,762.30 


20,479.42 


28,968.19 


Expenses 
Power purchased 


42,277.34 


5,712.94 


4,965.18 


10,008.20 


14,438.89 


Substation operation 




Substation maintenance. 












Distribution system, operation and 

maintenance 

Line transformer maintenance 


2,989.38 

25.70 

144.46 

110.05 

435.17 


54.51 
17.95 
68.48 
89.18 

20.65 


53.71 


1,873.67 

58.00 

227.96 


-2,396.45 
121.33 


Meter maintenance. . .' 


0.75 


277.77 


Consumers' premises expenses 


34.20 


Street lighting, operation and main- 
tenance 


32.20 


265.81 


483.35 


Promotion of business 




Billing and collecting 


1,029.58 

1,350.68 

684.71 

131.76 


506.15 
137.23 


380.00 
91.70 
21.01 


850.78 

1,090.86 

107.19 

290.03 


1,173.51 


General office, salaries and expenses. . 
Undistributed expenses 


478.07 
101.60 


Truck operation and maintenance 






Interest 






394.91 


Sinking fund and principal payments 
on debentures 










2,028.62 


Depreciation 


1,835.00 


589.00 


396.00 


1,242.00 


1,239.00 


Other reserves 
















Total operating costs and 
fixed charges 


51,013.83 


7,196.09 


5,940.55 


16,014.50 


23,167.70 






Net surplus 


4,284.07 


2,591.82 


821.75 


4,464.92 


5,800.49 


Net loss 
















Number of Consumers 
Domestic service 


552 
86 
19 


173 

31 

3 


147 
33 

4 


456 

103 

16 


448 


Commercial light service 


125 


Power service 


20 






Total 


657 


207 


184 


575 


593 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



255 



"B' 



Hydro Municipalities for Year Ended December 31, 1945 



Almonte 
2,136 


Alvinston 
620 


Amherst- 
burg 
2,709 


Ancaster 
Twp. 
V.A. 


Apple Hill 
P.V. 


Arkona 
376 


Arnprior 
4,049 


$ c. 

12,978.29 

5,105.27 

5,557.86 

704.51 


$ c. 

3,515.97 
1,902.03 
1,175.71 
222.94 
1,595.00 


$ c. 

24,534.29 

9,351.67 

10,697.53 


$ c. 

13,769.27 

4,819.57 

720.41 

250.48 

1,166.50 


$ c. 

1,369.33 
859.17 
581.70 


$ c. 

2,827.70 

1,358.25 

287.89 


$ c. 

19,050.58 
9,589.62 

17,290.80 
2,319.78 


2,703.00 


2,205.16 


493.50 


1,092.00 


3,113.50 


1,528.91 


287.50 


1,224.83 


210.00 


120.48 


121.97 


1,322.95 


28,577.84 


8,699.15 


48,013.48 


20,936.23 


3,424.18 


5,687.81 


52,687.23 


7,822.81 
5,261 . 98 


4,278.93 


29,434.02 


10,622.89 


1,464.87 


2,325.42 


25,890.70 


406.07 














2,842.96 
199.67 


427.49 


3,112.52 


1,970.70 

87.78 

379.22 

145.55 

400.05 


216.71 


183.17 


1,034.10 

154.74 


269.18 
74.61 


153.38 


396.54 
1,112.29 

790.05 
86.74 
1,135.24 
786.31 
113.75 
109.67 
285.67 

2,481.00 

1,815.00 


32.81 


104.65 


717.52 
55.71 


355.28 
555.03 


110.92 


76.85 


41.20 


321.42 


1,423.56 
1,864.53 
1,563.13 


438.27 

185.55 

38.09 


1,505.72 
602.67 
181.12 


216.18 
59.15 


265.15 
95.08 
11.50 


2,594.83 
2,384.82 


445.71 






1,805.64 




286.03 
922.90 
855.00 




61.49 

1,070.78 

500.00 


697.23 


3,067.94 






3,041 . 28 


3,409.00 


590.00 


156.00 


1,536.00 
















31,367.10 


6,222.63 


41,658.80 


17,959.63 


2,22?. 57 


4,658.44 


38,4.28.35 




2,476.52 


6,354.68 


2,976.60 


1,201.61 


1,029.37 


14,258.88 


2,789.26 
















674 

101 

23 


205 

51 

5 


761 

140 

15 


396 

45 
9 


70 

24 
2 


118 

34 

2 


915 

164 

22 


798 


261 


916 


450 


96 


154 


1,101 



256 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Arthur 
836 


Athens 
643 


Aurora 
2,990 


Aylmer 

2,474 


Ayr 


Population 


718 






Earnings 
Domestic service 


$ c. 

5,532.37 
5,051.03 
1,351.94 

420.47 
1,395.00 


$ c. 

3,847.25 

1,748.68 

816.96 


$ c. 

23,618.08 
8,003.82 

16,037.36 
1,518.38 
3,792.94 


$ c. 

16,594.70 
12,463.86 

9,228.18 
948.95 

2,660.48 


$ c. 
6,278.65 


Commercial light service 


2,312.50 


Commercial power service 


900.06 


Municipal power 




Street lighting 


1,065.26 


1,192.00 


Merchandise 




Miscellaneous 


200.01 


236.18 


248.44 


1,057.14 


125.00 






Total earnings 


13,950.82 


7,714.33 


53,219.02 


42,953.31 


10,808.21 






Expenses 
Power purchased 


5,836.65 


4,040.43 


35,609.63 


27,032.53 


6,734.90 


Substation operation 




Substation maintenance 












Distribution system, operation and 
maintenance 


806.06 


438.39 


1,450.28 
223.43 
693.94 
368.66 

400.48 


2,898.16 

131.03 

30.73 

664.94 

719.81 


550.29 


Line transformer maintenance . . 




Meter maintenance 


110.65 


19.24 


281 . 03 


Consumers' premises expenses. . . . 


96.77 


Street lighting, operation and main- 
tenance 


229.73 


63.71 


209.65 


Promotion of business 




Billing and collecting 




240.53 
90.88 


1,358.50 
941.43 
125.99 
538.12 


1,238.13 

1,212.72 

361.24 

308.60 

265.78 

1,336.78 

1,486.00 

2,600.00 


624.00 


General office, salaries and expenses. . 
Undistributed expenses. . . . 


754.07 
46.35 


79.36 
19.38 


Truck operation and maintenance . . . 






Interest 


352.06 

1,433.78 

949.00 


234.78 
945.67 
415.00 


94.32 


Sinking fund and principal payments 
on debentures. . . . 




314.36 


Depreciation 

Other reserves 


1,826.00 


516.00 












Total operating costs* and 
fixed charges 


10,518.35 


6,488.63 


43,536.46 


40,286.45 


9,520.06 






Net surplus 


3,432.47 


1,225.70 


9,682.56 


2,666.86 


1,288.15 


Net loss 
















Number of Consumers 
Domestic service 


240 
92 

7 


180 

43 

1 


832 

117 

20 


769 

156 

19 


232 


Commercial light service . . 


46 


Power service 


7 






Total 


339 


224 


969 


944 


285 







1946 THE HYDRO-ELECTRIC POWER COMMISSION 



257 



"B" — Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Baden 
P.V. 


Barrie 
10,469 


Bath 
296 


Beachville 
P.V. 


Beamsville 
1,306 


Beaverton 
786 


Beeton 
542 


$ c. 

4,231.28 

2,044.72 

11,404.79 


$ c. 

88,899.53 

47,943.47 

32,277.24 

1,877.88 

6,429.75 

115.11 

2,143.33 


$ c. 

2,768.95 
677.38 


$ c. 

3,985.18 

568.94 

19,136.43 


$ c. 

11,454.17 
4,640.64 
2,293.87 


$ c. 

7,855.51 
2,630.85 
1,265.35 


$ c. 

3,333.11 
1,857.05 
. 418.80 








738.00 


333.79 


463.14 


2,087.88 


1,197.00 


1,320.00 
5.60 


162 . 23 


t 


757.39 


563.97 


325.60 


306.25 








18,581.02 


179,686.31 


3,780.12 


24,911.08 


21,040.53 


13,274.31 


7,240.81 


14,893.79 


90,244.87 

777.43 

42.66 

5,897.25 
430.97 

1,008.85 
669.88 

1,582.46 

6.75 

7,134.24 

3,121.34 

510.09 
2,552.58 

188.59 

1,835.10 

11,476.00 

6.86 


1,542.41 


19,024.01 


11,615.25 


8,514.08 


2,622.06 














403.82 
17.94 


48.88 
39.63 
29.03 


104.90 

4.32 

12.35 

61.13 

193.28 


512.59 
7.65 


793.59 
19.34 
31.21 
76.66 

155.40 


667.72 


27.62 


25.63 


69.11 


313.07 
252.49 




166.11 


8.80 


210.16 


315.32 

130.52 

17.87 


230.83 
102.18 


335.38 

127.03 

10.96 


832.75 

375.18 

16.59 


759.69 

525.49 

24.20 


162.74 
155.46 










218.66 
408.94 
177.00 








173.00 










802.77 


666.00 


560.00 


1,127.00 


1,034.00 


551.00 














16,708.10 


127,485.92 


2,806.36 


20,433.36 


15,052.57 


11.933.66 


5,370:54 


1,872.92 


52,200.39 


973.76 


4,477.72 


5,987.96 


1,340.65 


1,870.27 
















170 

32 

3 


2,550 

426 
61 


67 
12 


166 

21 

4 


416 

71 

5 


341 

66 

8 


152 
33 

4 








205 


3,037 


79 


191 


492 


415 


189 



258 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Belle 

River 

845 


Belleville 
15,642 


Blenheim 
1,873 


Bloomfield 
618 


Blyth 


Population 


632 






Earnings 
Domestic service '. . . . . 


$ c. 

6,454.32 
3,442.94 
128.28 
1,170.35 
1,214.04 


$ c. 

106,469:17 

61,602.72 

52,945.84 

4,619.83 

11,145.20 

2,939.90 

5,319.07 


$ c. 

9,907.09 
9,432.86 
7,233.48 
1,622.48 
2,717.00 


$ c. 

3,217.26 
2,219.44 
1,276.04 


$ c. 
3,876.16 


Commercial light service 


2,030.55 


Commercial power service 


788.05 


Municipal power 




Street lighting 

Merchandise 


845.00 


1,382.60 


Miscellaneous 


213.45 


1,014.80 


290.00 


310.37 






Total earnings 


12,623.38 


245,041.73 


31,927.71 


7,847.74 


8,387.73 






Expenses 
Power purchased 


6,003.18 


142,317.86 
2,508.26 


17,609.11 


4,326.88 


5,436.48 


Substation operation 




Substation maintenance 










Distribution system, operation and 
maintenance 


1,176.65 

171.06 

297.12 

27.00 

314.81 


3,904.56 

248.48 

1,207.16 

1,713.35 

1,795.83 


905.22 

460.90 

90.17 

163.48 

798.59 

124.17 

1,905.72 

1,453.64 

7.84 


318.79 

37.62 

114.39 


744.60 


Line transformer maintenance 




Meter maintenance 




Consumers' premises expenses 




Street lighting, operation and main- 
tenance 


140.12 


150.53 


Promotion of business. . . . 




Billing and collecting 


987.02 

417.82 

86.21 


4,054.24 
5,756.75 
2,636.98 


240.72 
113.74 


450.00 


General office, salaries and expenses.. 
Undistributed expenses 


154.75 
73.63 


Truck operation and maintenance . . . 






Interest 






57.32 

959.75 

1,661.00 

2,200.00 


120.89 
460.36 
434.00 


13.28 


Sinking fund and principal payments 
on debentures 








Depreciation 


725.00 


11,453.00 


423.00 


Other reserves 














Total operating f costs and 
fixed charges 


10,-205.87 


177,596.47 


28,396.91 


6,307.51 


7,446.27 






Net surplus 


2,417.51 


67,445.26 


3,530.80 


1,540.23 


941.46 


Net loss 
















Number of Consumers 
Domestic service 


336 

48 

4 


4,028 
640 
108 


568 

144 
17 


185 
41 

7 


186 


Commercial light service 

Power service 


46 
5 






Total 


388 


4,776 


729 


233 


237 







1946 THE HYDRO-ELECTRIC POWER COMMISSION 



259 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 






Bolton 
609 


Bothwell 
605 


Bowmanville 
3,820 


Bradford 
1,034 


Braeside 
367 


Brampton 

6,157 


Brantford 
34,372 


$ c. 

4,788.99 

1,907.02 

3,331.21 

134.05 


$ c. 

2,757.85 
2,089.60 
1,010.15 
140.21 
1,225.02 


$ c. 

32,981.70 
11,040.91 
62,684.94 


$ c. 

7,357.12 
4,704.73 
5,266.58 
400.93 
1,306.50 


$ c. 

1,529.91 

333.49 

5,497.20 


$ c. 

50,548.34 

21,114.08 

23,684.86 

2,534.58 

6,744.47 

45.06 

1,685.90 


$ c. 

185,947.15 

94,151.76 

300,452.15 

9,575.68 


1,130.50 


3,919.02 
2,563.33 

4,711.15 


405.00 


33,285.16 


405.00 


592.50 


499.65 




13,454.54 








11,696.77 


7,815.33 


117,901.05 


19,535.51 


7,765.60 


106,357.29 


636,866.44 


6,742.11 


4,672.82 


66,631.45 


8,971.44 


6,390.01 


73,080.45 


467,935.90 
9,326.09 






17.82 

2,902.00 
125.06 
702.17 

445.75 

330.87 

191.90 

3,030.21 

3,376.30 

1,299.00 






238.99 

4,084.74 

125.61 

74.31 

1,170.95 

1,487.69 

6.00 

2,807.99 

1,968.61 

242.58 

510.66 


1,031.88 


612.39 


255.49 


740.97 

98.07 

258.49 


98.46 
13.39 
51.88 


11,601.32 
2,472.63 




133.62 


8,258.65 


161.77 


8,785.07 


247.48 


64.39 


331.75 


50.30 


6,056.18 
159.97 




181.43 
299.82 

1.72 


588.14 
445.45 
270.26 
168.93 
340.50 

1,356.17 

869.00 


297.87 

183.98 

41.62 


8,746.78 


696.08 
23.72 


10,603.82 
6,074.38 
2,362.23 




21.06 

342.68 

472.00 




240.00 
201.48 
120.00 












502.00 


3,341.00 


4,380.00 


27,020.00 
















8,985.55 


6,445.03 


82,393.53 


14,439.17 


7,688.99 


90,178.58 


570,434.90 


2,711.22 


1,370.30 


35,507.52 


5,096.34 


76.61 


16,178.71 


66,431.54 
















191 
45 
11 


190 

55 

9 


1,143 

170 

29 


294 
76 
11 


92 
9 
2 


1,659 

259 

59 


8,499 

1,313 

222 


247 


254 


1,342 


381 


103 


1,977 


10,034 



260 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTE M— Continued 



Municipality 


Brantford 
Twp. 
V.A. 


Brechin 
P.V. 


Bridge- 
port 
P.V. 


Brigden 
P.V. 


Brighton 


Population 


1,581 






Earnings 

Domestic service 

Commercial light service 


$ c. 

39,878.27 
5,768.56 
7,280.95 


$ c. 

1,446.38 
839.94 
743.89 


$ c. 

5,208.48 
1,117.90 
1,193.29 


$ c. 

2,181.00 

1,864.03 

940.71 


$ c. 

12,056.12 

4,699.42 


Commercial power service 


4,344.74 


Municipal power 




Street lighting 


4,959.16 


476.00 


876.00 


794.88 


2,000.12 


Merchandise 


134.22 


Miscellaneous : . 


1,076.36 




160.70 


240.13 


519.71 








Total earnings 


58,963.30 


3,506.21 


8,556.37 


6,020.75 


23,754.33 






Expenses 
Power purchased 


37,097.03 


1,514.15 


5,224.74 


2,977.77 


10,913.26 


Substation operation 




Substation maintenance 












Distribution system, operation and 
maintenance 


3,574.83 
709.71 
668.32 
656.14 

1,101.31 


322.. 28 


159.05 

7.65 

56.90 

5.40 

67.53 


253.61 
8^70 


2,131.32 


Line transformer maintenance 


216.69 


Meter maintenance 




167.39 


Consumers' premises expenses . 




27.90 


Street lighting, operation and main- 
tenance 


48.06 


99.30 


397.70 


Promotion of business 




Billing and collecting . 


2,331.05 

2,914.81 

795.23 

1,878.41 




487.52 

53.50 

7.26 


465.09 

201.25 

9.23 


883.14 


General office, salaries and expenses. . 
Undistributed expenses. . . . 


371.27 


1,698.61 

277.07 


Truck operation and maintenance . 




392.05 


Interest 


117.52 
184.76 
123.00 






155.53 


Sinking fund and principal payments 
on debentures 




1,203.64 
441.00 




1,677.01 


Depreciation 


3,937.00 


367.00 


1,058.00 


Other reserves 
















Total operating costs and 
fixed charges 


55,663.84 


2,681.04 


7,714.19 


4,381.95 


19,995.67 






Net surplus 


3,299.46 


825.17 


842.18 


1,638.80 


3 758 66 


Net loss 
















Number of Consumers 
Domestic service 


1,626 
68 

7 


58 

21 

2 


184 
21 

4 


125 
41 

4 


576 


Commercial light service 


99 


Power service 


10 






Total 


1,701 


81 


209 


170 


685 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



261 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Brockville 
11,112 


Brussels 
730 


Burford 
P.V. 


Burgessville 
P.V. 


Burlington* 
4,311 


Caledonia 
1,395 


Campbell- 
ville 
P.V. 


$ c. 

68,171.22 

31,579.60 

51,473.52 

8,795.32 


$ c. 

4,944.31 
3,321.78 
1,409.88 


$ c. 

5,459.42 
1,898.23 
1,609.21 


$ c. 

1,812.01 
594.26 
258.78 


$ c. 

36,779.44 
18,373.28 
16,466.34 


$ c. 

7,269.92 
5,580.42 
3,300.59 


$ c. 

1,344.88 
500.49 
366.15 


8,614.75 


1,305.00 


676.93 


312.00 


2,283.90 


1,977.34 


400.00 


5,783.44 


419.57 


281.00 


105.37 




528.71 


159.50 








174,417.85 


11,400.54 


9,924.79 


3,082.42 


73,902.96 


18,656.98 


2,771.02 


113,066.47 
6,035.57 


5,959.12 


6,538.86 


1,832.24 


39,317.38 


10,626.45 


1,699.20 


1,202.91 














4,173.78 
341 . 72 


710.17 


745.25 


142.25 


2,846.11 
376.47 
160.04 
978.17 

532.89 


1,751.70 
160.42 
821.01 
351.38 

477.08 


62.54 


2,256.23 


50.71 


113.36 
5.75 

144.11 


27.15 








1,511.17 


136.52 


16.54 


29.23 


3,005.49 




582.60 

289.51 

22.09 




3,550.62 

1,996.88 

164.13 


1,314.30 

1,278.43 

158.08 

401.04 

6.00 




5,729.17 
1,651.71 


716.84 
57.66 


166.26 


138.66 
5 66 


625.78 














2,391.22 














6,283.00 


614.00 


424.00 


213.00 


3,583.00 


1,077.00 


110.00 
















145.883.00 


8,245.02 


8,865.53 


2,397.44 


55,896.91 


18,422.89 


2,045.29 


28,534.85 


3,155.52 


1,059.26 


684.98 


18,006.05 


234.09 


725.73 
















3,151 

407 

78 


254 

59 

8 


237 

38 

5 


62 

17 

2 


1,278 
148 
23 


458 

104 

13 


53 

11 

1 


3,636 


321 


280 


81 


1,449 


575 


65 



11 months operation 



262 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 

SOUTHERN ONTARIO SYSTE M— Continued 



Municipality. 
Population. . 



Canning- 
ton 
718 



Cardinal 
1,641 



Carleton 
Place 

4,217 



Cayuga 
652 



Chatham 
17,807 



Earnings 

Domestic service 

Commercial light service . . 
Commercial power service . 

Municipal power 

Street lighting 

Merchandise 

Miscellaneous 



5,729.46 
2,665.65 
1,840.94 



9,470.35 

2,258.07 

270.00 



1,203.52 
" 185^25 



992.00 
201.25 



$ c. 

23,357.89 

10,123.66 

28,850.21 

1,467.64 

4,906.30 



4,345.97 
3,995.65 
1,780.03 



1,565.98 



1,564.53 
"218.52 



105,408.18 

113,411.10 

87,314.39 

6,636.72 

20,468.12 

579.34 

7,287.18 



Total'earnings , 



11,624.82 



13,191.67 



70,271.68 



11,904.70 



341,105.03 



Expenses 



Power purchased 

Substation operation 

Substation maintenance 

Distribution system, operation and 
maintenance 

Line transformer maintenance 

Meter maintenance 

Consumers' premises expenses 

Street lighting, operation and main- 
tenance 

Promotion of business 

Billing and collecting 

General office, salaries and expenses.. 

Undistributed expenses 

Truck operation and maintenance . . . 

Interest 

Sinking fund and principal payments 
on debentures 



6,194.20 



8,056.54 



40,552.86 
83.49 



5,958.44 



497.58 



18.80 
79.10 

128.77 



849.68 
23.10 
62.40 



130.93 



567.44 
503.59 



685.66 

198.18 

56.64 



Depreciation. . 
Other reserves . 



720.00 



283.03 
898.18 
612.00 



2,483.57 
106.78 
423.76 
177.51 

643.17 

5.36 

1,888.50 

3.853.12 

525.40 

266.57 

604.16 

2,301.80 

3,150.00 



398.33 
114.05 
156.12 



232.75 



181,238.91- 
9,766.00 
5,741.07 

14,395.88 
1,674.66 
7,604.29 
5,119.24 

6,520.46 



711.77 
542.17 
284.75 



18.71 



629.00 



12,638.07 

18,624.85 

5,961.74 

3,754.68 

3,966.51 

10,597.14 

22,310.00 

14,000.00 



Total operating costs and 
fixed charges 



8,709.48 



11,856.34 



57,066.05 



9,046.09 



323,913.50 



Net surplus. 
Net loss. . . . 



2,915.34 



1,335.33 



13,205.63 



2,858.61 



17,191.53 



Number of Consumers 



Domestic service 

Commercial light service . 
Power service 



Total 



273 

61 

9 

343 



396 

54 

2 

452 



1,098 

181 

18 

1,297 



186 
68 



262 



4,648 
822 
120 

5,590 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 



263 



"B" — Continued 

Hydro Municipalities for Year Ended December 31, 1945 






Chatsworth 
323 


Chesley 
1,550 


.Chesterville 
1,050 


Chippawa 
1,251 


Clifford 
436 


Clinton 
2,037 


Cobden 
637 


$ c. 

2,376.21 
1,351.71 


$ c. 

10,209.85 

5,918.45 

6,677.56 

864.54 

2,327.04 

86.62 

259.00 


$ c. 

5,499.67 
4,048.94 
3,236.52 


$ c. 

8,429.97 
2,196.58 


$ c. 

2,905,59 

1,853,83 

643.68 


$ c. 

14.254.13 
8,298.01 
4,718.78 
1,613.84 
2,791.00 
1,067.06 
1,278.21 


$ c. 

2,897.2^ 
2,284.56 
2,264.21 




1,032.08 
1,973.10 




546.00 


1,131.00 
279.04 
559.50 


968.04 


703.00 


89.36 


353.55 


152.14 


74.46 


4,363.28 


26,343.06 


14,754.67 


13,985.28 


6,523.28 


34,021.03 


8,223.46 


2,832.57 


14,986.20 


7,834.76 


6,979.58 


3,980.35 


19,319.98 


4,430.24 












100.00 

1,568.70 
223.50 
188.93 
171.93 

327.73 




355.30 


718.72 

96.75 

154.35 

117.19 

253.75 


1,425.12 

37.84 

252.87 


835.43 
179.44 
541.07 
312.26 

648.23 
40.00 
926.48 
719.62 
160.58 
219.67 


450.34 


341.82 


70.30 


74.30 


39.86 


74.00 


81.78 


136.86 


159.84 




610.13 

537.70 

70.03 

83.68 


566.47 
514.70 


287.69 

106.27 

22.49 


1,214.71 

2,388.42 

139.69 

363.35 


481.31 


288.04 
17.11 


111.92 












233.66 
322.24 
276.00 


128.58- 












773.28- 


245.00 


1,109.00 


485.00 


1,049.00 


1,583.00 


203.00 
















3,882.32 


18,737.50 


11,198.54 


12,611.36 


5,890. 2C 


27,589.94 


6,669.85 


480.96 


7,605.56 


3,556.13 


1,373.92 


633. 0£ 


6,431. 0£ 


1,553.61 
















IIS 
2( 


1 46C 
> 96 

2z 


) 25* 
> 6* 

! i 


5 36c 

I 51 
I ] 


\ 14C 
31 


) 59< 

12£ 

I 1< 


) 168- 
5 48 
) 3 






i3< 


) 57* 


I 33( 


) 41! 


> n: 


5 ' 74C 


I 219 



264 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality. . . 


Cobourg 
5,022 


Colborne 
872 


Coldwater 
580 


Colling- 
wood 
6,318 


Comber 


Population 


P.V. 






Earnings 
Domestic service 


$ c. 

40,346.96 

21,930.06 

28,058.22 

1,920.48 

5,824.33 

105.28 

1,930.56 


$ c. 

7,533.89 

4,631.55 

975.83 

213.26 

1,524.00 

30.77 

162.49 


$ c. 

4,068.81 
1,851.56 
3,448.86 


$ c. 

36,454.92 

15,782.93 

37,949.85 

1,660.99 

3,974.25 

6.00 

1,428.70 


$ c. 
2,193 78 


Commercial light service 


1,732 88 


Commercial power service 


2,265 25 


Municipal power 




Street lighting 


813.00 


738 00 


Merchandise 




Miscellaneous 


73.81 


337.06 






Total earnings 


100,115.89 


15,071.79 


10,256.04 


97,257.64 


7 266 97 






Expenses 
Power purchased 


51,500.20 


6,430.67 


5,750.82 


56,546.09 
221.00 


5,314 59 


Substation operation 














Distribution system, operation and 
maintenance 


3,930.64 
390.31 
878.48 
413.51 

1,628.86 


1,619.90 


455.67 


3,264.52 

225.90 

821.71 

44.48 

170.32 


297 51 


Line transformer maintenance 




Meter maintenance 


202.12 
484.07 

223.34 


78.00 
126.90 

123.57 


49 98 


Consumers' premises expenses 




Street lighting, operation and main- 
tenance 


90 80 


Promotion of business 




Billing and collecting 


4,219.65 
3,740.51 
1,066.51 
419.54 
1,463.38 

5,812.38 

5,680.00 


1,251.69 

1,058.75 

127.22 

230.25 

389.84 

774.07 

533.00 


649.38 
181.42 


2,756.90 

1,047.23 

619.47 

208.52 


274 99 


General office, salaries and expenses. . 
Undistributed expenses 


226.98 
21.33 


Truck operation and maintenance . . . 






Interest 






Sinking fund and principal payments 
on debentures 








Depreciation 

Other reserves 


585.00 


3,955.00 


434.00 














Total operating costs and 
fixed charges 


81,143.97 


13,324.92 


7,950.76 


69,881 . 14 


6,710 18 






Net surplus 


18,971.92 


1,746.87 


2,305.28 


27,376.50 


556 79 


Net loss 
















Number of Consumers 
Domestic service 


1,486 

250 

50 


284 

71 

6 


160 

48 

3 


1,666 

208 

48 


120 


Commercial light service 


42 


Power service 


4 






Total 


1,786 


361 


211 


1,922 


166 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



265 



"B" — Continued 

Hydro Municipalities for Year Ended 


December 


31, 1945 






Cookstown 
P.V. 


Cottam 
P.V. 


Courtright 
357 


Creemore 
661 


Dashwood 
P.V. 


Delaware 
P.V. 


Delhi 
2,063 


$ c. 

2,576.00 
1,288.76 
1,526 76 


$ c. 

2,691.52 

1,374.83 

595.56 


$ c. 

1,692.48 
730.79 


$ c. 

3,628.72 
2,016.26 
1,230.06 


$ c. 

2,371.14 
1,246.62 
1,341.24 


$ c. 

2,253.48 

773.71 


$ * c. 

14,193.92 

11,818.58 

6,926.89 




974.64 
645.00 






855.00 


480.00 


723.36 


505.98 


277.00 


2,753.16 
272.85 


272.98 


263.25 


207.07 


184.39 


234.27 


64.45 


1,001.65 


6,519.50 


5,405.16 


4,249.98 


7,782.79 


5,699.25 


3,368.64 


36,967.05 


2,831.86 


3,043.79 


1,885.83 


4,831.57 


3,834.82 


2,053.10 


18,064.40 
















190.76 


511.62 
24.30 
70.05 


164.31 


1,099.99 


163.80 


184.08 


1,753.24 
124 06 


27.73 


0.94 


16.50 
72.59 

157.93 


18.27 




605 65 




17.03 
14.76 


318 12 


46.00 


72.75 


99.14 


35.92 


393.18 
5 25 


307.87 

100.10 

1.71 


575.46 

76.02 

8.33 


194.30 

46.70 

5.97 


310.90 
90.20 


270.09 

65.25 

1.36 


225.16 
49.00 


1,903.78 

1,444.30 

408.20 








342 02 


125.24 


76.48 
676.65 
594.00 






24.50 
210.20 
215.00 


12.41 
248.30 
227.00 


2,607 62 


602.24 






3,554 37 


468.00 


198.00 


368.00 


1,841.00 
1,500 00 
















4,701.51 


5,729.45 


2,595.19 


6,947.68 


4,839.21 


3,030.84 


34,865.19 


1,817.99 




1,654.79 


835.11 


860.04 


337.80 


2,101 86 




324.29 
















124 

31 

4 


139 

29 

5 


98 
21 

1 


181 

53 

3 


105 

28 

3 


67 
15 


635 

159 

9 








159 


173 


120 


237 


136 


82 


803 



266 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Deseronto 
1,100 


Dorchester 
P.V. 


Drayton 
518 


Dresden 
1,532 


Drumbo 


Population 


P V 






Earnings 
Domestic service 


$ c. 

9,367.25 

4,005.52 

1,227.34 

876.28 

1,668.00 

397.11 

266.49 


$ c. 

3,014.36 
979.66 
563.78 


$ c. 

3,970.14 
2,396,71 
1,332.54 


$ c 

8,314.57 

6,681.57 

5,725.33 

674.90 

2,220.36 

978.42 

327.50 


$ c 

2,642.30 
1,106 43 


Commercial light service 


Commercial power service 


724 89 


Municipal power 




Street lighting 


750.00 


960.00 


522 17 


Merchandise 




Miscellaneous 


150.58 


235.00 


162 25 






Total earnings 


17,807.99 


5,458.38 


8,894.39 


24,922.65 


5,158 04 






Expenses 
Power purchased 


6,943.95 
113.35 


3,470.18 


5,128.74 


13,660.00 


2,879 92 


Substation operation 














Distribution system, operation and 
maintenance 


1,179.87 
15.32 
26.32 


78.89 


251.37 


1,922.71 
115.54 
153.13 
460.56 

408.48 


200 45 


Line transformer maintenance 




Meter maintenance \ 


115.30 
9.82 

44.22 


64.49 


47 01 


Consumers' premises expenses 




Street lighting, operation and main- 
tenance 


268.21 


178.16 


100.41 


Promotion of business 




Billing and collecting 


886.15 
683.21 
197.86 
631.79 


218.15 
53.71 




1,180.56 
721.63 
131.61 
223.66 


354 15 


General office, salaries and expenses. . 
Undistributed expenses 


563.82 
14.95 


61.58 


Truck operation and maintenance . . . 






Interest 


18.54 
263.92 
334.42 


110.69 

579.47 
526.00 




Sinking fund and principal payments 
on debentures 








Depreciation 


626.00 


1,120.00 


288.00 


Other reserves 












. 




Total operating costs and 
fixed charges 


11,572.03 


4,607.15 


7,417.69 


20,097.88 


3,931.52 






Net surplus 


6,235.96 


851.23 


1,476.70 


4,824.77 


1,226.52 


Net loss 
















Number of Consumers 

Domestic service 

Commercial light service 

Power service 


403 

77 
8 


161 

28 

1 


173 
61 

4 


493 

130 

16 


94 

29 

1 


Total 


488 


190 


238 


639 


124 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



267 



"B"— Continued 

Hydro Municipalities for Year Ended 


December 31, 1945 






Dublin 
P.V. 


Dundalk 
650 


Dundas 
5,588 


Dunnville 
4,305 


Durham 
1,957 


Dutton 
791 


East York 
Twp. 
V.A. 


$ c. 

1,531.92 
1,122.85 
1,508.51 


$ c. 

4,257.55 
3,384.27 
3,306.47 


$ c 

28,845 . 55 

17,270.77 

42,231.78 

647.65 

5,776.08 


$ c. 

15,874.40 

14,468.81 

17,560.23 

2,599.08 

3,776.33 


$ c 

8,349.63 
5,147.78 
3,973.47 
660.21 
1,616.04 


$ c. 

3,389.28 
2,646.41 
3,788.01 


$ c. 

290,562.69 

31,258.20 

44,339.00 

4,733.77 


550.00 


1,199.00 


1,034.19 


24,785.63 


64.90 


261.25 


811.35 


1,525.17 


448.97 


374.76 


146.76 


4,778.18 


12,408.54 


95,583.18 


55,804.02 


20,196.10 


11,232.65 


395,826.05 


2,762.00 


6,153.32 


.66,661.89 
716.15 


36,354.45 
476.98 


10,562.34 


7,692.17 


199,839.03 
2,119.07 












39.87 


1,277.22 


6,190.70 
758.38 

2,306.76 
289.58 

1,276.56 


3,450.83 
260.70 
526.82 


1,383.11 

206.24 

161.09 

67.59 

400.72 
3.59 
1,000.37 
770.19 
105.31 
383.76 


324.79 

8.10 

23.34 

20.51 

150.40 


13,243.37 
505 80 


14.25 


159.36 


5,083.72 
5,932 37 


146.40 


217.86 


1,300.97 

3.00 

1,504.95 

1,526.74 

281.79 

339.16 

653.08 

4,105.41 

3,010.00 


3,306.79 






1,744.05 

2,452.27 

901.25 

869.35 


"siiioo 

164.73 
19.74 


18,332.09 

15,133.93 

1,696.85 


416.45 
11.08 


818.70 
38.72 








2,032 . 75 












25,526.98 


292.00 


452.00 


4,208.00 


1,034.00 


538.00 


24,198.00 
















3,682.05 


9,117.18 


88,374.94 


53,794.88 


16,078.31 


9,452.78 


316,950.75 


1,096.13 


3,291.36 


7,208.24 


2,009.14 


4,117.79 


1,779.87 


78,875.30 
















62 
26 

2 


209 

73 

6 


1,472 

200 

39 


1,082 

226 

28 


477 

104 

12 


240 
65 
11 


12,330 
523 

45 


90 


288 


1,711 


1,336 


593 


316 


12,898 



268 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality. 
Population. . 



Earnings 



Domestic service 

Commercial light service . . 
Commercial power service . 

Municipal power 

Street lighting 

Merchandise 

Miscellaneous 



Total earnings . 



Expenses 



Power purchased 

Substation operation 

Substation maintenance. . . 

Distribution system, operation and 
maintenance 

Line transformer maintenance .... 

Meter maintenance 

Consumers' premises expenses 

Street lighting, operation and main- 
tenance 

Promotion of business 

Billing and collecting 

General office, salaries and expenses. 

Undistributed expenses 

Truck operation and maintenance . . 

Interest 

Sinking fund and principal payments 
on debentures 



Elmira 
2,186 



Elmvale 
P.V. 



Elmwood 
P.V. 



$ c. 

15,514.94 
9,513.28 

22,358.04 
3,044.53 
2,031.00 



1,438.44 



53,900.23 



34,376.90 



1,903.45 



46.78 
346.66 

369.30 

3.00 

1,324.81 

1,535.19 

331.71 

187.56 

163.90 



3,751.98 

1,703.86 

3,303.97 

256.87 

634.32 



284.04 



9,935.04 



4,756.81 



384.62 



68.25 
153.02 

237.11 



603.09 
236.86 



$ c. 

1,302.51 

699.95 

1,306.57 



437.63 



136.42 



3,883.08 



2,389.56 



202.72 
5'.66 



78.76 



Elora 
1,167 



8,871.07 

4,734.72 
4,974.52 



1,504.09 
"645!77 



20,730.17 



12,949.57 



2,230.41 



295.06 



Depreciation. . 
Other reserves . 



Total operating costs and 
fixed charges 



Net surplus. 
Net loss. . . . 



1,990.00 



42,579.26 



11,320.97 



583.00 



7,022.76 



2,912.28 



216.00 



3,187.70 



695.38 



106.70 
113.63 

278.38 
52.42 
969.87 
494.49 
244.54 
245.84 



Embro 
445 



$ c. 

4,262.97 
891.94 
295.08 



636.00 
'i07'.08 



6,193.07 



3,501.71 



190.70 



25.60 
4.40 

170.57 

338.38 

54.48 



1,014.00 



18,699.85 



2,030.32 



432.00 



4,717.84 



1,475.23 



Number of Consumers 



Domestic service 

Commercial light service 
Power service 



Total 



568 

126 

26 

720 



198 

50 

8 

256 



75 

24 

1 

100 



361 
66 

4 

431 



147 

29 

2 

178 



1946 



THE HYDRO-ELECTRIC POWER COMMISSIOM 



269 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Erieau 
228 


Erie Beach 
23 


Essex 
1,986 


Etobicoke 
Twp. 
V.A. 


Exeter 

1,794 


Fergus 
2,624 


$ c. 

4,696.73 
1,709.21 
4,157.67 


$ c. 

1,450.14 
252.01 


$ c. 

9,821.36 
9,781.08 
6,127.31 
1,236.07 
2,377.68 


$ c. 

238,581.94 

32,129.58 

38,621.07 

7,538.88 

15,098.27 


$ c. 

15,831.36 

8,886.98 

4,876.26 

675.33 

2,824.02 

432.04 

818.85 


$ c. 

19,659.68 

8,752.76 

18 891 56 






856 69 


504 00 




2 283 60 






43 03 


12.50 


45.00 


1,040.80 


1,922.44 


1,048.32 


11,080.11 


1,747.15 


30,384.30 


333,892.18 


34,344.84 


51,535.64 


6,117.91 


782.42 


15,798.07 


201,194.27 


21,440.44 


34,877.50 














204.72 
32.89 
24.30 
18.01 


183.17 

5.91 

18.86 


1,381.53 

48.50 

309.95 


11,468.78 
1,323.55 
2,271.42 
9,328.32 

1,615.73 


1,641.11 

18.08 

56.39 

229.68 

460.43 


4,600.36 
295.96 
876.85 
387 64 


36.27 




368.14 

66.78 

1,652.06 

1,994.84 

420.04 

369.53 

641.80 

906.32 

1,699.00 

2,000.00 


573 92 








511.48 

415.36 

2.18 


134.20 

198.04 

0.41 


13,219.92 
9,386.14 
3,809.85 
1,548.56 
2,698.13 

11,596.78 

19,380.00 


1,398.84 

2,364.70 

46.03 

170.27 


1,342.22 
1,319.25 

172.12 
774 87 




31.90 
256.03 
133.00 


131 11 






831 80 


398.00 
10.00 


1,388.00 
2,000.00 


2,525.00 










7,771.12 


1,743.94 


27,656.56 


288,841.45 


31,213.97 


48,708,60 


3,308.99 


3.21 


2,727.74 


45,050.73 


3,130.87 


2,827.04 














20£ 
14 

A 


81 

2 


53S 

125 
IS 


6,644 
338 

46 


548 
124 

15 


770 

120 

14 








226 


> $4 


682 


7,028 


687 


904 



270 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Finch 
393 


Flesherton 
341 


Fonthill 
1,009 


Forest 
1,573 


ForestHill 


Population 


13,484 






Earnings 
Domestic service . 


$ c. 

2,774.23 

2,025.48 

231.50 


$ c. 

2,218.09 

1,763.04 

677.36 


$ c. 

6,891 . 57 

1,956.31 

482.84 

172.17 

1,285.98 


$ c. 

14,895.03 
8,373.37 
5,616.75 
1,388.17 
2,451.57 
34.53 
1,168.25 


$ c. 
202,577.38 


Commercial light service 

Commercial power service 


29,847.52 
2,913.69 


Municipal power 


410.02 


Street lighting 


507.00 


631.00 


8,947.29 


Merchandise 




Miscellaneous 


204.83 


264.93 


110.33 


7,717.86 






Total earnings 


5,743.04 


5,554.42 


10,899.20 


33,927.67 


252,413.76 


Expenses 
Power purchased 


3,268.42 


2,313.42 


4,739.33 


20,570.25 


142,781.07 


Substation operation 




Substation maintenance 










255.64 


Distribution system, operation and 

maintenance 

Line transformer maintenance . . 


145.11 


339.47 


482.26 
2.00 
272.69 
3.03 

180.07 


3,832.88 

35.25 

243.60 

169.95 

532.63 


6,151.32 
173.94 


Meter maintenance . 


23.60 
36.85 

177.98 


210.34 


1,614.55 


Consumers' premises expenses 

Street lighting, operation and main- 
tenance 

Promotion of business 


6,410.05 


85.73 


638.11 


Billing and collecting 


236.26 
76.96 




776.34 

294.25 

2.91 


1,007.60 
988.14 
247.95 
131.28 


6,081.09 


General office, salaries and expenses. . 
Undistributed expenses 


405.76 


7,336.96 
878.28 


Truck operation and maintenance . . . 






1,177.52 


Interest 


170.17 
512.41 
396.00 


27.24 
340.73 
303.00 


132.07 

1,503.64 

799.00 


9,431.73 


Sinking fund and principal payments 
on debentures 




16,725.04 


Depreciation 


1,395.00 


16,043.00 


Other reserves 
















Total operating costs and 
fixed charges 


5,043.76 


4,025.69 


9,187.59 


29,154.53 


215,698.30 






Net surplus 


699.28 


1,528.73 


1,711.61 


4,773.14 


36,715.46 


Net loss 
















Number of Consumers 
Domestic service 


120 
43 

1 


127 

44 

2 


316 

37 

5 


530 

143 
21 


3,728 


Commercial light service 


254 


Power service 


27 






Total 


164 


173 


358 


694 


4,009 





1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



271 



"B"— Continued 
Hydro Municipalities 


for Year Ended December 31, 1945 




Gait 

14,693 


Georgetown 
2,448 


Glencoe 
752 


Goderich 
4,987 


Grand Valley 
576 


Granton 
P.V. 


$ c. 

117,755.17 

67,359.36 

161,925.02 


$ c. 

23,719.53 
9,435.04 

39,213.59 

611.74 

2,821.73 


$ c. 

4,509.79 
4,229.56 
1,816.99 
1,504.79 
2,170.80 


$ c. 

35,861.24 

17,844.67 

18,948.54 

2,894.83 

4,760.00 

203.01 

1,838.70 


$ c. 

3,375.71 
2,025.90 
2,717.32 


$ c. 

2,098.07 
1,071.83 


4,806.29 




17,416.50 
1,364.41 


780.00 


376.40 


3,202.06 


885.28 


643.78 


309.37 


190.45 


373,828.81 


76,686.91 


14,875.71 


82,350.99 


9,208.30 


3,736.75 


249,149.09 
6,450.17 


54,334.69 


7,645.73 


49,638.83 
2,266.03 


5,591.37 


2,289.89 


2,899.69 










5,956.36 
322.76 


2,108.30 

517.86 

1,505.24 


1,168.75 

68.97 

193.14 

73.13 

237.83 


2,635.97 
170.29 
729.90 
187.12 

600.12 


357.02 


83.96 


2,279.03 
2,649.43 


75.76 


8.13 
0.63 


2,992.71 
91.29 


633.70 


163.06 


39.92 


3,991.45 


2,300.47 

1,453.91 

246.20 

624.31 


528.80 

903.68 

65.02 


2,717.81 

2,023.33 

283.88 

291.97 

977.77 

2,003.19 
5,220.00 




317.87 


14,974.76 

5,354.26 

641.26 


760.47 
18.48 


79.62 
0.91 








14.64 










240. 5& 


22,438.00 


3,076.00 


928.00 


572.00 


211.00 














320,190.26 


66,800.68 


11,813.05 


69,746.21 


7,538.16 


3,287.15 


53,638.55 


9,886.23 


3,062.66 


12,604.78 


1,670.14 


449.60 














4,356 
501 
123 


849 

129 

26 


244 
77 
11 


1,376 

263 

23 


189 
53 

7 


85 
26 


4,980 


1,004 


332 


1,662 


249 


111 



272 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality. 
Population . . 



Earnings 



Domestic service 

Commercial light service . . 
Commercial power service 

Municipal power 

Street lighting 

Merchandise 

Miscellaneous 



Total earnings 



Expenses 



Power purchased 

Substation operation 

Substation maintenance 

Distribution system, operation and. 

maintenance 

Line transformer maintenance 

Meter maintenance 

Consumers' premises expenses 

Street lighting, operation and main-. 

tenance 

Promotion of business 

Billing and collecting 

General office, salaries and expenses. . . 

Undistributed expenses 

Truck operation and maintenance 

Interest 

Sinking fund and principal payments 

on debentures 



Depreciation. . 
Other reserves . 



Total operating costs and 
fixed charges 



Net surplus. 
Net loss. . . . 



Gravenhurst 
2,405 



12,587.89 

13,069.58 

16,847.51 

311.83 

2,144.96 

111.75 

560.01 



46,133.53 



30,745.57 
11.00 



4,052.08 
264.70 
384.67 
320.72 

346.74 



1,166.24 
928.79 
432.98 
235.56 



2,072.00 



40,961.05 



5,172.48 



Grimsby 
1,993 



$ 



c. 



18,773.68 

13,121.74 

11,106.66 

2,520.37 

3,484.54 



706.98 



49,713.97 



23,135.42 



1,430.66 



78.14 
365.95 

561.85 



2,639.30 

1,158.44 

39.02 



1,110.27 
3,223.86 
1,959.00 



35,701.91 



14,012.06 



Guelph 
23,225 



$ c. 

130,221.34 
59,920.86 

138,371.61 
16,080.44 
20,472.18 



2,581.53 



367,647.96 



267,244.30 



3,799.91 

8,567.00 
276.03 

4,859.28 
204.05 

4,197.02 
520.59 
7,540.59 
9,899.86 
2,087.32 



24,161.00 



333,356.95 



34,291.01 



Hagersville 
1,588 



8.259.63 

6,986.42 

17,735.29 



2,155.32 



1,236.41 



36,373.07 



27,159.91 



2,239.37 

208.06 

440.40 

1.85 

376.02 

*'977 '.44 
706.44 
280.89 
195.90 



1,039.00 



33,625.28 



2,747.79 



Number of Consumers 



Domestic service 

Commercial light service . 
Power service 



Total 



619 

108 

16 

743 



675 

126 

17 

818 



5,759 
806 
153 

6,718 



424 

120 

18 

562 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



273 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Hamilton 
174,222 


Hanover 
3,165 


Harriston 
1,242 


Harrow 

1,122 


Hastings 
698 


Havelock 
876 


Hensall 
601 


$ c. 

989,413.53 

569,569.55 

2,749,875.25 

88,735.25 


$ c. . 

22,637.91 

9,919.20 

22,300.63 

268.54 

2,191.18 

46.02 

1,981.88 


$ c. 

8,743.58 
5,962.22 
6,864. .82 
384.54 
1,618.50 


$ c. 

13,101.73 
6,398.53 
4,585.42 


$ c. 

4,724.59 

2,651.68 

192.09 


$ c. 

4,769.94 
2,133.18 
2,112.00 


$ c. 

4,789.19 
2,368.71 
2,813.30 


127,189.53 


1,336.50 
118.84 
190.75 


1,320.95 


1,524.00 


1,008.00 


132,321.74 


320.59 


285.87 


627.54 


427.80 


4,657,104.85 


59,345.36 


23,894.25 


25,731.77 


9,175.18 


11,166.66 


11,407.00 


3,315,834.98 
81,360.99 


30,246.64 


15,165.51 


18,323.13 


5,132.36 


6,096.47 


6,814.18 


13,172 99 














44,208.53 
8,493.24 


2,793.82 

245.19 

581.40 

15.08 

324.29 


1,569.27 

15.55 

242 . 78 

100.20 

219.07 
255.03 
916.17 
336.95 
81.69 
193.41 
106.70 

495.12 

938.00 


1,379.89 

170.66 

46.58 

119.81 

427.85 

4.00 

1,065.13 

156.15 

5.65 


673.86 
35.91 
54.06 


871.56 
48.95 
44.23 


639.96 


32,493.25 
38,161.81 


18.00 


22,358.07 
12,816.23 


214.25 


135.77 


90.00 


83,144.83 
60,324.20 
45,772 97 


1,690.23 

1,445.84 

367.22 

455.49 


542.16 

324.62 

7.94 


789.00 
335.52 


389.80 

325.24 

47 14 




252.35 




19,463.21 




550.26 

1,208.01 

806.00 


70 00 


210,583 33 








618 05 


182,601.80 
46,544.92 


3,372.00 
8,000.00 


1,401.00 


789.00 


610.00 














4,217,335.35 


49,537.20 


20,635.45 


23,099.85 


9,549.43 


9,362.85 


9,622.37 


439,769.50 


9,808.16 


3,258.80 


2,631.92 




1,803.81 


1,784.63 




374.25 
















44,209 
5,565 
1,078 


861 

138 

22 


395 
96 

14 


360 

89 

8 


249 

55 

3 


300 

52 

3 


213 
54 
15 


50,852 


1,021 


505 


457 


307 


355 


282 



274 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality. 
Population. . 



Earnings 



Domestic service 

Commercial light service . . 
Commercial power service 

Municipal power 

Street lighting 

Merchandise 

Miscellaneous 



Total earnings . 



Expenses 

Power purchased 

Substation operation 

Substation maintenance. 

Distribution system, operation and 
maintenance 

Line transformer maintenance .... 

Meter maintenance 

Consumers' premises expenses 

Street lighting, operation, and main- 
tenance 

Promotion of business 

Billing and collecting 

General office, salaries and expenses 

Undistributed expenses 

Truck operation and maintenance . . . 

Interest 

Sinking fund and principaljpayments 
on debentures 



Hespeler 
3,021 



$ c. 

18,518.05 
7,340.60 

57,214.41 
1,173.13 
2,986.96 



1,905.49 



89,138.64 



65,005.18 

"433"33 

4,037.51 

82.30 

493.98 

120.07 

665.77 



Depreciation. . 
Other reserves . 



Total operating costs and 
fixed charges 



Net surplus. 
Net loss. . . . 



1,107.08 

1,368.00 

791.51 

240.94 

509.11 

1,496.96 

3,853.00 



Highgate 
301 



1,946.71 

850.87 

1,270.95 



551.69 
i93!65 



4,813.27 



3,038.56 



64.43 



12.01 



317.07 

157.58 

17.76 



Holstein 
P.V. 



$ 



c. 



1,095.65 
369.62 
484.23 



345.00 
i59.75 



2,454.25 



755.90 



88.63 
i66.64 



Humber- 
stone 
3,287 



12,342.97 
4,872.97 
6,932.72 



1,568.50 
Y,66i'.62 



26,718.78 



13,504.54 



1,120.92 

28.02 

336.51 



24.00 



342.00 



80,204.74 



8,933.90 



3,949.41 



863.86 



197.72 



116.00 



327.35 



Huntsville 
2,810 



$ c. 

17,529.94 

12,887.76 

14,134.35 

1,468.67 

2,774.00 

282.79 

373.06 



49,450.47 



34,603.67 



2,101.73 

40.78 

402.80 

34.70 

582.70 



1,289.25 
620.32 
201.55 
159.91 



1,507.00 



1,348.89 



1,105.36 



19,095.37 



7,623.41 



1,500.53 

2,035.20 

1,741.51 

382.56 



1,200.00 



44,626.18 



4,824.29 



Number of Consumers 



Domestic service 

Commercial light service . 
Power service 



Total 



827 
90 
29 

946 



108 

32 

5 

145 



753 
79 

12 

844 



726 

133 

19 

878 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



275 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Ingersoll 
5,823 


Iroquois 
925 


Jarvis 
557 


Kemptville 
1,158 


Kincardine 
2,189 


Kingston 
32,463 


$ c. 

35,725.02 

20,389.70 

44,940.37 

1,976.92 


$ ' c. 

7,270.60 
3,327.42 
761.86 
1,072.30 
906.00 
980.26 
185.25 


$ c. 

2,923.81 
1,998.27 
3,870.55 


$ c. 

8,704.85 
6,204.29 
3,289.66 


$ c. 

15,664.70 

8,712.46 

12,365.32 

1,410.86 

4,218.58 

29.21 

828.60 


$ c. 

204,378.27 

136,129.99 

163,843.93 

16,358.93 


4,809.67 
623 . 59 


858.00 


1,786.00 
254.42 
746.45 


22,019.05 


1,310.93 


442.77 


10,883.25 


109,776.20 


14,503.69 


10,093.40 


20,985.67 


43,229.73 


553,613.42 


78,152.65 
184.30 


6,609.50 


6,079.50 


10,153.23 


22,348.62 
456.55 


300,623.18 
7,563 . 86 










2,069.65 


4,150.91 

299.88 

2,068.41 

1,443.32 


807.41 

64.11 

174.43 


97.57 
17.20 
75.05 


1,903.31 

16.83 

586.98 


2,543.30 
325.65 
273.04 
167.66 

1,533.49 


11,281.33 
1,190.15 
5,469.28 
2,453.35 


991.32 


209.13 


- 46.47 


177.68 


5,772.69 
179.11 


2,504.56 

4,321.18 

1,378.05 

283.40 


694.39 

187.79 

97.96 

239.16 


722.55 

76.13 

2.86 


1,060.36 
524.94 
103.73 
136.37 


1,442.22 
909.00 
199.18 


9,079.32 

21,087.98 

9,209.87 

4,855.42 




12.02 




1,053 . 12 










3,074.00 


5,488.00 


519.00 


408.00 


911.00 


2,106.00 


24,943.00 
5,907.97 














101,265.98 


9,602.88 


7,537.35 


15,574.43 


32,304.71 


415,813.28 


8,510.22 


4,900.81 


2,556.05 


5,411.24 


10,925.02 


137,800.14 














1,568 
227 

45 


318 

63 

5 


163 

41 
2 


391 

85 

6 


755 

131 

18 


8,023 

1,093 

180 


1,840 


386 


206 


482 


904 


9,296 



276 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Kingsville 
2,335 


Kirkfield 
P.V. 


Kitchener 
36,165 


Lakefield 


Population 


1,327 






Earnings 
Domestic service 


$ c. 

15,624.96 

10,714.73 

5,030.02 

1,025.42 

2,751.00 


$ c. 

912.16 
1,107.92 


$ c. 

246,982.51 

147,553.68 

426,064.64 

39,026.81 

33,624.38 


$ c. 

7,866.62 
5 035 85 


Commercial light service . . 


Commercial power service ... .... 


7,755 76 


Municipal power . . 






Street lighting 


432.00 


1,710 00 


Merchandise 




Miscellaneous 


1,519.89 


66.00 


9,680.49 


592 . 51 






Total earnings . . 


36,666.02 


2,518.08 


902,932.51 


22,960 74 






Expenses 
Power purchased . . 


19,645.52 


843.42 


612,704.09 

12,920.19 

3,689.83 

18,938.58 
2,292.46 
9,544.92 
5,319.00 

10,290.54 

37.60 

14,954.24 

16,145.98 

903.01 


9,180 51 


Substation operation 




Substation maintenance 








Distribution system, operation and 
maintenance 


2,464.34 

261.43 

818.65 

3.60 

687.81 

26.88 

2,377.49 

1,501.76 

562.07 

342.70 

1,074.74 

1,358.99 

1,863.00 

1,500.00 


212.13 


966.85 


Line transformer maintenance 




Meter maintenance 




232 95 


Consumers' premises expenses 






Street lighting, operation and main- 
tenance 


43.96 


157 34 


Promotion of business 




Billing and collecting 




595 69 


General office, salaries and expenses. . . . 

Undistributed expenses 

Truck operation and maintenance 

Interest. 


234.83 


939.68 
75 10 




142 37 




4,092.64 
22,100.00 
54,458.00 


807 23 


Sinking fund and principal payments 
on debentures 




1,758.13 


Depreciation 


206.00 


1,015.00 


Other reserves . . . 












Total operating costs and 
fixed charges 


34,488.98 


1,540.34 


788,391.08 


15,870.85 


Net surplus 


2,177.04 


977.74 


114,541.43 


7,089.89 


Net loss 














Number of Consumers 

Domestic service 

Commercial light service 


650 
164 

24 


40 
20 


8,964 

1,087 

285 


380 
68 


Power service 


10 








Total 


838 


60 


10,336 


458 










1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



277 



"B '— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Lambeth 
P.V. 


Lanark 
670 


Lancaster 
518 


La Salle 
1,020 


Leamington 
5,456 


Lindsay 
7,680 


Listowel 
3,209 


$ c. 

3,681.65 
939.88 
267.02 


$ c. 

3,323.73 
1,975.37 

477.09 


$ c. 

1,916.21 
1,079.09 


$ c. 

10,326.06 

1,833.95 

428.10 


$ c. 

30,070.99 

20,899.77 

25,612.22 

2,125.29 

6,098.66 


$ c. 

51,176.92 

31,246.35 

52,141.43 

3,061.49 

6,483.86 


$ c. 

18,533.71 
11,797.44 
19,519.59 


437.24 




1,041.96 


763.00 


578.50 


512.00 


804.00 


4,575.00 
118.70 


143.09 


31.98 


46.67 


164.18 


2,315.49 


3,044.01 


1,031.64 


6,231.88 


. 6,386.67 


3,553.97 


13,556.29 


87,122.42 


147,154.06 


56,618.04 


4,209.53 


3,672.88 


2,002.19 


8,472.68 


58,214.62 
414.44 


85,812.52 


42,442.99 












682.95 


225.37 


75.03 


157.46 


391.53 
20.00 


2,122.97 

308.76 

996.40 

4.70 

967.73 
135.62 
2,924.96 
3,441.07 
819.90 
383.74 


1,412.57 
813.56 

1,459.67 
768.66 

1,908.65 


1,982.24 
214.19 


261 . 10 


114.88 


73.06 


622.43 




41.29 

113.49 

10.66 

756.28 

252.68 

16.84 


160.43 


104.76 


49.77 


44.84 


904.67 


370.33 




223.54 
131.66 


4,716.22 
6,785.50 
1,918.64 
972.88 
1,539.70 

8,582.06 

6,445.00 


1,505.55 


38.98 


483.44 


1,056.91 
221.33 








331 . 16 
























380.00 


494.00 


403.00 


854.00 


3,271.00 
4,300.00 


2,805.00 












5,590.07 


4,890.00 


3,035.75 


10,929.45 


78,305.91 


123,135.63 


52,929.85 


641.81 


1,496.67 


518.22 


2,626.84 


8,816.51 


24,018.43 


3,688.19 
















144 

28 

4 


185 
39 

2 


121 
30 


288 

15 

3 


1,722 

299 

37 


2.318 

361 

70 


819 

164 

27 








176 


226 


151 


306 


2,058 


2,749 


1,010 



278 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 

Population 


London 
81,158 


London 
Twp. 
V.A. 


Long 

Branch 

5,253 


Lucan 
583 


Lucknow 
932 


Earnings 

Domestic service 

Commercial light service 


$ c. 

596,268.51 

233,849.96 

452,714.10 

98,106.97 

55,562.59 

530.26 

49,493.63 


$ c. 

17,549.00 
2,098.70 
1,763.54 


$ c. 

36,283.32 
6,681.45 

10,861.80 
2,438.12 
4,620.11 


$ c. 

4,811.11 
2,487.53 
1,273.38 


$ c. 

5,574.93 
3,695.38 


Commercial power service 

Municipal power .... 


9,985.64 
448.77 


Street lighting 


1,207.87 


1,381.67 


1,546.00 


Merchandise. . . 




Miscellaneous : . . . . 


38.54 


1,363.96 


261.08 


172.52 


Total earnings ...'.. 


1,486,526.02 


22,657.65 


62,248.76 


10,214.77 


21,423.24 


Expenses 
Power purchased 


935,753.36 
14,663.34 
23,107.60 

16,267.24 

7,235.02 

16,502.23 

23,290.50 

10,070.47 

2,165.83 

26,448.95 

53,302.63 

36,866.86 

5,033.19 

1,926.34 

4,502.52 

88,237.05 

135,128.12 


14,084.99 


34,220.19 


5,645.59 


10,271.52 


Substation operation 




Substation maintenance 










Distribution system, operation and 
maintenance 


678.82 


3,349.61 
103.16 
635.12 
316.98 

795.54 


221.04 


992.65 


Line transformer maintenance 




Meter maintenance 


55.27 
396.78 

127.77 


8.30 
177.53 

285.78 


112.04 


Consumers' premises expenses 




Street lighting, operation and main- 
tenance 


171.67 


Promotion of business 




Billing and collecting 


1,498.37 

434.40 

5.13 


3,883.76 

2,783.88 

983.00 


535.88 

614.19 

66.48 




General office, salaries and expenses. . 
Undistributed expenses 


1,569.02 


Truck operation and maintenance . . 




Interest 


55.59 
381.24 
845.00 


140.73 
1,536.73 
3,432.00 


23.31 

464.58 
594.00 




Sinking fund and principal payments 
on debentures 


• 


Depreciation 


1,061.00 


Other reserves 














Total operating costs and 
fixed charges 


1,400,501.25 


18,563.36 


52,180.70 


8,636.68 


14,177.90 






Net surplus 


86,024.77 


4,094.29 


10,068.06 


1,578.09 


7,245.34 


Net loss 
















Number of Consumers 
Domestic service 


20,979 
2,365 

447 


502 

16 

5 


1,618 

111 

10 


194 

52 

6 


293 


Commercial light service 


83 


Power service 


9 






Total 


23,791 


523 


1,739 


252 


385 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



279 



"B"— Continued 



Hydro Municipalities for Year Ended December 31, 1945 



Lynden 
P.V. 


Madoc 
1,094 


Markdale 
700 


Markham 
1,210 


Marmora 
938 


Martintown 
P.V. 


Maxville 
801 


$ c. 

2,914.29 
772.25 
767.53 


$ c. 

5,756.93 
4,094.63 
1,846.15 


$ c. 

3,429.42 

3,324.83 

1,802.97 

192,07 

959.00 


$ c. 

9,395.64 
3,127.77 
3,126.82 
334.92 
1,293.50 


$ c. 

4,873.81 

2,358.04 

205.82 


$ c. 

972.76 
1,239.79 


$ c. 

3,158.58 
2,429.07 








465.96 


1,448.32 


1,298.00 

79.70 

245.45 


176.00 


1,044.51 


128.09 


349.26 


310.75 


576.51 


100.55 


255.06 


5,048.12 


13,495.29 


10,019.04 


17,855.16 


9,060.82 


2,489.10 


6,887.22 


3,322.84 


7,224.92 


4,929.06 


9,895.27 


4,463.36 


1,332.84 


3,862.57 
















55.24 


915.03 


425.87 


1,053.41 

3.75 

16.25 


771.64 


105.98 


495.13 
10.10 


2.81 
35.30 


183.68 


113.72 


340.33 


30.98 


226.85 
17.50 


82.48 


328.32 


70.12 


167.04 


225.37 


75.68 


266.30 




609.70 

391.46 

21.25 




903.02 

220.96 

33.66 


926.40 

537.66 

60.30 


168.62 
33.94 


345 . 47 


239.21 


847.96 
16.79 


54.21 
28.87 








15.79 




37.01 
616.83 
576.00 










293.49 












251.00 


579.00 


1,202.00 


446.00 


131.00 


431.00 
















4,298.16 


10,253.36 


7,633.36 


13,495.36 


7,771.06 


1,879.04 


5,738.00 


749.96 


3,241.93 


2,385.68 


4,359.80 


1,289.76 


610.06 


1,149.22 
















101 

15 

2 


322 

89 

6 


242 

76 

8 


354 

61 

9 


258 

39 

1 


59 

24 


181 
46 








118 


417 


326 


424 


298 


83 


227 



280 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Meaford 
2,671 


Merlin 
P.V. 


Merritton 
3,450 


Midland 
6,636 


Mildmav 


Population 


725 






Earnings 
Domestic service . . 


$ c. 

15,518.41 

9,842.69 

11,016.55 

1,025.78 

3,422.37 

13.58 

656.19 


$ c. 

2,191.85 
1,943.35 
1,416.09 


$ c 

20,727. 10 

5,000.12 

218,837.63 

1,903.86 

3,579.00 


$ c. $ c. 
41,158.39 4.340.38 


Commercial light service 


20,438.38 

82,001.57 

2,820.15 


2,832.13 


Commercial power service 

Municipal power 

Street lighting 


1,099.20 


777.00 


6,376.00 651.41 


Merchandise ........ 


1,091.44 
2,341.85 




Miscellaneous 


449.90 


2,019.29 


310.29 






Total earnings 


41,495.57 


6,778.19 


252,067.00 


156,227.78 


9.233.41 






Expenses 
Power purchased 


21,258.03 


3,325.09 


201,800.25 
385.95 


89,325.98 

2,700.54 

452.44 

4,327.37 
830.64 

1,379.45 
106.37 

1,032.99 
24.00 
2,137.70 
1,713.31 
1,434.81 
239.95 


4,283.46 


Substation operation 




Substation maintenance 








Distribution system, operation and 
maintenance 


2,306.23 

151.70 

310.43 

98.94 

621.10 


363.78 
33.83 
20.79 

115.71 

58.33 

27.12 


3,397.33 

308.60 

462.69 

32.27 

1,008.50 


336.81 


Line transformer maintenance 




Meter maintenance 


162.79 


Consumers' premises expenses 

Street lighting, operation and main- 
tenance 


221 . 15 
163 . 10 


Promotion of business 




Billing and collecting 


1,015.43 
888.13 
637.28 
277.24 


393.36 

272.27 
1.54 


2,356.96 

2,050.03 

342.41 

274.27 




General office, salaries and expenses. . 
Undistributed expenses 


494.9a 


Truck operation and maintenance . . . 
Interest 






309.62 


Sinking fund and principal payments 
on debentures. . . . 










735 . 16 


Depreciation 


2,109.00 


356.00 


5,286.00 


9,727.00 


386.00 


Other reserves 
















Total operating costs and 
fixed charges. . 


29,673.51 


4,967.82 


217,705.26 


115,432.55 


7,093.07 






Net surplus 


11,822.06 


1,810.37 


34,361.74 


40,795.23 


2,140.34 


Net loss 
















Number of Consumers 
Domestic service 


799 

161 

20 


128 

55 

3 


977 
62 

17 


1,743 

211 

53 


194 


Commercial light service 


59 


Power service 


2 


Total 


980 


186 


1,056 


2,007 


255 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



281 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Millbrook 
673 


Milton 
1,955 


Milverton 
970 


Mimico 

8,400 


Mitchell 
1,531 


Moorefield 
P.V. 


Morrisburg 
1,436 


$ c. 

4,379.36 
1,981.74 
1,962.19 


$ c. 

14,263.35 

7,959.80 

28,292.33 


$ c. 

6,057.90 
4,031.73 
5,708.57 
534.92 
1,035.80 


$ c. 

69,460.98 

13,490.69 

8,477.74 

8,149.60 

8,158.06 


$ c. 

14,310.57 
7,437.71 
6,901.20 
1,137.52 
2,602.88 
3,044.47 
1,285.50 


$ c. 

1,385.40 

1,491.15 

.200.08 


$ c. 

10.994.77 

6,339.59 

3,392.13 

727.65 


787.08 


2,279.93 

259.72 

2,435,20 


350.00 


2,124.00 


76.52 


237.68 


1,804.08 


102.92 


172.28 


9,186.89 


55,490.33 


17,606.60 


109,541.15 


36,719.85 


3,529.55 


23,750.42 


3,460.50 


38,185.78 


13,383.18 


65,480.57 


19,670.82 


2,209.92 


8,515.07 
2,554.15 




246.68 

3,662.45 

392.38 

332.38 

82.59 

533.38 




318.23 

8,277.12 
144.32 
808.92 

2,678.94 

1,600.20 


739.00 

1,584.89 
459.40 
536.60 
225.81 

341.51 
7.50 

982.18 
1,248.91 
1,049.68 

633.17 






346.89 


747.56 


53.42 


823.05 
70.73 


279.36 


72.14 


34.85 


316.35 


268.18 


207.89 




273 98- 




63.14 




632.75 


838.67 

1,359.19 

138.10 

528.92 


714.29 

352.42 

34.73 


3,465.08 

1,651.78 

459.99 

587.47 


1,325. ia 


608.64 


180.31 
5.79 


419.65 
176.41 
347.51 








383.05 














4,908.58 


269.00 


1,840.00 


611.00 


5,138.00 


2,526.00 


184.00 


1,060.00 
















5,962.60 


48,140.52 


16,123.21 


90,610.62 


30,005.47 


2,731.43 


21,173.71 


3,224.29 


7,349.81 


1,483.39 


18,930.53 


6,714.38 


798.12 


2,576.71 
















185 

60 

5 


559 

111 

16 


271 
89 
10 


2,344 

165 

27 


530 

137 

25 


70 
29 

2 


437 

111 

17 


250 


686 


370 


2,536 


692 


101 


56S 



282 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Mount 

Brydges 

P.V. 


Mount 
Forest 
1,753 


Napanee 
3,298 


Neustadt 
418 


Newbury 


Population 


233 






Earnings 
Domestic service 


$ c. 

2,654.30 

1,012.12 

852.84 


$ c. 

10,253.61 
8,783.39 
5,898.81 
1,010.35 
2,275.92 


$ c. 

28,280.00 

19,373.20 

12,013.10 

120.00 

4,074.24 

1,976.02 

1,068.21 


$ c. 

2,092.68 

1,056.38 

505.89 


$ c. 
1,360.91 


Commercial light service 


458.72 


Commercial power service. ......... 


174.17 


Municipal power. . 




Street lighting 


807.00 


663.00 


720.00 


Merchandise 




Miscellaneous 


458.61 


380.79 


478.02 


159.99 






Total earnings 


5,784.87 


28,602.87 


66,904.77 


4,795.97 


2,873.79 






Expenses 
Power purchased 


3,170.95 


18,381.66 


31,797.47 


1,262.09 


1,247.23 


Substation operation 




Substation maintenance. . . . 












Distribution system, operation and 
maintenance 


94.46 


1,082.11 


4,001.00 
124.67 
621.08 

1,213.40 

791.31 


527.08 


218.61 


Line transformer maintenance 




Meter maintenance 


452.27 
16.89 

79.72 


150.60 




41.61 


Consumers' premises expenses 

Street lighting, operation and main- 
tenance 






316.56 


55.81 


67.06 


Promotion of business 




Billing and collecting 


238.94 

74.81 

6.39 


772.76 

198.67 

95.70 

51.54 

98.52 

1,205.62 

1,271.00 


2,176.17 

7,942.24 

3,432.37 

773.86 




167.77 


General office, salaries and expenses. . 
Undistributed expenses 


452.81 


36.90 
6.20 


Truck operation and maintenance 






Interest 


15.14 
275 23 
320.00 






Sinking fund and principal payments 
on debentures 








Depreciation 


2,808.00 


534.00 


284.00 


Other reserves ..... 
















Total operating costs and 
fixed charges 


4,744.80 


23,624.74 


55,681.57 


2,831.79 


2,069.38 






Net surplus. ....... 


1,040.07 


4,978.13 


11,223.20 


1,964.18 


804.41 


Net loss 
















Number of Consumers 
Domestic service 


170 

40 

5 


509 

138 

17 


920 
215 

24 


118 

25 

2 


76 


Commercial light service . . 


19 


Power service 


1 






Total 


215 


664 


1,159 


145 


96 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



283 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Newcastle 
690 


New 

Hamburg 

1,454 


Newmarket* 
3,956 


New 

Toronto 

8,374 


Niagara 
Falls 
19,138 


Niagara-on- 

the-Lake 

1,802 


$ c. 

5,232.23 
1,661.74 
3,061.93 


$ c. 

10,026.77 
4,911.46 
8,408.22 


$ c. 

18,089.70 

12,810.13 

9,579.80 

1,545.56 

3,456.71 


$ c. 

48,282.00 

21,226.75 

233,023.75 

13,099.10 

7,652,94 


$ c. 

134,099.25 

74,326.74 

100,205.48 

14,760.43 

25,120.86 


$ c. 

19,706.63 
7,166.17 
5,361.69 
1,157.07 


655.02 


2,217/00 


3,822.70 
335.44 


260.18 


620.03 




2,403.72 


5,581.41 


324.56 








10,871.10 


26,183.48 


45,481.90 


325,688.26 


354,094.17 


37,874.26 


5,427.40 


16,248.11 
277.30 


35,101.41 
468.98 
348.57 

1,747.79 
307.41 
344.46 


263,035.51 


183,535.31 
11,107.60 


19,795.71 
205.40 








640.13 

33.90 

188.59 

274.31 


1,431.51 

26.22 

276.27 

54.09 

246.27 
52.65 
954.36 
1,156.93 
386.31 
315.49 


7,069.63 

67.20 

1,763.10 

108.01 

1,188.92 


12,701.21 
1,190.74 
7,165.67 
2,277.08 

2,747.47 


1,588.38 
206.37 
678.95 
471.99 


116.47 


672.87 


815.53 
21.50 


681 . 10 

282.42 

93.36 


1,222.16 

774.26 

34.15 

81.50 


4,880.16 

6,951.94 

1,832.98 

471.56 


8,936.29 
13,459.65 
5,902.57 
2,996.82 
2,297.91 

14,553.04 

21,349.00 


1,318.30 

1,480.12 

1,284.43 

390.03 




830.51 










2,480.52 


585.00 


1,177.00 


2,554.00 


5,327.00 


3,009.00 














8,322.68 


22,602.51 


43,657.56 


292,696.01 


290,220.36 


34,576.74 


2,548.42 


3,580.97 


1,824.34 


32,992.25 


63,873.81 


3,297.52 














233 

35 

6 


386 
106 

12 


1,138 

170 

30 


2,064 

222 

36 


5,006 
750 
116 


641 

102 

11 


274 


504 


1,338 


2,322 


5,872 


754 



* 8 months' operation. 



284 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 

Population 


NorthYork 
Twp. 
V.A. 


Norwich 
1,199 


Norwood 
694 


Oil 

Springs 
426 


Omemee 
598 






Earnings 
Domestic service 


$ c. 

239,262.95 
34,769.28 

141,427.54 

29,974.15 

4,613.82 


$ c. 

10,067.41 
5,044.77 
1,754.20 

500.45 
2,220.00 
1,634.50 

404.35 


$ c. 

5,747.40 
2,992.53 
1,309.39 


$ c. 

2,137.54 
1,444.46 
5,485.75 


$ c. 
3,581.66 


Comirtercial light service 


909.77 


Commercial power service 


3,477.21 


Municipal power . . 




Street lighting 


1,606.00 


646.00 

11.56 

543.23 


986.04 


Merchandise 




Miscellaneous 


4,367.69 


719.31 


208.60 






Total earnings 


454,415.43 


21,625.68 


12,374.63 


10,268.54 


9,163.28 






Expenses 
Power purchased 


228,593.87 
399.46 


12,021.93 


4,657.76 


5,710.12 


5,158.98 


Substation operation 




Substation maintenance 










Distribution system, operation and 
maintenance 


17,764.81 
1,472.36 
4,762.92 
2,345.10 

1,334.02 


2,185.54 

35.59 

114.07 

184.73 

223.97 


530.86 

57.87 

106.59 


388.86 

31.39 

47.55 

5.21 

34.27 


550.12 


Line transformer maintenance 




Meter maintenance 


200.46 


Consumers' premises expenses 

Street lighting, operation and main- 
tenance 




86.15 


284.07 


Promotion of business 




Billing and collecting 


12,562.59 
9,853.87 
5,128.13 
5,563.46 
7,976.88 

22,067.05 

24,250.00 


1,101.22 

1,085.67 

149.13 

109.77 


570.63 
378.89 


529.38 
213.38 

21.79 




General office, salaries and expenses. . 

Undistributed expenses 

Truck operation and maintenance 


474.78 
10.76 


80.43 
711.33 

1,695.21 

962.00 




Interest. . 






Sinking fund and principal payments 
on debentures. . 




• 




Depreciation 


735.00 


744.00 


671.00 


Other reserves 
















fixed charges 


344,074.52 


17,946.62 


9,837.72 


7,725.95 


7,350.17 






Net surplus 


110,340.91 


3,679.06 


2,536.91 


2,542.59 


1,813.11 


Net loss 
















Number of Consumers 
Domestic service 


7,585 
372 

72 


401 
8S 


253 

61 

6 


108 
36 
32 


176 


Commercial light service 

Power service 


30 
6 






Total 


8.03C 


) 49c 


32C 


> 177 


212 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



285 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Orange- 
ville 
2,559 


Orono 
P.V. 


Oshawa 
26,824 


Ottawa 
163,829 


Otterville 
P.V. 


Owen Sound 
13,402 


$ c. 

17,819.41 

12,509.69 

6,232.38 

972.83 


$ c. 

4,615.90 

1,992,73 

303.68 


$ c. 

244,828.75 

82,963.58 

315,656.11 

10,542.68 

12,578.36 

7,643.30 

9,880.67 


$ c. 

643,752.25 

314,712.83 

63,881.40 

22,937.67 

82,147.00 


$ c. 

2,938.11 

1,965.30 

470.29 

\ 77.28 

906.50 


$ c. 

77,440.17 

52,609.29 

85,282.26 

1,536.20 


2,569.80 
91.28 


955.00 


11,643.58 
2,453.43 


817.08 


372.74 


15,974.26 


187.50 


671.70 


41,012.47 


8,240.05 


684,093.45 


1,143,405.41 


6,544.98 


231,636.63 


24,624.56 


3,383.59 


363,369.31 
1,697.88 


599,921.46 

34,095.74 

1,143.49 

28,094.33 
2,565.64 

13,780.34 
4,231.83 

35,015.36 
3,857.98 
51,434.88 
32,054.95 
23,117.27 
3,580.89 
12,089.55 

12,553.38 

123,405.00 

53,612.65 


3,272.83 


138,968.09 
5,428.05 










2,274.20 
54.50 


195.66 

29.32 

112.54 

5.00 

80.94 


18,557.44 

414.50 

7,029.57 

24,589.52 

1,750.01 

481.08 

13,950.78 

13,776.86 

6,341.66 


251.52 


4,346.43 
950.62 


395.83 
43.87 


9.00 


1,693.18 
17.85 


846.15 


104.18 


1,687.06 
497.58 


1,744.48 
751.17 
151.20 


621.66 

393.71 

27.05 


335.14 

313.39 

6.50 


6,335.77 

8,380.43 

3,627.25 

932.31 






2,792.24 
18,000.00 
18,047.00 














1,864.00 


238.00 


433.00 


6,539.00 












32,749.96 


5,087.47 


490,797.85 


1,034,554.74 


4,725.56 


179,403.62 


8,262.51 


3,152.58 


193,295.60 


108,850.67 


1,819.42 


52,233.01 














750 
155 

27 


183 

39 

2 


6,971 

727 
119 


15,805 

1,495 

207 


146 

48 

5 


3,726 
555 
105 


932 


224 


7,817 


17,507 


199 


4,386 



11— H.E. 



286 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality. . . 


Paisley 

577 


Palmer- 
ston 
1,396 


Paris 

4,524 


Parkhill 
801 


Penetan- 


Population 


guishene 
4,018 






Earnings 
Domestic service 


$ c. 

4,193.74 

2,561.44 

963.59 


$ c. 

11,776.66 
5,191.87 
7,408.46 
1,452.40 
2,495.40 
57.05 
410.26 


$ c. 

27,755.38 

10,930.90 

24,245.04 

1,220.47 

5,614.00 


$ c. 

6,251.77 
3,643.13 
2,024.66 
564.12 
1,724.98 


$ c. 
14,088.87 


Commercial light service 


8,800. 13 


Commercial power service. 


22,113.32 


Municipal power .... 


2,207.02 


Street lighting 


1,333.00 


2,325.83 


Merchandise 


229.17 


Miscellaneous 


206.75 


1,481.70 


264.50 


884.81 






Total earnings 


9,258.52 


28,792.10 


71,247.49 


14,473.16 


50,649.15 


Expenses 
Power purchased 


4,840.77 


20,119.49 


42,415.62 
624.25 


8,895.28 


24,683.50 


Substation operation 




Substation maintenance. 








56.70 


Distribution system, operation and 
maintenance 


758.50 


576.92 
181.51 
595.26 
436.70 

432.14 


2,976.22 
265.94 
968.62 
585.56 

1,856.51 


718.31 

25.76 

290.40 

100.00 

180.55 


3,576.36 


Line transformer maintenance 


364.13 


Meter maintenance 


125.85 


565.99 


Consumers' premises expenses 


187.03 


Street lighting, operation and main- 
tenance ] 


178.01 


446.26 


Promotion of business 




Billing and collecting 




1,051.65 

606.43 

74.86 

200.92 

7.94 


2,117.60 

1,404.03 

636.27 

583.51 


555.65 
36.12 
16.47 

125.30 


1,738.84 


General office, salaries and expenses. . 
Undistributed expenses 


829.89 


1,143.28 
153.83 


Truck operation and maintenance . . 




432.21 


Interest 






Sinking fund and principal payments 
on debentures 










Depreciation 


436.00 


1,925.00 


4,680.00 


686.00 


2,682.00 


Other reserves 


7,000.00 














Total operating costs and 
fixed charges 


7,169.02 


26,208.82 


59,114.13 


11,629.84 


43,030.13 






Net surplus 


2,089.50 


2,583.28 


12,133.36 


2,843.32 


7,619.02 


Net loss 
















Number of Consumers 
Domestic service 


209 

54 

3 


400 
95 
14 


1,220 

193 

27 


315 

85 

9 


838 


Commercial light service 

Power service 


112 
21 






Total 


266 


509 


1,440 


409 


971 







1946 THE HYDRO-ELECTRIC POWER COMMISSION 



287 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Perth 
4,230 


Peterborough 
27,871 


Petrolia 
2,684 


Picton 
3,690 


Plattsville 
P.V. 


Point 

Edward 

1,221 


$ c. 

29,726.33 

17,787.25 

16,911.87 

1,048.23 


$ c. 

203,373.29 
97,958.12 

191,755.39 

6,876.49 

24,730.02 


$ c. 

14,771.95 

9,240.77 

25,522.17 


$ c. 

25,143.91 
15,834.20 
6,578.73 
1,902.80 
3,749.82 
1,892.86 
1,733.42 


$ c. 

2,627.13 
1,797.60 
2,040.95 


$ c. 

7,547.38 

3,147.65 

43,965.96 


3,088.50 
4,546.37 


3,125.50 

365.09 

1,094.09 


408.00 


1,793.70 


2,773.13 


12,700.21 


268.55 


708.26 


75,881.68 


537,393.52 


54,119.57 


56,835.74 


7,142.23 


57,162.95 


37,439.11 
416.51 


291,552.37 

7,243.09 

572.10 

22,224.16 
2,203.43 
6,975.08 
5.880.20 

6,668.36 
169.45 

12,072.90 
7,848.74 
9,449.70 
1,570.12 

12,424.23 

5,682.04 

27,321.00 

300.00 


28,566.16 
244.25 


37,639.58 


4,828.16 


46,243.51 










1,812.70 
173 15 


3,557.21 
529.52 

1,005.96 
617.83 

1,251.48 
103.38 
1,496.91 
2,425.72 
199.96 
495.26 
195.54 

2,282.57 

2,785.00 


1,513.67 
222.79 
829.63 


35.52 


362.03 
8 04 


666.61 




439.27 








504.44 
6.71 


629.57 

8.00 

1,838.04 

3,108.12 

232.88 

232.08 


48.99 


286.77 
67.06 


2,148.88 

3,648.25 

595.54 

916.70 


264.50 

46.67 

6.88 


1,237.93 

1,111.57 

31.12 


1,601 . 83 






3,660.48 








3,439.00 


3,069.00 


245.00 


1,002.00 
3,256. 10 












57,021.91 


420,156.97 


45,756.75 


49,323.36 


5,475.72 


54,045.40 


18,859.77 


117,236.55 


8,362.82 


7,512.38 


1,666.51 


3,117.55 














1,119 

195 

30 


7,695 
984 
177 


825 

149 

55 


1,200 

212 

35 


124 

23 

2 


355 
45 

11 


1,344 


8,856 


1,029 


1,447 


149 


411 



288 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Port 

Colborne 

7,187 


Port 
Credit 
2,249 


Port 

Dalhousie 

1,747 


Port 
Dover 
2,001 


Port 


Population 


Elgin 
1,276 


Earnings 
Domestic service 


$ c. 

32,928.51 

21,126.07 

14,281.07 

6,604.91 

9,058.92 


$ c. 

19,699.45 
7,274.31 
4,934.00 
1,165.69 
2,918.50 


$ c. 

22,466.46 
5,109.10 

7,215.71 


$ c. 

11,580.25 
5,799.05 
5,871.07 


$ c. 
13,129.82 


Commercial light service 

Commercial power service 

Municipal power 


7,280.72 

3,602.12 

791.21 


Street lighting 

Merchandise. 


1,686.00 


2,591.97 


2,452.72 


Miscellaneous 


3,208.70 


793.93 


681.97 


461.80 




Total earnings 


87,208.18 


36,785.88 


37,159.24 


26,304.14 


27,256.59 






Expenses 
Power purchased 


41,566.99 


22,658.02 


21,312.69 


15,163.63 


15,699.30 


Substation operation 




Substation maintenance 












Distribution system, operation and 
maintenance 


6,668.11 

1,515.83 

1,615.54 

108.55 

3,073.23 
231.99 
2,931.93 
2,032.84 
1,280.77 
1,599.21 
658.30 

2,952.61 

3,748.00 

8,000.00 


1,812.36 
205.86 
283.31 
941.87 

1,144.12 


3,287.99 

50.69 

807.41 

195.12 

293.15 


2,720.87 

37.55 

637.44 

131.17 

598.40 


999.26 


Line transformer maintenance 

Meter maintenance 


2.64 
162.54 


Consumers' premises expenses 

Street lighting, operation and main- 
tenance 


134.14 
214.23 


Promotion of business. . . 




Billing and collecting 


1,376.83 
555.81 
138.41 


1,528.98 

1,272.02 

289.33 

855.24 


815.86 

1,299.24 

138.54 

579.52 

7.34 


715.34 


General office, salaries and expenses. . 

Undistributed expenses 

Truck operation and maintenance . . . 


273.87 

43.36 

171 . 02 


Interest 


85.36 

396.09 

1,537.00 


561 . 28 


Sinking fund and principal payments 
on debentures. . . 




2,514 92 


Depreciation 


1,533.00 


1,326.00 


1,420.00 


Other reserves 














Total operating costs and 
fixed charges 


77,983.90 


31,135.04 


31,425.62 


23,455.56 


22,911.90 






Net surplus 


9,224.28 


5,650.84 


5,733.62 


2,848.58 


4,344.69 


Net loss 
















Number of Consumers 

Domestic service 

Commercial light service 

Power service 


1,682 

238 

25 


652 
89 

14 


704 
72 
12 


781 

125 

16 


525 
129 

7 






Total 


1,945 


755 


788 


922 


661 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



289 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Port Hope 
4,881 


Port McNicoll 
825 


Port Perry 
1,275 


Port Rowan 

584 


Port Stanley 
833 


Prescott 
3,318 


$ c. 

35,697.20 
16,068.26 
39,947.14 


$ c. 

4,234.82 
823.10 


$ c. 

10,291.33 

3,925.30 

2,863.37 

412.46 

1,668.73 


$ c. 

3,328.98 

2,457.15 

105.43 


$ c. 

17,121.29 

4,877.86 

3,929.39 

912.40 

2,565.24 


$ c. 

25,061.42 
12,605.67 
14.240.57 


1,720.49 




1,435.98 


4,197.14 
285.69 


900.00 


846.66 


4,180.50 


1,089.65 


61.62 


228.75 


224.15 


730.81 


181.15 


99,005.57 


6,019.54 


19,389.94 


6,962.37 


30,136.99 


57,705.29 


62,632.66 


2,274.70 


11,162.94 


3,684.63 


20,133.36 


34,567.89 
1,595 35 














1,374.34 
552.19 


759.43 


1,341.21 


273.51 
3.75 
6.53 


2,765.88 
193.90 
109.14 
214.45 

369.96 


4,360.53 
194.87 


1,536.36 
1,806.27 


178.58 


330.68 


308.60 
501 . 18 


1,243.72 
34.95 


236.11 


188.65 


112.38 


739.80 


2,919.38 
4,162.98 
1,473.76 


745.50 

355.30 

92.72 


913.97 
496.63 


336.63 

64.30 

6.88 


1,289.53 

1,160.82 

416.61 

304.89 


1,403.07 

2,594.05 

534 63 


407.04 










185.91 

1,504.12 

809.00 


154.81 
805.22 
338.00 












3,850.00 


371.00 


1.244,00 
1,000.00 


2,629.00 












81,993.65 


5,013.34 


16,933.11 


5,786.64 


29,202.54 


49,428.97 


17,011.92 


1,006.20 


2,456.83 


1,175.73 


934.45 


8,276.32 














1,444 

202 

41 


251 
18 


391 
79 
10 


178 

41 

2 


950 
85 
11 


827 

152 

23 








1,687 


269 


480 


221 


1,046 


1,002 



290 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality : . . 


Preston 
6,707 


Priceville 
P.V. 


Princeton 
P.V. 


Queenston 
P.V. 


Renfrew 


Population 


5,673 






Earnings 
Domestic service 


$ c. 

41,118.06 

22,201.14 

59,504.93 

1,258.39 

5,790.31 


$ c. 

638.52 
162.92 
303.91 


$ c. 

2,811.44 

938.48 

2,674.67 


$ c. 

3,048.06 
1,482.35 


$ c. 
29,038.29 


Commercial light service 


20,617.28 


Commercial power service 


24,219.74 


Municipal power. . 






Street lighting 


. 34.00 


468.00 


460.01 


4,900.00 


Merchandise. .... 




Miscellaneous. 


1,351.31 


72.66 


204.47 


242.86 


8,976.95 






Total earnings 


131,224.14 


1,212.01 


7,097.06 


5,233.28 


87,752.26 






Expenses 
Power purchased 


90,338.46 

4,570.91 

12.81 

2,181.56 
280.44 
921.67 
621.92 

888.80 


315.00 


4,808.18 


2,780.93 


6,429.94 


Substation operation. . 


12,074.43 


Substation maintenance . 








764.13 


Distribution system, operation and 
maintenance. 


172.23 


45.51 


256.35 
66.75 
16.00 

151.34 

3.02 


1,941.17 


Line transformer maintenance . . 


96.13 


Meter maintenance 




7.78 
47.33 

63.60 


656.90 


Consumers' premises expenses 




11.65 


Street lighting, operation and main- 
tenance 


47.28 


1,153.64 


Promotion of business. . . 


47.15 


Billing and collecting . . 


1,967.26 

2,852.13 

1,077.24 

362.06 

374.65 

1,197.56 

7,477.00 




317.35 

87.62 

1.92 


243.69 

162.33 

35.63 


3,295.78 


General office, salaries and expenses.. 

Undistributed expenses 

Truck operation and maintenance . . . 
Interest. . 


149.07 


5,151.80 
1,264.94 




469.98 






24.79 

94.32 

317.00 


5,058.82 


Sinking fund and principal payments 
on debentures. . 






17,184.77 


Depreciation 


193.00 


201.00 


9,757.00 


Other reserves . 
















Total operating costs and 
fixed charges 


115,124.47 


876.58 


5,580.29 


4,152.15 


65,358.23 






Net surplus 


16,099.67 


335.43 


1,516.77 


1,081.13 


22,394.03 


Net loss. 
















Number of Consumers 
Domestic service 


1,701 

226 

51 


36 

9 
3 


96 

22 

3 


82 

17 


1,366 


Commercial light service 


227 


Power service 


58 








Total 


1,978 


48 


121 


99 


1,651 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



291 



"B'— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Richmond 
412 


Richmond 
Hill 

1,454 


Ridgetown 
1,911 


Ripley 
358 


Riverside 
5,686 


Rockwood 
P.V. 


Rodney 
718 


$ c. 

2,737.68 
1,142.34 


$ c. 

11,740.85 

4,494.96 

2,057.04 

387.30 

1,543.42 

19.29 

283.21 


$ c. 

9,407.31 
8,295.60 
6,111.92 
1,145.90 
3,452.29 
61.52 
1,459.48 


$ c. 

3,252.57 
1,985.62 
2,286.79 


$ c. 

44,340.08 
6,469.11 
4,486.21 
3,627.54 
4,151.58 
723.33 
1,508.93 


$ c. 

4,531.33 

1,195.44 

65.54 


$ c. 

3,621.01 
2,333.60 
1,981.58 






390.00 


1,096.00 


819.00 

21.65 

132.77 


1,132.08 


5.16 




200.05 








4,275.18 


20,526.07 


29,934.02 


8,620.98 


65,306.78 


6,765.73 


9,268.32 


2,568.17 


12,647.35 


17,456.35 


3,800.84 


38,335.09 
42.76 


4,342.74 


5,521.25 














270.58 


697.68 


1,995.46 
285.64 
102.51 
306.49 

797.85 


191.99 


2,338.19 

79.12 

561.28 

2,219.80 

871.62 


133.30 
58.84 
92.24 
19.88 

89.29 


584.44 
53.40 


35.85 


61.14 
175.85 

149.76 


63.17 


33.81 


98.36 


107.43 


156.03 


226.73 


1,189.42 

332.00 

4.73 


1,920.43 

1,254.04 

7.84 

735.84 

56.24 

719.68 

1,327.00 

1,000.00 




2,414.64 

3,277.87 

746.88 

698.94 




401.99 


44.11 


544.40 


698.21 
67.76 


519.21 
32 75 




"259^85 
768.21 
575.00 




117.82 




58.03 
142.57 
415.00 




448.88 








328.00 


901.00 


3,339.00 


703.00 














4,138.50 


16,158.93 


27,965.37 


6,310.89 


54,925.19 


6,117.86 


8,005.88 


136.68 


4,367.14 


1,968.65 


2,310.09 


10,381.59 


647.87 


1,262.44 
















93 
22 


431 
75 
15 


604 

138 

20 


133 

51 

2 


1,629 
72 
13 


180 

30 

2 


256 

67 

6 






115 


521 


762 


186 


1,714 


212 


329 



292 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Rosseau 
179 


Russell 
P.V. 


St. 

Catharines 

34,541 


St. Clair 

Beach 

230 


St. George 


Population 


P.V. 






Earnings 
Domestic service 


$ c. 

1,754.06 
805.24 
279.99 


$ c. 

3,604.81 
1,663.23 


$ c. 

194.040,79 
107,842.60 
417,186.72 


$ c. 

3,115.29 

1,849.81 

200.90 


$ c. 
3,341.55 


Commercial light service 


1,459.17 


Commercial power service 


4,279.82 


Municipal power 






Street lighting. 


797.17 


848.00 


28,367.88 




513.00 


Merchandise* . 






Miscellaneous. . 




177.50 


12,886.48 


307.95 


383.07 








Total earnings 


3,818.46 


6,293.54 


760,324.47 


5,473.95 


9,976.61 






Expenses 
Power purchased 


1,016.56 


2,836.52 


519,765.38 
7,614.55 


3,645.40 


6,388.97 


Substation operation 




Substation maintenance . 










Distribution system, operation and 
maintenance 


21.57 


389.61 


21,184.12 
1,745.11 
7,737.57 
1,857.90 

4,409.71 

383.76 

17,120.08 

13,918.26 

8,035.56 

2,160.25 

1,050.00 

3,500.00 

18,226.00 

4,000.00 


325.26 
37.28 
23.50 
58.05 


155.66 


Line transformer maintenance 




Meter maintenance 


16.00 


21.35 
12.90 

78.13 


53.71 


Consumers' premises expenses . 




Street lighting, operation and main- 
tenance 


60.00 


149.39 


Promotion of business 






Billing and collecting 


329.97 
107.76 


460.73 
153.54 


357.12 
209.46 


412.27 


General office, salaries and expenses.. 
Undistributed expenses . . 


203.55 


Truck operation and maintenance . 










Interest 


406.29 
670.86 
381.00 


43.62 
793.17 
249.00 






Sinking fund and principal payments 
on debentures 






Depreciation 


340.00 


281.00 


Other reserves 














Total operating costs and 
fixed charges 


3,010.01 


5,038.57 


632.708.25 


4,996.07 


7,644.55 








Net surplus 


808.45 


1,254.97 


127,616.22 


477.88 


2,332.06 


Net loss 
















Number of Consumers 
Domestic service 


6£ 

12 

1 


124 
31 


8,887 

1,094 

216 


108 

6 

i 


164 


Commercial light service 


28 


Power service 


3 








Total 


78 


155 


10,197 


he 


195 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



293 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



St. Jacobs 
P.V. 


St. Marys 
4,005 


St. Thomas 
17,773 


Sarnia 
20,082 


Scarborough 
Twp. 
V.A. 


Seaforth 
1,724 


$ c. 

4,215.64 
2,066.15 
5,223.62 


$ c. 

31,465.74 

12,621.53 

22,208.83 

2,424.73 

4,948.00 

118.76 

944.51 


$ c. 

147,175.51 

62,055.58 

70,439.23 

5,244.66 

15,126.85 


$ c. 

126,014.43 
67,465.29 
60,695.58 
4,842.63 
20,043.43 
163.69 
26,293.98 


$ c. 

141,923.12 
27,123.09 
24,536.42 
15,158.72 
15,264.30 


$ c. 

12,493.53 

9,667.14 

17,216.86 

747.58 


430.00 


2,134.50 
279.94 


292.50 


5,664.60 


3,637.50 


346.25 


12,227.91 


74,732.10 


305,706.43 


305,519.03 


227,643.15 


42,885.80 


8,998.67 


47,029.57 
2,810,78 


200,206.25 

9,653.82 

272.52 

6,998.61 

658.02 

2,305.42 

10,703.21 

1,695.12 
576.58 
8,332.99 
9,745.04 
5,816.65 


154,293.99 

11,646.73 

753.30 

6,941.69 
1,306.29 
7,938.16 
5,835.71 

6,862.32 

344.12 

11,358.44 

17,222.70 

6,942.20 

2,440.89 


120,879.70 


27,356.66 




350.47 

8,594.01 
1,260.72 
3,951.55 
1,424.67 

2,605.21 


108.56 


69.51 
16.25 
59.62 


2,885.79 
185.53 

1,391.28 
950.69 

1,188.00 

43.20 

1,619.82 

3,264.63 

1,673.08 

375.97 

620.55 

1,425.67 

4,343.00 


1,116.77 
301.35 
401.34 
313.86 


15.00 


374.62 


423.34 

228.83 

38.82 


7,005.22 
6,073.50 
1,997. 17 
2,229.45 


1.083,57 

1,389.71 

102.73 

314.47 






313.09 










555. 16 


535.00 


20,883.00 


15,772.00 
30,000.00 


11,770.00 


1,539.00 
100.00 












10,385.04 


69,807.56 


277,847.23 


279,658.54 


168,141.67 


35,370.89 


1,842.87 


4,924.54 


27,859.20 


25,860.49 


59,501.48 


7,514.91 














139 

33 

9 


1,084 

174 
40 


4,737 

618 

86 


5,518 

634 

90 


6,113 

406 

46 


525 

119 

22 


181 


1,298 


5,441 


6,242 


6,565 


666 



294 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 

SOUTHERN ONTARIO SYSTEM— Continued 



Municipality. 
Population. . 



Shelburne 
985 



Simcoe 
6,047 



Smiths 
Falls 
7,708 



Smithville 
P.V. 



Southamp- 
ton 
1,596 



Earnings 

Domestic service 

Commercial light service . . 
Commercial power service 

Municipal power 

Street lighting. . . : 

Merchandise 

Miscellaneous 



$ 



c. 



6,089.97 

4,047.55 

3,040.90 

286.56 

882.00 

4. 
496.00 



$ c. 

29,437.47 

32,888.24 

31,023.01 

2,966.79 

5,296.44 



$ c. 

53,345.30 

19,030.33 

30,681.65 

615.98 

7,758.99 



c. 



3,704.53 

2,673.44 
2,754.62 



1,236.00 



5t> C. 

11,288.94 

6,223.94 

7,881.51 

973.06 

2,519.23 



3,513.86 



3,586.63 



417.06 



28.08 



Total earnings 



14,847.78 



105,125.81 



115,018.88 



10,785.65 



28,914.76 



and 



Expenses 

Power purchased 

Substation operation 

Substation maintenance 

Distribution system, operation 

maintenance 

Line transformer maintenance 

Meter maintenance 

Consumers' premises expenses.- 

Street lighting, operation and main 

tenance 

Promotion of business 

Billing and collecting 

General office, salaries and expenses. 

Undistributed expenses 

Truck operation and maintenance . . . 

Interest 

Sinking fund and principal payments 

on debentures 



8,118.64 



69,290.01 



543.94 
203.28 
193.92 



50.51 



761.85 

119.74 

8.35 



Depreciation. . 
Other reserves . 



898.00 



228.20 

6,252.70 
859.54 

1,806.33 
298.80 

682.71 

116.65 
2,915.77 
3,006.56 

341.71 
1,567.74 

513.46 

2,696.23 
6,000.00 
4,300.00 



62,620.76 
463.43 
901.15 

6,221.16 
288.68 
892.42 

1,696.23 

847.67 

112.84 

4,327.52 

3,241.91 

1,461.29 

616.34 



5,034.58 



15,612.72 



1,120.93 
10.34 
51.84 
22.64 

183.49 



1,071.49 



206.09 
128.31 

487.74 



6,192.00 



786.11 
211.06 
38.12 
200.00 
219.74 

828.23 

435.00 



856.06 
501.87 
82.13 
253.78 
194.97 

1,975.98 

1,515.00 



Total operating costs and 
fixed charges 



10,898.23 



100,876.41 



89,883.40 



9,142.08 



22,886.14 



Net surplus. 
Net loss 



3,949.55 



4,249.40 



25,135.48 



1,643.57 



6,028.62 



Number of Consumers 



Domestic service 

Commercial light service . 
Power service 



Total 



318 
75 
14 

407 



1,691 

333 

49 

2,073 



2,033 

268 

38 

2,339 



190 

54 

5 

249 



583 
91 
12 

686 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



295 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Springfield 
401 


Stamford 
Twp. 
V.A. 


Stayner 
1,162 


Stirling 
984 


Stouffville 
1,295 


Stratford 
17,161 


$ c. 

2,273.20 

801.75 

1,253.15 


$ c. 

75,548.73 
14,812.65 
16,249.63 
2,715.57 
8,331.00 
1,192.34 
2,210.98 


$ c. 

6,456.78 
4,094.65 
2,780.93 
97.02 
1,462.00 

" "258^27 


$ c. 

6,942.69 

3,620.59 

1,207.38 

236.48 

1,747.08 

118.35 

519.45 


$ c. 

7,638.96 
4,162.82 
1,225.16 


$ c. 

150,950.81 

59,990.78 

55,081.00 

9,461 . 84 


611.50 


1,430.00 


16,944.87 
1,453.13 


185.62 


705.50 


11,462.59 


5,125.22 


121,060.90 


. 15,149.65 


14,392.02 


15,162.44 


305,345.02 


2,861.96 


51,397.83 
701.28 


7,782.84 


6,676.63 

240.00 

1.47 

697.45 


9,836.18 


180,100.87 
6,805.61 






4,359.93 


78.48 


9,915.51 

216.88 

2,753.98 

4,398.80 

1,688.35 
32.39 
4,272.18 
5,429.52 
2,394.63 
2,578.12 
2,197.13 

9,036.83 

10,866.00 

10,000.00 


909.63 


612.97 


10,579.21 
484.47 




133.20 
80.04 

270.27 


104.75 
5.84 

242.28 


289.84 
82.01 

216.38 


3,850 55 




3,028.18 


68.25 


2,472.74 
1,509.75 


377.86 

163.03 

4.88 


584.29 

412.54 

3.83 


651.38 

1,417.16 

98.06 

409.03 


784.16 

552.41 

49.71 


9,116.84 
9,140.58 
3,787.20> 
1,239.42 


80.31 






4,300.00' 


320.67 








1,154 50' 


481.00 


851.00 


1,147.00 


799.00 


19,547.00' 












4,436.44 


117,879.43 


11,027.64 


11,691.05 


13,222.66 


261,476.85 


688.78 


3,181.47 


4,122.01 


2,700.97 


1,939.78 


43,868.17 














135 

22 

4 


2,593 

162 

20 


335 

85 
17 


294 
70 
10 


420 

89 

6 


4,604 
604 
121 


161 


2,775 


437 


374 


515 


5,329' 



296 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Strathroy 
3,001 


Streets- 
ville 

707 


Sunder- 
land 
P.V. 


Sutton 
894 


Swansea 


Population 


7,110 






Earnings 

Domestic service 

Commercial light service 


$ c. 

25,120.13 

13,121.29 

16,564.22 

1,754.95 

4,439.03 


$ c. 

6,007.66 
2,244.77 
3,393.99 


$ c. 

3,088.90 

1,360.95 

377.59 


$ c. 

9.067,12 
3,557.22 
1,773.69 


$ c. 

66,639.66 
10,050.93 


Commercial power service 


23,417.39 


Municipal power 


2,188.46 


Street lighting 


1,517.00 


645.60 


1,862.92 


5,543.93 


Merchandise 




Miscellaneous 


1,211.87 


811.57 


92.50 


359.82 


2,739.35 






Total earnings 


62,211.49 


13,974.99 


5,565.54 


16,620.77 


110,579.72 






Expenses 
Power purchased 


36,885.36 
869.70 


6,089.58 
1,025.02 


3,145.08 


11,312.70 


68,743.28 


Substation operation 




Substation maintenance 








Distribution system, operation and 
maintenance 


1,269.39 
577.44 
536.94 

1,365.65 

1,040.79 


902.11 

74.18 

120.91 


295.29 


1,185.77 


3,343.87 


Line transformer maintenance .... 


294.18 


Meter maintenance 


5.70 


124.66 


1,110.04 


Consumers' premises expenses 

Street lighting, operation and main- 
tenance 


3,506.28 


88.05 


115.67 


336.48 


826.31 


Promotion of business 




Billing and collecting 


975.16 
2,735.08 
986.28 
740.69 
638.98 

2,686.00 

2,964.00 


1,071.41 

155.30 

47.32 


485.57 
113.35 


741.78 

235.15 

38.71 

289.05 


4,032.87 


General office, salaries and expenses.. 

Undistributed expenses 

Truck operation and maintenance . . . 
Interest 


2,232.08 
629.31 
644.58 


433.73 

689.66 

1,194.00 




2,346.41 


Sinking fund and principal payments 
on debentures . 






3,875.41 


Depreciation 


305.00 


840.00 


3,846.00 


Other reserves 
















Total operating costs and 
fixed charges 


54,271.46 


11,891.27 


4,465.66 


15,104.30 


95,430.62 






Net surplus 


7,940.03 


2,083.72 


1,099.88 


1,516.47 


15,149.10 


Net loss 
















Number of Consumers 
Domestic service 


890 

175 

32 


205 

48 
6 


149 

39 

o 

tu 


478 

77 

5 


2,109 


Commercial light service 

Power service . 


97 
16 






Total 


1,097 


259 


190 


560 


2,222 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



297 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Tara 

482 


Tavistock 
1,037 


Tecumseh 
2,794 


Teeswater 
846 


Thamesford 
P.V. 


Thamesville 

777 


Thedford 
573 


$ c. 

2,979.97 
1,552.97 
1,674.21 


$ c. 

8,612.44 
4,496.97 
9,043.85 

429.13 

1,317.60 

9.44 

402.77 


$ c. 

15,445.30 

5,244.16 

1,401.74 

288.55 

1,435.00 

181.96 

716.86 


$ c. 

4,512.13 
2,745.63 
2,208.89 
180.00 
1,029.00 


$ c. 

4,459.87 
1,394.58 
2,089.05 


$ c. 

3,807.74 
3,007.89 
1,866.21 
169.92 
1,332.62 


$ c. 

3,351.08 
2,465.15 
1,683.20 


821.12 


591.25 


1,110.00 


301.26 


354.01 


239.32 


580.56 


367.57 


7,329.53 


24,312.20 


24,713.57 


11,029.66 


8,774.07 


10,764.94 


8,977.00 


3,897.58 


18,020.56 


13,073.15 


5,979.57 


7,313.89 


6,531.65 


4,496.44 
















642.04 


514.05 

1.50 

384.29 

155.67 

212.08 


2,112.12 

16.66 

602.72 

1,271.18 

650.71 

43.85 

1,283.97 

1,454.26 

159.52 

240.14 


663.42 


333.63 


538.90 


295.26 
91 13 


5.75 


147.69 
160.17 

150.00 


264.13 
191.77 

110.56 


228.19 


82.40 


96.72 


249.11 


196.62 




1,110.72 

617.60 

35.93 




316.38 

132.02 

8.44 


353.70 

179.40 

12.13 


319 85 


411.07 
8.91 


729.50 


111.73 
9.82 










36.25 
354.06 
806.00 






















542.00 


2,212.00 


686.00 


380.00 


667.00 


399.00 


' 














5,604.07 


22,248.71 


23,120.28 


8,516.35 


9,050.82 


8,760.08 


6,002.25 


1,725.46 


2,063.49 


1,593.29 


2,513.31 




2,004.86 


2,974.75 




276.75 


















157 

35 

6 


300 

96 
9 


727 

58 

3 


236 

62 

5 


151 

36 

6 


243 

69 

6 


189 

49 

2 


198 


405 


788 


303 


193 


318 


240 



298 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Thornbury 
803 


Thorndale 
P.V. 


Thornton 
P.V. 


Thorold 
5,517 


Tilbury 


Population 


1,995 






Earnings 
Domestic service 


$ c. 

5,162.99 
3,023.22 
2,409.77 


$ c. 

1,951.98 

715.55 

1,181.55 


$ c. 

1,231.07 
453.27 
280.31 


$ c. 

22,166.27 
9,094.35 

54,938.75 
2,282.23 
3,819.27 


$ c. 
7,867.50 


Commercial light service 


7,408. 14 


Commercial power service 


32,305.79 


Municipal power 


225.00 


Street lighting. 


1,425.60 


384.00 


25.00 


1,875.00' 


Merchandise 




Miscellaneous . 




67.50 


75.00 


2,237.05 


1,336.26 








Total earnings 


12,021.58 


4,300.58 


2,064.65 


94,537.92 


51,017.69 






Expenses 
Power purchased 


3,951.67 
2,973.13 


3,007.31 


1,108.88 


67,168.34 
3,123.84 


37,982.44 


Substation operation 




Substation maintenance 








Distribution system, operation and 
maintenance 


954.10 


232.69 


186.34 


2,260.96 

30.81 

566.46 

159.48 

822.42 


1,212.28 


Line transformer maintenance 


20.80 


Meter maintenance 


117.51 


4.89 
3.50 

49.55 




707.59 


Consumers' premises expenses 






Street lighting, operation and main- 
tenance 


183.44 


86.26 


339.20 


Promotion of business 




Billing and collecting 


759.13 
219.33 
140.17 


185.36 
53.14 




2,428.95 
997.00 
260.37 
665.21 


817.26 


General office, salaries and expenses.. 
Undistributed expenses 


180.57 


996.20 
200.06 


Truck operation and maintenance . . . 






275.46 


Interest 


137.58 
674.24 
816.00 


28.25 
134.38 
251.00 






Sinking fund and principal payments 
on debentures 








Depreciation 


301.00 


2,353.00 


1,192.00 


Other reserves 


3,000.00 














Total operating costs and 
fixed charges 


10,926.30 


3,950.07 


1,863.05 


80,836.84 


46,743.29 






Net surplus 


1,095.28 


350.51 


201.60 


13,701.08 


4,274.40 


Net loss 
















Number of Consumers 
Domestic service 


261 
65 
11 


86 

21 

2 


68 

13 

2 


1,286 

163 

18 


521 


Commercial light service 


129 


Power service 


16 






Total 


337 


109 


83 


1,467 


666. 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



299 



"B '— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



TillsonbUrg 
4,031 


Toronto* 
676,887 


Toronto Twp. 
V.A. 


Tottenham 
454 


Trafalgar 

Twp. 
No. 1 V.A. 


Trafalgar 

Twp. 
No. 2 V.A. 


$ c. 

22,250.73 

21,350.11 

15,805.13 

1,685.22 


$ c. 

4,198,627.30 
2,929,153.15 
4,817,810.27 
1,408,714.53 

446,546.67 
14,452.74 

440,307.04 


$ c. 

101,064.03 
25,051.51 
10,275.98 

"5,973^78 


$ c. 

3,534.44 

1,082.39 

1,552.32 

221.35 

868.16 

1.41 

103.67 


$ c. 

19,572.00 
1,017.71 
2,706.78 


$ c. 

6,774.09 
915.45 
174.07 


5,021.13 






354.78 






770.62 


3,360.97 


552.96 


235.54 


67,237.72 


14,255,611.70 


145,726.27 


7,363.74 


23,849.45 


8,099.15 


37,406.00 
1,306.61 


*7,973,627.46 
228,942.78 
321,562.17 

382,682.18 

53,015.46 

121,274.10 

275,468.38 

134,923.98 
130,799.90 
451,484.25 
380,954.32 
329,236.94 


83,906.88 


4,152.39 


12,459.87 


5,029.18 












2,674.81 

14.57 

926.72 

339.94 


5,953.23 
742.27 
912.31 
282.81 

1,091.61 


589.92 
" 72.65 


2,537.54 

68.43 

158.05 

237.47 


976.25 

51.43 

7.50 


993.54 


119.42 










2,764.65 


9,699.29 
8,729.23 

593.88 
2,186.20 

601.82 

1,517.21 
9,094.00 


417.09 
221.80 


1,542.88 
374.18 
405.29 
530.30 




4,676.13 
214.86 


755.94 
25.21 


218.69 






342.96 


528,174.50 

607,485.38 

1,149,345.22 

1800,000.00 


108.78 
711.34 
415.00 


329.93 


392.86 




960.39 


4,514.00 
5,000.00 


1,175.00 


562.00 












61,786.34 


13,868,977.02 


125,310.74 


6,808.39 


19,489.01 


8,697.83 


5,451.38 


386,634.68 


20,415.53 


555.35 


4,360.44 






598.68 














1,278 

262 

38 


155,112 

24,330 

5,289 


3,305 

220 

34 


176 

38 

8 


415 
6 
8 


170 

20 

2 


1,578 


184,731 


3,559 


222 


429 


192 



* Includes 1945 cost adjustment. 

f Provision for renovation of street lighting system and other capital assets. 



300 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Trenton 
9,849 


Tweed 
1,250 


Uxbridge 
1,439 


Victoria 

Harbour 

894 


Walkerton 


Population 


2,723 






Earnings 
Domestic service 


$ c. 

41,473.91 

21,646.76 

84,362.92 

4,880.79 

8,721.98 


$ c. 

7,553.87 

5,142.10 

4,786.91 

374.41 

1,982.77 

214.19 

329.75 


$ c. 

10,337.74 

4,561.41 

2,700.48 

484.73 

1,798.95 

40.14 

197.50 


$ c. 

3,900.49 
946.72 


$ c. 
20,453.59" 


Commercial light service 


13,197.74 


Commercial power service 


10,776.21 


Municipal power 


106.66 
663.00 


514.29 


Street lighting . 


2,923 86 


Merchandise 




Miscellaneous 


3,178.20 


122.20 








Total earnings. . 


164,264.56 


20,384.00 


20,120.95 


5,739.07 


47,865.69 






Expenses 
Power purchased . . 


92,005.97 


10,630.07 


12,498.71 


2,154.62 


23,713 66 


Substation operation 




Substation maintenance 


29.87 

2,047.03 

294.97 

3,739.85 

1,158.70 

853.66 
52.17 
4,551.92 
6,925.34 
2,053.14 
1,158.98 










maintenance 


815.19 


760.59 


302.49 


1,992.77 


Line transformer maintenance. . 


284 01 


Meter maintenance 


310.22 


204.86 
171.30 

174.47 


169.35 


314.06 


Consumers' premises expenses 

Street lighting, operation and main- 
tenance 


52.17 


355.38 


192.90 


364.20 


Promotion of business. . . 


150 71 


Billing and collecting 


847.54 

235.37 

11.44 


553.49 

766.20 

11.89 


759.94 
343.43 


1,421.99 


General office, salaries and expenses. . 
Undistributed expenses 


1,612.61 
268.68 


Truck operation and maintenance . . . 
Interest . 




4.72 








1,016 33 


Sinking fund and principal payments 
on debentures 










3,592.70 


Depreciation ". . 


7,784.00 


794.00 


637.00 


414.00 


2,198.00 


Other reserves 
















fixed charges 


122,655.60 


13,999.21 


15,778.51 


4,336.73 


36,986.61 






Net surplus 


41,608.96 


6,384.79 


4,342.44 


1,402.34 


10,879.08 


Net loss 
















Number of Consumers 
Domestic service 


1,880 

277 

55 


334 
80 
15 


447 
92 
12 


281 
29 

1 


701 


Commercial light service 


137 


Power service 


19 






Total 


2,212 


429 


551 


311 


857 




1 







1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



301 



"B" — Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Wallace- 
burg 
5,088 


Wardsville 
226 


Warkworth 
P.V. 


Waterdown 
916 


Waterford 
1,352 


Waterloo 
9,460 


Watford 

972 


$ c. 

27,577.27 

19,208.22 

126,913.40 

4,064.43 


$ c. 

1,458.23 

947.79 

37.67 


$ c. 

2,592.65 

1,516.11 

122.24 


$ c. 

6,181.10 
1,646.71 
•1,406.47 
104.83 
1,092.50 


$ c. 

7,531.25 
3,926.37 
4,541.29 
333.20 
1,518.00 


$ c. 

69,958.26 

27,010.74 

72,617.19 

3,187.85 

8,054.62 


$ c. 

8,464.89 

4,144.75 

4,528.72 

311 90 


4,991.04 
2,926.95 


666.00 


611.28 


1,633.44 


2,728.17 


155.24 


194.75 


300.36 


510.56 


3,627.56 


648.72 


188,409.48 


3,264.93 


5,037.03 


10,731.97 


18,360.67 


184,456.22 


19,732.42 


128,900.26 
422.06 


1,643.29 


2,667.16 


6,454.35 


11,522.46 


135,583.34 
1,631.16 
. 906.71 

4,902.11 

993.48 

1,961.00 

1,567.47 

1,434.80 


12,186.78 














4,347.66 
676 97 


180.39 


187.79 


942.60 


1,519.38 

55.64 

131.99 


1,427.10 
24 75 


1,806 79 




24.16 


178.75 


116 75 


11.00 


33.71 
42.55 


213 84 


1,115.65 
222.50 


37.57 


205.25 


262.90 


208.68 


2,569.36 
5,366.07 
1,480 25 


100.95 

66.90 

0.77 


221.90 
49.28 


691.75 

192.07 

39.96 


698.65 

299.13 

93.39 

300.00 


4,338.44 

2,978.35 

433.41 

588.64 


692.59 

832.40 

41 41 


1,236.67 




375 71 


170.85 




353.41 
446.23 
212.00 






2,830.82 












7,627.00 
12,500.00 


227.00 


1,072.00 


840.00 


8,868.00 


789.00 
















171,283.91 


2,295.56 


4,199.50 


9,776.73 


15,723.54 


166,186.91 


16,909.01 


17,125.57 


969.37 


837.53 


955.24 


2,637.13 


18,269.31 


2,823.41 
















1,520 

237 

52 


68 

18 

1 


137 
36 

1 


280 
36 
10 


414 
78 
15 


2,358 

267 
71 


307 

83 

8 


1,809 


87 


174 


326 


507 


2,696 


398 



302 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 



SOUTHERN ONTARIO SYSTEM— Continued 



Municipality 


Waubau- 
shene 
P.V. 


Welland 
15,780 


Wellesley 
P.V. 


Welling- 
ton 
909 


West 


Population . . 


Lome 
791 






Earnings 
Domestic service 


$ c. 

3,621.69 

876.13 

34.80 

158.10 

495.80 


$ c. 

57,133.16 

44,419.39 

214,119.41 

3,326.83 

16,423.54 


$ c. 

2,594.73 
1,464.29 
1,238.31 


$ c. 

6,798.54 
3,015.55 
2,887.40 


$ c. 
3,990.03 


Commercial light service . . . . : 


3,391.05 


Commercial power service 


5,040.70 


Municipal power 




Street lighting 


660.00 


1,075.50 


1,069.98 


Merchandise. 




Miscellaneous 


6.31 


10,033.03 


219.11 


360.00 


547.42 






Total earnings 


5,192.83 


345,455.36 


6,176.44 


14,136.99 


14,039.18 






Expenses 
Power purchased 


2,775.87 


239,686.62 

8,383.21 

750.45 

7,349.60 
2,093.26 
6,395.39 
3,722.70 

3,504.02 


3,725.33 


7,006.22 


8,260 13 


Substation operation 




Substation maintenance 










Distribution system, operation and 
maintenance 


200.77 


224.86 
24.75 
97.54 
33.96 

48.10 


937.72 


479.28 


Line transformer maintenance 




Meter maintenance 


150.42 


61.15 


33 66 


Consumers' premises expenses 


41.60 


Street lighting, operation and main- 
tenance 

Promotion of business 


126.49 


127.59 


161.39 


Billing and collecting 


270.80 

274.28 


7,494.00 
9,039.38 
929.02 
1,236.03 
1,305.33 


286.50 

163.67 

20.57 


526.20 
250.55 
287.87 
322.92 
171.54 

595.26 

694.00 


928 85 


General office, salaries and expenses. . 
Undistributed expenses 


240.36 


Truck operation and maintenance . . . 






Interest 








Sinking fund and principal payments 
on debentures 








Depreciation 


510.00 


12,960.00 


303.00 


619 00 


Other reserves 
















Total operating costs and 
fixed charges 


4,308.63 


304,849.01 


4,928.28 


10,981.02 


10,764.27 






Net surplus 


884.20 


40,606.35 


1,248.16 


3,155.97 


3,274.91 


Net loss 
















Number of Consumers 
Domestic service 


239 

22 

2 


3,283 

468 

93 


138 

44 

6 


341 
68 
10 


236 


Commercial light service 


55 


Power service 


8 






Total 


263 


3,844 


188 


419 


299 







1946 THE HYDRO-ELECTRIC POWER COMMISSION 



303 



"B" — Continued 

Hydro Municipalities for Year Ended December 31, 1945 






Weston 
6,333 


Westport 
663 


Wheatley 
716 


Whitby 
4,641 


Wiarton 
1,709 


Williams- 
burg 
P.V. 


Winchester 
959 


$ c. 

60,332.57 
14,704.78 
70,409.80 


$ c. 

4,151.71 
2,911.88 


$ c. 

3,698.19 
3,833.96 
2,665.15 
504.88 
1,879.50 


$ c. 

32,807.57 

14,363.73 

18,379.96 

1,993.18 

4,994.04 


$ c. 

7,888.01 
.7,367.19 
4,988.40 
2,618.23 
2,174.13 


$ c. 

1,788.81 

1,994.26 

296.12 


$ c. 

7,247.66 
4,748.49 
2,018 69 


857.81 






7,551.24 


1,009.43 


326.40 


944.00 


590.87 


295.12 


293.00 


1,660.30 


578.30 


714.04 


457.76 


154,447.07 


8,368.14 


12,874.68 


74,198.78 


25,614.26 


5,119.63 


15,416.60 


110,602.62 


4,055.64 


7,673.00 


32,239.25 
473.15 


13,163.62 


2,773.72 


9,089.65 


603.85 












7,140.01 
602.10 


326.01 
28.15 
27.13 


842.40 


3,277.38 
923.58 
672.12 
419.74 

1,411.12 


1,795.63 

84.66 

206.54 


201.13 


666.92 


287.28 
1,326.78 


119.00 
157.14 

342.67 


39.25 
207.76 

31.78 


304.12 
121.23 


1,711.68 


108.19 


498.15 


105.74 


1,888.78 

3,127.20 

601.41 


770.75 

349.73 

31.41 


496.97 

322.50 

47.09 


2,596.59 

2,455.85 

934.24 

228.51 

330.25 

2,589.03 

4,494.00 


890.64 
540.99 
266.38 
151.28 
969.83 

2,031.24 

1,226.00 


495.28 
109.55 


745.36 
323.80 


497.53 






65.00 


393.08 
862.86 
352.00 
















7,773.00 


1,071.00 


206.00 


579.00 
















136,227.24 


7,304.95 


11,071.77 


53,044.81 


21,824.96 


4,064.47 


11,935.82 


18,219.83 


1,063.19 


1,802.91 


21,153.97 


3,789.30 


1,055.16 


3,480.78 
















1,737 

192 

33 


158 

51 


246 
76 

7 


1,065 

167 

28 


461 

307 

19 


92 

35 

1 


312 

85 

3 








1,962 


209 


329 


1,260 


587 


128 


400 



304 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 

SOUTHERN ONTARIO SYSTEM— Continued 



Municipality. 
Population. . 



Winder- 
mere 
100 



Windsor 
117,031 



Wingham 
2,051 



Wood- 
bridge 
1,089 



Earnings 

Domestic service 

Commercial light service . . 
Commercial power service 

Municipal power 

Street lighting 

Merchandise 

Miscellaneous 



Total earnings . 



Expenses 

Power purchased 

Substation operation. . 

Substation maintenance 

Distribution system, operation and 
maintenance 

Line transformer maintenance 

Meter maintenance 

Consumers' premises expenses 

Street lighting, operation and main- 
tenance 

Promotion of business 

Billing and collecting 

General office, salaries and expenses. . . 

Undistributed expenses 

Truck operation and maintenance 

Interest 

Sinking fund and principal payments 
on debentures 



Depreciation. . 
Other reserves . 



Total operating costs and 
fixed charges 



Net surplus. 
Net loss. . . . 



2,567.00 
561 . 42 
709.04 



325.00 



735,692.16 
427,653.53 
711,433.40 
19,345.02 
113,432.38 



44,378.09 



4,162.46 



2,051,934.58 



1,817.90 



144.56 



4.20 



31.75 



226.50 
6.07 



182.47 
719.05 
480.00 



3,612.50 



549.96 



1,192,905.33 
52,161.77 
25,831.80 

76,955.37 
17,347.35 
39,875.57 
54,828.64 

65,103.02 
8,741.31 
65,274.66 
57,644.87 
11,455.26 
18,979.18 
18,808.33 

45,630.32 

165,011.00 



14,701.67 

10,005.23 

17,848.03 

1,228.16 

3,295.81 

2,391.19 

48.43 



49,518.52 



23,563.01 
2,598.05 



1,916,553.78 



135,380.80 



2,507.84 

187.58 

495.83 

95.78 

674.42 



831.40 
759.28 
742.10 
617.75 
1,132.77 

2,040.68 

4,327.00 



40,573.49 



8,945.03 



$ . c 

8,229.90 

2,126.50 

9,276.11 

809.12 

999.26 



344.60 



21,785.49 



16,931.47 



217.72 



84.49 
171.05 

65.88 



830.99 

24.76 



78.19 
554.35 
738.00 



19,696.90 



2,088.59 



Number of Consumers 



Domestic service 

Commercial light service . 
Power service 



Total 



27,274 

3,367 

513 

31,154 



597 

194 

24 

815 



323 

47 
9 

379 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



305 



"B"— Continued 

Hydro Municipalities for Year Ended December 31, 1945 



Woodstock 
12,916 


Woodville 
381 


Wyoming 
480 


York Twp. 
V.A. 


Zurich 
P.V. 


SOUTHERN 
ONTARIO 
SYSTEM 

SUMMARY 


$ c. 

92,155.55 

58,545.57 

105,319 42 


$ c. 

2,417.16 
944.90 
685.16 


$ c. 

2,728.14 

1,575.01 

933.29 


$ c. 

498,427.95 
78,586.61 

164,093.98 

7,157.08 

46,354.65 


$ c. 

3,907.94 
3,333.56 


$ c. 

14,726,973.82 

7,740,433.31 

15,061,009 18 


7,449.96 




2,045,242 76 


9,068.04 


434.39 


688.50 


679.34 


1,828,314.89 
65,590 57 


3,600.50 


165.84 


78.00 


9,916.51 


269.82 


1,051,138.75 


276,139.04 


4,647.45 


6,002.94 


804,536.78 


8,190.66 


42,518,703.28 


204,007.36 
6,043.11 


2,493.78 


3,722.02 


412,490.28 
3,603.25 
2,508.28 

13,382.04 

5,971.11 

15,779.06 

11,923.26 

8,106.67 


4.950.67 


25,407,828.00 
603 321 88 








422,715 87 


5,114.85 
97.97 


• 
283.80 

" " 167 .'87 


248.91 
67.45 
72.20 


219.66 


1,190,737.73 
148,336 76 


3,803.44 
1,309.21 


11.28 


440,038.56 
573 222 84 


3,784.14 
2,135.50 


149.92 


118.83 


230.16 


460,850.11 
168 519 27 


5,111.86 
4,111.14 
2,329.62 


404.59 
97.85 


252.49 

131.79 

7.81 


42,630.92 

33,109.34 

6,220.09 


274.72 

119.95 

6.88 


1,223,899.20 

1,145,863.81 

617 571 66 


1,762 88 




116,663.66 
689 515 64 






3.84 


3,739.20 
17,300.05 
43,111.00 


60.49 
332.12 
370.00 






1,221,323.59 
2,636,651.49 
1,189,541.62 


11,733.00 
20,775.00 


210.00 


377.00 












272,119.08 


3,807.81 


5,002.34 


619,874.55 


6,575.93 


38.256,601.69 


4,019.96 


839.64 


1,000.60 


184,662.23 


1,614.73 


4,262,101.59 














3,478 
481 
101 


122 

23 

2 


172 

44 

4 


22,430 

1,015 

198 


148 
45 


563,693 
77,191 
13,882 








4,060 


147 


220 


23,643 


193 


654,766 



306 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 
Detailed Operating Reports of Electrical Departments of 






THUNDER BAY SYSTEM 



Municipality. 
Population. . 



Earnings 



Domestic service 

Commercial light service. . 
Commercial power service 

Municipal power 

Street lighting 

Merchandise 

Miscellaneous 



Total earnings . 



Expenses 



Power purchased 

Substation operation 

Substation maintenance 

Distribution system, operation and 
maintenance 

Line transformer maintenance 

Meter maintenance 

Consumers' premises expenses 

Street lighting, operation and main- 
tenance 

Promotion of business 

Billing and collecting 

General office, salaries and expenses. . . 

Undistributed expenses 

Truck operation and maintenance 

Interest 

Sinking fund and principal payments 
on debentures : 



Depreciation. . 
Other reserves . 



Total operating costs and 
fixed charges 



Net surplus. 
Net loss 



Fort William 
28,642 



$ c. 

270,017.78 

103,111.48 

74,593.06 

34,714.54 

20,871.57 



6,305.79 



509,614.22 



301,283.93 

8,888.58 

273.37 

10,429.57 
1,986.30 
7,327.82 
7,567.85 

8,011.77 

24.75 

22,533.17 

15,391.03 



13,843.75 
5,254.84 

22,668.00 
1,000.00 



426,484.73 



83,129.49 



Nipigon 
Twp. 
V.A. 



5,926.07 

4,672.80 

373.28 

396.14 

775.00 



287.43 



12,430.72 



5,814.85 



786.90 

22.52 

217.54 



127.52 



978.12 
37.36 



872.00 
1,000.00 



9,856.81 



2,573.91 



Port Arthur 
24,469 



$ 



c. 



158,657.24 
95,397.99 

315,915.47 
34,889.77 
29,293.62 



27,359.59 



661,513.68 



434,651.29 

31,734.16 

484.33 

17,306.08 
1,738.31 
9,252.38 



6,185.90 

2,365.32 

17,501.74 

12,397.23 

12,988.45 

1,391.10 



32,214.15 
3,000.00 



583,210.44 



78,303.24 



THUNDER 

BAY 

SYSTEM 

SUMMARY 



$ c. 

434,601.09 

203,182.27 

390,881.81 

70,000.45 

50,940.19 



33,952.81 



1,183,558.62 



741,750.07 

40,622.74 

757.70 

28,522.55 
3,747.13 

16,797.74 
7,567.85 

14,325.19 
2,390.07 
40,034.91 
28,766.38 
13,025.81 
1,391.10 
13,843.75 

5,254.84 

55,754.15 

5,000.00 



1,019,551.98 



164,006.64 



Number of Consumers 



Domestic service 

Commercial light service 
Power service 



7,506 

1,094 

124 



261 

54 
4 



6,339 
919 
120 



14,106 

2,067 

248 



Total 



8,724 



319 



7,378 



16,421 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



307 



"B"— Concluded 

Hydro Municipalities for Year Ended December 31, 1945 



NORTHERN ONTARIO DISTRICTS 



Capreol 
1,675 


North Bay 
15,827 


Sioux Lookout 
1,723 


Sudbury 
35,372 


NORTHERN 
ONTARIO 
DISTRICTS 
SUMMARY 


ALL 

SYSTEMS 

GRAND 

SUMMARY 


$ c. 

9,518.93 
3,636.06 


$ c. 

100,905.09 

58,933.77 

47,915.94 

6,432.03 

11,308.66 


$ c. 

19,809.60 

13,220.79 

1,423.32 


$ c. 

251,336.75 

131,517.70 

42,855.64 

11,648.39 

28,556.89 


$ c. 

381,570.37 

207,308.32 

92,194.90 

18,819.03 

43,026.05 


$ c. 

15,543,145.28 

8,150,923.90 

15,544,085.89 


738.61 


2,134,062.24 


1,260.00 


1,900.50 


1,922,281.13 
65,590.57 


294.63 


7,477.90 


884.81 


3,970.12 


• 12,627.46 


1,097,719.02 


15,448.23 


232,973.39 


37,239.02 


469,885.49 


755,546.13 44,457,808.03 


9,121.95 
43 17 


148,304.38 
2,933.47 


27,859.45 


298,302.85 
7,384.20 


483,588.63 
10,360.84 


26,633,166.70 
654,305.46 






423,473.57 


1,917.71 


5,186.93 
519.86 

3,632.07 
342.01 

2,304.80 
36.91 
10,336.45 
8,542.62 
3,865.91 
1,044.13 
3,166.67 

18,000.00 

17,966.00 


1,175.80 

20.10 

258.21 


15,840.64 

2,616.97 

9,219.34 

470.50 

8,848.14 

117.64 

26,738.71 

16,452.22 

6,012.88 

3,841.94 

3,774.88 

11,247.14 

24,995.00 

22,280.57 


24,121.08 

3,156.93 

13,366.88 

812.51 

12,389.90 

154.55 

41,608.37 

27,285.60 

10,234.28 

5,665.45 

6,941.55 

29,247.14 

44,501.00 

22,280.57 


1,243,381.36 
155,240.82 


257.26 


470,203.18 
581,603.20 


884.30 


352.66 


487,565.20 
171,063.89 


1,413.19 
992.55 
193.41 
306.34 


3,120.02 

1,298.21 

162.08 

473.04 


1,305,542.48 

1,201,915.79 

640,831.75 

123,720.21 

710,300 94 






1,255,825 57 


1,023.00 


517.00 


2,736,906.64 
1,216.822,19 










16,152.88 


226,182.21 


35,236.57 


458,143.62 


735,715.28 


40,011,868.95 




6,791.18 


2,002.45 


11,741.87 


19,830.85 


4,445,939.08 


704.65 
















354 

50 

1 


3,424 

662 

89 


520 

88 

2 


8,626 

1,060 

117 


12,924 

1,860 

209 


590,723 
81,118 
14,339 


405 


4,175 


610 


9,803 


14,993 


686,180 



308 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT "C" 



Street Lighting Installation in Hydro Municipalities 



Due to restrictions and changes resulting from orders of the 
Dominion Power Controller and economies effected by municipal 
co-operative action, which in many municipalities continued until 
the end of the war to modify the Street Lighting provided, statistics 
relating to Street Lighting are not presented in this year's Annual 
Report. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 309 



STATEMENT "D" 

(pages 310 to 327) 

Statistics relating to the Supply of Electricical Energy to Consumers 

in Ontario Urban Municipalities Served by 

The Hydro-Electric Power Commission 

for the year 1945 



STATEMENT "E" 

(pages 328 to 345) 

Cost of Power to Municipalities and Rates to Consumers for 

Domestic Service — Commercial Light Service — Power Service 

in Ontario Urban Municipalities Served by 

The Hydro-Electric Power Commission 

for the year 1945 



310 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

STATEMENT "D" 

Statistics Relating to the Supply of Electrical Energy to 

Consumers in Urban Municipalities Served by 

The Hydro-Electric Power Commission 

Regarding the results of Hydro operation from the standpoint of the 
consumers, the following tabulation gives much useful and interesting infor- 
mation. For each main class of service in each urban municipal utility receiv- 
ing power at cost from the Commission, Statement "D" lists the revenue, the 
consumption and the number of consumers, together with unit average costs 
and consumptions and other pertinent data. 

The policy and practice of the Commission has been, and is, to make as 
widespread and beneficial a distribution of electrical energy as possible, and to 
extend to every community that can economically be reached by transmission 
lines, the benefit of electrical service. Even where, in certain localities, by 
reason of the distance from a source of supply or on account of the small 
quantity of power required by the municipality, the cost per horsepower to 
the municipality — and, consequently, the cost of service to the consumer — 
must unavoidably be higher than in more favourably situated communities, 
service has not been withheld when the consumers were able and willing to 
pay the cost. 

The accompanying diagram summarizes graphically certain data of 
Statement "D" respecting the average cost to the consumer. It will be 
observed that the total amount of energy sold in municipalities where circum- 
stances necessitate rates which result in the higher average costs to the con- 
sumer is relatively insignificant. With respect to power service, it should be 
noted that the statistics of Statement "D", and of the diagram, cover mainly 
retail power service supplied to the smaller industrial consumers. The aver- 
age amount of power taken by the industrial consumers served by the 
municipalities is about 45 horsepower. The Commission serves certain 
large power consumers direct on behalf of the systems of municipalities. 

It should be kept in mind that the revenues reported in Statement "D", 
and used for purposes of calculating the net unit costs to the consumer, are 
the total revenues contributed by the consumers, and provide, in addition to 
the cost of power, sums specifically applicable to the retirement of capital, 
and also operating surplus which is in part applied to retirement of capital 
or extension of plant and is in part returned in cash to the consumers. 

It should also be noted that average costs per kilowatt-hour or per horse- 
power if employed indiscriminately as a criterion by means of which to com- 
pare the rates or prices for electrical service in various municipalities, will give 
misleading results. The average cost per kilowatt-hour, as given in State- 
ment "D" for respective classes of service in each municipality, are statistical 
results obtained by dividing the respective revenues by the aggregate kilowatt- 
hours sold. As such, the data reflect the combined influence of a number 
of factors, of which the rates or prices to consumers are but one factor. Owing 
to the varying influence of factors other than the rates, it is seldom found that 
in any two municipalities the average cost per kilowatt-hour to the consumers, 
even of the same classification, is in proportion to the respective rates for ser- 
vice. Instances even occur where for a class of consumers in one municipality, 
the average costs per kilowatt-hour are substantially lower than for the same 
class in another municipality, even though the rates are higher. 






1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



311 



COST OF ELECTRICAL SERVICE TO CONSUMERS 

IN MUNICIPALITIES SERVED BY 

THE HYDRO-ELECTRIC POWER COMMISSION OF ONTARIO 



DOMESTIC SERVICE 




THE AREAS OF THE CIRCLES REPRESENT PROPORTIONATELY THE 
TOTAL KILOWATT-HOURS SOLD FOR DOMESTIC SERVICE IN 
MUNICIPALITIES WHERE THE AVERAGE CHARGE TO CONSUMERS 
INCLUSIVE OF ALL CHARGES IS. PER KILOWATT-HOUR: 



1 .6 TO 2.9 CENTS 



3 .'4 

PER CENT 



o 



3.0 


CENTS 


OR 


MORE 




0.1 


PER 


CENT 



COMMERCIAL LIGHT SERVICE 




THE AREAS OF THE CIRCLES REPRESENT PROPORTIONATELY THE 
TOTAL KILOWATT-HOURS SOLD FOR COMMERCIAL LIGHT SERVICE 
N MUNICIPALITIES WHERE THE AVERAGE CHARGE TO CONSUMERS 
NCLUSIVE OF ALL CHARGES IS. PER KILOWATT-HOUR: 

2.0 TO 3.9 CENTS 



3.3 

PER CENT 

o 



4.0 


CENTS 


OR 


MORE 




0.1 


PER 


CENT 



POWER SERVICE SUPPLIED BY MUNICIPALITIES 



THE AREAS OF THE CIRCLES REPRESENT PROPORTIONATELY THE AGGREGATE HORSEPOWER 
SOLD FOR POWER SERVICE IN MUNICIPALITIES WHERE THE AVERAGE CHARGE TO CONSUMERS 
INCLUSIVE' OF ALL CHARGES IS. PER HORSEPOWER PER YEAR: 



$30 OR MORE 





0.1 

PER CENT 






312 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



With respect to domestic service, for example, instances may be observed 
where two municipalities have identical prices or rates for domestic service, 
but the average cost per kilowatt-hour to the consumer varies by as much as 
50 per cent or more. Such variations are due principally to differences in the 
extent of utilization of the service for the operation of electric ranges, water 
heaters and other appliances, an indication of which is afforded by the statis- 
tics of average monthly consumption. 

In the case of power service, average unit costs are still less reliable as an 
indication of the relative rates for service in different municipalities. In the 
case of hydro-electric power supplied to industries at cost, the rate schedules 
incorporate charges both for demand and for energy consumption, and thus, 
although the quantity of power taken by a consumer — that is, the demand 
as measured in horsepower— is the most important factor affecting costs and 
revenues, it is not the only one. The number of hours the power is used in 
the month or year— which, in conjunction with the power, determines the 
energy consumption, as measured in kilowatt-hours — also affects the costs 
and revenues. Consequently, in two municipalities charging the same rates 
for power service, the average cost per horsepower to the consumer will vary 
in accordance with the consumers' average number of hours use of the power 
per month. A greater average energy consumption per horsepower increases 
the average cost per horsepower and decreases the average cost per kilowatt- 
hour to the consumer, and vice versa. * 

*In view of the fact that the data of Statement "D" have been misinterpreted in the making 
of certain comparisons as to the cost of electricity in various territories, it is desirable to add 
a word of caution respecting their significance. Essentially, the average cost or revenue per 
kilowatt-hour is not a criterion of rates even with similar forms of rate schedules and for the same 
class of service. Particularly is this true when revenues and consumptions of all classes of service 
and of all kinds of rate schedules, are indiscriminately lumped together in order to deduce a 
so-called ''average cost or rate per kilowatt-hour" for all services. 

In one community rates for each class of service, and the cost to every consumer in each class for 
any given service and consumption, may be substantially higher than in another community, and yet 
there may be in the former community a lower "average revenue per kilowatt-hour" 

Example. — Assume sales of electrical energy by two electric utilities, A and B, in each case 
10,000,000 kilowatt-hours. 



Class 
of 


Case A 
Higher rates and lower revenues 
per kilowatt-hour 


Case B 
Lower rates and higher revenues 
per kilowatt-hour 




Energy 
sales 


Rate per 

kw-hr. 


Revenue 


Energy 
sales 


Rate per 
kw-hr. 


Revenue 


Residence 


kw-hr. 
1,000,000 
9,000,000 


cents 
A 
1 


$ 
40,000 
90,000 


kw-hr. 
3,000,000 
7,000,000 


cents 
3 
0.75 


$ 

90,000 


Power 


52,500 






Total 


10,000,000 




130,000 


10,000,000 




142,500 






Average revenue.. . . 


1 . 3 cents per kw-hr. 


1 . 425 cents per kw-hr. 



It will be observed that in Case A the rates both for residence and for power service are 33 
per cent higher than in Case B, but the average revenue per kilowatt-hour is nearly 9 per cent less. 

In this instance, the explanation lies in the relative quantities of energy sold to each class. 
Service to large power consumers entails a smaller capital investment in distribution lines and 
equipment and lower operating costs per kilowatt-hour delivered, than does service to domestic 
and to commercial light consumers, and even where the rates for all classes of service are low, 
produces a smaller average revenue per kilowatt-hour. Consequently, if one electrical utility 
as compared with another sells a larger proportion of its energy for power purposes, its "average 
revenue per kilowatt-hour" may easily be lower than that of the other utility even though its 
rates for every class of service are substantially higher. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 313 

Although the derived statistics of Statement "D" are valueless as a means 
of comparing the rates in one municipality with those in another, they never- 
theless fulfil a function in affording a general measure of the economy of service 
to consumers in the co-operating Ontario municipalities — an economy that 
has resulted primarily from the low rates themselves, and secondarily from 
the extensive use of the service that has been made possible by the low rates. 

Actual bills rendered to typical consumers for similar service under 
closely comparable circumstances constitute the best basis for making com- 
parisons. In researches respecting rates to consumers therefore the actual 
rates schedules of Statement "E" should be employed and not statistics of 
average revenues per kilowatt-hour, as these are valueless for rate comparisons 
— and particularly so when all classifications of service are combined. 

In any consideration of the relative economies of electrical service in the 
various municipalities — whether based on the actual rates for service as set 
forth in Statement "E", or on the derived statistics resulting from the rates 
and other factors as presented in Statement "D" — full account should be 
taken respectively of the influence upon costs of such factors as the size of 
the municipality, the distance from the source of power, the features of the 
power developments, the sizes and concentrations, of adjacent markets for 
electricity, and the sizes and characters of the loads supplied under the 
various classifications by the local electrical utility to the consumers. 

In Statement "D" account has been taken of the sizes of municipalities by 
grouping them according to whether they are (i) cities — over 10,000 popula- 
tion; (ii) towns of 2,000 to 10,000 population; or (iii) small towns less than 
2,000 population, villages, and suburban areas in townships (which are com- 
parable in respect of conditions of supply to the smaller towns and villages). 
The populations are also given, and the situation of any municipality with 
respect to transmission lines and power supplies may be ascertained by con- 
sulting the maps at the end of the Report. 

A feature of the electrical service in Ontario municipalities served by The 
Hydro-Electric Power Commission is the strikingly large average annual con- 
sumption per domestic consumer. Of the 94 cities and towns with popula- 
tions of 2,000 or more — in which over 85 per cent of the domestic consumers 
of the undertaking are served — no less than 93 have an average annual con- 
sumption per domestic consumer in excess of 1,000 kilowatt-hours; of these, 
77 have an average annual consumption per domestic consumer in excess of 
1,500 kilowatt-hours, 51 in excess of 2,000 kilowatt-hours, and 12 in excess of 
3,000 kilowatt-hours. In addition 128 smaller urban municipalities have an 
average annual consumption per domestic consumer exceeding 1,000 kilowatt^ 
hours, including 31 in excess of 2,000 kilowatt-hours. 

The high average consumption for domestic service results essentially 
from the policy of the undertaking in providing service "at cost"; the rate 
schedules designed according to this principle automatically encourage liberal 
use of the service. Under the standard rate schedules employed by Ontario 
municipalities, follow-up rates of 0.8 to 1.2 cents (less 10 per cent) are in 
common use, and as a rule even where the higher initial rates per kilowatt- 
hour obtain, it is only necessary for the domestic consumer to reach a monthly 
charge of from $2.00 to $3.00 to obtain the benefit of a follow-up rate of 1.8 
cents net or less. The cost of electric cooking is thus within reach of most of 
the domestic consumers in Ontario. Electric water heating is also encouraged 
by low flat rates for continuous heaters and by installation of equipment 
without capital cost to the consumer. In 1941, war conditions made neces- 
sary the suspension of new installations for water heating. 



314 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Statistics Relating to the Supply of Electrical Energy to Consumers 
For Domestic Service, for Commercial Light Service 

Group I— CITIES 



Municipality 



System 



Popula- 
tion 



Domestic service 



Revenue 



Consumption 





a 




Number 






of 


>*& 


>. 


con- 
sumers 


gel 


&2 




5 o g 






4™ 


>ux 



Belleville 

Brantford. . . 

Chatham 

Fort William 
Gait 



Guelph. . . 
Hamilton. 
Kingston: 
Kitchener . 
London. . 



Niagara Falls 
North Bay . . . 

Oshawa 

Ottawa 

Owen Sound . 



Peterborough . 
Port Arthur . . 
St. Catharines 
St. Thomas. . . 
Sarnia 



Stratford. . . . 
Sudbury. . . . 

Toronto 

Toronto D.C. 
Welland 



& 60 cycle * 



Windsor. . . 
Woodstock 



S.O. 
S.O. 
S.O. 
T.B. 
S.O. 


15,642 
34,372 
17,807 
28,642 
14,693 


S.O. 
S.O. 
S.O. 
S.O. 
S.O. 


23,225 
174,222 
32,463 
36,165 
81,158 


S.O. 
N.O.P. 
S.O. 
S.O. 
S.O. 


19,138 
15,827 
26,824 
163,829 
13,402 


S.O. 
T.B. 
S.O. 
S.O. 
S.O. 


27,871 
24,469 
34,541 
17,773 
20,082 


S.O. 

N.O.P. 

S.O. 


17,161 

35,372 

676,887 


S.O. 


15,780 


S.O. 
S.O. 


117,031 
12,916 



$ c. 
106,469.17 
185,947.15 
105,408.18 
270,017.78 
117,755.17 

130,221.34 
989,413.53 
204,378.27 
246,982.51 
596,268.51 

134,099.25 
100,905.09 
244,828.75 
643,752.25 
77,440.17 

203,373.29 
158,657.24 
194,040.79 
147,175.51 
126,014.43 

150,950.81 

251,336.75 

4,189,689.02 

8,938.28 

57,133.16 

735,692.16 
92,155.55 



kw-hr. 
13,789,061 
19,162,966 

7,179,637 
44,480,694 

9,980,273 

12,413,988 
97,132,631 
23,812,268 
23,975,551 
63,128,783 

14,793,375 

8,285,704 

18,250,068 

85,883,484 

6,350,035 

22,520,352 
20,683,880 
20,015,719 
15,696,980 
9,444,780 

13,080,311 

19,224,053 

421,550,239 

308,810 

5,409,229 

64,324,475 
9,071,790 





kw-hr. 


$ c. 


4,028 


285 


2.20 


8,499 


188 


1.82 


4,648 


129 


1.89 


7,506 


494 


3.00 


4,356 


191 


2.25 


5,759 


180 


1.88 


44,209 


183 


1.87 


8,023 


247 


2 12 


8,964 


223 


2.30 


20,979 


250 


2.37 


5,006 


246 


2.23 


3,424 


202 


2.46 


6,971 


218 


2.93 


15,805 


453 


3.39 


3,726 


142 


1.73 


7,695 


244 


2.20 


6,339 


272 


2.09 


8,887 


188 


1.82 


4,737 


276 


2.59 


5,518 


143 


1.90 


4,604 


237 


2.73 


8,626 


186 


2.43 


154,966 


227 


2.25 


146 


176 


5.09 


3,283 


137 


1.45 


27,274 


197 


2.25 


3,478 


217 


2.21 



cents 
0.77 
0.97 
1.47 
0.61 
1.18 

1.04 
1.02 
0.86 
1.03 
0.94 

0.94 
1.22 
1.34 
0.75 
1.22 

0.90 
0.77 
0.97 
0.94 
1.33 

1.15 
1.31 
0.99 
2.89 
1.06 

1.14 
1.02 



* This — with the exception of a relatively small D.C. power load — is a special service not 
created by The Hydro-Electric Power Commission but acquired through the purchase of a 
privately owned company. It does not include street railway power. 

GROUP II— TOWNS 



Almonte. . . . 
Amherstburg 
Arnprior. . . . 

Aurora 

Aylmer 



Barrie 

Bowmanville. . . 

Brampton 

Brockville 

Carleton Place . 

Clinton 

Cobourg 

Collingwood . . 

Delhi 

Dundas 



S.O. 


2,136 


S.O. 


2,709 


S.O. 


4,049 


S.O. 


2,990 


S.O. 


2,474 


so.. 


10,469 


S.O. 


3,820 


S.O. 


6,157 


S.O. 


11,112 


S.O. 


4,217 


S.O. 


2,037 


S.O. 


5,022 


S.O. 


6,318 


S.O. 


2,063 


S.O. 


5,588 



12,978.29 
24,534.29 
19,050.58 
23,618.08 
16,594.70 

88,899.53 
32,981.70 
50,548.34 
68,171.22 
23,357.89 

14,254.13 
40,346.96 
36,454.92 
14,193.92 
28,845.55 



1,453,502 
2,201,466 
1,302,773 
1,759,242 
1,459,420 

8,156,650 
2,403,557 
4,671,245 
6,641,554 
1,762,575 

1,170,389 
2,792,746 
2,573,968 
811,335 
2,147,960 



674 


179 


1.60 


761 


241 


2.69 


915 


119 


1.74 


832 


176 


2.37 


769 


158 


1.80 


2,550 


267 


2.91 


1,143 


175 


2.40 


1,659 


235 


2.54 


3,151 


176 


1.80 


1,098 


134 


1.77 


599 


163 


1.98 


1,486 


157 


2.26 


1,666 


129 


1.82 


635 


106 


1.86 


1,472 


122 


1.63 



0.89 
1.11 
1.46 
1.34 

1.14 

1.09 
1.37 
1.08 
1.03 
1.33 

1.21 
1.44 
1.42 
1.75 
1.34 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



315 



"D" 

in Ontario Municipalities Served by the Commission 
and for Power Service during the year 1945 



Population, 10,000 or more 


















Commercial Light service 


Power service 










c 












Total 
number 






Number 


•2 




I 




Number 


Average 


of 






of 


>•£• 


>» 




of 


monthly 


con- 


Revenue 


Consumption 


con- 


sgi 


8.5 


o h 


Revenue 


con- 


horse- 


sumers 






sumers 


2 c <2 

J ri C 

^S8 


$ B2 






sumers 


power 




$ C. 


kw-hr. 




kw-hr. 


$c. 


cents 


$ C. 








61,602.72 


6,125,335 


640 


798 


8.02 


1.01 


57,565.67 


108 


3,824.2 


4,776 


94,151.76 


9,627,388 


1,313 


611 


5.98 


0.98 


310,027.83 


222 


18,293.0 


10,034 


113,411.10 


8,008,962 


822 


812 


11.50 


1.42 


93,951.11 


120 


4,949.5 


5,590 


103,111.48 


10,837,833 


1,094 


826 


7.85 


0.95 


109,307.60 


124 


6,710.7 


8,724 


67,359.36 


4,225,267 


501 


703 


11.20 


1.59 


166,731.31 


123 


9,365.4 


4,980 


59,920.86 


5,146,352 


806 


532 


6.20 


1.17 


154,452.05 


153 


9,510.4 


6,718 


569,569.55 


52,417,748 


5,565 


785 


8.53 


1.09 


2,838,610.50 


1,078 


157,349.2 


50,852 


136,129.99 


13,076,154 


1,093 


997 


10.38 


1.04 


180,202.86 


180 


10,040.6 


9,296 


147,553.68 


10,218,240 


1,087 


783 


11.31 


1.44 


465,091.45 


285 


23,301.2 


10,336 


233,849.96 


20,557,618 


2,365 


724 


8.24 


1.14 


550,821.07 


447 


31,752.0 


23,791 


74,326.74 


6,699,066 


750 


744 


8.26 


1.11 


114,965.91 


116 


6,927.9 


5,872 


58,933.77 


3,897,018 


662 


491 


7.42 


1.51 


54,347.97 


89 


2,245.9 


4,175 


82,963.58 


4,697,089 


727 


538 


9.51 


1.77 


326,198.79 


119 


14,700.7 


7,817 


314,712.83 


27,716,221 


1,495 


1,545 


17.54 


1.14 


86,819.07 


207 


5,756.1 


17,507 


52,609.29 


3,612,580 


555 


542 


7.90 


1.46 


86,818.46 


105 


4,790.2 


4,386 


97,958.12 


7,222,900 


984 


668 


9.06 


1.40 


198,631.98 


177 


10,862.0 


8,856 


95,397.99 


8,926., 699 


919 


809 


8.65 


1.07 


350,805.24 


120 


24,153.7 


7,378 


107,842.60 


10,014,740 


1,094 


763 


8.21 


1.08 


417,186.72 


216 


24,920.5 


10,197 


62,055.58 


5,484,316 


618 


740 


8.37 


1.13 


75,683.89 


86 


4,643.2 


5,441 


67,465.29 


4,987,126 


634 


656 


8.87 


1.35 


65,538.21 


90 


3,437.7 


6,242 


59,990.78 


3,786,393 


604 


522 


8.28 


1.59 


64,542.84 


121 


3,626.0 


5,329 


131,517.70 


7,697,863 


1,060 


605 


10.34 


1.71 


54,504.03 


117 


2,355.9 


9,803 


2,879,278.15 


228,118,378 


24,040 


791 


9.97 


1.26 


f4,825,770.28 


4,576 


229,911.0 


183,582 


48,875.00 


1,293,230 


290 


372 


14.35 


3.86 


276,178.84 


711 


10,762.0 


1,147 


44,419.39 


4,017,814 


468 


715 


7.91 


1.11 


217,446.24 


93 


17,391.2 


3,844 


427,653.53 


33,252,673 


3,367 


823 


10.58 


1.29 


730,778.42 


513 


41,064.6 


31,154 


58,545.57 


4,732,105 


481 


820 


10.14 


1.24 


112,769.38 


101 


6,853.0 


4,060 



Note— The above group of 26 cities utilizes about 80 per cent of the power distributed by 
the Commission to Ontario municipalities. 
fDoes not include street railway power. 



of Population, 2,000 or more 



5,105.27 


403,928 


101 


333 


4.21 


1.26 


6,262.37 


23 


386.0 


798 


9,351.67 


656,170 


140 


391 


5.57 


1.43 


10,697.53 


15 


475.9 


916 


9,589.62 


483,819 


164 


246 


4.87 


1.98 


19,610.58 


22 


1,059.1 


1,101 


8,003.82 


574,270 


117 


409 


5.70 


1.39 


17,555.74 


20 


852.1 


969 


12,463.86 


933,305 


156 


499 


6.66 


1.34 


10,177.13 


19 


618.4 


944 


47,943.47 


3,290,737 


426 


644 


9.38 


1.46 


34,155.12 


61 


1,801.5 


3,037 


11,040.91 


619,319 


170 


304 


5.41 


1.78 


62,684.94 


29 


2,729.6 


1,342 


21,114.08 


1,441,861 


259 


464 


6.79 


1.46 


26,219.44 


59 


1,464.0 


1,977 


• 31,579.60 


2,608,423 


407 


534 


6.47 


1.21 


60,268.84 


78 


3,502.0 


3,636 


10,123.66 


520,560 


181 


240 


4.66 


1.94 


28,850.21 


18 


1,585.5 


1,289 


8,298.01 


479,282 


125 


320 


5.53 


1.73 


6,332.62 


19 


343.6 


743 


21,930.06 


1,238,968 


250 


413 


7.31 


1.77 


29,978.70 


50 


1,578.7 


1,786 


15,782.93 


968,335 


208 


388 


6.32 


1.63 


39,610.84 


48 


2,303.7 


1,922 


11,818.58 


557,150 


159 


292 


6.19 


2.12 


6,926.89 


9 


278.5 


803 


17,270.77 


1,132,325 


200 


472 


7.20 


1.53 


42,879.43 


39 


2,711.6 


1,711 



316 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Statistics Relating to the Supply of Electrical Energy to Consumers 
For Domestic Service, for Commercial Light Service 

Group II— TOWNS 



Municipality 



System 



Popula- 
tion 



Domestic service 



Revenue 



Consumption 





c 




Number 






of 


>>£* 


>> 


con- 


&si 




sumers 


2c | 


5c_ 




3 o £ 


<u 0_ 




5 E » 


>*2 



Dunnville 

Elmira 

Fergus 

Forest Hill 

Georgetown. . . . 

Goderich. 

Gravenhurst 

Hanover 

Kespeler. 

Humberstone . . . 

Huntsville 

Ingersoll 

Kincardine. . . . . 

Kingsville 

Leamington .... 

Lindsay 

Listowel 

Long Branch. . . 

Meaford 

Merritton 

Midland. . . 

Mimico 

Napanee 

New Toronto . . . 

Orangeville 

Paris 

Penetanguishene 

Perth 

Petrolia 

Picton 

Port Colborne . . 
Port Credit. 

Port Dover 

Port Hope 

Prescott 

Preston 

Renfrew 

Riverside 

St. Marys 

Simcoe 

Smiths Falls 

Strathroy 

Swansea 

Tecumseh 

Thorold 

Tillsonburg 

Trenton 

Walkerton 

Wallaceburg. . . . 

Waterloo 

Weston 

Whitby 

Wingham 



s.o. 


4,305 


s.o. 


2,186 


s.o. 


2,624 


s.o. 


13,484 


s.o. 


2,448 


s.o. 


4,987 


s.o. 


2,405 


s.o. 


3,165 


s.o. 


3,021 


s.o. 


3,287 


s.o. 


2,810 


s.o. 


5,823 


s.o. 


2,189 


s.o. 


2,335 


s.o. 


5,456 


s.o. 


7,680 


s.o. 


3,209 


s.o. 


5,253 


s.o. 


2,671 


s.o. 


3,450 


s.o. 


6,636 


s.o. 


8,400 


s.o. 


3,298 


s.o. 


8,374 


s.o. 


2,559 


s.o. 


4,524 


s.o. 


4,018 


s.o. 


4.230 


s.o. 


2,684 


s.o. 


3,690 


s.o. 


7,187 


s.o. 


2,249 


s.o. 


2,001 


s.o. 


4.881 


s.o. 


3,318 


s.o. 


6,707 


s.o. 


5,673 


s.o. 


5,686 


s.o. 


4.005 


s.o. 


6,047 


s.o. 


7,708 


s.o. 


3,001 


s.o. 


7,110 


s.o. 


2,794 


s.o. 


5,517 


s.o. 


4,031 


s.o. 


9,849 


s.o. 


2,723 


s.o. 


5,088 


s.o. 


9,460 


s.o. 


6,333 


s.o. 


4,641 


s.o. 


2,051 



$ c 
15,874. 
15,514. 
19,659. 
202,577. 
23,719. 
35,861. 
12,587. 
22,637. 
18,518. 
12,342. 
17,529. 
35,725. 
15,664. 
15,624. 
30,070. 
51,176. 
18,533. 
36,283. 
15.518. 
20,727. 
41,158. 
69,460. 
28,280. 
48,282. 
17,819. 
27,755. 
14,088. 
29,726. 
14,771. 
25,143. 
32,928. 
19,699. 
11,580. 
35,697. 
25,061. 
41,118. 
29,038. 
44,340. 
31,465. 
29,437. 
53,345. 
25,120. 
66,639. 
15,445. 
22,166. 
22,250. 
41,473. 
20,453. 
27,577. 
69,958. 
60,332. 
32,807. 
14,701. 



kw-hr. 
1,110,507 
1,293,500 
1,494,960 
19,751,575 
1,913,513 
2,626,257 
1,258,803 
1,622,032 
1,365,367 

792,660 
1,594,038 
2,994,438 

836,140 
1,068,081 
2,324,515 
4,246,440 
1,408,089 
3,132,649 

929,355 
1,753,288 
3,278,550 
6,537,303 
2,292,909 
4,238,189 
1,155,200 
2,369,090 

866.532 
2,255,953 

869,871 
2,201,950 
2,069,470 
2,016,105 

739,283 
3,108,201 
1,993,650 
3,442,798 
1,895,357 
2,955,141 
2,298,443 
2,117,374 
4,761,565 
2,072,626 
6,764,893 

845,230 
1,972,230 
1,638,531 
4,629,485 
1,277,982 
1,670,295 
8,251,975 
6,994,256 
2,546,928 

866,725 



1,082 

568 

770 

3,728 

849 

1,376 

619 

861 

827 

753 

726 

1,568 

755 

650 

1.722 

2,318 

819 

1,618 

799 

977 

1,743 

2,344 

920 

2,064 

750 

1,220 

838 

1,119 

825 

1,200 

1,682 

652 

781 

1,444 

827 

1.701 

1,366 

1,629 

1,084 

1,691 

2,033 

890 

2,109 

727 

1,286 

1,278 

1,880 

701 

1,520 

2,358 

1,737 

1,065 

597 



kw-hr. 

86 
190 
162 
442 
188 
159 
169 
157 
140 

88 
183 
159 

92 
137 
112 

153 
143 
162 

97 
150 
157 
232 
208 
171 
128 
162 

86 
168 

88 
153 
103 
258 

79 
179 
200 
169 
116 
151 
177 
104 
195 
194 
267 

97 

128 

107 

. 205 

152 

92 
292 
336 
199 
121 



$ c. 
1.22 
2.28 
2.13 
4,53 
2.33 
2.17 
1.69 
2.19 
1.90 
1.37 
2.01 
1.90 
1.73 
2.00 
1.46 



cents 
1.42 
1.20 
1.31 
1.03 
1.24 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



317 



"D"— Continued 

in Ontario Municipalities Served by the Commission 
and for Power Service during the year 1945 

population 2,000 or more 



Commercial Light service 


Power 


service 










c 












Total 
number 






Number 


•- 




o 




Number 


Average 


of 






of 


>•& 


v£ 


Mi 




of 


monthly- 


con- 


Revenue 


Consumption 


con- 


Sfji 


^5 


CO ,• 

8-= 


Revenue 


con- 


horse- 


sumers 






sumers 


>S3 


2s~ 

0) o — 

3 SS 


1 


sumers 


power 




$ C. 


kw-hr. 




kw-hr. 


$C. 


cents 


$ C. 








14,468.81 


1,064,268 


226 


392 


5.34 


1.36 


20,159.31 


28 


1,284.6 


1,336 


9,513.28 


551,044 


126 


364 


6.29 


1.73 


25,402.57 


26 


1,108.3 


720 


8,752.76 


498,340 


120 


346 


6.08 


1.76 


19,748.25 


14 


946.8 


904 


29,847.52 


1,961,087 


254 


643 


9.79 


1.52 


3,323.71 


27 


200.3 


4,009 


9,435.04 


547,158 


129 


353 


6.09 


1.73 


39,825.33 


26 


1,854.0 


1,004 


17,844.67 


974,711 


263 


309 


5.65 


1.83 


21,843.37 


23 


1,033.0 


1,662 


13,069.58 


1,305,208 


108 


1.007 


10.08 


1.00 


17,659.34 


16 


956.3 


743 


9,919.20 


541,659 


138 


327 


5.99 


1.83 


22,569.17 


22 


1,028.5 


1,021 


7,340.60 


435,499 


90 


403 


6.80 


1.69 


58,387.54 


29 


2,827.8 


946 


4,872.97 


326,744 


79 


341 


5.09 


1.49 


6,932.72 


12 


413.3 


844 


12,887.76 


922,120 


133 


578 


8.08 


1.40 


15,602.92 


19 


226.3 


878 


20,389.70 


1,548,480 


227 


568 


7.49 


1.32 


46,917.29 


45 


2,721.4 


1,840 


8,712.46 


337,622 


131 


215 


5.54 


2.58 


13,776.18 


18 


523.2 


904 


10,714.73 


653,335 


164 


332 


5.44 


1.64 


6,055.44 


24 


363.4 


838 


20,899.77 


1,481,665 


299 


413 


5.82 


1.41 


27,737.51 


37 


1,475.5 


2,058 


31,246.35 


1,894,191 


361 


437 


7.21 


1.65 


55,202.92 


70 


2,672.7 


2,749 


11,797.44 


734,303 


164 


373 


5.99 


1.61 


20,561.55 


27 


1,083.2 


1,010 


6,681.45 


455,105 


111 


342 


5.02 


1.47 


13,299.92 


10 


637.6 


1,739 


9,842.69 


521,235 


161 


270 


5.09 


1.89 


12,042.33 


20 


584.8 


980 


5,000.12 


368,450 


62 


495 


6.72 


1.36 


220,741.49 


17 


11,586.5 


1,056 


20,438.38 


1,316,099 


211 


520 


8.07 


1.55 


84,821.72 


53 


4,881.5 


2,015 


13,490.69 


1,028,264 


165 


519 


6.81 


1.31 


16,627.34 


27 


761.7 


2,536 


19,373.20 


1,050,963 


215 


407 


7.51 


1.84 


12,133.10 


24 


704.7 


1,159 


21,226.75 


1,867,666 


222 


701 


7.97 


1.13 


246,122.85 


36 


12,003.0 


2,322 


12,509.69 


684,117 


155 


368 


6.73 


1.83 


7,205.21 


27 


427.6 


•932 


10,930.90 


755,551 


193 


326 


4.72 


1.45 


25,465.51 


27 


1,561.9 


1,440 


8,800.13 


498,051 


112 


371 


6.55 


1.77 


24,320.34 


21 


1,068.4 


971 


17,787.25 


1,102,347 


195 


471 


7.60 


1.61 


17,960.10 


30 


1,016.2 


1,344 


9,240.77 


471,977 


149 


264 


5.17 


1.96 


25,522.17 


55 


972.5 


1,029 


15,834.20 


1,140,760 


212 


448 


6.22 


1.39 


8,481.53 


35 


572.4 


1,447 


21,126.07 


1,300,226 


238 


455 


7.40 


1.63 


20,885.98 


25 


1,245.2 


1,945 


7,274.31 


490,540 


89 


459 


6.81 


1.48 


6,099.69 


14 


280.8 


755 


5,799.05 


396,204 


125 


264 


3.87 


1.46 


5,871.07 


16 


323.0 


922 


16,068.26 


991,794 


202 


409 


6.63 


1.62 


41,667.63 


41 


2,038.9 


1,687 


12,605.67 


725,096 


152 


398 


6.91 


1.74 


14,240.57 


23 


551.8 


1,002 


22,201.14 


1,453,849 


226 


536 


8.19 


1.53 


60,763.32 


51 


3,599.7 


1,978 


20,617.28 


1,512,664 


227 


555 


7.57 


1.36 


24,219.74 


58 


1,175.8 


1,651 


6,469.11 


368,626 


72 


427 


7.49 


1.75 


8,113.75 


13 


335.3 


1,714 


12,621.53 


641,085 


174 


307 


6.04 


1.97 


24,633.56 


40 


1,148.5 


1,298 


32,888.24 


2,760,273 


403 


571 


6.80 


1.19 


33,989.80 


49 


1,862.2 


2,143 


19,030.33 


1,334,015 


268 


415 


5.92 


1.43 


31,297.63 


38 


1,638.8 


2,339 


13,121.29 


803,564 


175 


382 


6.25 


1.63 


18,319.17 


32 


1,150.6 


1,097 


10,050.93 


656,030 


97 


564 


8.63 


1.53 


25,605.85 


16 


1,262.8 


2,222 


5,244.16 


297,679 


58 


428 


7.53 


1.76 


1,690.29 


3 


84.4 


788 


9,094.35 


897,433 


163 


459 


4.65 


1.01 


57,220.98 


18 


2,792.4 


1,467 


21,350.11 


1,605,035 


262 


511 


6.79 


1.33 


17,490.35 


38 


1,023.3 


1,578 


21,646.76 


1,711,805 


277 


515 


6.51 


1.26 


89,243.71 


55 


4,373.4 


2,212 


13,197.74 


659,195 


137 


401 


8.03 


2.00 


11,290.50 


19 


428.7 


857 


19,208.22 


1,270,881 


237 


447 


6.75 


1.51 


130,977.83 


52 


5,572.6 


1,809 


27,010.74 


2,186,530 


267 


682 


8.43 


1.24 


75,805.04 


71 


3,983.1 


2,696 


14,704.78 


1,288,277 


192 


559 


6.38 


1.14 


71,267.61 


33 


3.933.8 


1,962 


14,363.73 


928,515 


167 


463 


7.17 


1.55 


20,373.14 


28 


907.3 


1,260 


10,005.23 


459,700 


194 


197 


4.30 


2.18 


19,076.19 


24 


751.1 


815 



2— H.E. 



318 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Statistics Relating to the Supply of Electrical Energy to Consumers 

For Domestic Service, for Commercial Light Service 

Group III— SMALL TOWNS (less than 2,000 population), 

NOTE— The power used in the smaller places and rural districts is, and possibly must always 
be, a relatively small proportion of the power distributed by the Commission. Thus, the power 
used by the small municipalities in the following group, which includes small towns, villages and 
certain suburban areas in townships, is less than 10 per cent of the power distributed by the 
Commission to Ontario municipalities. This relatively small proportion of the total power, 



Municipality 



System 



Popula- 
tion 



Domestic service 



Revenue 



Consumption 





a 


Number 




of 


>»a 


con- 


to-z 3 


sumers 


^68 




kw-hr. 


552 


181 


173 


239 


147 


103 


456 


63 


448 


137 


205 


47 


396 


212 


70 


43 


118 


81 


240 


73 


180 


50 


232 


148 


170 


169 


67 


103 


166 


135 


416 


237 


341 


115 


152 


69 


336 


78 


568 


94 


185 


85 


186 


86 


191 


146 


190 


78 


294 


100 


92 


60 


1,626 


145 


58 


67 


184 


137 


125 


61 


576 


76 


254 


63 


237 


164 


62 


121 


458 


80 


53 


120 


273 


84 


354 


113 


396 


144 


193 


69 

i 



So5 



Acton. 
Agincourt. . 

Ailsa Craig . 
Alexandria . 
Alliston . . . 



Alvinston. . . . 
Ancaster Twp. 
Apple Hill. . . . 

Arkona 

Arthur 



Athens . . . 

Ayr 

Baden 

Bath 

Beachville. 



Beamsville . 
Beaverton. , 

Beeton 

Belle River , 
Blenheim. . . 



Bloomfield 

Blyth 

Bolton 

Bothwell . . 
Bradford . . 



Braeside 

Brantford Twp. 

Brechin 

Bridgeport. . . . 
Brigden 



Brighton . . . 
Brussels. . . . 
Burford .... 
Burgessville , 
Caledonia. . 



Campbellville . 
Cannington. . . 

Capreol 

Cardinal 

Cayuga 



S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 



S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 



S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 



1,876 
P.V. 

434 
1,904 
1,542 

620 

P.V. 

376 
836 

643 
718 

P.V. 
296 

P.V. 

1,306 
786 
542 
845 

1,873 

618 
632 
609 
605 
1,034 

367 

' P.V. 
P.V. 
P.V. 

1,581 
730 

P.V. 

P.V. 
1,395 

P.V. 

718 
1,675 
1,641 

652 



$ c. 

14,980.46 
6,231.92 
2,880.69 
7,694.17 

12,779.34 

3,515.97 
13,769.27 
1,369.33 
2,827.70 
5,532.37 

3,847.25 
6,278.65 
4,231.28 
2,768.95 
3,985.18 

11,454.17 
7,855.51 
3,333.11 
6,454.32 
9,907.09 

3,217.86 
3,876.16 
4,788.99 
2,757.85 
7,357.12 

1,529.91 
39,878.27 
1,446.38 
5,208.48 
2,181.00 

12,056.12 
4,944.31 
5,459.42 
1,812.01 
7,269.92 

1,344.88 
5,729.46 
9,518.93 
9,470.35 
4,345.97 



kw-hr. 

1,200,073 
495,515 
181,850 
343,988 
737,917 

116,330 

1,006,481 

36,528 

115,164 

210,587 

107,485 
412,560 
343,790 
82,890 
268,517 

1,187,156 
469,881 
125,630 
316,109 
640,242 

187,609 
191,908 
335,458 
177,020 

354,414 

65,902 

2,837,629 

46,856 

302,320 

91,240 

526,538 
191,550 
466,257 
90,253 
441,511 

76,230 
276,680 
479,130 
685,845 
158,892 



•> c. 

2.26 

3.00 

1.63 

1.41 

2.38 

1.43 
2.90 
1.63 
2.00 
1.92 

1.78 
2.26 
2.07 
3.44 
2.00 

2.30 
1.92 
1.83 
1.60 
1.45 

1.45 
1.74 
2.09 
1.21 
2.09 

1.39 
2.04 
2.08 
2.36 
1.45 

1.74 
1.62 
1.92 
2.44 
1.32 

2.11 
1.75 
2.24 
1.99 
1.88 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



319 



"D"— Continued 

in Ontario Municipalities Served by the Commission 
and for Power Service during the year 1945 
VILLAGES AND SUBURBAN AREAS 

however, exerts upon the economic life of the Province a most beneficial influence. It should 
further be appreciated that about 35 per cent of these municipalities obtain their power, not from 
Niagara, but from relatively small water-power developments throughout the Province, or from 
purchased power. The net cost per kilowatt-hour given in the table is the cost inclusive of all 
charges. Consult also introduction to Statement "D", page 310. 





Commercial Light service 






Powei 


• service 


i 










c 












Total 
number 






Number 


•2 




<u 




Number 


Average 


of 






of 


*§• 


>> 


Q. 




of 


monthly 


con- 


Revenue 


Consumption 


con- 


as! 


So£ 


en ' 


Revenue 


con- 


horse- 


sumers 






sumers 


2c S 


2 c- 
$S2 


IS 




sumers 


power 




$ C. 


kw-hr. 




kw-hr. 


$c. 


cents 


$ C. 








6,168.47 


457,479 


86 


443 


5.98 


1.3 


31,421.99 


19 


1,414.0 


657 


1,533.34 


59,619 


31 


160 


4.12 


2.6 


775.70 


3 


47.0 


207 


1,111.79 


57,677 


33 


146 


2.81 


1.9 


1,711.11 


4 


74.2 


184 


4,779.17 


209,201 


103 


169 


3.87 


2.3 


4,932.11 


16 


165.5 


575 


8,293.8! 


355,692 


125 


237 


5.53 


2.3 


4,917.60 


20 


238.0 


593 


1,902.03 


77,102 


51 


126 


3.1! 


2.5 


1,398.65 


5 


51.1 


261 


4,819.57 


244,692 


45 


453 


8.93 


2.0 


970.89 


9 


64.4 


450 


859.17 


35,980 


24 


125 


2.98 


2.4 


581.70 


2 


25.6 


96 


1,358.25 


44,832 


34 


110 


3.33 


3.0 


287.89 


2 


8.7 


154 


5,051.03 


158,085 


92 


143 


4.58 


3.2 


1,772.41 


7 


101.4 


339 


1,748.68 


46,656 


43 


90 


3.39 


3.7 


816.96 


1 


34.0 


224 


2,312.50 


115,066 


46 


208 


4.19 


2.0 


900.06 


n 
i 


36.2 


285 


2,044.72 


134,642 


32 


351 


5.32 


1.5 


11,404.79 


3 


501.0 


205 


677.38 


18,390 
27,018 


12 
21 


128 
107 


4.70 
2.26 


3.7 

2.1 








79 


568.94 


' 19* 136 '43 


4 


"' 709' 1 


191 


4,640.64 


293,418 


71 


344 


5.45 


1.6 


2,293.87 


5 


139.6 


492 


2,630.85 


142,060 


66 


179 


3.32 


1.9 


1,265.35 


8 


70.1 


415 


1,857.05 


58,265 


33 


147 


4.69 


3.2 


418.80 


4 


21.7 


189 


3,442.94 


198,693 


48 


345 


5.98 


1.7 


1,298.63 


4 


40.9 


388 


9,432.86 


597,416 


144 


346 


5.46 


1.6 


8,855.96 


17 


416.3 


729 


2,219.44 


100,613 


41 


205 


4.51 


2.2 


1,276.04 


7 


65.6 


233 


2,030.55 


81,330 


46 


147 


3.68 


2.5 


788.05 


5 


49.9 


237 


1,907.02 


91,388 


45 


169 


3.53 


2.1 


3,465.26 


11 


130.8 


247 


2,089.60 


112,030 


55 


170 


3.17 


1.9 


1,150.36 


9 


108.1 


254 


4,704.73 


153,631 


76 


168 


5.16 


3.1 


5,667.51 


11 


247.0 


381 


333.49 


8,179 


9 


76 


3.09 


4.1 


5,497.20 


2 


415.4 


103 


5,768.56 


351,195 


68 


430 


7.07 


1.6 


7,280.95 


7 


312.3 


1.701 


839.94 


25,949 


21 


103 


3.33 


3.2 


743.89 


2 


31.0 


81 


1,117.90 


54,831 


21 


218 


4.44 


2.0 


1,193.29 


4 


56.1 


209 


1,864.03 


82,750 


41 


168 


3.79 


2.3 


940.71 


4 


29.1 


170 


4,699.42 


259,761 


99 


219 


3.96 


1.8 


4,344.74 


10 


246.0 


685 


3,321.78 


114,920 


59 


162 


4.69 


2.9 


1,409.88 


8 


63.1 


321 


1,898.23 


112,629 


38 


247 


4.16 


1.7 


1,609.21 


5 


106.7 


280 


594.26 


16,477 


17 


81 


2.91 


3.6 


258.78 


2 


14.4 


81 


5,582.42 


416,533 


304 


334 


4.47 


1.3 


3,300.59 


13 


177.5 


575 


500.49 


23,479 


11 


178 


3.79 


2.1 


366.15 


1 


8.5 


65 


2,665.65 


100,855 


61 


138 


3.64 


2.6 


1,840.94 


9 


102.2 


343 


3,636.06 


178,480 


50 


297 


6.06 


2.0 


738.61 


1 


25.0 


405 


2,258.07 


136,200 


54 


210 


3.48 


1.7 


270.00 


2 


18.0 


452 


3,995.65 


114,547 


71 


134 


4.69 


3.5 


1,780.03 


7 


92.1 


271 



320 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Statistics Relating to the Supply of Electrical Energy to Consumers 
For Domestic Service, for Commercial Light Service 

Group III— SMALL TOWNS (less than 2,000 population), 





System 


Popula- 
tion 


Domestic service 


Municipality 


Revenue 


Consumption 


Number 
of 

con- 
sumers 


| 

*-• S <2 

£68 


3 e -° 


u 

a 

h 

p 


Chatsworth 


s.o. 
s.o. 
s.o. 
s.o. 
s.o. 

s.o. 
s.o. 
s.o. 
s.o. 
s.o. 

s.o. 
s.o. 
s.o. 
s.o. 
s.o. 

s.o. 
s.o. 
s.o. 
s.o. 
s.o. 

s.o. 
s.o. 
s.o. 
s.o. 
s.o. 

s.o. 
s.o. 
s.o. 
s.o. 
s.o. 

s.o. 
s.o. 
s.o. 
s.o. 
s.o. 

s.o. 
s.o. 
s.o. 
s.o. 
s.o. 


323 

1,550 

1,050 

1,251 

436 

627 
872 
580 

P.V. 

P.V. 

P.V. 
357 
661 

P.V. 

P.V. 

1,100 

P.V. 

518 

1,532 
P.V. 

P.V. 
650 

1,957 
791 

P.V. 
P.V. 

1,167 
445 
228 

22 
1,986 

' 1,794 
393 

341 
1,009 
1,573 

752 
576 


$ c. 
2,376.21 
10,209.85 
5,499.67 
8.429.97 
2,905.59 

2,897.23 
7,533.89 
4,068.81 
2,193.78 
2,576.00 

2,691.52 
1,692.48 
3,628.72 
2,371.14 
2,253.48 

9,367.25 
3,014.36 
3,970.14 
8,314.57 
2,642.30 

1,531.92 
4,257.55 
8,349.63 
3,389.28 
290,562.69 

3,751.98 
1,302.51 
8,871.07 
4,262.97 
4,696.73 

1,450.14 

9,821.36 

238,581.94 

15,831.36 

2,774.23 

2,218.09 
6,891 . 57 
14.895.03 
4,509.79 
3,375.71 


kw-hr. 
131,345 
722,530 
432,165 
821,593 
141,649 

160,679 

396,465 

253,083 

97,510 

89,705 

129,245 
68,489 
164,200 
114,527 
159,424 

437,449 
187,890 
141,725 
463,424 
143,011 

75,065 

228,485 

522,595 

233.50C 

21,848,176 

217,39C 
49,947 
542,182 
250,305 
224,895 

35,52* 

641, 06C 

23,458,806 

1,244,00? 

125,886 

103,97C 
437,01c 
1,024,58C 
209,182 
158.27C 


113 
460 
258 
363 
140 

168 

284 
160 
120 

124 

139 

98 

181 

105 

67 

403 
161 
173 
493 
94 

62 

209 

477 

240 

12,330 

198 
75 
361 
147 
208 

81 

539 

6,644 

548 

120 

1 127 
316 

> 530 
244 

) 189 


kw-hr. 

97 

131 

140 

189 

84 

80 

116 

132 

68 

60 

77 
58 
76 
91 
198 

90 
97 
68 
78 
127 

101 
91 
91 
81 

148 

91 

55 

125 

142 

90 

37 

99 

294 

189 

87 

68 
116 
161 

71 

70 


$c. 

1.75 

1.85 

1.78 

1.94 

1.73 

1.44 
2.21 
2.12 
1.52 
1.73 

1.61 
1.44 
1.67 
1.88 
2.80 

1.94 
1.56 
1.91 
1.41 
2.34 

2.06 
1.70 
1.46 
1.18 
1.96 

1.58 
1.45 
2.05 
2.42 
1.88 

1.49 
1.52 
2.99 
2.41 
1.93 

1.46 
1.83 
2.34 
1.54 

1.49 


cents 
1.8 


Chesley 

Chesterville 

Chippawa : . . . 


1.4 
1.3 
1.0 


Clifford 


2.1 


Cobden 


1.8 


Colborne 


1.9 


Coldwater 


1.6 


Comber 


2.3 


Cookstown 

Cottam 


2.9 
2.1 


Courtright 


2.5 


Creemore 


2.2 


Dashwood 


2.1 


Delaware 


1.4 


Deseronto 


2.1 


Dorchester. . 


1.6 


Drayton 


2.8 


Dresden 


1.8 


Drumbo 


1.8 


Dublin 


2.0 


Dundalk 


1.9 


Durham 


1.6 


Dutton 


1.5 


East York Twp 


1.3 


Elmvale 


1.7 


Elmwood 


2.6 


Elora 


1.6 


Embro 


1.7 


Erieau 


2.1 


Erie Beach 


4.1 


Essex 


1.5 


Etobicoke Twp 


1.0 


Exeter 


1.3 


Finch 


2.2 


Flesherton 


2.1 


Fonthill 


1.6 


Forest ." 


1.5 


Glencoe 


2.2 


Grand Valley 


2.1 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



321 



"D"— Continued 

in Ontario Municipalities Served by the Commission 
and for Power Service during the year 1945 

VILLAGES AND SUBURBAN AREAS 





Commercial Light service 










Number 






u 

& 






of 


*& 


>. 


Revenue 


Consumption 


con- 
sumers 


8*8 


&2 
2c„ 


to ,• 

8-? 










P 








>Hb 


i e * 



Power service 



Revenue 



Number 
of 
con- 
sumers 



Average 
monthly- 
horse- 
power 



Total 

number 

of 

con- 
sumers 



$ c. 


kw-hr. 




kw-hr. 


Sc. 


cents 


$. c. 








1,351.71 


46,960 


26 


150 


4.33 


2.9 








139 


5,918.45 


355,520 


96 


309 


5.14 


1.7 


"7,542:i0 


22 


415.0 


578 


4,048.94 


215,609 


68 


264 


4.96 


1.9 


3,236.52 


4 


142.5 


330 


2,196.58 


176,378 


51 


288 


3.59 


1.2 


1,032.08 


1 


35.8 


415 


1,853.83 


78,897 


31 


212 


4.98 


2.3 


643.68 


2 


20.2 


173 


2,284.56 


87,430 


48 


152 


3.97 


2.6 


2,264.21 





70.9 


219 


4,631.55 


175,585 


71 


206 


5.44 


2.6 


1,189.09 


6 


57.4 


361 


1,851.56 


61,123 


48 


106 


3.21 


3.0 


3,448.86 


3 


127.8 


211 


1,732.88 


70,077 


42 


139 


3.44 


2.5 


2,265.25 


4 


104.7 


166 


1,288.76 


33,166 


31 


89 


3.46 


3.9 


1,526.76 


4 


74.2 


159 


1,374.83 


87,965 


29 


253 


3.95 


1.6 


595.56 


5 


33.4 


173 


730.79 


34,708 


21 


138 


2.90 


2.1 


974.64 


1 


12.5 


120 


2,016.26 


99,577 


53 


156 


3.17 


2.0 


1,230.06 


3 


77.2 


237 


1,246.62 


57,153 


28 


170 


3.71 


2.2 


1,341.24 


3 


57.9 


136 


773.71 


31,737 
166,570 


15 

77 


176 
180 


4.30 
4.34 


2.4 
2.4 








82 


4,005.52 


2,103 62 


8 


83.3 


488 


979.66 


43,636 


28 


130 


2.92 


2.2 


563.78 


1 


19.5 


190 


2,396.71 


83,718 


61 


114 


3.27 


2.9 


1,332.54 


4 


66.1 


238 


6,681.57 


421,942 


130 


270 


4.28 


1.6 


6,400.23 


16 


360.1 


639 


1,106.43 


44,849 


29 


127 


2.94 


2.5 


724.89 


1 


33.8 


124 


1,122.85 


33,157 


26 


106 


3.60 


3.4 


1,508.51 


2 


69.6 


90 


3,384.27 


129,722 


73 


148 


3.86 


2.6 


3,306.47 


6 


179.5 


288 


5,147.78 


266,340 


104 


213 


4.12 


1.9 


4,633.68 


12 


225.9 


593 


2,646.41 


159,910 


65 


205 


3.39 


1.7 


3,788.01 


11 


207.5 


316 


31,258.20 


2,206,211 


523 


352 


4.98 


1.4 


49,072.77 


45 


2,236.5 


12,898 


1,703.86 


74,130 


50 


124 


2.84 


2.3 


3,560.84 


8 


161.0 


256 


699.95 


20,772 


24 


72 


2.43 


3.4 


1,306.57 


1 


44.5 


100 


4,734.72 


233,808 


66 


295 


5.98 


2.0 


4,974.52 


4 


268.1 


431 


891.94 


40,189 


29 


115 


2.56 


2.2 


295.08 


2 


14.2 


178 


1,709.21 


74,400 


14 


443 


10.17 


2.3 


4,157.67 


4 


116.1 


226 


252.01 


8,275 
701,805 


3 
125 


230 
468 


7.00 
6.52 


3.0 
1.4 








84 


. 9,781.08 


"7,363.38 


"18 


""m.i 


682 


32,129.58 


1,936,103 


338 


477 


7.92 


1.7 


46,159.95 


46 


2,251.7 


7,028 


8,886.98 


560,855 


124 


377 


5.97 


1.6 


5,551.59 


15 


329.9 


687 


2,025.48 


67,030 


43 


130 


3.93 


3.0 


231.50 


1 


5.0 


164 


1,763.04 


70,757 


44 


134 


3.34 


2.5 


677.36 


2 


33.6 


173 


1,956.31 


92,879 


37 


209 


4.41 


2.1 


655.01 


5 


32.5 


358 


8,373.37 


450,499 


143 


263 


4.88 


1.9 


7,004.92 


21 


295.6 


694 


4,229.56 


183,131 


77 


197 


4.56 


2.3 


3,321.78 


11 


144.2 


332 


2,025.90 


92,740 


53 


146 


3.19 


2.2 


2,717.32 


7 


128.2 


249 



322 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Statistics Relating to the Supply of Electrical Energy to Consumers 
For Domestic Service, for Commercial Light Service 

Group III— SMALL TOWNS (less than 2,000 population). 



Municipality 



System 



Popula- 
tion 





Domestic service 










Number 


c 




u 

CD 






of 


>>£ 


>> 




Revenue 


Consumption 


con- 


%*% 


&2 


%* 






sumers 


2c» 


2c„ 


8-c 








Soc 


CD O — 


+-> > 








< S8 


>HJa 


^ 



Gran ton . . : 
Grimsby. . . 
Hagersville . 
Harriston. . 
Harrow 



Hastings . 
Havelock. 
Hensall . . 
Highgate. 
Holstein. . 



Iroquois. . . 

Jarvis 

Kemptville 
Kirkfield.. 
Lakefield. . 



Lambeth 

Lanark 

Lancaster. . . 

La Salle 

London Twp. 



Lucan. . . 
Lucknow. 
Lynden. . 
Madoc. . . 
Markdale . 



Markham. . 
Marmora. . . 
Martintown 
Maxville. . . 
Merlin 



Mildmay . 
Millbrook . 
Milton. . . 
Milverton 
Mitchell .. . 



Moorefield. . 
Morrisburg . . 
Mt. Brvdges. 
Mt.Forest . . . 
Neustadt. . . . 



S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 



P.V 

1,993 
1,588 
1,242 
1,122 

698 
876 
601 
301 
P.V. 

925 

557 

1,158 

P.V 

1,327 

P.V. 
670 
518 

1,020 



S.O. 


583 


S.O. 


932 


S.O. 


P.V. 


S.O. 


1,094 


S.O. 


700 


S.O. 


1,210 


S.O. 


938 


S.O. 


P.V. 


S.O. 


801 


S.O. 


P.V. 


S.O. 


725 


S.O. 


673 


S.O. 


1,955 


S.O. 


970 


S.O. 


1,531 


S.O. 


P.V. 


S.O. 


1,436 


S.O. 


P.V. 


S.O. 


1,753 


S.O. 


418 



$ c. 

2,098.07 
18,773.68 

8,259.63 

8,743.58 
13,101.73 

4,724.59 
4,769.94 
4,789.19 
1,946.71 
1,095.65 

7,270.60 
2,938.81 
8,704.85 
912.16 
7,866.62 

3,681.65 

3,323.73 

1,916.21 

10,326.06 

17,549.00 

4,811.11 
5,574.93 
2,914.29 
5,756.93 
3,429.42 

9,395.64 
4,873.81 
972.76 
3,158.58 
2,191.85 

4,340.38 
4,379.36 

14,263.35 
6,057.90 

14,310.57 

1,385.40 
10,994.77 

2,654.30 
10,253.61 

2,092.68 



kw-hr. 
102,156 

1,435,277 
516,575 
549,770 
978,295 

200,699 

236,195 

243,970 

84,901 

41,780 

479,552 
134,730 
510,730 
26,155 
474,291 

285,061 

132,346 

84,440 

627,200 

1,462,115 

341,346 
272,230 
185,893 
294,610 
313,289 

563,521 
188,205 
43,750 
153,465 
107,050 

265,877 
158,002 

1,045,516 
532,130 

1,086,456 

57,350 
650,920 
141,402 
571,120 

70,053 



85 
675 
424 
395 
360 

249 
300 
213 
108 
63 

318 
163 
391 
40 
380 

144 
185 
121 
288 
502 

194 
293 
101 
322 

242 



kw-hr 
100 
177 
102 
116 
226 

67 
66 
95 
66 
55 

126 
69 

109 
54 

104 

165 

60 

58 

181 

243 

147 
77 

153 
76 

108 



354 


133 


258 


61 


59 


62 


181 


71 


128 


70 


194 


114 


185 


71 


559 


156 


271 


164 


530 


171 


70 


68 


437 


124 


170 


69 


509 


94 


118 


49 



$ c. 

2.06 

2.32 

1.62 

1.84 

3.03 

1.64 
1.32 
1.87 
1.50 
1.45 

1.91 
1.50 
1.86 
1.90 

1.72 

2.13 
1.50 
1.32 
2.99 
2.91 

2.06 
1.59 
2.40 
1.48 
1.18 

2 21 
1.57 
1.37 
1.45 
1.43 

1.86 
1.97 
2.13 
1.86 
2.25 

1.65 
2.10 
1.30 
1.68 
1.48 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



323 



4 'D"— Continued 

in Ontario Municipalities Served by the Commission 
and for Power Service during the year 1945 

VILLAGES AND SUBURBAN AREAS 





Commercial Light service 






Power service 




Revenue 


Consumption 


Number 
of 
con- 
sumers 


c 
o 

5 o c 

|B8 


Sc„ 

>e-2 


u 

CO ,• 


Revenue 


Number 
of 
con- 
sumers 


Average 
monthly 
horse- 
power 


Total 

number 

of 

con- 
sumers 



$ c. 
1,071.83 

13,121.74 
6,986.42 
5,962.22 
6,398.53 

2,651.68 

2,133.18 

2,368.71 

850.87 

369.62 

3,327.42 
1,998.27 
6,204.29 
1,107.92 
5,035.85 

939.88 
1,975.37 
1,079.09 
1,833.95 
2,098.70 

2,487.53 
3,695.38 
772.25 
4,094.63 
3,324.83 

3,127.77 
2,358.04 
1,239.79 
2,429.07 
1,943.35 

2,832.13 
1,981.74 
7,959.80 
4,031.73 

7,437.71 

1,491.15 
6,339.59 
1,012.12 
8,783.39 
1,056.38 



kw-hr. 
47,890 
713,662 
405,234 
307,583 
297,625 

93,419 
82,692 
81,930 
31,600 
15,790 

165,938 
112,009 
313,711 
29,478 
249,638 

48,550 

100,234 

43,340 

84,357 

128,331 

110,868 
133,556 
33,872 
181,225 
190,448 

139,994 

115,540 

41,280 

92,668 

88,779 

112,202 
44,680 
445,493 
191,480 
419,549 

70,284 
301,099 

70,702 
426,058 

47,917 



26 

126 

120 

96 

89 

55 
52 
54 
32 
12 

63 
41 
85 
20 
68 

28 
39 
30 
15 
16 

52 
83 
15 
89 

76 

61 
39 
24 
46 
55 

59 
60 

111 
89 

137 

29 
111 

40 
138 

25 



kw-hr. 
153 
472 
281 
267 
279 

142 
133 
126 
82 
110 

219 
228 
308 
123 
306 

144 
214 
120 
469 
668 

178 
134 
188 
170 
209 

191 
247 
143 
168 
135 

158 
62 
334 
179 
255 

202 
226 
147 
257 
160 



$ c 

3.44 

8.68 

4.85 

5.18 

5.99 



4.40 
4.06 
6.08 
4.62 
6.17 

2.80 

4.22 

3.00 

10.19 

10.93 

3.9S 
3.71 
4.29 
3.83 
3.65 

4.27 
5.04 
4.30 
4.40 
2.94 

4.00 
2.75 
5.98 
3.78 
4.52 

4.28 
4.76 
2.11 
5.30 
3.52 



cents 
2.2 
1 
1 

1.9 
2.1 

2.8 
2.6 
2.9 

2.7 
2.3 

2.0 
1.8 
2.0 
3.8 
2.0 



1 

2 

2.5 

2.2 

1.6 

2.2 
2.8 
2.3 
2.3 
3.6 



2.2 
2.0 
3.0 
2.61 
2.2 



2.1 
2.1 
1.4 
2.1 
2.2 



$ 



13,627.03 

17,735.29 

7,249.36 

4,585.42 

192.09 
2,112.00 
2,813.30 
1,270.95 

484.23 

1,834.16 
3,870.55 
3,289.66 



7,755.76 

704.26 
477.09 



428.10 
1,763.54 

1,273.38 

10,434.41 

767.53 

1,846.15 

1,995.04 

3,461.74 
205.82 



1,416.09 

1,099.20 
1,962.19 
28,292.33 
6,243.49 
8,038.72 

200.08 
4,119.78 

852.84 
6,909.16 

505.89 



17 

18 

14 

8 

3 

3 

15 

5 

2 

5 
2 



527.9 

1,035.9 

334.0 

382.1 

15.2 
81 
159.6 
64.2 
28.0 

75 

146.0 
152.2 



400.3 

59.7 
12.8 



16.3 
85.7 

73.7 

341.1 

45.2 

93.0 

116.1 

179.6 
19.9 



60.8 

32.8 

101.2 

1,265.9 

360.5 

409.0 

6.3 
219.6 

53.8 
359.4 

15.5 



324 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Statistics Relating to the Supply of Electrical Energy to Consumers 
For Domestic Service, for Commercial Light Service 

Group III— SMALL TOWNS (less than 2,000 population), 



Municipality 



System 


Popula- 
tion 




Domestic service 




Revenue 


Consumption 


Number 
of 

con- 
sumers 


a 

>68 


IP 

3 ES 



£ 



Newbury ..." 

Newcastle 

New Hamburg 

Niagara-on-the-L ake . 
Nipigon Twp 



North York Twp. 

Norwich 

Norwood 

Oil Springs 

Omemee 



Orono 

Otterville. . 
Paisley. . ! . 
Palmerston 
Parkhill. . . 



Plattsville 

Point Edward . 
Port Dalhousie. 

Port Elgin 

Port McNicoll . 



Port Perry . . 
Port Rowan . 
Port Stanley. 
Priceville. . . . 
Princeton. . . 



Queenston 

Richmond 

Richmond Hill . 
Ridgetown. . . . 
Ripley 



Rockwood 

Rodney 

Rosseau 

Russell 

St. Clair Beach. 



St. George 

St. Jacobs 

Scarborough Twp. 

Seaforth 

Shelburne 



Sioux Lookout , 
Smithville .... 
Southampton . 
Springfield. . . 
Stamford Twp. 



S.O. 
S.O. 
S.O. 
S.O. 
T.B. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 



S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

S.O. 
S.O. 
S.O. 
S.O. 
S.O. 

N.O.P 
S.O. 
S.O. 
S.O. 
S.O. 



233 

690 

1,454 

1,802 



1,199 
694 
426 
598 

P.V 
P.V 

577 

1,396 

801 

P.V 

1,221 

1,747 

1,276 

825 

1,275 

584 

833 

P.V 

P.V 

P.V 

412 
1,454 
1,911 

358 

P.V 
718 
179 

P.V. 
230 

P.V. 
P.V. 

1,724 
985 

1,723 

P.V. 

1,596 

401 



3> c. 

1,360.91 

5,232.23 
10,026.77 
19,706.63 

5,926.07 

239,262.95 

10,067.41 

5,747.40 

2,137.54 

3,581.66 

4,615.90 
2,938.11 
4,193.74 
11,776.66 
6,251.77 

2,627.13 

7,547.38 

22,466.46 

13,129.82 

4,234.82 

10,291.33 
3,328.98 

17,121.29 

638.52 

2,811.44 

3,048.06 
2,737.68 
11,740.85 
9,407.31 
3,252.57 

4,531.32 
3,621.01 
1,754.06 
3,604.81 
3,115.29 

3,341.55 

4,215.64 

141,923.12 

12,493.53 

6,089.97 

19,809.60 
3,704.53 

11,288.94 
2,273.20 

75,548.73 



kw-hr. 
47,008 
301,172 
771,674 

1,901,432 
356,090 

18,775,178 
832,220 
282,330 
131,124 
170,415 

180,828 
219,920 
143,805 
936,974 
363,450 

118,722 
363,950 
2,046,149 
730,622 
175,020 

468,866 

158,050 

1,170,753 

18,118 

153,330 

323,941 

133,890 

1,134,665 

650,260 

95,025 

287,740 
188,345 
33,100 
145,347 
174,220 

218,236 
354,960 
11,301,577 
855,825 
325,200 

474,274 

187,353 

705,265 

92,824 

7,817,480 



76 
233 
386 
641 
261 

7,585 
401 
253 
108 
176 

183 
146 
209 
400 
315 

124 
355 
704 
525 
251 

391 

178 

950 

36 

96 

82 

93 

431 

604 

133 

180 

256 

65 

124 
108 

164 
139 
6,113 
525 
318 

520 
190 
583 
135 
2,593 



kw-hr. 
52 
108 
167 
247 
114 

206 
173 

93 
101 

81 

82 
126 

57 
195 

96 



85 
242 
116 

58 

100 
74 

103 
42 

133 

329 

120 

219 

90 

60 

133 
61 

42 

98 

134 

111 
213 
154 
136 
85 

76 

82 

101 

57 

251 



$c. 

1.49 

1.87 

2.16 

2.56 

1.89 

2.63 
2.09 
1.89 
1.65 
1.70 

2.1C 
1.68 
1.67 
2.45 
1.65 

1.77 
1.77 
2.66 
2.08 
1.41 



1.48 
2.44 

3.10 
2.45 
2.27 
1.30 
2.04 



1.70 

2.53 

1.93 

1. 

1.60 



cents 
2.9 
1.7 
1.3 
1.0 
1.7 



1.61 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



325 



"D"— Continued 

in Ontario Municipalities Served by the Commission 
and for Power Service during the year 1945 

VILLAGES AND SUBURBAN AREAS 



Commercial Light service 


Powei 


• service 
























Total 








c 












number 






Mumber 


•_j3 




V 




Number 


Average 


of 






of 


>>& 


a, £ 


D. 




of 


monthly 


con- 


Revenue 


Consumption 


con- 


831 


Sox: 


th 


Revenue 


con- 


horse- 


sumers 






sumers 


fill 

>S3 


2e~ 
<u o— . 


8-c 

1* 




sumers 


power 




$ c. 


kw-hr. • 




kw-hr. 


$ c. 


cents 


$ C. 








458.72 


12,043 


19 


97 


2.01 


3.8 


174.17 


1 


11.4 


96 


1,661.74 


85,474 


35 


204 


3.96 


1.9 


3,061.93 


6 


116.5 


274 


4,911.46 


246,175 


106 


194 


3.86 


2.0 


8,408.22 


12 


406.3 


504 


7.166.17 


491,440 


102 


402 


5.85 


1.5 


6,518.76 


11 


315.3 


754 


4,672.80 


286,252 


54 


442 


7.21 


1.6 


769.42 


4 


42.8 


319 


34,769.28 


1,766,499 


372 


396 


7.79 


2.0 


171,401.69 


73 


6,201.8 


8,030 


5,044.77 


225,383 


89 


211 


4.72 


2.2 


2,254.65 


9 


154.9 


499 


2,992.53 


96,100 


61 


131 


4.09 


3.1 


1,309.39 


6 


66.0 


320 


1,444.46 


69,406 


36 


161 


3.34 


2.1 


5,485.75 


33 


169.8 


177 


909.77 


34,045 


30 


95 


2.53 


2.7 


3,477.21 


6 


149.0 


212 


1,992.73 


69,775 


39 


149 


4.26 


2.9 


303.68 


2 


11.7 


224 


1,965.30 


98,605 


48 


171 


3.41 


2.0 


547.57 


5 


42.6 


199 


2,561.44 


95,915 


54 


148 


3.95 


2.7 


963.59 


3 


36.8 


266 


5,191.87 


278,932 


95 


245 


4.55 


1.9 


8,860.86 


14 


556.5 


50S 


3,643.13 


157,345 


85 


154 


3.57 


2.3 


2,588.78 


9 


117.7 


40S 


1,797.60 


92,812 


23 


336 


6.51 


1.9 


2,040.95 


2 


77.9 


14S 


3,147.65 


128,944 


45 


239 


5.83 


2.4 


43,965.96 


11 


1,737.0 


411 


5,109.10 


358,495 


72 


415 


5.91 


1.4 


7,215.71 


12 


434.0 


788 


7,280.72 


305,206 


129 


197 


4.70 


2.4 


4,393.33 


7 


235.4 


661 


823.10 


32,000 
158,948 


18 
79 


148 
168 


3.81 

4.14 


2.6 

2.5 








26S 


3,925.30 


3,275.83 


10 


141.8 


48C 


2,457.15 


138,900 


41 


282 


4,99 


1.8 


105.43 


2 


2.8 


221 


4,877.86 


228,549 


85 


224 


4.78 


2.1 


4,814.79 


11 


193.6 


1,146 


162.92 


4,973 


9 


46 


1.51 


3.3 


303.91 


3 


12.0 


4£ 


938.48 


42,241 


22 


160 


3.55 


2.2 


2,674.67 


3 


97.4 


121 


1,482.35 


93,503 
41,066 


17 
22 


458 
155 


7.27 
4.33 


1.6 

2.8 








9£ 


1,142.34 








115 


4,494.96 


289,027 


75 


321 


4.99 


1.6 


"2,444:34 


" " 15 


" 169^1 


521 


8,295.60 


458,379 


138 


277 


5.01 


1.8 


7,257.82 


20 


443.2 


762 


1,985.62 


48,141 


51 


79 


3.24 


4.1 


2,286.79 


2 


90.9 


186 


1,195.44 


53 530 


30 


140 


3.32 


2.4 


65.54 


2 


4.0 


212 


2,333.60 


94 340 


67 


117 


2.90 


2.5 


1,981.58 


6 


104.1 


32£ 


805.24 


19,302 


12 


134 


5.59 


4.2 


279.99 


1 


15.2 


7£ 


1,663.23 


57,366 
88,025 


31 
6 


154 
1,223 


4.47 
25.69 


2.9 
2.1 








155 


1,849.81 


"2OO:90 


"l 


"ioio 


115 


1,459.17 


87,225 


28 


260 


4.34 


1.7 


. 4,279.82 


3 


170.7 


195 


2,066.15 


102,1 1C 


33 


258 


5.22 


2.0 


5,223.62 


9 


265.9 


181 


27,123.09 


1.836 375 


406 


377 


5.57 


1.5 


39,695.14 


46 


1,775.0 


6,565 


9,667.14 


447,404 


119 


313 


6.77 


2.2 


17,964.44 


22 


826.2 


666 


4,047.55 


189,900 


75 


211 


4.50 


2.1 


3,327.46 


14 


198.6 


407 


13,220.79 


246,678 


88 


234 


12.52 


5.4 


1,423.32 


2 


32.5 


61C 


2,673.41 


108,849 


54 


168 


4.13 


2.5 


2,754.62 


5 


159.4 


24S 


6,223.94 


285,890 


91 


262 


5.7C 


2.2 


8,854.57 


12 


347.6 


686 


801.75 


22,528 


22 


85 3.04 


3.6 


1,253.15 


4 


50.5 


161 


14,812.65 


954,198 


162 


491 


1 7.62 


1.6 


18,965.20 


20 


1,227.9 


2,775 



326 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Statistics Relating to the Supply of Electrical Energy to Consumers 
For Domestic Service, for Commercial Light Service 

Group III— SMALL TOWNS (less than 2,000 population), 



Municipality 



System 







Domestic service 






emula- 






Number 


tion 




& 


tion 






of 


£§" 


>> 




Revenue 


Consumption 


con- 


¥>* 


&fj 


S-V 








sumers 




gc„ 










5 o c 


0) o~ 


& 










$£* 


^ s:s 



Stayner .... 
Stirling. . . . 
Stouffville . . 
Streetsville . 
Sunderland. 

Sutton 

Tara 

Tavistock. . 
Teeswater . . 
Thamesford 



Thamesville . 
Thedford. . . 
Thornbury. . 
Thorndale. . 
Thornton. . 



Tilbury 

Toronto Twp 

Tottenham 

Trafalgar Twp. No. 1 . 
Trafalgar Twp. No. 2. 

Tweed 

Uxbridge 

Victoria Harbour 

Wardsville 

Warkworth 



Waterdown. . . 
Waterford. . . . 

Watford 

Waubaushene. 
Wellesley 



Wellington . 
West Lome. 
Westport. . . 
Wheatley. . . 
Wiarton. . . . 



Williamsburg 
Winchester. . 
Windermere. 
Woodbridge. , 
Woodville . . . 



Wyoming. . 
York Twp. 
Zurich .... 



S.O. 


1,162 


S.O. 


984 


S.O. 


1,295 


S.O. 


707 


S.O. 


P.V. 


S.O. 


894 


S.O. 


482 


S.O. 


1,037 


S.O. 


846 


S.O. 


P.V. 


S.O. 


777 


S.O. 


573 


S.O. 


803 


S.O. 


P.V. 


S.O. 


P.V. 


S.O. 


1,995 


S.O. 




S.O. 


454 


S.O. 




S.O. 




S.O. 


1,250 


S.O. 


1,439 


S.O. 


894 


S.O. 


226 


S.O. 


P.V. 


S.O. 


916 


S.O. 


1,352 


S.O. 


972 


S.O. 


P.V. 


S.O. 


P.V. 


S.O. 


909 


S.O. 


791 


S.O. 


663 


S.O. 


716 


S.O. 


1,709 


S.O. 


P.V. 


S.O. 


959 


S.O. 


100 


S.O. 


1,089 


S.O. 


381 


S.O. 


480 


S.O. 




S.O. 


P.V. 



$ c 
6,456.78 
6,942.69 
7,638.96 
6,007.66 
3,088.90 

9,067.12 
2,979.97 
8,612.44 
4,512.13 
4,459.87 

3,807.74 

3,351.08 

5,162.99 

1,951.5 

1,231.07 

7,867. 5C 

101,064.03 

3,534.44 

19,572.00 

6,774.09 

7,553.87 
10,337.74 
3,900.49 
1,458.23 
2,592.65 

6,181.10 
7,531.25 
8,464.89 
3,621.69 
2,594.73 

6,798.54 
3,990.03 
4,151.71 
3,698.19 
7,888.01 

1,788.81 
7,247,66 
2,567.00 
8,229.90 
2,417.16 

2,728.14 

498,427.95 

3,907.94 



kw-hr 
361,870 
566,800 
569,550 
435,150 
132,728 

462,250 
113,882 
703,828 
203.181 



335 

294 
420 
205 
149 

478 
157 
300 
236 



3bZ,44U 
245,008 


151 
243 


137,520 


189 


250,720 


261 


89,357 


86 


38,480 


68 


531,924 


521 


7,863,238 


3,305 


157,080 


176 


934,000 


415 


390,406 


170 


383,133 


334 


576,380 


447 


190,410 


281 


65,767 


68 


92,200 


137 


505,640 


280 


541,039 


414 


542,620 


307 


165,706 


239 


138,380 


138 


396,440 


341 


248,391 


236 


155,390 


158 


216,700 


246 


386,381 


461 


163,320 


92 


551,314 


312 


64,280 


70 


693,414 


323 


105,100 


122 


125,630 


172 


0,822,256 


22,430 


185,277 


148 



kw-hr. I 

90 

161 

113 

177 

74 

81 
60 

196 
72 

200 

84 
61 
80 

87 
47 

85 
198 

74 
188 
191 

96 
107 
56 
81 
56 

150 

109 

147 

69 

84 

97 
88 
82 
73 
70 

148 
147 

77 
179 

72 

61 
152 
104 



$ c. 
1.61 
1.97 
1.52 
2.44 
1.73 

1.58 
1.58 
2.39 
1.59 
2.46 

1.31 

1.48 
1.65 
1. 
1.51 



cents 
1.8 
1.2 
1.3 
1.4 
2.3 



1.26 
2.55 
1.67 
3.93 
3.32 

1.88 
1.93 
1.16 
1.79 
1.58 

1.84 
1.52 
2.30 
1.26 
1.57 

1.66 
1.41 
2.19 
1.25 
1.43 

1.62 
1.94 
3.05 
2.12 
1.65 

1.32 
1.85 
2.20 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



327 



"D"— Concluded 

in Ontario Municipalities Served by the Commission 
and for Power Service during the year 1945 

VILLAGES AND SUBURBAN AREAS 



Commercial Light service 


Power 


service 












c 












Total 
number 






Number 


•2 




I 




Number 


Average 


of 






of 


„,£& 


>> 




of 


monthly 


con- 


Revenue 


Consumption 


con- 


|3i 


as 


Cfl j_; 


Revenue 


con- 


horse- 


sumers 






sumers 


£ 2 S 

>S8 


2c_ 






sumers 


power 




$ C. 


kw-hr. 




kw-hr. 


$c. 


cents 


$ C. 








4,094.65 


194,738 


85 


191 


4.01 


2.1 


2,877.95 


17 


209.7 


437 


3,620.59 


172,839 


70 


206 


4.31 


2.1 


1,443.86 


10 


87.3 


374 


4,162.82 


239,720 


89 


224 


3.90 


1.7 


1,225.16 


6 


75.6 


. 515 


2,244.77 


98,910 


48 


172 


3.90 


2.3 


3,393.99 


6 


166.8 


259 


1,360.95 


48,825 


39 


104 


2.91 


2.8 


377.59 


2 


13.0 


190 


3,557.22 


201,850 


77 


218 


3.85 


1.8 


1,773.69 


5 


62.7 


560 


1,552.97 


79,857 


35 


190 


3.70 


1.9 


1,674.21 


6 


62.1 


198 


4,496.97 


203,292 


96 


176 


3.90 


2.2 


9,472.98 


9 


416.4 


405 


2,745.63 


121,562 


62 


163 


3.69 


2.3 


2,388.89 


5 


62.0 


303 


1,394.58 


85,654 


36 


198 


3.23 


1.6 


2,089.05 


6 


102.4 


193 


3,007.89 


175,301 


69 


212 


3.63 


1.7 


2,036.13 


6 


99.9 


318 


2,465.15 


85,353 


49 


145 


4.19 


2.9 


1,683.20 


2 


52.0 


240 


3,023.22 


79,355 


65 


102 


3.88 


3.8 


2,409.77 


11 


124.1 


337 


715.55 


23,081 


21 


92 


2.84 


3.1 


1,181.55 


2 


45.6 


109 


453.27 


16,544 


13 


106 


2.91 


2.7 


280.31 


2 


5.8 


83 


7,408.14 


428,144 


129 


277 


4.79 


1.7 


32,530.79 


16 


1,546.2 


666 


25,051.51 


1,787,687 


220 


677 


9.49 


1.4 


10,275.98 


34 


531.0 


3,559 


1,082.39 


36,170 


38 


79 


2.37 


3.0 


1,773.67 


8 


64.7 


222 


1,017.71 


52,920 


6 


735 


14.14 


1.9 


2,706.78 


8 


109.4 


429 


915.45 


43,215 


20 


180 


3.81 


2.1 


174.07 


2 


11.0 


192 


5,142.10 


176,742 


80 


184 


5.36 


2.9 


4,786.91 


15 


195.9 


429 


4.561.41 


160,625 


92 


145 


4.13 


2.8 


3,185.21 


12 


174.0 


551 


946.72 


45,738 


29 


131 


2.72 


2.1 


106.66 


1 


3.0 


311 


947.79 


39,244 


18 


182 


4.39 


2.4 


37.67 


1 


3.0 


87 


1,516.11 


63,870 


36 


148 


3.51 


2.4 


122.24 


1 


5.1 


174 


1,646.71 


125,370 


36 


290 


3.81 


1.3 


1,511.30 


10 


68.4 


326 


3,926.37 


297,615 


78 


318 


4.19 


1.3 


4,874.49 


15 


321.8 


507 


4,144.75 


191,200 


83 


192 


4.16 


2.2 


4,840.62 


8 


196.2 


398 


876.13 


45,920 


22 


174 


3.32 


1.9 


192.90 


3 


8.0 


263 


1,464.29 


65,146 


44 


123 


2.77 


2.3 


1,238.31 


6 


60.8 


188 


3,015.55 


127,376 


68 


156 


3.70 


2.4 


2,887.40 


10 


156.1 


419 


3,391.05 


203,139 


55 


308 


5.14 


1.7 


5,040.70 


8 


247.2 


299 


2,911.88 


109,195 
180,949 


51 
76 


178 
198 


4.76 
4.20 


2.7 
2.1 








209 


3,833.96 


" 3,170^03 


7 


" 152.1 


329 


7,367.19 


369,678 


107 


288 


5.74 


2.0 


7,606.63 


19 


238.7 


587 


1,994.26 


121,180 


35 


289 


4.75 


1.6 


296.12 


1 


23.5 


128 


4,748.49 


261,377 


85 


256 


4.66 


1.8 


2,018.69 


3 


103.0 


400 


561.42 


13,718 


11 


104 


4.25 


4.1 


709.04 


2 


38.5 


83 


2,126.50 


109,670 


47 


194 


3.77 


1.9 


10,085.23 


9 


545.2 


379 


944.90 


31,405 


23 


114 


3.42 


3.0 


685.16 


2 


42.8 


147 


1,575.01 


62,690 


44 


119 


2.98 


2.5 


933.29 


4 


44.2 


220 


78,586.61 


5,268,814 


1.015 


433 


6.45 


1.5 


171,251.06 


198 


9,117.8 


23,643 


3,333.56 


127,883 


45 


237 


6.17 


2.6 








193 













328 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



STATEMENT "E" 

Cost of Power to Municipalities and Rates to Consumers for 

Domestic Service — Commercial Light Service — Power Service 

in Ontario Urban Municipalities Served by 

The Hydro-Electric Power Commission 

for the year 1945 



In Statement "E" are presented the rate schedules applicable to con- 
sumers for domestic service, for commercial light service and for power service 
in each of the co-operating municipalities receiving service at cost through 
The Hydro-Electric Power Commission.* The cost per horsepower of the 
power supplied at wholesale by the Commission to the municipality, an 
important factor in determining rates to consumers, is also stated. 

Cost of Power to Municipalities 

The figures in the first column represent the total cost for the year of the 
power supplied by the Commission to the municipality, divided by the number 
of horsepower supplied. Details respecting these costs are given in the "Cost 
of Power" tables relating to the systems, as presented in Section IX, and an 
explanation of the items making up the cost of power is given in the intro- 
duction to that Section. 

Rates to Consumers 

The Power Commission Act stipulates that 'The rates chargeable by any 
municipal corporation generating or receiving and distributing electrical power 
or energy shall at all times be subject to the approval and control of the 
Commission" f- I n accordance with the Act and in pursuance of its funda- 
mental principle of providing service at cost, the Commission requires that 
accurate cost records be kept in each municipality, and exercises a continuous 
si iper vision over the rates charged to consumers. 

At the commencement of its operations, the Commission introduced 
scientifically-designed rate schedules for each of the three main classes into 
which electrical service is usually divided, namely: residential or domestic 
service, commercial light service, and power service, and the schedules in use 
during the past year are presented in the tables of this statement. 

♦Except townships served as parts of rural power districts, for which consult Section IV. 
fR.S.O. 1937, Ch. 62, Sec. 89. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 329 

Domestic Service: Domestic rates apply to electrical service in residences, 
for all household purposes, including lighting, cooking and the operation of all 
domestic appliances. 

During the past few years most of the urban municipal utilities have 
further simplified the domestic rate structure by abolishing the service charge, 
and making a suitable adjustment in the first consumption rate. Where the 
service charge is retained at 33 and 66 cents gross per month the charge of 
33 cents per month per service is made when the permanently installed 
appliance load is under 2,000 watts, and the charge of 66 cents per month 
when 2,000 watts or more. 

Commercial Light Service: Electrical energy used in stores, offices, 
churches, schools, public halls and institutions, hotels, public boarding-houses, 
and in all other premises for commercial purposes, including sign and display 
lighting, is billed at commercial lighting rates. 

Water-Heater Service: For all consumers using continuous electric water 
heaters, low flat rates are available consisting of a fixed charge per month 
dependent on the capacity of the heating element and the cost of power to the 
municipal utility. Such heaters are so connected that the electrical energy 
they consume is not metered. For new installations the necessary equip- 
ment, including heater, thermostat, efficient insulation for water-storage tank, 
and wiring, is installed by a large number of municipal Hydro utilities, 
without capital cost to the consumer.! The installation of new water-heating 
services was suspended during the war. 

Power Service: The rate schedules given for power service in Statement 
"E" are those governing the supply of power at retail by each of the local 
municipal utilities. The Commission serves direct, certain large power con- 
sumers under special contracts, on behalf of the systems of municipalities. 

The rates for power service, as given in the tables, are the rates for 24- 
hour unrestricted power at secondary distribution voltage. For service at 
primary distribution voltage the rates are usually five per cent lower than 
those stated. In municipalities where load conditions and other circumstances 
permit, lower rates are available for ' 'restricted power", discounts additional 
to those listed in the table being applicable. 

The service charge relates to the connected load or to the maximum 
demand, as measured by a 10-minute average peak, where a demand meter 
is installed. The prompt payment discount of 10 per cent on the total 
monthly bill is given for settlement within 10 days. 

Under the tabulation of rates for power service there is a column headed 
"Basis of rate 130 hours' monthly use of demand/' This column shows 
approximately the net annual amount payable for a demand of one horse- 
power, assuming a monthly use of 130 hours, which includes 30 hours' use each 
month at the third energy rate. Broadly, the figures in this column serve to 
indicate approximately the relative cost of power service in the different 
municipalities listed. 

fin addition, the municipal Hydro utilities supply booster water-heating equipment to 
furnish extra requirements beyond the capacity of the continuous heater; current for the booster 
heater is measured and charged for at the regular rates. 



330 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Cost of Power to Municipalities and Rates to Consumers for 
for the Year 1945, in Urban Municipalities 









Domestic service 








Annual cost to 
the Commission 












Municipality 
















on the works to 




First rate 










serve electrical 
energy to munici- 


Service 






All 








charge 






additional 


gross 


payment 


c— City 


power basis 


per , ,. 


Number 


Per 


per 


monthly 


discount 


T — Town 


month* 


of kw-hrs. 


kw-hr. 


kw-hr. 


bill 




(pop. 2,000 or more) 






per month 


per month 










$ c. 


cents 




cents 


cents 


$ C. 


% 


Acton 


24.61 




60 


2.3 


1.0 


0.83 


10 


Agincourt 


24.69 




60 


3.0 


1.0 


0.83 


10 


Ailsa Craig . ; 


30.92 




60 


2.5 


0.9 


0.83 


10 


Alexandria T 


37.85 




60 


3.0 


1.0 


1.11 


10 


Alliston T 


31.09 




55 


3.5 


1.0 


1.11 


10 


Almonte 


29.68 


a2 




bl.5 


1.0 




10 


Alvinston. .' 


39.00 




60 


3.5 


1.0 


0.83 


10 


Amherstburg t 


26.60 




60 


2.5 


0.9 


0.83 


10 


Ancaster Twp 


23.19 




60 


3.4 


1.0 


0.83 


10 


Apple Hill 


35.92 




60 


4.0 


1.0 


1.39 


10 


Arkona 


39.00 




60 


4.0 


1.0 


1.11 


10 


Arnprior T 


22.33 




60 


2.8 


0.8 


0.83 


10 


Arthur 


39.00 




45 


4.5 


1.2 


1.11 


10 


Athens 


35.90 


33-66 


50 


4.5 


1.5 

xl.6 


1.11 
tl.67 


10 


Atikokan 




56 


40 


3.5 


0.75 


J2.25 


10 








Aurora T 


23.56 




60 


2.6 


1.0 


0.83 


10 


Aylmer T 


25.92 




60 


2.2 


0.8 


0.83 


10 


Ayr 


27.99 




60 


2.7 


1.0 


1.11 


10 


Baden 


23.95 




60 


2.4 


0.9 


0.83 


10 


Bala T 




33-^66 


50 


3.7 


1.2 


1.66 


10 








Barrie T 


22.05 




60 


2.4 


0.8 


0.83 


10 


Bath 


39.00 




60 


4.8 


1.5 


2.22 


10 


Beachville 


24.65 




60 


2.8 


0.9 


0.83 


10 


Beamsville. 


22.07 




60 


2.2 


0.8 
xl.6 


0.83 
fl.67 


10 


Beardmore Townsite. . 




56 


40 


3.5 


0.75 


J2.25 


10 


Beaverton 


28.46 




60 


2.8 


1.0 


1.11 


10 


Beeton 


39.00 




45 


4.0 


1.2 


1.39 


10 


Belle River 


29.89 
19.73 




60 
55 


3.0 
1.8 


0.9 
0.6 


1.11 
0.83 


10 


Belleville c 


10 


Blenheim t 


26.71 




60 


2.3 


0.8 


0.83 


10 


Bloomfield 


33.64 




60 


2.5 


0.9 


0.83 


10 


Blyth 


34.63 




60 


2.9 


1.0 


1.11 


10 


Bolton 


28.46 




60 


2.9 


1.0 


0.83 


10 


Bothwell T 


34.13 




60 


2.2 


0.75 


0.83 


10 


Bowman ville T 


24.92 




60 


2.8 


0.9 


0.83 


10 


Bradford 


32.62 




45 


4.2 


1.0 


1.39 


10 


Braeside 


24.07 




50 


4.0 


1.3 


0.83 


10 


Brampton T 


23.06 




60 


2.1 


0.9 


0.83 


10 


Brantford C 


21.76 




60 


1.8 


0.8 


0.83 


10 


Brantford Twp 


25.11 




60 


2.6 


0.9 


1.11 


10 



*Where domestic service charge has not been abolished the charge is 33 cents per month 
per service when the permanently installed appliance load is under 2,000 watts and 66 cents per 
month when 2,000 watts or more. 

f2 wire service. J3 wire service. a. Service Charge per 100 square feet floor area. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



331 



Domestic Service — Commercial Light Service — Power Service 
Served by The Hydro-Electric Power Commission 



Commercial Light service 








Power 


service 








Service 
charge 
per 100 
watts 
min. 
1,000 
watts 


First 
100 hrs. 

per 
month 

per 
kw-hr. 


All ad- 
ditional 

per 
kw-hr. 


Mini- 
mum 
gross 
monthly 
bill 


Prompt 
pay- 
ment 
discount 


Basis of 
rate 130 

hours' 
monthly 

use of 
demand 


Service 
charge 
per h.p. 

per 
month 


First 
50 hrs. 

per 
month 

per 
kw-hr. 


Second 
50 hrs. 

per 
month 

per 
kw-hr. 


All ad- 
ditional 

per 
kw-hr. 


Mini- 
mum 
per 
h.p. 
per 
month 


Local 
discoimt 


Prompt 
pay- 
ment 
discount 


cents 
5.0 
5.0 
5.0 
5.0 


cents 
1.8 
2.6 
2.0 
2.6 
3.2 


cents 
0.5 
0.6 
0.6 
0.8 
0.9 


$ C. 

0.83 
0.83 
0.83 
1.11 
1.11 


% 

10 

10 
10 
10 
10 


$ C. 

18.00 
20.00 
22.00 
35.00 
27.00 


$ C. 

1.00 
1.00 
1.00 
1.00 
1.00 


cents 
1.9 
1.6 
1.9 
3.5 
2.3 


cents 
1.2 
1.0 
1.3 
2.3 
1.5 


cents 
0.33 
0.33 
0.33 
0.33 
0.33 


$ C. 


% 

25 
10 
10 


% 

10 
10 
10 
10 


5.0 






10 












c3.0. 

d2.0. 
3.0 
2.0 
2.9 
3.5 


1.0 
0.9 
0.5 
0.7 
1.0 


a83 
0.83 
0.83 
1.39 


10 
10 
10 
10 
10 


38.00 
20.00 
24.00 
30.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.0 
4.0 
1.6 
2.3 
2.8 


0.5 
. 2.6 
1.0 
1.5 
1.8 


0.10 
0.33 
0.33 
0.33 
0.33 






10 


5.0 






10 


5.0 
5.0 
5.0 




10 
10 


10 
10 
10 










5.0 


3.5 
2.5 
4.0 
4.5 

3.5 


0.8 
0.6 
1.0 
1.0 

1.0 


1.11 
0.83 
1.11 
1.11 

fl.67. 

|2.25. 


10 

10 
10 
10 

10 


40.00 
18.00 
35.00 
40.00 

30.00 


1.00 
1.00 
1.00 
1.00 

1.00 


4.3 
1.9 
3.5 
4.3 

2.8 


2.8 
1.2 
2.3 
2.8 

1.8 


0.33 
0.33 
0.33 
0.33 

0.33 






10 


5.0 
5.0 




25 


10 
10 


5.0 






10 


5.0 






10 










5.0 
5.0 
5.0 


1.6 
1.8 
2.2 
2.0 
3.7 


0.4 
0.4 
0.7 
0.6 
0.8 


1.11 
0.83 
1.11 
0.83 
1.66 


10 

10 
10 
10 
10 


20.00 
19.00 
28.00 
19.00 
20.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.6 
2.0 
2.5 
2.0 

1.6 


1.0 

1.4 
1.6 
1.4 
1.0 


0.33 
0.33 
0.33 
0.33 
0.33 




10 
25 


10 
10 
10 


5.0 
5.0 




25 
10 


10 
10 


5.0 
5.0 


2.0 
5.0 
2.4 
1.8 

3.5 


0.6 
1.0 
0.5 
0.5 

1.0 


0.83 
2.22 
0.83 
0.83 

fl.67. 
J2.25. 


10 
10 
10 
10 

10 


18.00 
35.00 
19.00 
18.00 

30.00 


1.00 
1.00 
1.00 
1.00 

1.00 


1.9 
3.5 
2.0 

1.9 

2.8 


1.2 
2.3 

1.4 
1.2 

1.8 


0.33 
0.33 
0.33 
0.33 

0.33 




25 


10 
10 


5.0 
5.0 

5.0 




25 
25 


10 
10 

10 










5.0 
5.0 


2.0 
3.5 
2.5 
1.5 
1.8 


0.8 
1.0 
0.5 
0.3 
0.5 


1.11 
1.39 
1.11 
0.83 
0.83 


10 
10 
10 
10 
10 


24.00 
30.00 
28.00 
14.00 
22.00 


1.00 
1.00 
1.00 
1.00 
1.00 


2.3 
2.8 
2.5 
1.1 

1.9 

i 


1.5 
1.8 
1.6 
0.7 
1.3 


0.33 
0.33 
0.33 
0.33 
0.33 




10 


10 
10 


5.0 






10 


4.5 
5.0 




25 
10 


10 
10 


5.0 


2.3 
2.4 
2.5 
1.7 
2.3 


0.7 
0.8 
0.8 
0.3 
0.6 


0.83 
1.11 
0.83 
0.83 
0.83 


10 
10 
10 
10 
10 


30.00 
30.00 
22.00 
22.00 
20.00 


1.00 
1.00 
1.00 
1.00 
1.00 


2.8 
2.8 
1.9 
1.9 
1.6 


1.8 
1.8 
1.3 
1.3 
1.0 


0.33 
0.33 
0.33 
0.33 
0.33 






10 


5.0 






10 


5.0 
5.0 
5.0 




10 
10 
10 


10 
10 
10 


5.0 


3.7 
4.0 
1.7 
1.5 

2.2 


1.0 

1.0 

0.5 

0.35 

0.5 


1.39 
0.83 
0.83 
0.83 
1.11 


10 
10 
10 
10 
10 


25.00 
25.00 
16.00 
15.00 
18.00 


1.00 
■1.00 
1.00 
1.00 
1.00 


2.0 
2.0 
1.5 
1.3 
1.9 


1.3 
1.3 

0.9 
0.8 
1.2 


0.33 
0.33 
0.33 
0.33 
0.33 






10 


5.0 






10 


5.0 

z5.0 

5.0 




25 
25 
25 


10 
10 
10 



b. Per kw-hr for first 2 kw-hrs per IO0 square feet. 

c. First 30 hours use— 3 cents per kw-hr. d. Next 70 hours use — 2 cents per kw-hr. 
x2 wire service next 80 kw-hrs. 3 wire service next 180 kw-hrs. 

z Minimum 500 watts. 



332 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Cost of Power to Municipalities and Rates to Consumers for 
for the Year 1945, in Urban Municipalities 





Annual cost to 
the Commission 
on the works to 

serve electrical 
energy to munici- 
pality on a horse- 
power basis 


Domestic service 


Municipality 


Service 
charge 

per 
month 


First rate 


All 

additional 

per 

kw-hr. 


Minimum 

gross 

monthly 

bill 


Prompt 
payment 
discount 


c— City 
T — Town 

(pop. 2,000 or more) 


Number 
of kw-hrs. 
per month 


Per 

kw-hr. 
per month 



Brechin 

Bridgeport 

Brigden 

Brighton 

Brockville T 


$ c. 
32.68 
26.61 
36.63 
24.21 
22.19 


cents 


45 
60 
60 
60 
60 


cents 

5.5 

3.0 

3.0 

3.5 

1.8 


cents 

1.2 

0.9 

0.9 

0.9 

0.7 


$ c. 
1.67 
0.83 
1.11 
0.83 
0.83 


% 
10 
10 
10 
10 
10 


Brussels 

Burford ...... 

Burgessville 

Burlington T 

Burlington Beach or 
Hamilton Beach. . . . 


34.79 
24.81 
38.07 
23.13 




60 
60 
60 

60 


3.2 
2.3 
4.0 

3.5 


1.0 

0.8 

1.0 

Special 

1.1 


1.11 
0.83 
1.11 

0.83 


10 
10 
10 

10 










Caledonia 

Callander 


24.73 


56 


60 

40 
60 
60 
50 


2.0 

3.5 
2.8 
3.2 
3.6 


0.8 
•1.6 

0.75 
1.0 
1.0 
1.0 


0.83 
tl.67 
12.25 
1.11 
1.11 
1.39 


10 
10 


Campbellville 

Cannington 

Capreol T 


39.00 
28.75 


10 
10 
10 








Cardinal 

Carleton Place T 

Cayuga 

Chatham : .c 

Chatsworth 


23.15 
21.87 
35.22 
23.12 
30.63 




55 
55 

60 
60 
50 


2.5 
2.5 
3.5 
2.8 
3.0 


1.0 
0.9 
1.0 
0.8 
1.0 


1.11 
0.83 
1.39 
0.83 
1.39 


10 
10 
10 
10 
10 


Chesley T 

Chesterville 

Chippawa 

Clifford 

Clinton T 


25.60 
27.41 
18.83 
39.00 
27.35 




55 
55 
60 
55 

60 


2.5 
2.3 
2.0 
3.3 

2.2 


0.8 
0.9 
0.8 
1.1 
0.7 


1.11 
0.83 
0.83 
1.11 
0.83 


10 
10 
10 
10 
10 


Cobden 

Cobourg T 

Colborne 

Coldwater 

Collingwood T 


32.75 
23.94 
26.61 
26.37 
22.93 


33-66' 


40 
60 
60 
55 
55 


2.8 
2.9 
3.8 
2.5 
2.3 


1.0 
1.0 
1.0 
1.0 
0.9 


1.11 

0.83 
0.83 
1.11 
0.83 


10 
10 
10 
10 
10 


Comber 

Cookstown 

Cottage Cove 

Townsite 


32.33 
29.43 


56 


60 

45 

40 
60 
60 


2.9 
4.3 

3.5 
3.0 
3.0 


0.8 

1.0 

•1,6 

0.75 

1.0 

1.1 


0.83 
1.39 
tl.67 
J2.25 
0.83 
1.11 


10 

10 

10 


Cottam 

Courtright 


31.90 
39.00 


10 
10 


Creemore 

Dashwood 

Delaware 

Delhi 

Deseronto t 


30.48 
30.38 
25.86 
26.97 
29.42 




50 
60 
60 
60 
60 


3.1 
3.5 
3.4 
3.2 
3.9 


1.0 
1.0 
1.0 
1.0 

1.0 


1.39 
0.83 
0.83 
0.83 
0.83 


10 
10 
10 
10 
10 



* 2-wire service next 80 kw-hrs-3-wire service next 180 kw-hrs. 
f 2-wire service. 
% 3-wire service. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



333 



"E"— Continued 

Domestic Service — Commercial Light Service — Power Service 
Served by The Hydro-Electric Power Commission 



Commercial Light service 








Power service 








Service 


























charge 
per 100 


First 




Mini- 




Basis of 


Service 


First 


Second 




Mini- 






100 hrs. 


All ad- 


mum 


Prompt 


rate 130 


charge 


50 hrs. 


50 hrs. 


All ad- 


mum 




Prompt 


watts 


per 


ditional 


gross 


ray- 


hours' 


per h.p. 


per 


per 


ditional 


per 


Local 


pay- 


min. 


month 


per 


monthly 


ment 


monthly 


per 


month 


month 


per 


h.p. 


discount 


ment 


1,000 


per 


kw-hr. 


bill 


discount 


use of 


month 


per 


per 


kw-hr. 


per 




discount 


watts 


kw-hr. 








demand 




kw-hr. 


kw-hr. 




month 







cents 
5 


cents 
4.8 
2.7 
2.5 
3.0 
1.6 


cents 
0.8 
0.6 
0.7 
0.7 
0.3 


$ c. 
1.67 
0.83 
1.11 
0.83 
0.83 


% 
10 
10 
10 
10 
10 


$ c. 
34.00 
20.00 
34.00 
21.00 
15.00 


$ c. 
1.00 
1.00 
1.00 
1.00 
1.00 


cents 
3.4 
1.6 
3.4 
1.8 
1.3 


cents 
2.2 
1.0 
2.2 
1.1 

♦0.8 


cents 
0.33 
0.33 
0.33 
0.33 
0.33 


$ c. 


% 


% 
10 


5.0 
5 




10 


10 

10 


5.0 

4.5 




10 
25 


10 
10 


5 


2.7 
1.8 
3.5 

3.2 


0.8 
0.6 
0.8 

0.7 


1.11 

0.83 

1.11 

Special 

0.83 


10 
10 
10 

10 


30.00 
18.00 
31.00 

27.00 


1.00 
1.00 
1.00 

1.00 


2.8 
1.9 
2.9 

2.3 


1.8 

1.2 
1.9 

1.5 


0.33 
0.33 
0.33 

0.33 






10 


5.0 
5 




25 


10 
10 


5 


Special 




10 










5.0 
5.0 


1.6 

3.5 
2.5 
2.8 
3.2 


0.5 

1.0 
0.8 
0.9 
0.8 


0.83 
fl.67 
|2.25 
1.11 
1.11 
1.39 


10 

10 
10 
10 
10 


18.00 

30.00 
35.00 
26.00 
31.00 


1.00 

1.00 
1.00 
1.00 
1.00 


1.9 

2.8 
3.5 
2.2 
2.9 


1.2 

1.8 
2.3 

1.4 
1.9 


0.33 

0.33 
0.33 
0.33 
0.33 




25 


10 
10 


5.0 






10 


5.0 






10 


5.0 






10 










5.0 


2.0 
2.0 
3.0 
2.2 
2.5 


0.8 
0.7 
0.8 
0.6 
0.9 


1.11 
0.83 
1.39 
0.83 
1.39 


10 
10 
10 
10 
10 


25.00 
18.00 
30.00 
18.00 
30.00 


1.00 
1.00 
1.00 
1.00 
1.00 


2.0 
1.9 
2.8 
1.9 

2.8 


1.3 

1.2 
1.8 
1.2 
1.8 


0.33 
0.33 
0.33 
0.33 
0.33 






10 


5.0 
5.0 




25 


10 
10 


5.0 
5.0 




25 


10 
10 










5.0 
5 
5.0 
5.0 


2.0 
2.0 
1.6 
3.5 
1.9 


0.7 
0.9 
0.5 
1.0 
0.6 


1.11 
0.83 
0.83 
1.11 
0.83 


10 
10 
10 
10 
10 


20.00 
22.00 
18.00 
32.00 
22.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.6 
1.9 
1.9 
3.1 
1.9 


1.0 
1.3 
1.2 

2.0 
1.3 


0.33 
0.33 
0.33 
0.33 
0.33 




10 
10 
25 


10 
10 
10 
10 


5.0 




10 


10 


5.0 


2.5 
2.4 
3.0 
2.5 
1.8 


1.0 
0.8 
1.0 
1.0 
0.8 


1.11 
0.83 
0.83 
1.11 
0.83 


10 
10 
10 
10 
10 


35.00 
20.00 
30.00 
28.00 
18.00 


1.00 
1.00 
1.00 
1.00 
1.00 


3.5 
1.6 
2.8 
2.5 
1.9 


2.3 
1.0 
1.8 
1.6 
1.2 


0.33 
0.33 
0.33 
0.33 
0.33 






10 


5.0 
5.0 




10 


10 
10 


5.0 






10 


5.0 




25 


10 


5.0 


2.5 
3.8 

3.5 
2.6 
3.2 


0.6 
1.0 

1.0 
0.8 
1.0 


0.83 
1.39 

fl.67. 

J2.25. 
0.83 
1.11 


10 
10 

10 
10 
10 


26.00 
25.00 

30.00 
27.00 
40.00 


1.00 
1.00 

1.00 
1.00 
1.00 


2.2 
2.0 

2.8 
2.3 
4.3 


1.4 
1.3 

1.8 
1.5 
2.8 


0.33 
0.33 

0.33 
0.33 
0.33 






10 


5.0 






10 


5.0 






10 


5.0 






10 


5.0 






10 










5.0 
5.0 


2.6 
3.0 
3.0 
2.6 
3.5 


0.9 
0.8 
0.8 
0.8 
0.9 


1.39 
0.83 
0.83 
0.83 
0.83 


10 
10 
10 
10 
10 


21.00 
30.00 
30.00 
25.00 
28.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.8 
2.8 
2.8 
2.0 

I 2.5 


1.1 
1.8 
1.8 
1.3 
1.6 


0.33 
0.33 
0.33 
0.33 
0.33 




10 


10 
10 


5.0 






10 


5.0 






10 


5.0 






10 



334 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Cost of Power to Municipalities and Rates to Consumers for 
for the Year 1945, in Urban Municipalities 











Domestic service 








Annual cost to 
the Commission 












Municipality 
















on the works to 




First rate 










serve electrical 
energy to munici- 


Service 
charge 






All 
additiona 


Minimum 
gross 


Prompt 








payment 


c— City 


power basis 


per 


Number 


Per 


per 


monthly 


discount 


T — Town 


month 


of kw-hrs. 


kw-hr. 


kw-hr. 


bill 




(pop. 2,000 or more) 






per month 


per month 










$ C. 


cents 




cents 


cents 


$ C. 


% 


Dorchester 


27.07 




60 


2.6 


1.0 


0.83 


10 


Drayton 


39.00 




55 


4.0 


1.3 


1.11 


10 


Dresden : T 


28.11 




60 


2.5 


0.8 


0.83 


10 


Drumbo 


28.91 




60 


3.5 


1.0 


1.11 


10 


Dublin.. . . .. 


34.45 




60 


3.5 


1.1 


1.11 


10 


Dundalk 


26.51 




60 


2.7 


1.0 


1.11 


10 


Dundas T 


20.86 




60 


2.2 


0.8 


0.83 


10 


Dunnville T 


23.31 




60 


1.8 


0.7 


0.83 


10 


Durham .T 


27.31 




55 


2.5 


1.0 


0.83 


10 


Dutton 


27.61 




60 


2.0 


0.8 


0.83 


10 


East York Twp 


21.29 




60 


2.3 


1.0 


0.83 


10 


Elmira .T 


24.02 




60 


2.6 


0.8 


0.83 


10 


Elmvale 


28.55 




60 


2.6 


1.0 


0.83 


10 


Elmwood 


38.05 




50 


3.5 


0.9 


1.11 


10 


Elora. 


26.81 




60 


2.8 


1.0 


1.11 


10 


Embro 


28.79 




60 


3.3 


1.1 


0.83 


10 


Erieau 


33.97 




60 


3.7 


1.0 


1.11 


10 


Erie Beach . . . . • 


39.00 




60 
40 
60 


4.5 
5.0 
2.3 


1.2 
1.5 
0.8 


1.39 
1.39 
0.83 


10 


Erin. . . 


10 


Essex. t 


26.34 




10 


Etobicoke Twp 


22.23 




60 


2.5 


1.0 


0.83 


]0 


Exeter 


27.26 




60 


2.6 


0.9 


0.83 


10 


Fergus 


25.73 




60 


2.6 


0.9 


1.11 


10 


Finch 


32.39 




45 


3.0 


1.2 


1.39 


10 


Flesherton 


31.40 




60 


2.8 


1.0 


1.11 


10 


Fonthill 


23.85 




60 


2.8 


1.0 


0.33 


10 


Forest T 


. 29 59 




60 


3.0 


0.9 


0.83 


10 


Forest Hill 


20.84 

18.70 




60 
60 


2.5 
1.8 


1.1 
0.7 


0.83 
0.83 


10 


Fort William c 


10 


Frank ford . 






60 


4.5 


1.2 


0.83 


10 










Gait c 


22.15 




60 


2.5 


0.7 


0.83 


10 


Gamebridge 






45 


5.5 


1.2 


1.67 


10 


Georgetown t 


25.81 




60 


2.5 


0.9 


0.83 


10 


Geraldton Townsite. . 






60 
60 


3.7 
3.0 


1.2 
0.9 


1.11 
1.11 


10 


Glencoe 


38.05 




10 


Glen Williams 






60 
60 


2.9 
2.7 


1.0 
0.9 


0.83 
0.83 


10 


Goderich T 


29.26 




10 


Grand Valley 


34.69 




60 


2.8 


1.0 


1.11 


10 


Granton 


32.72 




60 


3.3 


1.0 


0.83 


10 


Gravenhurst T 


21.94 




60 


1.8 


0.7 


0.83 


10 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



335 



"E"— Continued 

Domestic Service— Commercial Light Service — Power Service 
Served by The Hydro-Electric Power Commission 



Commercial Light service 



Power service 



Service 










charge 


First 




Mini- 




per 100 


100 hrs. 


All ad- 


mum 


Prompt 


watts 


per 


ditional 


gross 


pay- 


min. 


month 


per 


monthly 


ment 


1,000 


per 


kw-hr. 


bill 


discount 


watts 


kw-hr. 

























Basis of 


Service 


First 


Second 




Mini- 






rate 130 


charge 


50 hrs. 


5J hrs. 


All ad- 


mum 




Promp 1 


hours' 


per h.p. 


per 


per 


ditional 


per 


Local 


pay- 


monthly 


per 


month 


month 


per 


h.p. 


discount 


ment 


use of 


month 


per 


per 


kw-hr. 


per 




discount 


demand 




kw-hr. 


kw-hr. 




month 







cents 
5.0 
5.0 


cents 
2.1 
3.4 
2.0 
3.0 
3.0 


cents 
0.8 
0.7 
0.5 
0.8 
0.8 


$ c. 
0.83 
1.11 
0.83 
1.11 
1.11 


% 
10 
10 
10 
10 
10 


$• c. 
24.00 
30.00 
22.00 
25.00 
34.00 


$ c. 
1.00 
1.00 
1.00 
1.00 
1.00 


cents 
2.3 
2.8 
1.9 
2.0 
3.4 


cents 
1.5 
1.8 
1.3 
1.3 
2.2 


cents 
0.33 
0.33 
0.33 
0.33 
0.33 


$ c. 


% 
10 


% 
10 
10 


5.0 
5.0 




10 


10 
10 


5.0 






10 










5.0 
5.0 
5.0 
5.0 
5.0 


2.3 
1.8 
1.5 

2.1 
1.7 


0.8 
0.5 
0.4 
0.8 
0.3 


1.11 
0.83 
0.83 
0.83 
0.83 


10 
10 
10 
10 
10 


20.00 
16.00 
16.00 
24.00 
18.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.6 

1.5 
1.5 
2.3 
1.9 


1.0 

0.9 
0.9 
1.5 

1.2 


0.33 
0.33 
0.33 
0.33 
0.33 




10 
25 
25 
10 
25 


10 
10 
10 
10 
10 


5.0 
5.0 
5.0 


1.8 
2.3 
2.2 
3.0 

2.4 


0.5 
0.5 
0.8 
0.8 
0.6 


0.83 
0.83 
0.83 
1.11 
1.11 


10 
10 
10 
10 
10 


18.00 
20.00 
26.00 
30.00 
20.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.9 
1.6 
2.2 
2.8 
1.6 


1.2 
1.0 
1.4 
1.8 
1.0 


0.33 
0.33 
0.33 
0.33 
0.33 




25 

10 


10 
10 
10 


5.0 






10 


5.0 




10 


10 


5.0 


2.7 
3.5 
4.0 
4.0 
1.8 


0.7 
0.9 
1.0 
1.0 
0.5 


0.83 
1.11 
1.39 
1.39 
0.83 


10 
10 
10 
10 
10 


32.00 
38.00 
45.00 
36.00 
18.00 


1.00 
1.00 
1.00 
1.00 
1.00 


3.1 
4.0 
4.9 
3.7 
1.9 


2.0 
2.6 
3.3 
2.4 
1.2 


0.33 
0.33 
0.33 
0.33 
0.33 






10 


5.0 
5.0 


2.22 




10 
10 


5.0 






10 


5.0 




25 


10 


5.0 
5.0 
5.0 
5.0 


1.9 
2.1 
2.2 
2.8 
2.3 


0.5 
0.4 
0.4 
1.0 
0.8 


0.83 
0.83 
1.11 
1.39 
1.11 


10 
10 
10 
10 
10 


18.00 
19.00 
19.00 
35.00 
23.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.9 
2.0 
2.0 
3.5 

2.1 


1.2 
1.4 

1.4 
2.3 

1.4 


0.33 
0.33 
0.33 
0.33 
0.33 




25 
25 
25 


10 
10 
10 
10 


5.0 




10 


10 


5.0 
5.0 


2.3 
2.5 
2.0 
1.6 
3.5 


0.6 
0.6 
0.6 
0.3 
1.0 


0.83 
0.83 
0.83 
0.83 
0.83 


10 
10 
10 
10 
10 


24.00 
29.00 
18.00 
15.00 
20.00 


1.00 
1.00 
1.00 
1.00 
1.00 


2.3 
2.6 
1.9 
1.3 
1.6 


1.5 
1.7 
1.2 
0.8 
1.0 


0.33 
0.33 
0.33 
0.33 
0.33 




10 


10 
10 


5.0 
5.0 
5.0 




25 
25 
10 


10 
10 
10 


5.0 
5.0 


2.1 
4.8 
2.0 

3.5 
2.6 


0.4 
0.8 
0.5 

1.0 
0.8 


0.83 
1.67 
0.83 

fl.67. 

J2.25. 
1.11 


10 
10 
10 

10 
10 


16.00 
34.00 
18.00 

30.00 
31.00 


1.00 
1.00 
1.00 

1.00 
1.00 


1.5 
3.4 
1.9 

2.8 
2.9 


0.9 
2.2 
1.2 

1.8 
1.9 


0.33 
0.33 
0.33 

0.33 
0.33 




25 


10 
10 


5.0 
5 




25 


10 
10 


5.0 






10 










5.0 
5.0 
5.0 
5 


2.3 
2.3 

2.4 
2.6 

1.5 


0.6 
0.5 
0.8 
1.0 
0.4 


0.83 
0.83 
1.11 
0.83 
0.83 


10 
10 
10 
10 
10 


21.00 
22.00 
22.00 
27.00 
16.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.8 
1.9 
1.9 
2.3 
1.5 


1.1 
1.3 
1.3 
1.5 
0.9 


0.33 
0.33 
0.33 
0.33 
0.33 




10 
10 
10 


10 
10 
10 
10 


5.0 




25 


10 



f 2-wire service, 
j 3-wire service. 



336 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Cost of Power to Municipalities and Rates to Consumers for 

for the Year 1945, in Urban Municipalities 





Annual cost to 
the Commission 
on the works to 

serve electrical 
energy to munici- 
pality on a horse- 
power basis 


Domestic service 


Municipality 


Service 
charge 

per 
month 


First rate 


All 

additional 

per 

kw-hr. 


Minimum 

gross 

monthly 

bill 


Prompt 
payment 
discount 


c— City 
T — Town 

(pop. 2,000 or more) 


Number 
of kw-hrs. 
per month 


Per 

kw-hr. 
per month 





$ c. 


cents 




cents 


cents 


$c. 


% 


Grimsby T 


23.98 




60 


2.8 


1.0 


0.83 


10 


Guelph c 


21.98 




60 


1.8 


0.8 


0.83 


10 


Hagersville 


26.07 




60 


2.3 


0.9 


0.83 


10 


Hamilton c 


20.42 




60 


2.0 


0.7 


0.83 


10 


Hanover. T 


22.24 




60 . 


2.4 


1.0 


0.83 


10 


Harriston T 


32.15 




55 


3.0 


1.0 


0.83 


10 


Harrow . . . . T 


28.36 




60 


3.2 


1.0 


0.83 


10 


Hastings 


33.35 




45 


4.2 


1.0 


1.11 


10 


Havelock 


37.75 




60 


2.8 


1.0 


0.83 


10 


Hensall . . '. 


35.10 




60 


3.2 


1.0 


0.83 


10 


Hepworth 






60 


4.0 


1.2 


1.67 


10 


Hespeler .t 


22.14 




60 


2.7 


0.8 


0.83 


10 


Highgate 


31.99 




60 


3.2 


0.9 
•1.6 


0.83 
fl.67 


10 


Hislop Townsite 




56 


40 


3.5 


0.75 


{2.25 


10 


Holstein 


39.00 




60 


3.0 


1.0 


1.11 


10 












*1.6 


fl.67 




Hudson Townsite 




56 


40 


3.5 


0.75 


|2.25 


10 


Humberstone 


22.74 




60 


2.2 


0.8 


0.83 


10 


Huntsville T 


25.45 




60 


2.0 


0.9 


0.83 


10 


Ingersoll T 


23.11 




60 


2.3 


0.8 


0.83 


10 


Iroquois 


21.90 




60 


2.5 


1.0 


0.83 


10 


Jarvis. ..' 


34.12 




60 


2.8 


0.9 
•1.6 


0.83 
tl.67 


10 


Kearns Townsite 




56 


40 
55 


3.5 
3.2 


0.75 
1.0 


|2.25 
0.83 


10 


Kemptville 


32.16 


10 


Kincardine t 


29.50 




50 


3.1 


1.0 


1.11 


10 


King Kirkland 










•1.6 


tl.67 




Townsite 




56 


40 


3.5 


0.75 


12.25 


10 








Kingston c 


20.40 




50 


1.8 


0.6 


0.83 


10 


Kingsville T 


27.45 




60 


2.6 


0.9 


0.83 


10 


Kirkfield 


39.00 




50 


5.0 


1.2 


1.66 


10 


Kitchener c 


21.53 




60 


2.0 


0.9 


0.83 


10 


Lakefield 


24.25 




55 


2.8 


1.0 


0.83 


10 


Lambeth 


29.14 
38.95 




60 
50 


2.6 
3.8 


0.8 
1.2 


0.83 
0.83 


10 


Lanark 


10 


Lancaster 


39.00 




60 


3.0 


1.0 


0.83 


10 


La Salle t 


26.48 




60 


3.6 


1.1 


1.11 


10 


Leamington t 


27.79 




60 


2.0 


0.8 


0.83 


10 


Leaside . T 






50 
60 


1.8 
2.3 


1.0 

0.8 


0.83 
0.83 


10 


Lindsay T 


24.79 




10 


Listowel T 


27.19 




60 


2.3 


0.9 


0.83 


10 


London c 


21.68 




60 


2.2 


0.75 


0.83 


10 


London Twp 


24.70 




60 


2.9 


1.0 


1.11 


10 






Long Branch 


22.35 




60 


2.2 


0.8 


0.83 


10 


Lucan 


26.71 
33.39 
26.11 




60 
55 
60 


2.9 
2.7 
3.0 


0.9 
1.0 
1.0 


0.83 
1.39 
0.83 


10 


Lucknow 


10 


Lynden 


10 


MacTier 






50 


4.7 


1.6 


1.66 


10 



* 2-wire service next 80 kw-hrs, 
z per kw. t 2-wire service. 



3-wire service next 180 kw-hrs. 
J 3-wire service. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



337 



"E"— Continued 

Domestic Service — Commercial Light Service — Power Service 



Served by The Hydro- 


Electric Power Commission 










Commercial Light service 


Power service 


Service 
charge 
per 100 
watts 
min. 
1,000 
watts 


First 
100 hrs. 

per 
month 

per 
kw-hr. 


All ad- 
ditional 

per 
kw-hr. 


Mini- 
mum 
gross 
monthly 
bill 


Prompt 
pay- 
ment 
discount 


Basis of 
rate 130 

hours' 
monthly 

use of 
demand 


Service 
charge 
per h.p. 

per 
month 


First 
50 hrs. 

per 
month 

per 
kw-hr. 


Second 
50 hrs. 

per 
month 

per 
kw-hr. 


All ad- 
ditional 

per 
kw-hr. 


Mini- 
mum 
per 
h.p. 
per 
month 


Local 
discount 


Prompt 
pay- 
ment 

discount 


cents 
5.0 
5.0 
5.0 

x5.0 


cents 
2.3 
1.6 
1.8 
1.5 
2.0 


cents 
0.7 
0.3 
0.6 
0.35 
0.7 


$ c. 1 

0.83 

0.83 

0.83 

0.83 

0.83 


% 

10 
10 
10 
10 
10 


$ C. 

23.00 
14.00 

17.00 
14.50 
20.00 


$ C. 

1.00 
1.00 
1.00 
zl.00 
1.00 


cents 
2.1 
1.1 
1.7 
0.9 
1.6 


cents 
1.4 
0.7 
1.1 
0.56 
1.0 


cents 
0.33 
0.33 
0.33 
0.25 
0.33 


$ C. 


% 

10 
25 
25 


% 

10 
10 
10 
10 


5.0 




10 


10 


5 


2.6 
2.6 
3.6 
2.3 

2.7 


0.7 
0.7 
1.0 
0.8 
0.9 


0.83 
0.83 
1.11 
0.83 
0.83 


10 
10 
10 
10 
10 


25.00 
23.00 
37.00 
30.00 
24.00 


1.00 
1.00 
1.00 
1.00 
1.00 


2.0 
2.1 
3.8 
2.8 
2.3 


1.3 

1.4 
2.5 
1.8 
1.5 


0.33 
0.33 
0.33 
0.33 
0.33 






10 


5.0 
5.0 




10 


10 
10 


5.0 






10 


5.0 




10 


10 


5.0 


3.5 

2.2 
2.8 

3.5 
2.5 


1.0 
0.5 

0.7 

1.0 

0.8 


1.67 
0.83 
0.83 

fl.67. 

|2.25. 
1.11 


10 
10 
10 

10 
10 


45.00 
18.00 
29.00 

30.00 
35.00 


1.00 
1.00 
1.00 

1.00 
1.00 


4.9 
1.9 
2.6 

2.8 
3.5 


3.3 
1.2 
1.7 

1.8 
2.3 


0.33 
0.33 
0.33 

0.33 
0.33 






10 


5.0 
5.0 




25 


10 
10 


5.0 






10 


5.0 






10 










5.0 


3.5 
1.7 
1.8 
1.8 
2.0 


1.0 
0.5 
0.7 
0.4 
0.8 


fl.67. 

|2.25. 
0.83 
0.83 
0.83 
0.83 


10 
10 
10 
10 
10 


30.00 
18.00 
18.00 
16.00 
23.00 


1.00 
1.00 
1.00 
1.00 
1.00 


2.8 
1.9 
1.9 
1.5 

2.1 


1.8 
1.2 
1.2 
0.9 
1.4 


0.33 
0.33 
0.33 
0.33 
0.33 






10 


5.0 
5.0 
5.0 
5.0 




25 
25 
25 
10 


10 

10 
10 
10 


5.0 
5.0 


2.3 

3.5 

2.7 
2.6 

3.5 


0.6 

1.0 
1.0 

0.8 

1.0 


0.83 

fl.67. 

J2,25. 
0.83 
1.11 

fl.67. 

J2.25. 


10' 

10 
10 
10 

10 


24.00 

30.00 
25.00 
26.00 

30.00 


1.00 

1.00 
1.00 
1.00 

1.00 


2.3 

2.8 
2.0 
2.2 

2.8 


1.5 

1.8 
1.3 
1.4 

1.8 


0.33 

0.33 
0.33 
0.33 

0.33 




10 


10 
10 


5.0 






10 


5.0 






10 


5.0 






10 










5.0 
5.0 
5.0 


1.5 
1.9 

4.5 
1.8 

2.4 


0.3 
0.5 
1.0 
0.6 
0.8 


0.83 
0.83 
1.66 
0.83 
0.83 


10 
10 
10 
10 
10 


15.00 
21.00 
40.00 
18.00 
22.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.3 
1.8 
4.3 
1.9 
1.9 


0.8 
1.1 

2.8 
1.2 
1.3 


0.33 
0.33 
0.33 
0.33 
0.33 




25 
10 


10 
10 
10 


5.0 
5.0 




25 
10 


10 
10 


5.0 
5.0 


2.1 
3.3 
2.5 
3.2 
1.7 


0.5 
1.0 
1.0 
0.9 
0.4 


0.83 
0.83 
0.83 
1.11 
0.83 


10 
10 
10 
10 
10 


24.00 
38.00 
35.00 
25.00 
18.00 


1.00 
1.00 
1.00 
1.00 
1.00 


2.3 
4.0 
3.5 
2.0 
1.9 


1.5 

2.6 
2.3 
1.3 
1.2 


0.33 
0.33 
0.33 
0.33 
0.33 




10 


10 
10 


5.0 






10 


5.0 






10 


5.0 




25 


10 


x5.0 


1.9 

1.9 
2.0 
1.7 
2.5 


0.35 

0.6 

0.5 

0.3 

0.6 


0.83 
0.83 
0.83 
0.83 
1.11 


10 
10 
10 
10 
10 


18.50 
17.00 
19.00 
14.00 
21.00 


al.00 
1.00 
1.00 
1.00 
1.00 


1.5 
1.7 
2.0 
1.1 
1.8 


0.9 
1.1 
1.4 
0.7 
1.1 


0.25 
0.33 
0.33 
0.33 
0.33 






10 


5.0 
5.0 
5.0 
5.0 




25 
25 
25 

10 


10 
10 
10 
10 


5.0 
5.0 
5.0 


1.8 
2.4 
2.2 
2.5 

4.4 


0.5 
0.5 
0.8 
0.8 
1.0 


0.83 
0.83 
1.39 
0.83 
1.66 


10 
10 
10 
10 
10 


18.00 
22.00 
30.00 
23.00 
40.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.9 
1.9 

2.8 
2.1 
4.3 


1.2 
1.3 

1.8 
1.4 
2.8 


0.33 
0.33 
0.33 
0.33 
0.33 




25 
10 


10 
10 
10 


5.0 
5.0 




10 


10 
10 



x Minimum 500 watts. 



a $1.00 per kw. 



338 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Cost of Power to Municipalities and Rates to Consumers for 
for the Year 1945, in Urban Municipalities 




* 2-wire service next 80 kw-hrs, 3-wire service next 180 kw-hrs. 
j 2-wire service. 
I 3-wire service. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



339 



"E"— Continued 

Domestic Service — Commercial Light Service — Power Service 
Served by The Hydro-Electric Power Commission 



Commercial Light service 


Power service 


Service 
charge 
per 100 
watts 
min. 
■ 1,000 
watts 


First 
100 hrs. 

per 
month 

per 
kw-hr. 


All ad- 
ditional 

per 
kw-hr. 


Mini- 
mum 
gross 
monthly 
bill 


Prompt 
pay- 
ment 
discount 


Basis of 
rate 130 

hours' 
monthly 

use of 
demand 


Service 
charge 
per h.p. 

per 
month 


First 
50 hrs. 

per 
month 

per 
kw-hr. 


Second 
50 hrs. 

per 
month 

per 
kw-hr. 


All ad- 
ditional 

per 
kw-hr. 


Mini- 
mum 
per 
h.p. 
per 
month 


Local 
discount 


Prompt 
pay- 
ment 

discount 


cents 
5.0 


cents 
2.5 
1.8 
2.4 
3.2 
3.0 


cents 
0.8 
0.8 
0.6 
0.9 
1.0 


$ C. 
0.83 

0.83 
0.83 
0.83 
1.66 


% 

10 
10 
10 
10 
10 


$ C. 

33.00 
21.00 
21.00 
32.00 
30.00 


$ C. 
1.00 

1.00 
1.00 
1.00 
1.00 


cents 
3.2 
1.8 
1.8 
3.1 
2.8 


cents 
2.1 

1.1 
1.1 

2.0 
1.8 


cents 
0.33 
0.33 
0.33 
0.33 
0.33 


$ C. 


% 


/o 
10 


5.0 
5.0 
5.0 




10 
10 


10 
10 
10 


5.0 






10 










5.0 


3.5 
2.8 
2.2 
2.3 
1.6 


1.0 
1.0 
0.8 
0.6 
0.5 


fl.67. 

{2.25. 
0.83 
0.83 
0.83 
0.83 


10 
10 
10 
10 
10 


30.00 
45.00 
24.00 
27.00 
15.00 


1.00 
1.00 
1.00 
1.00 
1.00 


2.8 
4.9 
2.3 
2.3 
1.3 


1.8 
3.3 
1.5 
1.5 
0.8 


0.33 
0.33 
0.33 
0.33 
0.33 






10 


5.0 






10 


5.0 




. .10 


10 


5.0 






10 


5.0 




25 


10 


5.0 
5.0 


1.8 
2.4 
4.2 
2.3 
2.2 


0.7 
0.8 
1.0 
0.5 

0.7 


0.83 
1.39 
0.83 
0.83 
0.83 


10 
10 
10 
10 
10 


17.00 
30.00 
35.00 
21.00 
19.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.7 
2.8 
3.5 
1.8 
2.0 


1.1 
1.8 
2.3 

1.1 
1.4 


0.33 
0.33 
0.33 
0.33 
0.33 




25 


10 
10 


5.0 






10 


5.0 
5.0 




10 
25 


10 
10 


5.0 
5.0 


1.9 
2.3 

2.8 

3.5 

2.7 


0.5 
0.6 
0.9 

1.0 
0.8 


0.83 
0.83 
1.39 

fl.67. 

{2.25. 
0.83 


10 
10 
10 

10 
10 


19.00 
21.00 
35.00 

30.00 
23.00 


1.00 
1.00 
1.00 

1.00 
1.00 


2.0 
1.8 
3.5 

2.8 
2.1 


1.4 
1.1 
2.3 

1.8 
1.4 


0.33 
0.33 
0.33 

0.33 
0.33 




25 

. .10 


10 
10 


5.0 






10 


5.0 






10 


5.0 




..10 


10 










5.0 


1.8 
2.3 
2.4 
2.5 
4.5 


0.5 
0.8 
0.7 
0.8 

1.5 


0.83 
0.83 
0.83 
1.39 
1.39 


10 
10 
10 
10 
10 


20.00 
26.00 
19.00 
30.00 
45.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.6 
2.2 
2.0 
2.8 

4.9 


1.0 
1.4 
1.4 
1.8 
3.3 


0.33 
0.33 
0.33 
0.33 
0.33 




..10 


10 


5.0 






10 


5.0 
5.0 




25 


10 
10 


5.0 






10 










5.0 


3.5 

2.5 
2.2 

c3.0. 

dl.5. 
1.6 


0.9 
0.8 
0.6 

0.5 

0.4 


1.11 
1.11 
0.83 

1.00 
0.83 


10 
10 
10 

10 
10 


35.00 
25.00 
20.00 

16.00 


1.00 
1.00 
1.00 

1.00 
1.00 


3.5 

2.0 
1.6 

2.5 
1.5 


2.3 
1.3 

1.0 

1.5 
0.9 


0.33 
0.33 
0.33 

0.25 
0.33 






10 


5.0 






10 


5 




.10 


10 


5.0 


e3.00 


"25" 


10 
10 


5.0 
5.0 
5.0 

5 


1.5 

2.0 

2.4 

3.5 

1.8 


0.35 

0.5 

0.8 

1.0 
0.8 


0.83 
0.83 
1.11 

fl.67. 

{2.25. 
0.83 


10 

10 
10 

10 
10 


14.00 
18.00 
21.00 

30.00 
22.00 


1.00 
1.00 
1.00 

1.00 
1.00 


1.1 
1.9 
1.8 

2.8 
1.9 


0.7 
1.2 
1.1 

1.8 
1.3 


0.33 
0.33 
0.33 

0.33 
0.33 




25 
25 

10 


10 
10 

10 

10 


5.0 




10 


10 


5.0 
5.0 
5 


2.2 
2.1 
3.3 
2.4 
2.8 


0.5 
0.5 
0.8 
0.6 
0.8 


0.83 
0.83 
1.11 
1.11 
0.83 


10 
10 
10 
10 
10 


18.00 
18.00 
25.00 
27.00 
30.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.9 
1.9 
2.0 
2.3 
2.8 


1.2 
1.2 
1.3 
1.5 
1.8 


0.33 
0.33 
0.33 
0.33 
0.33 




25 
25 


10 
10 
10 


5 






10 


5 






10 











c First 50 hours' use. 
d Second 50 hours' use. 
e Demand meter rental. 



340 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Cost of Power to Municipalities and Rates to Consumers for 

for the Year 1945, in Urban Municipalities 



Municipality 


Annual cost to 
the Commission 
on the works to 

serve electrical 
energy to munici- 
pality on a horse- 
power basis 


Domestic service 


Service 
charge 

p'er 
month 


First rate 


All 

additional 

per 

kw-hr. 


Minimum 

gross 

monthly 

bill 


Prompt 
playment 
discount 


c— City 
T — Town 

(pop. 2,000 or more) 


Number 
of kw-hr s. 
per month 


Per 

kw-hr. 
per month 



Orangeville T 

Orono 

Oshawa c 

Ottawa c 

Otterville 



Owen Sound 
Paisley. .... 
Palmerston . 

Paris 

Parkhill 



Penetanguishene 

Perth 

Peterborough . . . 

Petrolia 

Picton . . 



Plattsville 

Point Edward . 
Port Arthur . . 
Port Carling . . 
Port Colborne . 



Port Credit 

Port Dalhousie 

Port Dover 

Port Elgin 

Port Hope T 



Port McNicoll 
Port Perry . . . 
Port Rowan . . 
Port Stanley. . 



Powassan t 



Prescott T 

Preston T 

Priceville 

Princeton 

Queenston 



Ramore-Matheson . 



Red Lake Townsite. . . 

Renfrew T 

Richmond 

Richmond Hill 



$ c. 
29.64 
31.45 
23.75 

15.24 
30.48 

22.66 
33.76 
30.11 
22.26 
36.23 



23.49 
22.70 
20.29 
27.66 
27.67 



32.08 
27.60 
18.65 



22.59 



23.15 
22.06 
28.64 
28.61 
24.60 



24.26 
30.60 
34.71 
28.37 



22.23 
21.91 
33.90 
33.93 
21.11 



26.03 
34.85 
23.71 



cents 



33-66 



33-66 



33-66 



56 



56 
56 



55 
60 
60 
60 
60 
60 

60 
50 
60 
60 
60 



60 
55 
60 
60 
60 



60 
60 
50 

45 
60 



60 
60 
60 
40 
60 



60 
50 
60 
60 

40 



60 
60 
60 
60 
60 



40 

40 
45 
40 
60 



cents 

2.8 

4.5 

3.0 

2.0 

1.0 

2.6 

2.1 
4.0 
2.6 
2.2 
3.0 



2.4 
2.8 
2.0 
2.7 
2.0 



3.0 
3.0 
1.7 

4.7 
2.5 



2.1 
2.4 
2.2 
2.5 
2.2 



3.5 



2.5 
2.5 
3.5 
3.0 
2.3 



3.5 



cents 
1.0 
1.0 
1.0 

0.5 
0.9 

0.8 
1.0 
1.0 
0.9 
1.0 



0.9 
1.0 
0.9 
0.8 
0.8 



1.0 
1.0 
0.6 
1.5 
0.8 



0.9 
1.0 
0.8 
1.2 
0.9 



1.0 
1.2 
1.0 
0.9 
"1.6 
0.75 



1.1 
0.8 
1.0 
1.0 
0.9 



"1.6 
0.75 
"1.6 
0.75 
1.0 
1.2 
0.8 



0.83 
0.83 

0.83 
1.39 
1.11 
0.83 
0.83 



0.83 
0.83 
0.83 
0.83 
0.83 



0.83 
0.83 
0.83 
1.66 
0.83 



0.83 
0.83 
0.83 
1.11 
0.83 



0.83 
1.11 
0.83 
0.83 
tl.67 
|2.25 



0.83 
0.83 
1.39 
1.39 
0.83 



tl.67 

J2.25 

tl.67 

{2.25 

0.33 

1.67 

0.83 



* 2-wire service next 80 kw-hrs, 3-wire service next 180 kw-hrs. 
t 2-wire service. 
X 3-wire service. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



341 



'^"—Continued 

Domestic Service — Commercial 



Light Service — Power Service 
Served by The Hydro-Electric Power Commission 



Commercial Light service 








Power service 








Service 
charge 
per 100 
watts 
min. 
1,000 
watts 


First 
100 hrs. 

per 
month 

per 
kw-hr. 


All ad- 
ditional 
per 

kw-hr. 


Mini- 
mum 
gross 
monthly 
bill 


Prompt 
pay- 
ment 
discount 


Basis of 
rate 130 

hours' 
monthly 

use of 
demand 


Service 
charge 
per h.p. 

per 
month 


First 
50 hrs. 

per 
month 

per 
kw-hr. 


Second 
50 hrs. 

per 
month 

per 
kw-hr. 


All ad- 
ditional 

per 
kw-hr. 


Mini- 
mum 

per 

h.p. 

per 
month 


Local 
discount 


Prompt 
pay- 
ment 
discount 


cents 
5.0 
5 


cents 
2.0 
4.0 
2.5 

2.1 
2.2 


cents 
0.8 
0.8 
0.7 

0.5 
0.5 


$ C. 
1.11 
1.1*1 

0.83 

0.83 
0.83 


% 

10 
10 
10 

10 
10 


$ C. 

18.00 
35.00 
21.00 

18.00 
22.00 


$ C. 

1.00 
1.00 
1.00 

1.00 
1.00 


cents 
1.9 
3.5 
1.8 

1.8 
1.9 


cents 
1.2 
2.3 

1.1 

1.2 
1.3 


cents 
0.33 
0.33 
0.33 

0.15 
0.33 


$ C. 


% 

25 


/o 
10 
10 


5.0 

5.0 
5.0 




10 

15 & 

10 

10 


10 

10 
10 


5.0 
5.0 


1.8 
3.5 
2.2 
1.7 
2.5 


0.7 
0.8 
0.8 
0.4 
0.8 


0.83 
1.39 
1.11 
0.83 
0.83 


10 
10 
10 
10 
10 


17.00 
35.00 
21.00 
15.00 
29.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.7 
3.5 
1.8 
1.3 
2.6 


1.1 
2.3 
1.1 
0.8 

1.7 


0.33 
0.33 
0.33 
0.33 
0.33 




25 


10 
10 


5.0 
5.0 
5.0 




10 
25 


10 
10 
10 










5.0 
5.0 
5.0 
5.0 
5.0 


2.1 
2.0 
1.8 

2.1 
1.7 


0.7 
0.6 
0.7 
0.5 
0.5 


0.83 
0.83 
0.83 
0.83 
0.83 


10 
10 
10 
10 
10 


20.00 
17.00 
16.00 
23.00 
18.00 


1.00 
1.00 
1.00 
1.00 
1.00 


1.6 
1.7 
1.5 
2.1 
1.9 


1.0 
1.1 
0.9 

1.4 
1.2 


0.33 
0.33 
0.33 
0.33 
0.33 




10 
25 
25 
10 
25 


10 

10 

10 

10.. 

10 


5.0 
5.0 
4.5 
5.0 


2.5 
2.4 
1.5 
4.5 

2.2 


0.8 
0.6 
0.3 
0.8 
0.5 


0.83 
0.83 
0.83 
1.66 
0.83 


10 

10 
10 
10 
10 


26.00 
24.00 
15.00 
32.00 
18.00 


1.00 
1.00 
1.00 
1.00 
1.00 


2.2 
2.3 
1.3 
3.1 
1.9 


1.4 
1.5 
0.8 
2.0 
1.2 


0.33 
0.33 
0.33 
0.33 
0.33 


2.00 


"10" 
25 


10 
10 
10 
10 


5.0 




25 


10 


5.0 
5.0 
5.0 
5.0 


1.8 
1.9 
1.7 
2.5 
1.9 


0.5 
0.6 
0.6 
0.8 
0.6 


0.83 
0.83 
0.83 
1.11 
0.83 


10 
10 
10 
10 
10 


19.00 
16.00 
18.00 
26.00 
18.00 


1.00 
1.00 
1.00 
1.00 
1.00 


2.0 
1.5 
1.9 
2.2 
1.9 


1.4 
0.9 
1.2 
1.4 
1.2 


0.33 
0.33 
0.33 
0.33 
0.33 




25 
25 
25 


10 
10 
10 
10 


5.0 




25 


10 


5.0 


2.8 
3.2 
2.5 

2.2 

3.5 


0.8 
1.0 
0.8 
0.5 

1.0 


0.83 
1.11 
0.83 
0.83 

fl.67. 

J2.25. 


10 
10 
10 
10 

10 


30.00 
28.00 
28.00 
24.00 

30.00 


1.00 
1.00 
1.00 
1.00 

1.00 


2.8 
2.5 
2.5 
2.3 

2.8 


1.8 

1.6 
1.6 
1.5 

1.8 


0.33 
0.33 
0.33 
0.33 

0.33 






10 


5.0 






10 


5.0 






10 


5.0 






10 


5.0 






10 










5.0 


2.2 
2.0 
3.0 
2.7 
1.8 


1.0 

0.5 
1.0 
0.8 
0.7 


0.83 
0.83 
1.39 
1.39 
0.83 


10 
10 
10 
10 
10 


19.00 
16.00 
30.00 
24.00 
22.00 


1.00 
1.00 
1.00 
1.00 
1.00 


2.0 
1.5 

2.8 
2.3 
1.9 


1.4 
0.9 
1.8 
1.5 
1.3 


0.33 
0.33 
0.33 
0.33 
0.33 




..25 


10 


5.0 




..25 


10 


5.0 






10 


5.0 
5.0 




10 
10 


10 
10 


5.0 


3.5 

3.5 
2.0 
4.0 
1.8 


1.0 

1.0 
0.5 
1.0 
0.4 


fl.67. 

|2.25. 

tl.67. 

{2.25. 
0.50 
1.67 
0.83 


10 

10 
10 
10 
10 


30.00 

30.00 

35.00' 
18.00 


1.00 

1.00 
1.00 
1.00 
1.00 


2.8 

2.8 
2.1 
3.5 
1.9 


1.8 

1.8 
1.4 
2.3 
1.2 


0.33 

0.33 
0.33 
0.33 
0.33 






10 


5.0 






10 


5.0 






10 


5.0 






10 


5.0 




.25 


10 



342 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Cost of Power to Municipalities and Rates to Consumers for 

for the Year 1945, in Urban Municipalities 









Domestic service 








Annual cost to 
the Commission 












Municipality 
















on the works to 




First rate 










serve electrical 
energy to munici- 
pality on a horse- 
power basis 


Service 
charge 






All 
additional 


Minimum 
gross 


Prompt 








payment 


. C— City 


per 


Number 


Per 


per 


monthly 


discount 


T — Town 


month 


of kw-hrs. 


kw-hr. 


kw-hr. 


bill 




(pop. 2,000 or more) 






per month 


per month 










$ c 


cents 




cents 


cents 


$ C. 


% 


Ridgetown. . . .t 


27.03 




60 


2.0 


0.8 


0.83 


10 


Ripley .... 


39.00 




55 


4.8 


1.0 


1.67 


10 


Riverside t 


25.94 




60 


2.8 


0.9 


0.83 


10 


Rockwood 


29.35 




60 


2.8 


1.0 


0.83 


10 


Rodney 


37.47 




60 


2.4 


o:8 


0.83 


10 


Rosseau. 


39.00 




60 


4.0 


2.0 


x2.22 


10 


Russell 


36.07 




55 


4.6 


1.2 


1.39 


10 


St. Catharines c 


19.29 




60 


1.8 


0.8 


0.83 


10 


St. Clair Beach. 


30.02 




60 


3.5 


1.0 


1.11 


10 


St. George 


30.03 




60 


2.5 


0.9 


0.83 


10 


St. Jacobs 


23.62 




60 


2.4 


0.9 


0.83 


10 


St. Marys. ; t 


27.04 




60 


3.0 


1.0 


0.83 


10 


St. Thomas c 


22.77 




60 


2.4 


0.8 


0.83 


10 


Sarnia c 


25.11 




60 


2.5 


0.8 


0.83 


10 


Scarborough Twp 


23.04 




60 


2.3 


0.9 


0.83 


10 


Seaforth t 


25.87 




60 


2.6 


1.0 


0.83 


10 


Shelburne 


29.62 




60 


2.7 


1.0 


1.11 


10 


Simcoe. ... t 


23.25 




60 


2.0 


0.7 


0.83 


10 


Sioux Lookout T 






60 
60 


6.0 
2.5 


2.0 
0.8 


2.00 
0.83 


10 


Smiths Falls t 


20.84 




10 


Smithville 


26.27 




60 


3.0 


0.9 


0.83 


10 


Southampton . . . . t 


27.40 




40 


3.2 


1.0 


1.11 


10 


Springfield 


35.27 




60 


3.4 


0.9 


0.83 


10 


Stamford Twp 


16.88 




60 


2.3 


0.8 


0.83 


10 


Stayner t 


26.53 




55 


3.0 


1.0 


0.83 


10 


Stirling 


20.46 




60 


2.3 


0.9 


0.83 


10 


Stoney Creek . . 






60 
60 


3.5 
2.1 


1.1 
0.8 


0.83 
0.83 


10 


Stouffville 


27.47 




10 


Stratford c 


23.71 




60 


2.6 


0.9 


0.83 


10 


Strathroy t 


24.30 




60 


2.6 


0.8 


0.83 


10 


Streetsville 


26.04 




60 


2.8 


1.0 


0.83 


10 


Sudbury c 






60 
60 


2.4 
3.5 


1.0 
1.0 


0.83 
1.11 


10 


Sunderland 


36.14 




10 


Sutton 


34.55 




60 


2.7 


1.0 


1.11 


10 


Swansea 


24.12 




60 


2.1 


0.9 


0.83 


10 


Tara 


31.12 




55 


2.6 


1.0 


1.11 


10 


Tavistock 


27.12 




60 


2.5 


0.9 


0.83 


10 


Tecumseh t 


27.79 




60 


3.0 


0.9 


0.83 


10 


Teeswater 


33.76 




60 


3.0 


1.0 


1.11 


10 


Thamesford 


28.09 




60 


2.7 


0.9 


0.83 


10 


Thamesville 


27.55 




60 


2.1 


0.8 


0.83 


10 


Thedford 


39.00 




60 


3.6 


1.0 


0.83 


10 


Thornbury 


38.09 




60 


3.5 


1.0 


0.83 


10 


Thorndale 


37.43 




60 


3.8 


1.0 


0.83 


10 


Thornton 


34.20 




60 


3.8 


1.0 


1.39 


10 



x According to consumers' demand. 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



343 



"E"— Continued 
Domestic Servic 



Commercial Light Service — Power Service 
Served by The Hydro-Electric Power Commission 



Commercial Light service 


Power service 


Service 


























charge 


First 




Mini- 




Basis of 


Service 


First 


Second 




Mini- 






per 100 


100 hrs. 


All ad- 


mum 


Prompt 


rate 130 


charge 


50 hrs. 


50 hrs. 


All ad- 


mum 




Prompt 


watts 


per 


ditional 


gross 


pay- 


hours' 


per h.p. 


per 


per 


ditional 


per 


Local 


pay- 


mm. 


month 


per 


monthly 


ment 


monthly 


per 


month 


month 


per 


h.p. 


discount 


ment 


1,000 


per 


kw-hr. 


bill 


discount 


use of 


month 


per 


per 


kw-hr. 


per 




discouni 


watts 


kw-hr. 








demand 




kw-hr. 


kw-hr. 




month 







cents 
5.0 
5.0 
5.0 
5.0 
5.0 



5.0 
5.0 
z5.0 
5.0 
5.0 



5.0 
5.0 
5.0 
5.0 
5.0 



5.0 
5.0 
5.0 
5.0 
5.0 



5.0 
5.0 
5.0 
5.0 
5.0 



5.0 
5.0 
5.0 
5.0 
5.0 



5.0 
5.0 
5.0 
5.0 
5.0 



cents 
1.6 
4.3 
2.3 
2.3 
2.1 



4.0 
4.3 
1.5 
3.2 
2.0 



2.0 
2.5 
1.7 
1.9 
1.8 



cents 
0.4 
0.8 
0.5 
0.7 
0.5 



2.0 
1.0 

0.9 
0.6 



2.1 
2.3 
1.6 
6.0 
2.0 



1.8 
3.2 
1.8 
2.0 
2.0 



2.3 
2.4 
3.0 
2.4 
1.7 



2.2 
2.0 
2.5 
2.6 
2.1 



1.7 
3.2 
3.0 
3.2 
3.3 



0.6 
0.7 
0.3 
0.4 
0.5 



0.7 
0.9 
0.4 
2.0 
0.3 



0.7 
0.8 
0.8 
0.5 
0.9 



0.8 
0.7 
0.5 
0.4 
0.5 



0.5 
0.8 
0.8 
0.7 
0.5 



0.8 
0.5 
0.5 
0.8 
0.6 



0.4 
0.7 
0.8 
0.9 



$ c. 
0.83 
1.67 
0.83 
0.83 
0.83 



x2.22 
1.39 

a0.83 
1.11 
0.83 



0.83 
0.83 
0.83 
0.83 
0.83 



0.83 
1.11 
0.83 
bl.00 
0.83 



0.83 
1.11 
0.83 
0.83 
0.83 



0.83 
0.83 
0.83 
0.83 
0.83 



0.83 
0.83 
1.11 
1.11 
0.83 



1.11 
0.83 
0.83 
1.11 
0.83 



0.83 
0.83 
0.83 
0.83 



1.0 J 1.39 



% 
10 
10 
10 
10 
10 



10 
10 
10 
10 
10 



10 
10 
10 
10 
10 



10 
10 
10 
10 
10 



10 
10 
10 
10 
10 



10 
10 
10 
10 
10 



10 
10 
10 
10 
10 



10 
10 
10 
10 
10 



10 
10 
10 
10 

10 



$ c. 
17.00 
30.00 
22.00 
25.00 
24.00 



40.00 
50.00 
14.00 
30.00 
22.00 



18.00 
20.00 
15.00 
19.00 
19.00 



20.00 
20.00 
17.00 
40.00 
17.00 



25.00 
25.00 
30.00 
15.00 
21.00 



17.00 
27.00 
20.00 
18.00 
19.00 



20.00 
24.00 
33.00 
28.00 
18.00 



30.00 
20.00 
23.00 
34.00 
21.00 



20.00 
28.00 
20.00 
32.00 
30.00 



$ c. 
1.00 
1.00 
1.00 
1.00 
1.00 



1.00 
1.00 
1.00 
1.00 
1.00 



1.00 
1.00 
1.00 
1.00 
1.00 



1.00 
1.00 
1.00 
1.00 
1.00 



1.00 
1.00 
1.00 
1.00 
1.00 



1.00 
1.00 
1.00 
1.00 
1.00 



1.00 
1.00 
1.00 
1.00 
1.00 



1.00 
1.00 
1.00 
1.00 
1.00 



1.00 
1.00 
1.00 
1.00 
1.00 



cents 
1.7 
2.8 
1.9 
2.0 
2.3 



4.3 
5.7 
1.1 
2.8 
1.9 



1.9 
1.6 
1.3 
2.0 
2.0 



1.6 
1.6 
1.7 
4.3 
1.7 



2.0 
2.0 
2.8 
1.3 
1.8 



1.7 
2.3 
1.6 
1.9 
2.0 



1.6 
2.3 
3.2 
2.5 
1.9 



2.8 
1.6 
2.1 
3.4 
1.8 



1.6 
2.5 
1.6 
3.1 
2.8 



cents 
1.1 
1.8 
1.3 
1.3 
1.5 



2.8 
3.8 
0.7 
1.8 
1.3 



1.2 
1.0 
0.8 
1.4 
1.4 



1.3 
1.3 

1.8 
0.8 
1.1 



1.1 
1.5 
1.0 
1.2 

1.4 



1.0 
1.5 
2.1 
1.6 
1.2 



1.8 
1.0 
1.4 
2.2 
1.1 



1.0 
1.6 
1.0 
2.0 
1.8 



cents 
0.33 
0.33 
0.33 
0.33 
0.33 



0.33 
0.33 
0.33 
0.33 
0.33 



0.33 
0.33 
0.33 
0.33 
0.33 



0.33 
0.33 
0.33 
0.33 
0.33 



0.33 
0.33 
0.33 
0.33 
0.33 



0.33 
0.33 
0.33 
0.33 
0.33 



0.33 
0.33 
0.33 
0.33 
0.33 



0.33 
0.33 
0.33 
0.33 
0.33 



0.33 
0.33 
0.33 
0.33 
0.33 



% 
25 



10 

10 



25 



10 



25 
10 
25 
25 
25 



10 
10 
25 



25 



25 
10 



25 



10 
25 
25 



10 
10 



25 



10 
10 



10 



10 



10 



a $0.83 or $0.83 per kw. 

b Per 100 watts-Min. $2.00 Max. $5.00. 

z Minimum 500 watts. 



344 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



STATEMENT 

Cost of Power to Municipalities and Rates to Consumers for 
for the Year 1945, in Urban Municipalities 









Domestic service 








Annual cost to 
the Commission 












Municipality 
















on the works to 














serve electrical 
energy to munici- 


Service 
charge 






All 
additional 


Minimum 
gross 


Prompt 








payment 


c— City 


power basis 


per 


Number 


Per 


per 


monthly 


discount 


T — Town 


month 


of kw-hrs. 


kw-hr. 


kw-hr. 


bill 




(pop. 2,000 or more) 






per month 


per month 










$ C. 


cents 




cents 


cents 


$ C. 


% 


Thorold T 


19.78 




60 


1.8 


0.7 


0.83 


10 


Tilbury T 


25.95 




60 


2.0 


0.75 


0.83 


10 


Tillsonburg. T 


24.01 




60 


2.2 


0.75 


0.83 


10 


Toronto C 


20.73 




50 


1.8 


1.0 


0.83 


10 


Toronto Twp 


23.73 




60 


2.7 


1.0 


1.11 


10 


Tottenham 


39.00 




50 


3.5 


1.0 


1.39 


10 


Trafalgar Twp. No. 1 . 


26.55 




60 


3.1 


1.7 


*0.83 


10 


Trafalgar Twp. No. 2. 


26.62 




60 


3.6 


1.2 


1.11 


10 


Trenton T 


19.22 




60 


1.8 


0.6 


0.83 


10 


Tweed 


34.08 




50 


3.8 


1.0 


0.83 


10 


Uxbridge T 


31.32 




60 


3.1 


1.0 


1.11 


10 


Victoria Harbour 


28.30 




60 


2.4 


0.9 


1.11 


10 


Walkerton T 


22.86 




50 


3.2 


1.1 


1.11 


10 


Wallaceburg T 


25.21 




60 


2.6 


0.8 


0.83 


10 


Wardsville 


39.00 




60 


3.6 


0.9 


1.11 


10 


Warkworth 


31.07 




50 


3.5 


1.2 


1.11 


10 


Waterdown 


23.63 




60 


2.2 


0.8 


0.83 


10 


Waterford 


23.94 




60 


2.1 


0.8 


0.83 


10 


Waterloo T 


21.71 




60 


1.8 


0.7 


0.83 


10 


Watford. 


30.53 




60 


3.0 


1.0 


0.83 


10 


Waubaushene 


25.39 




55 


3.0 


1.0 


1.11 


10 


Welland c 


19.51 




60 


1.7 


0.6 


0.83 


10 


Wellesley 


29.07 




60 


2.8 


1.0 


0.83 


10 


Wellington 


25.78 




60 


2.7 


1.0 


0.83 


10 


West Lome 


30.76 




60 


2.4 


0.8 


0.83 


10 






Weston t 


21.12 




60 


2.0 


0.8 


0.83 


10 


Westport 


39.00 




50 


4.0 


1.0 


1.94 


10 


Wheatley 


36.93 




60 


2.5 


0.8 


0.83 


10 


Whitby T 


23.37 




60 


2.5 


0.9 


0.83 


10 


Wiarton t 


33.98 




50 


2.8 


0.9 


1.11 


10 


Williamsburg 


24.80 




60 


2.0 


0.8 


0.83 


10 


Winchester 


26.26 




60 


2.3 


1.0 


0.83 


10 


Windermere 


39.00 




60 


4.0 


1.5 


2.22 


10 


Windsor c 


23.18 




60 


2.6 


0.7 


0.83 


10 


Wingham t 


30.15 




50 


3.2 


1.1 


1.11 


10 


Woodbridge 


24.87 




60 


2.4 


0.8 


0.83 


10 


Woodstock c 


22.08 




60 


2.3 


0.75 


0.83 


10 


Woodville 


35.68 




50 


3.8 


1.0 


1.11 


10 


Wyoming 


32.92 




60 


3.0 


0.9 


0.83 


10 


York Twp 


20.70 




60 


2.0 


0.8 


0.83 


10 






Zurich 


35.36 




60 


3.6 


1.0 


0.83 


10 



Under 10 kw, 83 cents; over 10 kw $2.22 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



345 



"E"— Concluded 

Domestic Service — Commercial Light Service — Power Service 
Served by The Hydro-Electric Power Commission 



Commercial Light service 




Service 












charge 


First 




Mini- 




Basis of 


per 100 


100 hrs. 


All ad- 


mum 


Prompt 


rate 130 


watts 


per 


ditional 


gross 


pay- 


hours' 


mm. 


month 


per 


monthly 


ment 


monthly 


1,000 


per 


kw-hr. 


bill 


discount 


use of 


watts 


kw-hr. 








demand 



Power service 



Service 
charge 
per h.p. 

per 
month 



First 


Second 




Mini- 




50 hrs. 


50 hrs. 


All ad- 


mum 




per 


per 


ditional 


per 


Local 


month 


month 


per 


h.p. 


discount 


per 


per 


kw-hr. 


per 




kw-hr. 


kw-hr. 




month 





Prompt 
pay- 
ment 
discount 



cents 
5.0 
5.0 
5.0 

f5.0 
5.0 



cents 
1.3 
1.6 
1.7 

1.9 
2.2 



cents 
0.35 
0.4 
0.4 

0.35 
0.6 



$ c. 
0.83 
0.83 
0.83 

0.83 
1.11 



10 
10 
10 

10 
10 



$ c. 
14.00 
16.00 
.17.00 

18.50 
20.00 



$ c. 
1.00 
1.00 
1.00 

d.D.C. 

1.1.00 
1.00 



cents 
1.1 
1.5 
1.7 
3.2 
1.5 
1.6 



cents 
0.7 
0.9 
1.1 
1.2 
0.9 
1.0 



cents 

0.33 

0.33 

0.33 

0.6 

0.25 

0.33 



% 
25 
25 
25 



10 



5.0 
5.0 
5.0 
5.0 
5.0 



3.0 
2.8 
2.8 
1.6 
3.3 



1.0 
0.7 
0.7 
0.3 
1.0 



1.39 
0.83 
1.11 
0.83 
0.83 



10 
10 
10 
10 
10 



30.00 
26.00 
28.00 
17.00 
29.00 



1.00 
1.00 
1.00 
1.00 
1.00 



2.8 
2.2 
2.5 
1.7 
2.6 



0.33 
0.33 
0.33 
0.33 
0.33 



25 



5.0 
5.0 
5.0 
5.0 
5.0 



0.8 
0.7 
0.9 
0.5 
0.8 



1.11 
1.11 
1.11 
0.83 
1.11 



10 
10 
10 
10 
10 



26.00 
28.00 
26.00 
19.00 
30.00 



00 
00 
00 
00 
00 



2.2 
2.5 
2.2 
2.0 
2.8 



1.4 
1.6 
1.4 
1.4 
1.8 



0.33 
0.33 
0.33 
0.33 
0.33 



25 



5.0 
5.0 
5.0 
5.0 
5.0 



5.0 
5.0 
5.0 
5.0 
5.0 



3.0 
1.8 
1.6 
1.6 
2.6 



1.0 
0.5 
0.5 
0.4 
0.8 



1.11 
0.83 
0.83 
0.83 
0.83 



10 
10 
10 
10 
10 



32.00 
17.00 
16.00 
17.00 
26.00 



1.00 
1.00 
1.00 
1.00 
1.00 



3.1 
1.7 
1.5 
1.7 
2.2 



2.0 
1.1 
0.9 
1.1 
1.4 



0.33 
0.33 
0.33 
0.33 
0.33 



1.0 
0.3 
0.8 
0.8 
0.5 



1.11 
0.83 
0.83 
0.83 
0.83 



10 
10 
10 
10 
10 



33.00 
14.00 
23.00 
27.00 
24.00 



1.00 
1.00 
1.00 
1.00 
1.00 



3.2 
1.1 
2.1 
2.3 
2.3 



2.1 
0.7 
1.4 
1.5 
1.5 



0.33 
0.33 
0.33 
0.33 
0.33 



25 
25 
25 



25 
10 



10 



5.0 
5.0 
5.0 
5.0 
5.0 



5.0 
5.0 
5.0 
5.0 
5.0 



1.5 
3.5 

2.4 
2.0 
2.3 



0.4 
1.0 
0.5 
0.6 
0.8 



0.83 
1.94 
0.83 
0.83 
1.11 



10 
10 
10 
10 
10 



15.00 
45.00 
25.00 
24.00 
33.00 



1.00 
1.00 
1.00 
1.00 
1.00 



1.3 

4.9 
2.0 
2.3 
3.2 



0.8 
3.3 
1.3 
1.5 
2.1 



0.33 
0.33 
0.33 
0.33 
0.33 



0.83 
0.83 
2.22 
0.83 
1.11 



10 
10 
10 
10 
10 



32.00 
22.00 
40.00 
17.00 
28.00 



1.00 
1.00 
1.00 
1.00 
1.00 



3.1 
1.9 
4.3 
1.7 
2.5 



2.0 
1.3 
2.8 
1.1 
1.6 



0.33 
0.33 
0.33 
0.33 
0.33 



25 



10 



10 



25 



5.0 
5.0 
5.0 
5.0 
5.0 



5.0 



2.0 
1.7 
2.8 
2.5 
1.8 



3.1 



0.5 
0.4 
0.8 
0.6 
0.5 



0.83 
0.83 
1.11 
0.83 
0.83 



10 
10 
10 
10 
10 



17.00 
15.00 
28.00 
30.00 
17.00 



1.00 
1.00 
1.00 
1.00 
1.00 



1.7 
1.3 
2.5 

2.8 

1.7 



1.1 
0.8 
1.6 
1.8 
1.1 



0.33 
0.33 
0.33 
0.33 
0.33 



0.8 



0.83 



10 



30.00 



1.00 



2.8 



1.8 



0.33 



25 
25 



25 



t Minimum 500 watts. J $1 . 00 per kw per month. 

d D.C.— Service charge $1 . 50 per kw per month for first iy 2 kw plus $1 . 05 per kw for all 
additional demand. 



346 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 






RECENTLY ACQUIRED HYDRO PLANTS IN NORTHERN ONTARIO 

Sandy Falls, Mattagami R 4,900 hp Wawaitin, Mattagami R 14,900 hp 

Upper Notch, Montreal R 13,000 hp Indian Chute, Montreal R 4,500 hp 

Matabitchuan, Matabitchuan R. 13,200 hp Lower Sturgeon, Mattagami R. . 8,000 hp 

Hound Chute, Montreal R 5,340 hp Fountain Falls, Montreal R. .. 3,000 hp 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



347 



APPENDIX I 



GENERATING STATIONS IN NORTHERN ONTARIO 



Operated by The Hydro-Electric Power Commission of Ontario 

on Behalf of the Province in the case of the 

Northern Ontario Properties 

In the Annual Report for 1944 the list of generating stations published 
did not include the generating stations in the Timiskaming district, which 
were acquired by the Commission in December 1944. The following list 
includes all stations operated by the Commission as parts of the Northern 
Ontario Properties. 

The generating stations are grouped under the districts to which they 
belong and particulars are given of the hydraulic features of the developments, 
the turbines, the generators, the exciters and the step-up and step-down 
transformers. Transmission line mileage is route or structure mileage not 
circuit mileage. 

Abbreviations 



hp 

kw 

kva 

kv 

ft 

rpm 



horsepower 

kilowatts 

kilovolt-amperes 

kilovolts 

foot or feet 

revolutions per minute 



The generating stations of the Commission are all water power develop- 
ments and are listed as encountered ascending the respective rivers and 
tributaries. The Abitibi district of the Northern Ontario Properties and four 
generating stations of the Timiskaming district operate at 25 cycles. Other 
northern plants operate at 60 cycles, including the generating stations of the 
Thunder Bay system, which supply power to the Rainy River district and the 
Longlac mining area. 



Note: — A list of generating stations operated by The Commission on behalf of municipalities 
comprising the Southern Ontario and Thunder Bay Systems was published in the Thirty-seventh 
Annual Report. 



348 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



NORTHERN ONTARIO PROPERTIES 

General — Held and operated by The Hydro-Electric Power Commission in trust for the 
Province of Ontario. Six districts serve mining areas and municipalities in northern Ontario. 

The Abitibi district comprises the area that can be served from a 132 kv transmission line 
extending from the Abitibi Canyon power development to Sudbury. Power at 25 cycles is trans- 
mitted from developments on the Abitibi river to Northern Ontario mining districts and the 
International Nickel Company. 

The Timiskaming district comprises the drainage basins of the Matabitchuan river, the 
Montreal river( Timiskaming) and that portion of the Mattagami river basin south of Smooth 
Rock falls. There are eight hydro-electric generating stations in this district and one hydro- 
pneumatic plant which produces compressed air for commercial use in the Cobalt area. These 
properties were purchased by the Commission from the Northern Ontario Power Company in 1944. 

The Sudbury district serves the territory adjacent to the city of Sudbury, including the mining 
area known as Sudbury Basin. Power is obtained from developments on the Wanapitei and 
Sturgeon rivers, respectively acquired by The Commission from the Wahnapitae Power Company 
in April 1930, and from the Abitibi Power and Paper Company Limited in August, 1937. 

The Nipissing district includes municipalities lying immediately to the east of lake Nipissing. 
Power is obtained from developments on the South River. Power rights and plant formerly owned 
by Nipissing Power Company, controlled by Electric Power Company, Limited. Commission 
assumed control March, 1916, when the latter company and all its subsidiaries were acquired 
by the Ontario Government. 

The Patricia district combines the Patricia and St. Joseph districts. The former was established 
to supply power to the Red Lake mining district. Power is obtained from a development on the 
English river. The latter was established to supply power to Central Patricia and Pickle Crow 
Mining Companies. Power is obtained from a development on the Albany River. 

The Rainy River district serves the Steep Rock iron mines by a transmission line 120 miles 
long, west of Port Arthur. Power is obtained from developments on the Nipigon river of the 
Thunder Bay system. 

Transmission Lines— 132 and 110 kv = 906.27 miles, 44 kv = 588.55 miles, 26.4—11 kv = 
409.50 miles. 

Transformer Stations — Total capacity in 58 stations operated by the Commission = 
558,592 kva as follows: 14— step-up 283,300 kva; 32— step-down 252,975 kva. 

Abitibi District 

Abitibi Canyon Generating Station 

Situated on the Abitibi river approximately seventy miles north of Cochrane. Formerly 
property of the Ontario Power Service Corporation. Commission assumed control April, 1933, 
and completed installation of two generators which were placed in operation in May and Decem- 
ber. 1933; one unit installed in 1935; final two units installed in 1936. Unit No. 3 was dismantled 
and re-installed at DeCew Falls, 25-cycle plant. Water conveyed from head works to turbines 
through steel-plate penstocks, 18 ft in diameter. Normal operating head, 237 ft. 

Turbines — Four 66,000 hp Canadian Allis-Chalmers, Francis type, vertical shaft, 150 rpm. 
Total capacity, 264,000 hp. 

Auxiliary Turbine — One 600 hp Canadian Allis-Chalmers, Francis type, 750 rpm. 

Generators — Four 48,500 kva Canadian General Electric Company, 3-phase, 25-cycle, 13,800 
volts, direct connected to turbines. Total capacity, 194,000 kva. 

Auxiliary Generator — One 500 kva Canadian General Electric Company. 

Exciters — Four 180 kw, 250 volt, direct connected to generators. 

Pilot Exciters — Four 7 kw, 250 volts, direct connected to exciters. 

Transformers — Four banks = twelve 16,000 kva Canadian General Electric Company, 
single-phase, 13.8 to 76.2 kv to operate at 132 kv star connected. Total capacity, 192,000 kva. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 349 

Timiskaming District 

Matabitchuan Generating Station 

Situated on the Matabitchuan river about two miles upstream from Lake Timiskaming. 
The main dam is of concrete gravity type backed by rock fill. A canal conveys the waters to a 
concrete intake, thence through two steel penstocks to the turbines. Original construction in 
1910, the turbines were replaced in 1923. Purchased by the Commission from the Northern 
Ontario Power Company in 1944. Normal operating head 312 ft. 

Turbines — Four 3,300 hp Dominion Engineeiing Company, Francis type, single runner, 
spiral casing, horizontal shaft, 600 rpm. Total capacity, 13,200 hp. 

Auxiliai y Turbines — Two 180 hp A. Doble Company, impulse wheel type, horizontal shaft, 
475 rpm. 

Generators — Four 1,875 kva Canadian General Electric, 3-phase, 60-cycle, 2,400 volt. 
Total capacity, 7,500 kva. 

Exciters — Two 100 kw Canadian Allis Chalmers, turbine driven, 125 volt. 

Transformers — Four banks = four 1,875 kva Canadian Westinghouse, 3-phase, 2.4 to 44 kv. 
Total capacity 7,500 kva. 

Upper Notch Generating Station 

Situated on the Montreal river about 10 miles upstream from lake Timiskaming. Power 
house and head works integral with. dam. Constructed in 1930. Purchased by the Commission 
from the Northern Ontario Power Company in 1944. Normal operating head 48 ft. 

Turbines — Two 6,500 hp Allis-Chalmers, Francis type, vertical shaft, 125 rpm. Total capacity 
13,000 hp. 

Generators — Two 6,500 kva Swedish General Electric, 3-phase, 25-cycle, 11,000 volt. Total 
capacity 13,000 kva. 

Exciters — Two 94 kw Swedish General Electric, direct connected to generators, 125 volt. 

Transformers — One bank = three 4,500 kva English Electric, single-phase, 11 to 63.5 kv for 
operation 110 kv star connected. Total capacity, 13,500 kva. 

Fountain Falls Generating Station 

Situated on the Montreal river about 16 miles upstream from lake Timiskaming. Power 
house and headworks integral with dam. Canal excavated in left bank conveys waters to intake. 
Constructed in 1914. Purchased by the Commission from the Northern Ontario Power Company 
in 1944. Normal operating head 30 ft. 

Turbines — Two 1,500 hp I. P. Morris, Francis type, vertical shaft, 150 rpm. Total capacity 
3,000 hp. 

Generators — Two 1,250 kva Swedish General Electric, 3-phase, 60-cycle, 11,000 volt. Total 
capacity 2,500 kva. 

Exciters — Two 52 kw Swedish General Electric, motor diiven, 125 volt, 1,150 rpm. 

Transformers — Power is transmitted at generator voltage. 

Hound Chute Generating Station 

Situated on the Montreal river 20 miles upstream from lake Timiskaming. Concrete dam 
with spillway section. Intake and power house an integral unit some 1,400 feet south of dam. 
Water is conveyed through canal to intake. Constructed in 1910. Purchased by the Commission 
from the Northern Ontario Power Company in 1944. Normal operating head 32 feet. 

Turbines — Four 1,335 hp William Kennedy, Francis type, vertical shaft, 150 rpm. Total 
capacity, 5,340 hp. 

Auxiliary Turbines — Two 100 hp, William Kennedy, Francis type, vertical shaft, 500 rpm. 
Total capacity, 200 hp. 

Generators — Four 875 kva Swedish General Electric, 3-phase, 60-cycle, 11,000 volt. Total 
capacity, 3,500 kva. 

Exciters — Two 60 kw Swedish General Electric, turbine driven, 110 volt: one 75 kw Siemens 
Electric, motor driven, 110 volt, 900 rpm. 

Transformers — Power is transmitted at generator voltage. 
13— H.E. 



350 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 

Indian Chute Generating Station 

Situated on the Montreal river 10 miles upstream from the town of Elk Lake. Concrete dam 
flanked by concrete spillway. Water conveyed to turbines by two wood-stave pipes. Constructed 
in 1923. Purchased by the Commission from the Northern Ontario Power Company in 1944. 
Normal operating head 45 ft. 

Turbines — One 2,250 hp Boving Company; one 2,250 hp William Kennedy; both Francis 
type, double runnner, horizontal shaft, 300 rpm. Total capacity 4,, 500 hp. 

Geneiators — Two 1,800 kva Canadian Westinghouse Company, 3-phase, 60-cycle, 2,300 
volt. Total capacity, 3,600 kva. 

Exciters — Two 30 kw Canadian Westinghouse, belt driven, 125 volt, 1,100 rpm. 

Transformers — One bank = three 1,500 kva Canadian Westinghouse, single-phase, arranged 
for 2.2 kv "Y" to 44kv delta operation. Total capacity, 4,500 kva. 

Lower Sturgeon (Mattagami River) Generating Station 

Situated on the Mattagami river 30 miles downstream from Timmins. Headworks and 
power house integral part of the concrete dam. Constructed in 1923. Purchased by the Com- 
mission from the Northern Ontario Power Company in 1944. Normal operating head 46 feet. 

Turbines — Two 4,000 hp Dominion Engineering Companv, Francis type, vertical shaft, 
136.3 rpm. Total capacity, 8,000 hp. 

Generators — Two 4,000 kva Canadian General Electric, 3-phase, 25-cycle, 2,300 volt. Total 
capacity, 8,000 kva. 

Exciters — Two 58 kw Canadian General Electric, 125 volt, direct connected to generators. 

Transformers — Two banks = two 4,000 kva, 3-phase, 2.3 to 44 kv Total capacity, 8,000 kva. 

Sandy Falls Generating Station 

Situated on the Mattagami river seven miles downstream from Timmins. Concrete dam with 
spillway section. Intake at left bank with entrances to three penstocks controlled by butterfly 
valves. Water conveyed to unit No. 1 by a steel penstock and to units Nos. 2 and 3 by wood-stave 
pipes each provided with a surge tank. Purchased by the Commission from the Northern Ontario 
Power Company in 1944. Normal operating head 34 ft. 

Turbines — Two 1,200 hp S. Morgan Smith, Francis type, double runner, horizontal shaft, 
214 rpm installed in 1911. One 2,500 hp LP. Morris, Francis type, vertical shaft, 136.3 rpm 
installed in 1916. Total capacity, 4,900 hp. 

Generators — Two 950 kva Canadian Westinghouse, horizontal, one 1,875 kva Canadian 
General Electric, vertical; all 3-phase, 25-cycle, 12,000 volt, direct connected to turbines. Total 
capacity, 3,775 kva. 

Exciters — Two 30 kw Canadian Westinghouse, 125 volt, direct connected to generators; one 
100 kw Canadian General Electric, motor driven, 125 volt, 750 rpm. 

Transformers — Power is transmitted at generator voltage to Shumacher transformer station 
about 7 miles distant. 

Wawaitin Generating Station 

Situated on the Mattagami river about 16 miles upstream from Timmins. Main dam has 
two concrete sluiceways both flanked by rock fill sections with concrete core. A canal conveys 
the water to the intake, thence through wood-stave pipes provided with surge tanks, and finally 
through steel penstocks, to the turbines. All penstocks have butterfly valve controls. Purchased 
by the Commission from the Northern Ontario Power Company in 1944. Normal operating 
head 125 feet. 

Turbines — Two 3,450 hp S. Morgan Smith, Francis type, double runner, horizontal shaft, 
365 rpm, installed in 1912. Two 4,500 hp S. Morgan Smith, Francis type, vertical shaft, 375 rpm. 
(one installed in 1913 and one in 1918). Total capacity, 14,900 hp. 

Auxiliary Turbines — Two 150 hp, S. Morgan Smith, horizontal shaft, 600 rpm. 

Generators — Two 3,750 kw vertical and two 2,500 kw horizontal, Canadian Westinghouse, 
3-phase, 25-cycle, 12,000 volt, direct connected to turbines. Total capacity 12,500 kw. 

Exciters — Two 70 kw turbine driven, 600 rpm and one 150 kw motor driven, Canadian 
Westinghouse, 125 volt, 730 rpm. 

Transformers — Power is transmitted at generator voltage. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 351 



Kirkland Lake Frequency-Changer Station 

Situated in Kirkland Lake. This frequency-changer station includes three 25/60-cycle sets. 
These sets are used to exchange power from the 25- and 60-cycle generating stations of the Timis- 
kaming district. Two sets installed in 1920, the third set installed in 1926. Acquired by the 
Commission November, 1944. 

Motors — 1st unit — one 1,125 kva; 2nd unit — one 2,200 kva, General Electric, 3-phase, 
25-cycle, 12,000 volt; 3rd unit— one 4,250 kva Swedish General Electric, 3-phase, 25-cycle, 
11,000 volt; all 300 rpm. Total capacity, 7,575 kva. 

Generators — 1st unit — one, 1,250 kva; 2nd unit— 2,500 kva General Electric, 3rd unit — one 
4,250 kva Swedish General Electric, 3-phase, 60-cycle, 2,300 volt, direct connected to motors. 
Total capacity, 8,000 kva. 

Ragged Chute Hydro-Pneumatic Plant 

Situated on the Montreal river (Timiskaming) about 8 miles south of Cobalt between Hound 
Chute and Fountain Falls generating stations. This plant at present produces compressed air 
by hydraulic means, which is delivered through steel pipe lines to commercial customers in the 
Cobalt area. 

Sudbury District 

McVittie Generating Station 

Situated on Wanapitei river, approximately 26 miles from Sudbury. Formerly property of 
Wahnapitae Power Company. In operation 1912. Commission assumed control April, 1930. 
Water conveyed through canal to head works, steel penstocks to turbines. Average operating 
head 38 ft., 

Turbines — Two 1,800 hp William Kennedy, Francis type, horizontal shaft, 257 rpm. Total 
capacity, 3,600 hp. 

Auxiliary Turbine — One 75 hp William Kennedy, Francis type. 

Generators — Two 1,250 kva Canadian General Electric Company, 3-phase, 60-cycles, 2,300 
volts, direct connected to turbines. Total capacity, 2,500 kva. 

Exciters — Two 75 kw Canadian General Electric Company, one direct connected to auxiliary 
turbine, one motor driven. 

Transformers — One bank = three 625 kva Canadian General Electric Company, single-phase, 
2.3 to 23 kv. Total capacity, 1,875 kva. 

Coniston Generating Station 

Situated on Wanapitei river, approximately ten miles east of Sudbury. Formerly property 
of Wahnapitae Power Company. In operation 1905. Commission assumed control April, 1930. 
Water conveyed through canal to head works, steel penstocks to turbines. Average operating 
head, 53 ft. 

Turbines— One 1,200 hp, one 1,600 hp, each 300 rpm, Jenckes; one 3,500 hp, 257 rpm, Allis- 
Chalmers, all Francis type, horizontal shaft. Total capacity, 6,300 hp. 

Auxiliary Turbines — One 35 hp, one 70 hp Jenckes, Francis type. Total capacity, 105 hp. 

Generators — One 800 kva, one 1,250 kva, one 2,500 kva Canadian General Electric Company, 
3-phase, 60-cycles, 2,300 volts, direct connected to turbines. Total capacity, 4,550 kva. 

Exciters — One 25 kw, one 55 kw, turbine driven, one 100 kw, motor driven, Canadian General 
Electric Company. 

Transformers — Two banks = six 800 kva Canadian General Electric Company, single-phase, 
2.3 to 23 kv; one 8,000 kva, three-phase, 24 to 110 kv, English Electric Company. Total capacity, 
12,800 kva. 



352 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



Stinson Generating Station 

Situated on Wanapitei river, approximately eight miles up stream from Coniston generating 
station. Formerly property of Wahnapitae Power Company. In operation 1925. Commission 
assumed control April, 1930. Water conveyed through canal to head works, steel penstocks to 
turbines. Average operating head, 52.5 ft. 

Turbines — Two 3,500 hp Allis-Chalmers, Francis type, horizontal shaft, 240 rpm. Total 
capacity, 7,000 hp. 

Auxiliary Turbine — One 150 hp Allis-Chalmers, Francis type. 

Generators — Two 2,500 kva Canadian General Electric Company, 3-phase, 60-cycles, 2,300 
volts, direct connnected to turbines. Total capacity, 5,000 kva. 

Exciters — One 100 kva turbine driven, one 100 kva, motor driven, Canadian General Electric 
Company, 125 volts. 

Transformers — One bank = three 1,667 kva Canadian General Electric Company, single- 
phase, 2.3 to 23 kv. Total capacity, 5,000 kva. 

Crystal Falls Generating Station 

Situated on the Sturgeon river about ten miles up stream and north of the town of Sturgeon 
Falls. Formerly property of the Abitibi Power and Paper Company. Commission assumed control 
in August, 1937. Power house integral part of dam. Normal operating head, 33ft. 

Turbines — Four 2,600 hp LP. Morris, Francis type, vertical shaft, 138.5 rpm. Total capacity, 
10,400 hp. 

Generators — Four 2,125 kva Westinghouse Electric Company generators, 3-phase, 60-cycle, 
2.300 volt, direct connected to turbines. 

Exciters — One 68 kw, 125 volt, motor driven, Canadian Westinghouse Company. 

Transformers — One bank = three 3,000 kva Canadian Westinghouse Company, single-phase, 
2.3 to 22 kv; one bank = one 8,000 kva English Electric Company, 3-phase, 24 to 110 kv. Total 
capacity, 17,000 kva. 

Nipissing District 

Nipissing Generating Station 

Situated on the South river, about V/2 miles from the village of Nipissing. Formerly the 
property of Nipissing Power Company. Control assumed by Commission March, 1916. Water 
conveyed to plant through canal, wood-stave pipe line and steel penstock provided with surge tank. 
Average operating head, 90 ft. 

Turbines — Two 1,250 hp Jenckes Machine Company, Francis type, horizontal shaft, 450 rpm. 
Total capacity, 2,500 hp. 

Generators — One 1,400 kva Canadian Westinghouse Company; one 1,250 kva Swedish General 
Electric Company, 3-phase, 60-cycles, 2,300 volts, direct connected to turbines. Total capacity, 
2.650 kva. 

Exciters — One 17.5 kw Swedish General Electric Company, 115 volts; one 21 kw Canadian 
Westinghouse. Company, 125 volts, direct connected to main generators; one 373^ kw motor 
driven. 

Transformers — One bank = three 900 kva Packard Electric Company, single-phase, 2.3 to 
22kv. Total capacity, 2,700, kva. 

Bingham Chute Generating Station 

Situated on South river, about two miles fron Powassan. Constructed by Commission. In 
operation December, 1923. Water conveyed to plant through wood-stave pipe line. Average 
operating head, 47 ft. 

Turbines — Two 650 hp William Kennedy, Francis type, horizontal shaft, 450 rpm. Total 
capacity, 1,300 hp. 

Generators — Two 450 kva Canadian Westinghouse Company, 3-phase, 60-cycles, 2,200 volts, 
direct connected to turbines. Total capacity, 900 kva. 

Exciters — Two 12.5 kw Canadian Westinghouse Company, direct connected to generators. 

Transformers — One bank = three 300 kva Canadian Westinghouse Company, single-phase, 
2.2 to 22 kv. Total capacity, 900 kva. 



1946 THE HYDRO-ELECTRIC POWER COMMISSION 353 



Elliott Chute Generating Station 

Situated on South river, approximately 13^ miles up stream from Bingham Chute plant 

Constructed by Commission. In operation October, 1929. Semi-automatic. Remote controlled 

from Bingham Chute station. Water conveyed to plant through wood-stave pipe line. Average 
operating head, 39 ft. 

Turbine — One 1,800 hp S. Morgan Smith-Inglis Company, propeller type, vertical shaft, 
327 rpm. 

Generator — One 1,800 kva Swedish General Electric Company, 3-phase, 60-cycles, 2,300 
volts, direct connected to turbine. 

Exciter — One 22 kw Swedish General Electric Company, direct connected, 125 volts. 

Transformers — One bank = three 650 kva English Electric Company, single-phase, 2.3 to 
23 kv. Total capacity, 1,950 kva. 

Patricia District 

Ear Falls Generating Station 

Situated at Ear Falls on the English river. Constructed by Commission. In operation Decem- 
ber, 1929. Water conveyed from Lac Seul conservation dam to power house through four wood- 
stave pipes and two concrete conduits. Normal operating head 36, ft. 

Turbines — One 5,000 hp, propeller type, 180 rpm, Dominion Engineering Works; one 5,000 
hp, propeller type, 180 rpm, and one 7,500 hp, Kaplan type, 150 rpm, Morgan-Smith- Ingiis; all 
vertical shaft. Total capacity, 17,500 hp. 

Generators — One 5,000 kva, one 6,000 kva Canadian Westinghouse Company; one 4,500 kva 
Ateliers de Construction Oerlikon, 3-phase, 60-cycles, 6,600 volts, all direct connected to turbines. 
Total capacity, 15,500 kva. 

Exciters — One 65 kw, one 75 kw, and one 5 kw pilot, 125 volt, direct connected, Canadian 
Westinghouse Company; one 48 kw, 125 volt, Ateliers de Construction Oerlikon, direct connected. 

Transformers — One bank = three 750 kva, single-phase, English Electric Company; one bank 
= three 750 kva, single-phase, Commonwealth Electric Corporation; one bank = three 1,500 kva, 
single-phase, Moloney Electric Company; one bank = three 2,000 kva, single-phase, Packard 
Electric Company. Total capacity, 15,000 kva. 



Rat Rapids Generating Station 

Situated at Rat Rapids at the outlet of lake St. Joseph, on the Albany river. Constructed by 
Commission. In operation March, 1935. Concrete turbine chamber and generating room substruc- 
ture. Rock filled timber crib dams. Average operating head, 14.5 ft. 

Turbine — One 1,750 hp Dominion Engineering Works, propeller type, vertical shaft, 128.5 
rpm. 

Generator — One 1,500 kva Canadian General Electric Company, 3-phase, 60-cycles, 2,300 
volts, direct connected to turbine. 

Exciters — One 32 kw and one 2.5 kw pilot exciter direct-connected, Canadian General Electric 
Company. 

Transformers — One bank = three 333 kva Packard Electric Company, single-phase, 6.6 to 
22 kv; one bank = three 500 kva Packard Electric Company, single-phase 2.3 to 22 kv. Total 
capacity, 2.500 kva. 



354 THIRTY-EIGHTH ANNUAL REPORT OF No. 26 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



355 



INDEX 



A 

Abitibi Canyon Gen. Sta — Power 
Generated 16 

Abitibi District — Generating Plants, 

Power Generated 16 

Diagram of Peak Loads 30 

Operation of 31 

Loads of Municipalities 34 

Electrical Engineering andConstr 92 

Fixed Assets '. . 184 

Abitibi Power and Paper Co.— Power 
Purchased 17 

Accidents 109 

Accounts, Explanatory Statement Re- 
specting Ill 

Accounts Receivable 134 

Acton — Load in Horsepower 22 

Cost of Power .... 138 

Credit or Charge Account 154 

Sinking Fund 170 

*Municipal Accounts: 

a. Balance Sheet 200 

B. Detailed Operating Report 254 

*Statements: 

c. Street Lighting Installation 

(See Page 308) 

D. Consumers, Consumption, Bills, etc.318 

E. Cost of Power and Rates for Service.330 

Acts, None in 1945 11 

Advertising 73 

Agincourt — Load in Horsepower 22 

Municipal Work 42 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 200; b, 254 

Statements d, 318; e, 330 

Agreements Approved by Order-in- 
Council 11 

Aguasabon River Survey 80 

Ailsa Craig — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account lt>4 

Sinking Fund 170 

Municipal Accounts a, 200; b, 254 

Statements d, 318; e, 330 

Alexander Gen. Sta.— Power Generated. . 16 

Alexandria — Load in Horsepower 22 

Cost of Power 138 

. Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 200; b, 254 

Statements d, 318; e, 330 



Alliston — Load in Horsepower 22 

Municipal Work 45 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts .A, 200; b, 254 

Statements d, 318; E, 330 

Almonte — Load in Horsepower 28 

Municipal Work 48 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 201 ; B, 255 

Statements D, 314; E, 330 

Alvinston — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts A, 201 ; B, 255 

Statements d, 318; e, 330 

Amherstburg— Load in Horsepower 22 

Municipal Work 42 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts A, 201 ; B, 255 

Statements D, 314; E, 330 

Ancaster Twp. — Load in Horsepower .... 22 

Municipal Work 42 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts A, 201 ; B, 255 

Statements d, 318; E, 330 

Annual Report, Guide to 6 

ApDle Hill — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts A, 201; B, 255 

Statements d, 318; e, 330 

Appliances in Use 66 

Approvals Laboratory 108 

Aquarius Porcupine Gold Mines Limited, 
Agreement Approved 12 

Arkona — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 201; B, 255 

Statements D, 318; E, 330 

Armistice Gold Mines Limited, Agreement ^ 
Approved 12 

Arnprior — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 201; B, 255 

Statements d, 314; E, 330 



*The Statements "A", "B", "C", "D" and "E", appertaining to the local municipal electric 
utilities — and given in Section X of the Report — are detailed individually for Acton, but in the 
case of other municipalities are grouped under the sub-heading of ''Municipal Accounts" with 
reference to Statements "A" and "B" and under the sub-heading "Statements" with reference 
to Statements "D" and "E". Statement "C" suspended. 



356 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



Arthur — Load in Horsepower 22 

Municipal Work 45 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund. 170 

Municipal Accounts A, 202; b, 256 

Statements d, 318; e, 330 

Assets Fixed : 

Re Hydro-Electric Power Commission . 122 
Re Northern Ontario Properties 183 

Athens — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 202; B, 256 

Statements d, 318; E, 330 

Atikokan Townsite — Load in Horsepower 29 

Atikokan — Cost of Power and Rates for 
Service 330 

Auburn Gen. Sta. — Power Generated .... 16 

Aurora— Load in Horsepower 22 

Municipal Work 42 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 202; B, 256 

Statements d, 314; e, 330 

Ausic Mining and Reduction Company 
Limited, Agreement Approved 12 

Aylmer — Load in Horsepower 22 

Municipal Work 42 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 202; b, 256 

Statements d, 314; E, 330 

Ayr — Load in Horsepower 22 

Municipal W^ork 42 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 202; b, 256 

Statements . d, 318; e, 330 

B 

Baden — Load in Horsepower 22 

Municipal Work 42 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund. . 170 

Municipal Accounts a, 203; b, 257 

Statements d, 318; e, 330 

Bala Gen. Stns. — Power Generated 16 

Bala — Load in Horsepower. 22 

Cost of Power and Rates for Service. . .330 

Balance Sheet 

Re Hydro-Electric Power Commission . 1 18 

Re Northern Ontario Properties 180 

Re Hamilton Street Railway 190 

Barrett Chute Gen. Sta. — Power 
Generated '. 16 

Barrie — Load in Horsepower 22 

Municipal Work 46 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 203; B, 257 

Statements d, 314; E, 330 



Bath — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 203; b, 257 

Statements d, 318; e, 330 

Beach Estate, M.F.— Power Purchased.. . 17 

Beachville — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 203; b, 257 

Statements d, 318; e, 330 

Beamsvilie — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 203; b, 257 

Statements d, 318; e, 330 

Beardmore Townsite — Load in Horse- 
power 29 

Cost of Power and Rates for Service .... 330 

Beauharnois Light, Heat and Power Co., 
Power Purchased 17 

Beaverton — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts A, 203; B, 257 

Statements d, 318; e, 330 

Beeton — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts A, 203; B, 257 

Statements D, 318; E, 330 

Belle River — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts A, 204; B, 258 

Statements D, 318; E, 330 

Belleville —Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts A, 204; B, 258 

Statements d, 314; e, 330 

Big Chute Gen. Sta. — ■ Power Generated . 16 
Big Eddy Gen. Sta. — Power Generated.. 16 
Bingham Chute Gen. Sta. — Power Gener- 
ated 16 

Blenheim — Load in Horsepower 22 

Municipal Work 42 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 204; b, 258 

Statements d, 318; e, 330 

Bloomfield — Load in Horsepower. 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts A, 204; b, 258 

Statements d, 318: E, 330 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



357 



Blyth — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 204; b, 258 

Statements d, 318; E, 330 

Bobcaygeon — Municipal Work 48 

Bolton — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account. 154 

Sinking Fund 170 

Municipal Accounts a. 205; b, 259 

Statements d, 318: e, 330 

Bonter, W.F.. Agreement Approved 11 

Bothwell — Load in Horsepower 22 

Cost of Power ,,.... 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a. 205; b, 259 

Statements D, 318: E, 330 

Bowman ville — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a. 205; B, 259 

Statements D, 314; E, 330 

Bradford — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 205; b, 259 

Statements D. 318; E. 330 

Braeside — Agreement Approved 11 

Load in Horsepower 22 

Municipal Work 48 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 205; b, 259 

Statements d, 318; e, 330 

Brampton — Load in Horsepower 22 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 205; b, 259 

Statements D. 314; E, 330 

Brantford — Load in Horsepower 23 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 205; b, 259 

Statements D, 314; E, 330 

Brantford Twp. — Load in Horsepower ... 23 

Municipal Work 42 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund . . . . 170 

Municipal Accounts a, 206; b, 260 

Statements d, 318; e, 330 

Erechin — Load in Horsepower 23 

Rural Lines -: . 175 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts A, 206; B, 260 

Statements D, 318; E, 332 



Brigden — Load in Horsepower 23 

Municipal Work 43 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts A, 206; B, 260 

Statements d, 318; E, 332 

Bridgeport — Load in Horsepower 23 

Cost of Power 138 

Credit or Charge Account 154 

Sinking Fund 170 

Municipal Accounts a, 206; b, 260 

Statements d, 318; E, 332 

Brighton — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts a, 208; B, 260 

Statements d, 318; e, 332 

Brockville — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund .... 170 

Municipal Accounts ! A, 207; b, 261 

Statements d, 314; E, 332 

Brompton Pulp and Paper Company 
Limited, Agreement Approved 11 

Bronte — Load in Horsepower 23 

Brussels —Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts a, 207: B, 261 

Statements D, 318; E, 332 

Burford — Load in Horsepower 23 

Municipal Work 43 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 207; b, 261 

Statements D, 318; E, 332 

Burgessvile — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts a, 207; b, 261 

Statements d, 318; E, 332 

Burlington, Agreement Approved. ....... 11 

Load in Horsepower 23 

Municipal Work f 43 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 207; B, 261 

Statements E, 332 

Burlington Beach — Load in Horsepower. . 23 
Cost of Power and Rates for Service. . . 332 
Burlington Steel Company Limited, 
Agreement Approved 11 

C 

Calabogie Gen. Sta. — Power Generated. . 16 
Caledon Electric Gen. Sta. — Power Gener- 
ated 16 



358 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



Caledon Electric Company Properties 
Incorporated 91 

Caledonia — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 207; B, 261 

Statements d, 318; e, 332 

Callander — Load in Horsepower 34 

Cost of Power and Rates for Service . . 332 

Calvert, Agreement Approved 12 

Cameron Falls Gen. Sta. — Power Genera- 
ted 16 

Campbellford Water and Light Commis- 
sion — Power Purchased 17 

Campbellville— Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 207; B, 261 

Statements d, 318; e, 332 

Canada Cement Company Limited, 
Agreement Approved 11 

Canadian Electrical Code 108, 1 10 

Canadian Industries Limited, Agreement 
Approved 11 

Canadian Niagara Power Co. — Power 
Purchased 17 

Canadian Northern Railway Company, 
. Agreement Approved 12 

Canadian Splint & Lumber Corporation 
Ltd., Agreement Approved 12 

Cannington — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 208; b, 262 

Statements D, 318; E, 332 

Capital Expenditures 

Rural Power Districts 130 

Capital Investment — Thirty Years' 
Record 3 

Capital Investment xviii 

Capreol — Load in Horsepower 34 

Municipal Accounts A, 253; b, 307 

Statements . . . d, 318; E, 332 

Cardinal — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 208; B, 262 

Statements D, 318; E, 332 

Carleton Place — Load in Horsepower. ... 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 208; b, 262 

Statements D, 314; E, 332 

Carleton Place Gen. Sta. — Power Gen- 
erated. 16 

Cathroy Larder Mines Limited, Agree- 
ment Approved 12 



Cayuga — Load in Horsepower 23 

Municipal Work 43 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 208; B, 262 

Statements d, 318; e, 332 

Cedars Rapids Transmission Company 
Limited, Agreement Approved 11 

Chatham — Load in Horsenower 23 

Municipal Work * 43 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 208; B.262 

Statements d, 314; E, 332 

Chats Falls Gen. Sta.— Power Generated . 16 

Chatsworth — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 209; B, 263 

Statements d, 320; e, 332 

Chemical Testing 106 

Chesley — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 209; B, 263 

Statements d, 320; e, 332 

Chester ville — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 209; B, 263 

Statements D, 320; E, 332 

Chippawa — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 209; B, 263 

Statements d, 320; E, 332 

Clifford — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 209; B, 263 

Statements d. 320; E, 332 

Clinton — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account. 156 

Sinking Fund 170 

Municipal Accounts A, 209; B, 263 

Statements D, 314; E, 332 

Cobden — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts a, 209: b, 263 

Statements .D, 320; E, 332 

Cobourg — Load in Horsepower . . 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 210; B, 264 

Statements D, 314; E, 332 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



359 



Colborne — Load in Horsepower 23 

Cost of Power . . . : 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 210; b, 264 

Statements d, 320; E, 332 

Coldwater — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts a, 210; b, 264 

Statements d, 320; E, 332 

Collingwood — Load in Horsepower 23 

Municipal Work . , 46 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts a, 210; B, 264 

Statements n, 314; e, 332 

Comber — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts a, 210; b, 264 

Statements d, 320; e, 332 

Commercial Service Rural, Description of 57 

Communications, All Systems 97 

Concrete, Inspection of. 106 

Coniaurum Mines Limited, Agreement 
Approved 12 

Coniston Gen. Sta. — Power Generated.. 16 

Construction Activities, Summary of ... . xi 
In Rural Power Districts 98 

Consumers, Number of, Consult State- 
ments "B" and "D" 254, 310 

Consumption, Energv, Consult State- 
ment "D" 310 

Cookstown — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 211; b, 265 

Statements D, 320; E, 332 

Co-operative Systems, Comparative 

Financial Statements xx 

Financial Features of 1 

Operating Described 4 

Agreements Approved 11 

Financial Operations Explained Ill 

Cottage Cove Townsite — Load in Horse- 
power 34 

Cost of Power and Rates for Service .... 332 

Cottam — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund .170 

Municipal Accounts a, 211; b, 265 

Statements o, 320; E, 332 

Courtright — Load in Horsepower 23 

Cost of Power 1 40 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 211; B, 265 

Statements D, 320, E, 332 



Creemore — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 211; B, 265 

Statements d, 320; e, 332 

Cross Lake Lease, Agreement Approved.. 12 

Crowshore Patricia Gold Mines Limited, 
Agreement Approved 12 

Crystal Falls Gen. Sta. — Power Generated 16 

D 

Dashwood — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account lo6 

Sinking Fund 170 

Municipal Accounts A, 211; B, 265 

Statements D-,'320; E, 332 

Debentures (See Under Funded Debt.).. . 132 

DeCew Falls Gen. Sta. — Power Generated 16 
Hydraulic Construction 76 

Defence Industries Limited, Agreement 
Approved 11 

Delaware— Load in Horsepower. 23 

Cost of Power 140 1 

Credit or Charge Account 156 

Sinking Fund 170' 

Municipal Accounts A, 211; b, 265 

Statements d, 320; E, 332 

Delhi — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts a, 211; b, 265 

Statements D, 314; E, 332 

Deloro Smelting and Refining Company 
Limited, Agreement Approved 11 

Deseronto — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 212; b, 266 

Statements D, 320; E, 332 

Des Joachim's Power Site — Hydraulic 
Construction 79 

Distribution Lines and Systems in Rural 
Power Districts 98 

Dome Mines Limited, Agreement 
Approved 12 

Domestic Hot Water Tanks and Heaters, 
Research re 101 

Domestic Service, Average Annual Con- 
sumption for xiii 

Statistics re Consult Statement "D". . . 310 
Rates for, Consult Statement "E" 328 

Dorchester — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 212; B, 266 

Statements d, 320; e, 334 

Drayton — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 212: B, 266 

Statements D, 320; E, 334 



360 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



Dresden — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts a, 212; b, 266 

Statements. D, 320; e, 334 

Drumbo — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts a. 212; b. 266 

Statements D, 320; E, 334 

Dublin — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts a, 213; b, 267 

Statements D, 320; E, 334 

Dundalk— Load in Horsepower 23 

Municipal Work 46 

Cost of Power 140 

Credit or Charge Account li>6 

Sinking Fund 170 

Municipal Accounts A, 213; B, 267 

Statements D, 320; E, 334 

Dundas — Load in Horsepower 23 

Cost of Power 140 

Credit or Charge Account 156 

Sinking Fund 170 

Municipal Accounts A, 213; b, 267 

Statements n, 314; E, 334 

Dunnville —Load in Horsepower 23 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 213; b, 267 

Statements d, 316; E, 334 

Durham — Load in Horsepower 23 

Municipal Work 46 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 213; b, 267 

Statements d, 320; E, 334 

Dutton -— Load in Horsepower 23 

• Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 213; b, 267 

Statements d, 320: E, 334 

E 

Ear Falls Gen. Sta. — Power Generated. . 16 

Eastern Ontario Division — Right-of-Way 14 

Generating Plants — Power Generated. . 16 

Municipal Work 48 

Hydraulic Construction 78 

East York Twp. — Load in Horsepower. . . 24 

Municipal Work 43 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 213; b, 267 

Statements d, 320; E, 334 

Electrical Engineering and Constr 84 



Electrical Equipment, Routine Testing. . . 104 
Inspection of 105 

Electrical Inspection Department 109 

Electronic Applications, Research re 104 

Elliott Chute Gen. Sta. — Power Gen- 
erated 16 

Elmira — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 214; b, 268 

Statements d, 316; E, 334 

Elmvale — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 214; b, 268 

Statements d, 320; e, 334 

Elmwood — Load in Horsepower 24 

Municipal Work . 46 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 214; b, 268 

Statements d, 320; E, 334 

Elora — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 214; b, 268 

Statements D, 320; E, 334 

Embro •— Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 214: B, 268 

Statements u. 320; E, 334 

Energy Production, Summary of viii 

Equipment, New 107 

Erieau— Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 215; B, 269 

Statements D, 320: E, 334 

Erie Beach — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 215; b, 269 

Statements n, 320; E, 334 

Erin —Load in Horsepower 24 

Cost of Power and Rates for Service. . . 334 

Essex — Load in Horsepower 24 

Municipal Work 43 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 215: b, 269 

Statements d, 320; E, 334 

Etobicoke Twp. — Load in Horsepower. . . 24 

Municipal Work 43 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 215; b, 269 

Statements d. 320; e, 334 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



361 



Eugenia Falls Gen. Sta.— Power Gen- 
erated 16 

Exeter — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 215; b, 269 

Statements D, 320; e, 334 

F 

Farm Service, Description of 57 

Uses for Electricity 62 

Statistics re 68 

Fenelon Falls Gen. Sta. — Power Gen- 
erated 16 

Fergus — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 215; b, 269 

Statements d, 316; e, 334 

Financial Features of Undertaking 1 

Financial Statements Ill 

Finch — Load in Horsepower 24 

Cost of Power ..142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts. a, 216; b, 270 

Statements d, 320; E, 334 

Fires Attributed to Electricity 109 

Flesherton — Load in Horsepower. . 24 

Municipal Work 46 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 216; b, 270 

Statements D, 320; E, 334 

Fonthill — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 216; b, 270 

Statements D, 320; e, 334 

Forest — Load in Horsepower 24 

Municipal Work 43 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 216; b, 270 

Statements D, 320; e, 334 

Forest Hill — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 216; B, 270 

Statements d, 316; E, 334 

Forestry Division 35 

Foreword 1 

Fort William — Load in Horsepower 29 

Cost of Power 176 

Credit or Charge Account 176 

Sinking Fund 178 

Municipal Accounts A, 252; B, 306 

Statements d, 314; e, 334 

Fountain Falls Gen. Sta.— Power Gen- 
erated 16 

Frankford Gen. Sta. — Power Generated. . 16 



Frankford — Load in Horsepower 24 

Cost of Power and Rates for Service. . 334 
Frederick House Dam 

Hydraulic Construction 82 

Freeman, Agreement Approved 11 

Frequencies— Consult table on page 22 

Frequency-Changer Station, Additional. . 88 
Funded Debt — Thirty Years' Record .... 5 
Funded Debt, Tabulation of 132 

G 

Gair Company Limited, Agreement 
Approved 11 

Galetta Gen. Sta. — Power Generated. ... 16 

Gait — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 217; B. 271 

Statements d, 314; E, 334 

Gamebridge 
Cost of Power and Rates for Service. . . 334 

Gatineau Power Co. — Power Purchased. . 17 

Generating Stations, New 88 

Georgetown — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 217; B, 271 

Statements d, 316; E, 334 

Georgian Bay Division, Right-of-Way ... 13 
Generating Plants — Power Generated. . 16 

Municipal Work 45 

Hydraulic Construction 78 

Gerald ton Townsite — Load in Horse- 
power 29 

Cost of Power and Rates for Service. . . 334 

Glencoe — Load in Horsepower 24 

Municipal Work 43 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 217; b, 271 

Statements d, 320; E, 334 

Glen Williams 
Cost of Power and Rates for Service. . . 334 

Goderich — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 217; b, 271 

Statements d, 316; e, 334 

Gold Hawk Porcupine Mines Limited. 
Agreement Approved 12 

Grand Valley — Load in Horsepower. . . . . 24 

Municipal Work 46 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 217; b, 271 

Statements d, 320; E, 334 

Granton — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 217; B, 271 

Statements o, 322; E, 331 



362 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



Gravenhurst — Load in Horsepower 24 

Municipal Work 46 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 218; b, 272 

Statements d, 316; e, 334 

Grimsby — Load in Horsepower 24 

Cost of Power , 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 218; B, 272 

Statements D, 322; E, 336 

Grounding, Reasearch re 104 

Ground Tests 109 

Growth, Statistics re 40 

Guelph — Load in Horsepower 24 

Municipal Work 43 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 218; B, 272 

Statements D, 314; E, 336 

Gypsum Lime and Alabastine, Canada, 
Limited, Agreement Approved 11 

H 

Hagersville — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 218; b, 272 

Statements D, 322 ; E, 336 

Hague's Reach Gen. Sta. — Power Gen- 
erated 16 

Hamilton — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 219; B, 273 

Statements d, 314; e, 336 

Hamilton Street Railway 

Financial Accounts 189 

Balance Sheet 190 

Operating Account 192 

Hamlet Service, Description of 57 

Hanna Chute Gen. Sta. — Power Gen- 
erated 16 

Hanover— Load in Horsepower 24 

Municipal Work 46 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts. a, 219; B, 273 

Statements d, 316; E, 336 

Hanover Gen. Sta. — Power Generated . . 16 

Harriston — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 219; b, 273 

Statements D, 322; e, 336 

Harrow — Load in Horsepower 24 

Cost of Power 1 42 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts a, 219; b, 273 

Statements D, 322; E, 336 



Hasaga Gold Mines Limited, Agreement 
Approved 12 

Hastings — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts \, 219; B, 273 

Statements d, 322; E, 336 

Havelock — Load in Horsepower 24 

Municipal Work 48 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 1 71 

Municipal Accounts A, 219; B, 273 

Statements d, 322; E, 336 

Hayes Steel Products Limited, Agreement 
Approved 12 

Heely Falls Gen. Sta,— Power Generated. 16 

Hensall — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 219; B, 273 

Statements d, 322; £, 336 

Hepworth — Load in Horsepower 24 

Cost of Power and Rates for Service. . . 336 

Hespeler — Load in Horsepower 24 

Municipal Work 43 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 220; B, 274 

Statements d, 316; E, 336 

High Falls Gen. Sta. — Power Generated. . 16 

Highgate — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 220; B, 274 

Statements D, 322; E, 336 

Hislop Townsite — Load in Horsepower. . . 34 
Cost of Power and Rates for Service. . . 336 

Holstein — Load in Horsepower 24 

Cost of Power 142 

Credit or Charge Account 158 

Sinking Fund 171 

Municipal Accounts A, 220; B, 274 

Statements D, 322; E, 336 

Hound Chute Gen. Sta. — Power Generated 16 

Hudson Townsite — Load in Horsepower. . 34 
Cost of Power and Rates for Service. . . 336 

Humberstone — Load in Horsepower 24 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 220; B, 274 

Statements d, 316; E, 336 

Huntsville — Load in Horsepower 24 

Municipal Work 46 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 220; B, 274 

Statements d, 316; R, 336 

Hydraulic Fngineering and Construction. 76 
Hydraulic Investigations 83 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



363 



Hydro-Electric Power Commission of 
Ontario — War Service of Employees, .xvii 

Financial Operations Explained Ill 

Balance Sheet 118 

Statement of Operations 120 

Fixed Assets, Summary of 125 

Fixed Assets, Changes in 128 

Account with Provincial Treasurer. ... 131 

Funded Debt .....132 

Power Accounts Receivable 134 

Renewals Reserves 134 

Contingencies and Obsolescence 

Reserves 135 

Stabilization of Rates Reserves 136 

Sinking Fund Reserves 136 

Hydro Utilities — Statistics re Growth. ... 37 

I 

Illumination, Research re 102 

Imperial Oil Limited 

Agreement Approved 12 

Indian Chute Gen. Sta. — Power Generated 1 6 
Industrial Power Service in Rural Areas 58 

Rates to Consumers 59 

Industrial Promotional Work 75 

Ingersoll — Load in Horsepov/er 24 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts. a, 221; b, 275 

Statements d, 316; E, 336 

Inspection 99 

Materials and Equipment 104 

Of Equipment, Special , . 110 

Insulation, Electrical, Research re 100 

Iroquois — Load in Horsepower 24 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 221; B, 275 

Statements d, 322; E, 336 

J 

Jarvis — Load in Horsepower 24 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 221; B, 275 

Statements d, 322; E, 336 

K 

Kaministiquia Power Co.— Power Pur- 
chased 17 

Kearns Townsite — Load in Horsepower . . 34 
Cost of Power and Rates for Service. . . 336 

Kemptville — Load in Horsepower 24 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 221; b, 275 

Statements d, 322; E, 336 

Kincardine — Load in Horsepower 24 

Municipal Work 47 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund .171 

Municipal Accounts A, 221; b, 275 

Statements D, 316; B, 336 



King Kirkland Townsite — Load in Horse- 
power 34 

Cost of Power and Rates for Service. . .336 

Kingston — Load in Horsepower 24 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 221; B, 275 

Statements D, 314; E, 336 

Kingsville — Load in Horsepower 24 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 222 ; b, 276 

Statements d, 316; E, 336 

Kirkfield — Load in Horsepower 24 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 222; b, 276 

Statements D, 322; E, 336 

Kirkland Lake Gold Mining Company 
Ltd., Agreement Approved 12 

Kitchener — Load in Horsepower 25 

Municipal Work 43 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 222; B, 276 

Statements d, 314; E, 336 

L 

Laboratories, Research and Testing 100 

Lakefield — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 222; b, 276 

Statements n, 322; e, 336 

Lakefield Gen. Sta. — Power Generated. . . 16 

Lambeth — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 223; B, 277 

Statements d, 322; e, 336 

Lamps and Lighting Equipment, Inspec- 
tion of 107 

Lanark — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 223; B, 277 

Statements d, 322; e, 336 

Lancaster — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 223; b, 277 

Statements D, 322; e, 336 

LaSalle — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 223; b, 277 

Statements d, 322; E, 336 



364 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



Leamington — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 223; B, 277 

Statements. , D, 316; E, 336 

Leaside 
Cost of Power and Rates for Service. . . 336 

Legal Proceedings 11 

Lighting Service, Rural 63 

Promotional Work 75 

Lindsay — Load in Horsepower 25 

Municipal Work 48 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 223; b, 277 

Statements d, 316; e, 336 

Linemen's Training School xvii 

Listowel — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 223; B, 277 

Statements d, 316; E, 336 

Load Conditions, Summarv of v 

Conditions, All Systems 15 

Loads, Increased Municipal 37 

Loans to Rural Consumers 55 

London- -Load in Horsepower 25 

Municipal Work 43 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 224; B, 278 

Statements d, 314; e, 336 

London Twp. — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 224; b, 278 

Statements d, 322; E, 336 

Long Branch -Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 224; B, 278 

Statements D, 316; E, 336 

Lower Sturgeon Gen. Sta. — Power Gener- 
ated 16 

Lucan — Load in Horsepower 25 

Cost of Power ..... . . . : 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 224; B, 278 

Statements d, 322; E, 336 

Lucknow — Load in Horsepower 25 

Municipal Work 47 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a. 224 ; B. 278 

Statements D, 322; E, 336 

Lynden — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 225; B, 279 

Statements D, 322: E. 336 



M 

Macassa Mines Limited, 

Agreement Approved 12 

Maclaren Quebec Power Company 

Agreement Approved 12 

Power Purchased 17 

MacTier — Load in Horsepower 25 

Cost of Power and Rates for Service. . . 336 

Madoc — Load in Horsepower 25 

Cost of Power * 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 225; B, 279 

Statements d, 322: e, 338 

Maintenance of the Systems 35 

Manitoulin District, Operation of 33 

Manitoulin Pulp Co.— Power Purchased.. 17 

Manitoulin Rural Power District 

Electrical Engineering and Constr... . 93 

Markdale — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 225; B, 279 

' Statements d, 322; e, 338 

Marknam — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 225; B, 279 

Statements d, 322; e, 338 

Marmora — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 225; B, 279 

Statements d, 322; e, 338 

Martintown — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 225; b, 279 

Statements D, 322; e, 338 

Masonry Materials, Research re 103 

Matabitchuan Gen. Sta. -Power Gener- 
ated 16 

Matachewan Townsite — Load in Horse- 
power 34 

Cost of Power and Rates for Service. . . 338 

Maxville — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 225; B, 279 

Statements d, 322; e, 338 

Mclntyre Porcupine Mines Limited, 

Agreement Approved 12 

McVittie Gen. Sta. — Power Generated. . . 16 

Meaford — Load in Horsepower 25 

Municipal Work 47 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 226: B, 280 

Statements d, 316; E. 338 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



365 



Mechanical and Structural Equipment, 
Inspection of . . . . 106 

Merlin — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts A, 226; B, 280 

Statements D, 322; E, 338 

Merritton — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 226; b, 280 

Statements D, 316; E, 338 

Meyersburg Gen. Sta. — Power Generated 16 

Middleton, Agreement Approved. ........ 11 

Midland — Load in Horsepower 25 

Coet of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 226; b, 280 

Statements d, 316; E, 338 

Mildmay — Load in Horsepower 25 

Cost of Power .144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts. ... a, 226; b, 280 
Statements . .D, 322; e, 338 

Miles (Red Lake) Mines Limited, 

Agreement Approved 12 

Millbrook— Load in Horsepower 25 

Cost of Power 14-1 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 227; B, 281 

Statements .d, 322; F, 338 

Milton —Load in Horsepower ...... 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 227; B, 281 

Statements D, 322; E, 338 

Milverton — Load in Horsepower 25 

Cost of Power 144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 227; b, 281 

Statements o, 322; E, 338 

Mimico — Load in Horsepower 25 

Cost of Power .144 

Credit or Charge Account 160 

Sinking Fund 171 

Municipal Accounts a, 227; B. 281 

Statements d, 316; E, 338 

Mitchell— Load in Horsepower 25 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 227; B, 281 

Statements d, 322; e, 338 

Moorefield — Load in Horsepower 25 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 227; B, 281 

Statements .d, 322; E, 338 



Mooretown Townsite — Load in Horse- 
power 34 

Cost of Power and Rates for Service. . .338 

Morrisburg — Load in Horsepower 25 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 227; B, 281 

Statements D, 322; e, 338 

Motion Pictures 73 

Mount Brydges— Load in Horsepower. . . 25 

Cost oi Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 228; b, 282 

Statements d, 322; e, 338 

Mount Forest — Load in Horsepower. ... 25 

Municipal Work 47 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 228; b, 282 

Statements d, 322; E, 338 

Municipal Electric Utilities, Financial 

Progress, Summary of x 

Summarized Operating Results . . . .xxi 
Financial Progress 41 

Municipalities, Assistance to Small ix 

Numbers served 36 

Municipal Work 36 

N 

Napanee — Load in Horsepower 25 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 228; b, 282 

Statements d, 316; E, 338 

National Defence, Minister of, Agreement 
Approved 12 

Neustadt — Load in Horsepower 25 

Municipal Work 47 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 228; b. 282 

Statements D, 322; E, 338 

Newburgh — Load in Horsepower 25 

Cost of Power and Rates for Service. . 338 

Newbury — Load in Horsepower 25 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 228; B, 282 

Statements d, 324; f, 338 

Newcastle— Load in Horsepower 25 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 229; B, 283 

Statements d, 321; e, 338 



366 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



New Hamburg— Load in Horsepower. ... 25 

Municipal Work 43 

Cost of Power 146 

Credit or Charge Account , 162 

Sinking Fund 172 

Municipal Accounts a, 229; B, 283 

Statements d, 324; E, 338 

Newmarket, Agreement Approved 11 

Load in Horsepower 25 

Municipal Work 44 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 229; B, 283 

Statements E, 338 

New Toronto — Load in Horsepower. ... 25 

Municipal Work 44 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 229; b, 283 

Statements d, 316; e, 338 

Niagara Division, Right-of-Way 13 

Generating Plants — Power Generated. . 16 
Municipal Work 42 

Niagara Falls — Load in Horsepower ... 25 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 229; b. 283 

Statements d, 314; E, 338 

Niagara-on-the-Lake — Load in Horse- 
power 25 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 229; B, 283 

Statements D, 324; E, 338 

Niagara River Power Plants 77 

Niagara River Remedial Weir 78 

Nichols Chemical Company Limited, 

Agreement Approved 12 

Nipigon Twp. — Load in Horsepower. ... 29 

Cost of Power 176 

Credit or Charge Account 176 

Sinking Fund 178 

Municipal Accounts A, 252; B, 306 

Statements D, 324; E, 338 

Nipissing — Load in Horsepower 34 

Cost of Power and Rates for Service . . 338 

Nipissing District— Generating Plants — 

Power Generated 16 

Operation of . . . . 32 

Diagram of Peak Loads 33 

Loads of Municipalities 34 

Electrical Engineering and Constr 93 

Fixed Assets 184 

Nipissing Gen. Sta — Power Generated . 16 

North Bay — Load in Horsepower 34 

Municipal Accounts a, 253; B, 307 

Statements d, 314; E, 338 

Northern Ontario Activities, Summary of xii 

Northern Ontario Power Company 37 

Municipalities Served 37 

Merchandising 75 

Plants Operation Commenced 82 

Properties Acquired 85 



Northern Ontario Properties, Summarized 

Operating Results xix 

Described 4 

Agreements Approved 12 

Right-of-Way 14 

Generating Plants — Power Generated. . 16 

Operation of 30 

Loads of Municipalities 34 

Municipal Work 50 

Rate Reductions 50 

Hydraulic Construction 82 

Electrical Engineering and Constr 92 

Transformer Changes 94 

Total Mileage of Transmission Lines. . . 95 

Communications 97 

Account with Provincial Treasurer. . . . 131 

Funded Debt 132 

Financial Accounts 179 

Balance Sheet 180 

Operating Account 182 

Fixed Assets. 183 

Fixed Assets, Changes in 186 

Reserves 188 

Utilities Balance Sheets 253 

Utilities Operating Reports 307 

North York Twp. — Load in Horsepower.. 25 

Municipal Work 44 

Cost of Power 145 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 230; B, 284 

Statements d, 324; e, 338 

Norwich — Load in Horsepower 25 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 230; b, 284 

Statements D, 324; E, 338 

Norwood — Load in Horsepower 25 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 230; b, 284 

Statements D, 324; E, 338 

O 

Oakville — Load in Horsepower 25 

Ogoki Diversion — Hydraulic Construction 78 

Oil Springs — Load in Horsepower 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 230; b, 284 

Statements D, 324; E, 338 

Omemee — Load in Horsepower 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 230; b, 284 

Statements .D, 324; E, 338 

Ontario Power Gen. Sta. — Power Gener- 
ated 16 

Ontario Reformatory — Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Operating Conditions, Summary of vi 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



367 



Operating Results, Summary of Financial viii 

Operating Accounts 

Re Co-operative Systems 120 

Re Northern Ontario Properties 182 

Re Hamilton Street Railway 192 

Operation of the Systems 15 

Orangeville — Load in Horsepower 26 

Municipal Work 47 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 231; b, 285 

Statements d, 316; e, 340 

Orlac Red Lake Mines Limited, 

Agreement Approved 12 

Orono — Load in Horsepower 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 231; b, 285 

Statements d, 324; e, 340 

O'Shaughnessy, C.V.J., Agreement 

Approved 12 

Oshawa — Load in Horsepower 26 

Municipal Work 48 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 231; b, 285 

Statements D, 314; e, 340 

Ottawa — Load in Horsepower 26 

Cost of Power 146 

Credit or Charge Account. . 162 

Sinking Fund 172 

Municipal Accounts .a, 231; b, 285 

Statements D, 314; e, 340 

Ottawa Valley Power Co.— Power Pur- 
chased 17 

Otter ville — Load in Horsepower 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 231; b, 285 

Statements d, 324; E, 340 

Owen Sound — Load in Horsepower 26 

Municipal Work 47 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 231; b, 285 

Statements D, 314; E, 340 

P 

Paints and Protective Coatings, Research 
re 104 

Paisley — Load in Horsepower 26 

Municipal Work 48 

Cost of Power 146 

Credit or Charge Account \ . 162 

Sinking Fund 172 

Municipal Accounts A, 232; B, 286 

Statements D, 324; E, 340 



Palmerston — Load in Horsepower 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 232; b, 286 

Statements D, 324; e, 340 

Paris — Load in Horsepower 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 232; B, 286 

Statements D, 316; E, 340 

Parkhill — Load in Horsepower 26 

Municipal Work 44 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 232; B, 286 

Statements d, 324; E, 340 

Patricia District — Generating Plants — 

Power Generated 16 

Operation of 33 

Diagram of Peak Loads 34 

Loads of Municipalities 34 

Electrical Engineering and Constr 93 

Fixed Assets 185 

Peak Loads, Summary of vii 

Urban Municipal Utilities, Summary of 21 
Rural Hydro Service, Summary of 21 

Pembroke, Agreement Approved 11 

Municipal Work 49 

Penetanguishene — Load in Horsepower.. . 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 232; B, 286 

Statements D, 316; e, 340 

Perth — Load in Horsepower 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 233; b, 287 

Statements d, 316; e, 340 

Peterborough — Load in Horsepower 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 233; B, 287 

Statements D, 314; e, 340 

Petroleum Products, Research re 104 

Petrolia — Load in Horsepower 26 

Municipal Work 44 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 233; B, 287 

Statements d, 316; E, 340 

Picton — Load in Horsepower 26 

Municipal Work ' 49 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 233; B, 287 

Statements D, 316; E, 340 

Planning, Long Range xi 

Planning Work 84 



368 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



Plattsville — Load in Horsepower 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund .172 

Municipal Accounts A, 233; b, 287 

Statements d. 324; E. 340 

Point Edward — Load in Horsepower 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts a, 233; b, 287 

Statements d, 324; E, 340 

Port Arthur — Load in Horsepower 29 

Cost of Power 176 

Credit or Charge Account 176 

Sinking Fund 178 

Municipal Accounts a, 252; b, 306 

Statements D, 314; E, 340 

Port Carling— Load in Horsepower 26 

Cost of Power and Rates for Service. . . 340 

Port Colborne — Load in Horsepower .... 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 234; B, 288 

Statements d, 316; E, 340 

Port Credit — Load in Horsepower 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund. . 172 

Municipal Accounts a, 234; b, 288 

Statements D, 316; E, 340 

Port Dalhousie — Load in Horsepower. ... 26 

Cost of Power 146 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 234; b, 288 

Statements d, 324; E, 340 

Port Dover — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 162 

Sinking Fund 172 

Municipal Accounts A, 234; B, 288 

Statements D, 316; E, 340 

Port Elgin — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 234; b, 288 

Statements D. 324; E, 340 

Port Hope — Load in Horsepower 26 

Cost of Power. 148 

Credit or Charge Account 164 

Sinking Fund : 172 

Municipal Accounts A, 235; B, 289 

Statements d, 316; e, 340 

Port McNicol — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts a, 235; b, 289 

Statements D, 324; E, 340 

Port Perry — Load in Horsepower . 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts a, 235; B, 289 

Statements d, 324; E, 340 



Port Rowan — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts a, 235; b, 289 

Statements d, 324; E, 340 

Port Stanley — Load in Horsepower 26 

Municipal Work 44 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts a, 235; b, 289 

Statements d, 234; e, 340 

Porcupine Peninsular Gold Mines Ltd., 

Agreement Approved 12 

Poupore Lumber Company, Agreement 

Approved 12 

Powassan — Load in Horsepower 34 

Cost of Power and Rates for Service. . . 340 
Power Generated and Purchased, Table of 16 

Power Purchased — All Systems 17 

Power Service in Rural Areas 58 

Power Service, Retail — Statistics re 

Consult Statement "D" 310 

Rates for, Consult Statement "E". . . .328 

Prescott — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts .A, 235; b, 289 

Statements d, 316; E, 340 

Preston — Load in Horsepower 26 

Cost of Power . 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 236; B, 290 

Statements d, 316; e, 340 

Priceville— Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 236; b, 290 

Statements d, 324; e, 340 

Primary Power, Distribution of to Systems vii 

Princeton — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 236; b, 290 

Statements d, 324; e, 340 

Priorities 75 

Production and Service Department. .99, 110 

Promotional Activities, Reference to xvi 

Promotional Services 73 

Publicity Service 73 



Queenston — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts a, 236; b, 290 

Statements d, 324; e, 340 

Queenston-Chippawa Gen. Sta. — Power 
Generated 16 

Queenston Gold Mines Limited, 

Agreement Approved 12 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



369 






R 

Ragged Rapids Gen. Sta — Power Gen- 
erated 16 

Rainy River District 

Operation of 33 

Electrical Engineering and Constr 93 

Transformer Changes 94 

Fixed Assets 185 

Ramore — Matheson — Load in Horse- 
power 34 

Cost of Power and Rates for Service. . . 340 

Ranney Falls Gen. Sta.— Power Generated 16 

Rat Rapids Gen. Sta. — Power Generated. 16 

Rates to Consumers, Reductions in xiii 

Rates, Reductions in . 40 

For Rural Electrical Service . 55 

To Urban Consumers, Consult State- 
ment "E" 328 

Red Lake Townsite — Load in Horsepower 34 
Cost of Power and Rates for Service. . . 340 

Refunds to Consumers xiii, 40 

Regulations, Infractions of 109 

Renfrew — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund . 172 

Municipal Accounts. a, 236; b, 290 

Statements D, 316; E, 340 

Research and Testing, Reference to xvi 

Research 99 

Reserves, Summary of xviii 

Thirty Years' Record 3 

Resuscitation Training xvii 

Revenue of Commission xix 

Richmond — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 237; B, 291 

Statements d, 324; E, 340 

Richmond Hill — Load in Horsepower .... 26 

Cost of Power 148 

Credit or Charge Account. 164 

Sinking Fund 172 

Municipal Accounts A, 237; b, 291 

Statements D, 324; E, 340 

Rideau Power Co. — Power Purchased. ... 17 

Ridgetown — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 237; B, 291 

Statements d, 234; E, 342 

Right-of-Way and Property 13 

Southern Ontario System 13 

Ripley — Load in Horsepower 26 

Municipal Work 48 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 237; B, 291 

Statements D, 324; E, 342 



Riverside — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 237; B, 291 

Statements D, 316; E, 342 

Rockwood — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 237; B, 291 

Statements D, 324; e, 342 

Rodnev — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 237; b, 291 

Statements d, 324; E, 342 

Rosseau — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 238; b, 292 

Statements d, 324; E, 342 

Rural Electrical Service, during War 

Years xiv 

Summary of Peakloads 21 

Provincial Assistance 51 

Status of Service in 1945 52 

Extensions Approved 54 

Rural Loans 55 

New Rate Structure 55 

Rate Schedules, Minimum Demand. ... 56 
Rate Schedules, Additional Charges 

and Consumptions 56 

Farm Service, Description of 57 

Hamlet Service, Description of 57 

Commercial Service, Description of . . . . 57 

Summer Service, Description of 57 

Power Service, Rate Schedules for 

Industrial 58 

Power Service in Rural Areas 58 

Industrial Power Service in Rural Areas 

— Rates to Consumers 59 

Farm Uses for Electricity 62 

Lighting Service 63 

Heating Service 64 

Power for Electric Motors 65 

Power Rural 65 

Electrical Appliances in Use 66 

Appliances, Statistics re Use 66 

Average Cost to Rural Consumers 

Decreasing 67 

Cost of Service Rural 67 

Rural Service, Statistics re 67 

Hamlet Service, Statistics re 68 

Farm Service, Statistics re 68 

Rural Power Districts 

Rural Primary Lines Approved 52 

Aggregate Peak Loads 53 

Miles of Line, Number of Consumers . . 58 

Capital Expenditures and Grants 130 

Renewals Reserves 134 

Sinking Fund Reserves 136 

Financial Operating Accounts 174, 178 

Rural Promotional Activities 73 



370 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



Russell — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts a, 238; b, 292 

Statements D, 324; E, 342 

S 

St. Catharines — Load in Horsepower. ... 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 238; b, 292 

Statements D, 314; E, 342 

St. Clair Beach — Load in Horsepower. ... 26 

Cost of Power : 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 238; b, 292 

Statements D, 324; E, 342 

St. George — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts a, 238; B, 292 

Statements d, 324; E, 342 

St. Jacobs — Load in Horsepower 26 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 239; B, 293 

Statements D, 324; E, 342 

St. Marys — Load in Horsepower 26 

Municipal Work 44 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 239; B, 293 

.Statements D, 316; E, 342 

St. Thomas — Load in Horsepower 27 

Municipal Work 44 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts a, 239; B, 293 

Statements D, 314; E, 342 

Salvage of Old Poles 88 

Sandwich, Windsor & Amherstburg Rail- 
way Sinking Fund. 173 

Sandy Falls Gen. Sta. — Power Generated 16 

Sarnia — Load in Horsepower 27 

Municipal Work 44 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 239; B, 293 

Statements D, 314; E, 342 

Scarborough Twp. — Load in Horsepower . 27 

Cost of Power .148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 239; b, 293 

Statements d, 324; E, 342 

Schools, Promotional Work 75 



Seaforth — Load in Horsepower 27 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts a, 239; b, 293 

Statements d, 324; e, 342 



Secondary Power, 
Systems 



Distribution 



of to 
vii 

89 



Service Centre, Proposed New 

Service Charge, Consult Statement "E". . 328 
In Rural Power Districts 55 

Seymour Gen. Sta. — Power Generated. . . 16 

Shelburne — Load in Horsepower 27 

Municipal Work 48 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 240; B, 294 

Statements D, 324; E, 342 

Sidney Gen. Sta. — Power Generated 16 

Silanco Mining and Smelting Corporation 
Limited, Agreement Approved 12 

Sills Island Gen. Sta. — Power Generated. 16 

Simcoe — Load in Horsepower 27 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 240; B, 294 

Statements D, 316; e, 342 

Sioux Lookout — Load in Horsepower .... 34 

Municipal Accounts a, 253; b, 307 

Statements D, 324; E, 342 

Smiths Falls — Load in Horsepower 27 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 240; B, 294 

Statements d, 316: e, 342 

Smithville — Load in Horsepower 27 

Municipal Work 44 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 240; B, 294 

Statements D, 324; E, 342 

South Falls Gen. Sta. — Power Generated . 16 

Southampton — Load in Horsepower 27 

Municipal Work 48 

Cost of Power 148 

Credit or Charge Account 164 

Sinking Fund 172 

Municipal Accounts A, 240; B, 294 

Statements D, 324; E, 342 

Southern Ontario System, Summarized 

Operating Results xix 

Power Resources — Thirty Years' Record 7 

Operation of 18 

Diagram of Primary Peak Loads 19 

Loads of New Municipalities 28 

Engineering Assistance to Munici- 
palities 42 

Hydraulic Construction 76 

Transformer Changes 93 

Total Mileage of Transmission Lines. . . 95 

High- Voltage Lines 96 

Low- Voltage Lines 96 






1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



371 



Communications . . . . 97 

Electrical Engineering and Constr 88 

vStatement of Operations 120 

Fixed Assets 122 

Fixed Assets, Changes in 126 

Power Accounts Receivable 134 

Renewals Reserves 134 

Contingencies and Obsolescence Re- 
serves 135 

Stabilization of Rates Reserves 136 

Sinking Fund Reserves 136 

Cost of Power Table 138 

Credit or Charge Table 154 

Sinking Fund Equities 170 

Rural Operating Report 174 

Rural Lines 175 

Specification and Committee Work 108 

Springfield — Load in Horsepower 27 

Cost of Power 148 

Credit or Charge Account 166 

Sinking Fund 172 

Municipal Accounts a, 241; b, 295 

Statements D, 324; e, 342 

Stamford Twp. — Load in Horsepower. ... 27 

Municipal Work 45 

Cost of Power 148 

Credit or Charge Account , . . 166 

Sinking Fund 172 

Municipal Accounts a, 241; B, 295 

Statements D, 324; e, 342 

Statement "A" Utility Balance Sheets. . .200 

Statement "B" Utility Operating Reports 25^ 

Statement "C" Street Lighting Suspended 
Statement "D" Statistics re Utilities' 
Consumers 310 

Statement "E" Rates to Utilities' Con- 
sumers 328 

Statistics — Electrical Inspection Dept- 
ment 109 

Stayner — Load in Horsepower 27 

Municipal Work 48 

Cost of Power 148 

Credit or Charge Account 166 

Sinking Fund 172 

Municipal Accounts A, 241; B, 295 

Statements d, 326; e, 342 

Steel and Timber, Inspection of 106 

Stewartville Development — Hydraulic 
Construction 78 

Stinson Gen. Sta. — Power Generated .... 16 

Stirling — Load in Horsepower 27 

Cost of Power 148 

Credit or Charge Account 166 

Sinking Fund 172 

Municipal Accounts a, 241; b, 295 

Statements D, 326; E, 342 

Stoney Creek — Load in Horsepower 27 

Cost of Power and Rates for Service. . . 342 

Stouff ville — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 172 

Municipal Accounts a, 241; b, 295 

Statements d, 326; E, 342 



Stratford — Load in Horsepower 27 

Municipal Work 45 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 241; B, 295 

Statements D, 314; E, 342 

Strathcona Paper Company Limited, 
Agreement Approved 12 

Strathroy — Load in Horsepower 27 

Municipal Work 45 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 242; b, 296 

Statements D, 316; E, 342 

Streetsville — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 242; b, 296 

Statements d, 326; e, 342 

Sudbury, Agreement Approved 12 

Load in Horsepower 34 

Municipal Accounts A, 253 ; B, 307 

Statements D, 314; E, 342 

Sudbury District — Generating Plants 

Power Generated 16 

Operation of 31 

Diagram of Peak Loads 32 

Loads of Municipalities 34 

Electrical Engineering and Constr 93 

Transformer Changes 94 

Fixed Assets 184 

Summer Service Rural, Description of . . . 57 

Sunderland — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 242; b, 296 

Statements d, 326; E, 342 

Survey Work 14 

Sutton — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 242 ; b, 296 

Statements D, 326; E, 342 

Swansea — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 242; B, 296 

Statements d, 316; E, 342 

Sylvanite Gold Mines Limited, Agreement 
Approved 12 

T 

Tara — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 243; B, 297 

Statements d, 326; E, 342 

Tavistock— Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 243; B, 297 

Statements d, 326; E, 342 



372 



THIRTY-EIGHTH ANNUAL REPORT OF 



No. 26 



Taylor Hydraulic Air Compressor 81 

Teck Hughes Gold Mines Limited, 
Agreement Approved 12 

Tecumseh — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 243; b, 297 

Statements ... d, 316; E, 342 

Teeswater — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 243; b, 297 

Statements D, 326; E, 342 

Testing 99 

Thamesford — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 243; b, 297 

Statements d, 326; e, 342 

Thamesville — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 243; b. 297 

Statements d, 326; E, 342 

Thedford — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 243; b, 297 

Statements d, 326; E, 342 

Thornbury, Agreement Approved 11 

Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 244; B, 298 

Statements D, 326; E, 342 

Thorndale— Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 244; b, 298 

Statements D, 326; E, 342 

Thornton — Load in Horsepower 27 

Cost of Power . ..... 150 

Credit or Charge Account 166 

Sinking Fund. . 173 

Municipal Accounts A, 244; B, 298 

Statements D, 326; E, 342 

Thorold — Load in Horsepower 27 

Municipal Work 45 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 244; B, 298 

Statements d, 316; e, 344 

Thunder Bay System, Increased Power for xii 

Right-of-Way 14 

Generating Plants — Power Generated. . 16 

Operation of 28 

Diagram of Peak Loads 29 

Loads of Municipalities . . . . . .29 

Engineering Assistance to Municipal- 
ities 49 



Municipal Work 49 

Hydraulic Construction 79 

Electrical Engineering and Constr 92 

Transformer Changes 94 

Total Mileage of Transmission Lines. . . 95 

Statement of Operations 121 

Fixed Assets 124 

Fixed Assets, Changes in 128 

Power Accounts Receivable 134 

Renewals Reserves 134 

Contingencies and Obsolescence 

Reserves 135 

Stabilization of Rates Reserves 136 

Sinking Fund Reserves 136 

Cost of Power Table 176 

Credit or Charge Table 176 

Sinking Fund Equities 178 

Rural Operating Report 178 

Tilbury — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 244; b, 298 

Statements d, 326; e, 344 

Tillsonburg — Load in Horsepower 27 

Municipal Work 45 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 245; b ,299 

Statements d, 316; E, 344 

Timiskaming District — Generating Plants 

Power Generated 16 

Operation of 31 

Electrical Engineering and Constr 92 

Transformer Changes 94 

Toburn Gold Mines Limited, Agreement 
Approved 12 

Toronto — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 245; B, 299 

Statements d, 314; E, 344 

Toronto Power Gen. Sta. — Power Gen- 
erated 16 

Toronto Township — Load in Horsepower. 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 245; b, 299 

Statements d, 326; E, 344 

Toronto Transportation Commission 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Tottenham — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 245; b, 299 

Statements . D, 326; e, 344 

Trafalgar Twp. V.A. No. 1— Load in 

Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 245; b, 299 

Statements D, 326; E, 344 



1946 



THE HYDRO-ELECTRIC POWER COMMISSION 



373 



Trafalgar Twp. V.A. No. 2— Load in 

Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 245; b, 299 

Statements D, 326; E, 344 

Transformer Changes, Tabulation of 93 

Transmission Lines, New 85 

Transmission Lines Changes and Addi- 
tions 96 

Transmission Structures, Wooden, Treat- 
ment of 101 

Transmission Line Materials, Inspection 
of .106 

Transport, Minister of 

Agreement Approved 12 

Department of — Power Purchased 17 

Trenton — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 1 73 

Municipal Accounts A, 246; B, 300 

Statements D, 316; E, 344 

Trethewey Falls Gen. Sta. — Power Gen- 
erated 16. 

Tweed — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund. . , 173 

Municipal Accounts. A. 246; b, 300 

Statements d, 326; E, 344 

U 

Undersill Gold Mining Company Limited, 
Agreement Approved 12 

Upper Canada Mines Limited, 
Agreement Approved 12 

Upper Notch Gen. Sta. — Power Gen- 
erated 16 

Uxbridge — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 246; B, 300 

Statements : D, 326; e, 344 

V 

Vibration of Line Conductors 100 

Victoria Harbour — Load in Horsepower. 27 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund . 173 

Municipal Accounts a, 246; b, 300 

Statements d, 326; E, 344 

Vienna, Agreement Approved 11 

W 

Walkerton — Load in Horsepower 27 

Municipal Work ... 48 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts A, 246; B, 300 

Statements D, 316; E, 344 

Walkerton Gen. Sta.— Power Generated.. 16 



Wallaceburg — Load in Horsepower 27 

Municipal Work 45 

Cost of Power 150 

Credit or Charge Account 166 

Sinking Fund 173 

Municipal Accounts a, 247; B, 301 

Statements d, 316; E, 344 

Wardsville — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts a, 247; b, 301 

Statements d, 326; E, 344 

Warkworth — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts a, 247; B, 301 

Statements d, 326; E, 344 

Wasdells Falls Gen. Sta. — Power Gen- 
erated 16 

Watabeag Lake Dam 
Hydraulic Construction 82 

Waterdown — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts a, 247; b, 301 

Statements d, 326; E, 344 

Waterford — Load in Horsepower 27 

Cost of Power 150 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 247; B, 301 

Statements D, 326; E, 344 

Waterloo — Load in Horsepower 27 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 247; b, 301 

Statements d, 316; E, 344 

Watford — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts a, 247; b, 301 

Statements D, 326; E, 344 

Waubaushene — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account • 168 

Sinking Fund 173 

Municipal Accounts A, 248; b, 302 

Statements d, 326; E, 344 

Wawaitin Gen. Sta. — Power Generated.. . 16 

Welding, Research re 104 

Welland — Load in Horsepower 28 

Municipal Work 45 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 248; B, 302 

Statements D, 314; E, 344 

Wellesley — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 248; B, 302 

Statements d, 326; E, 344 



374 



THIRTY-EIGHTH ANNUAL REPORT 



No. 26 



Wellington — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 248; B, 302 

Statements D, 326; E, 344 

West Lome — Load in Horsepower 28 

Municipal Work 45 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 248; B, 302 

Statements . .D, 326; E, 344 

Weston — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 249; b, 303 

Statements D, 316; e, 344 

Westport — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts a, 249; b, 303 

Statements D, 326; E, 344 

Wheatley — Load in Horsepower 28 

Municipal Work 45 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 249; b, 303 

Statements d, 326; e, 344 

Whitby — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account , . . 168 

Sinking Fund 173 

Municipal Accounts A, 249; b, 303 

Statements D, 316; E, 344 

Wiarton — Load in Horsepower 28 

Municipal Work 48 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 249; b, 303 

Statements D, 326; e, 344 

Williamsburg — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account. 168 

Sinking Fund 173 

Municipal Accounts a, 249; b, 303 

Statements. d, 326; E, 344 

Winchester — Load in Horsepower 28 

Cost of Power . . . ; 152 

Credit or Charge Account 168 

Sinking Fund. 173 

Municipal Accounts A, 249; B, 303 

Statements d, 326; e, 344 

Windermere — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 250; B, 304 

Statements d, 326; E, 344 



Windsor — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 250; b, 304 

Statements d, 314; e, 344 

Wingham — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 250; b, 304 

Statements D, 316; e, 344 

Woodbridge — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts a, 250; b, 304 

Statements D, 326; e, 344 

Woodstock — Load in Horsepower 28 

Municipal Work 45 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 251; b, 305 

Statements d, 314; E, 344 

Woodville — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 251 ; b, 305 

Statements D, 326; E, 344 

Wright Hargreaves Mines Limited, 

Agreement Approved 12 

Wyoming — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts A, 251; B, 305 

Statements D, 326; e, 344 

X 

X-Ray and Microscopical Examinations.. 106 

Y 

York, East, Township (See East York 

Township) 
York, North, Township (See North York 

Township) 
York Township — Load in Horsepower ... 28 

Municipal Work 45 

Cost of Power 152 

Credit or Charge Account 168 

Sinking Fund 173 

Municipal Accounts a, 251 ; b, 305 

Statements d, 326; e, 344 

Young's Point Gen. Sta. — Power Gen- 
erated 16 

Z 

Zurich — Load in Horsepower 28 

Cost of Power 152 

Credit or Charge Account. 168 

Sinking Fund 173 

Municipal Accounts A, 251; B, 305 

Statements D, 326; E, 344 




>« 




PROVINCE OF ONTARIO 
TRANSMISSION LINES AND STATIONS 

NORTHERN ONTARIO PROPERTIES 



THUNDER BAY SYSTEM 



J^ 



Ifr' 




MAP OT PORTION OF THE 

PROVINCE OF ONTARIO 

SHOWING 

TRANSMISSION LINES AND STATIONS 



SOUTHERN ONTARIO SYSTEM 















vS^g^ 



ft 



i 



University of Toronto 
Library 



DO NOT 

REMOVE 

THE 

CARD 

FROM 

THIS 

POCKET 



Acme Library Card Pocket 
LOWE-MARTIN CO. limited